The State of the Opera House
the wheels are turning for the installation of an air conditioning system that should be functional Lots of progress has been made in the last few years. by the hot season of 2022. The roof’s been stabilized, a new restroom has been added upstairs, the downstairs restrooms have been The air conditioning is being funded by an LSA updated so they no longer flood in the middle of grant. LSA stands for Local Shared Account, concerts, the concession stand has been remodeled, and is funded by a tax on casinos. All grants The entire building has been re-carpeted, there are must be used for arts or cultural projects. The new stage curtains, and a new custom designed Historical Society Board is planning to apply for another grant next year, and considering either sound system. a redo of the Opera House ceiling , or a remodel A contractor has been hired to redo the bar area, and of the concrete entrance to the building. Photos and editor: Cleo Fogal Printer/publisher: Milan Printing, 1012 North Street, Jim Thorpe, PA