

Forty Bank Street, Canary Wharf
Forty Bank Street is a high-rise tower building in Canary Wharf It provides Grade A office space within London’s iconic business district with an array of excellent amenities

Refurbishment Upgrade for Stylish & Functional Entrance Control
Background
Forty Bank Street is a testament to London’s dynamic business landscape in Canary Wharf With its soaring height of 153 metres, it stands as a beacon of modernity and functionality. Surrounded by thriving global corporations, the building sits perfectly in the vibrant business community. As well as this, the client wanted to ensure measures put in place wouldn’t compromise the overall aesthetics of the refurbished reception and lobby
Canary Wharf Group operates the highrise tower building 40 Bank Street, situated in London’s iconic business district
With 33 storeys and 153 meters tall, the building is set to provide 56,000 square meters of Grade A office space. Being located in Canary Wharf, 40 Bank Street has excellent transport links including the Jubilee Line, DLR, and Elizabeth Line which are only a short walk away
Forty Bank Street offers a variety of workspaces of different sizes, with serviced and managed areas to choose from With a range of amenities including showers, secure bike parking, and a coffee bar, it is the ideal work environment for many people.
Challenge
In 2020, Canary Wharf Group undertook a refurbishment of 40 Bank Street’s reception and lobby The client had concerns regarding unauthorised access into certain areas of the building while still offering a seamless journey experience for users.
Project Facts
Client
Forty Bank Street
Sector
Commercial offices
Location
London Area
56,000 sqft
Products Installed
EasyGate Elite Speed Gates
Solution
Meesons proposed twelve lanes of EasyGate Elite Speed Gates split across three banks to cover each lift lobby entrance However, the EasyGate Elite Speed Gates do not have anti-vault detection readily available therefore,
Meesons worked closely with manufacturing partners to integrate anti-climb technology into the cabinets as well as alarm tones
to alert the security teams immediately of unauthorised access
In addition to this, Meesons helped the client to achieve simple navigation for users with QR readers integrated into the cabinets, allowing user verification either with a smartphone, tablet or paper.
Since it was essential for the client to create an aesthetic look with the solution, we worked with the client to colour-match the EasyGate Elite Speed Gates to the interior
From this collaborative work, we sourced a distinctive dark bronze finish
Outcome
Meesons helped to upgrade the entrance control to suit the refurbished 40 Bank Street’s reception with minimal disruption, simplifying installation with a speed gate sub-frame solution that set out their footprint clearly before the arrival to the site.
Once installed, Canary Wharf Group’s 40 Bank Street was left with a stylish security solution that not only complemented the overall look, but ensured users benefitted from its easy navigation, allowing for desirable flexibility


“We are really pleased with the solution Meesons have provided, the speed gates have delivered on all our requirements, and their slimline design enabled us to improve throughput by increasing the number of lanes, making the best use of the available space.”
Vincent Peacock Business Manager






Cardea House
Sidings Business Park
