Mill Hill
Program: Demolition of an existing house and erection of new build house*
Client: Private
Construction Costs: £1,100,000 + VAT
Status: Completed in August 2019
Location: Wise Lane, Mill Hill, London
GIFA: 290 sqm
Role: Project Architect, responsible for all stages of the RIBA Plan of Work, from conception to completion and handover
* Nominated for Building of the Year 2021, via ArchDaily.
Proposed Site Plan
Ground Floor Plan
Proposed
Proposed Axo Plans
Proposed Axo Sections
Proposed North and South Elevations
Proposed Section A-A
Keslake Road
Program: Complete refurbishment and extension, including loft, of a three-story dwelling in a Conservation Area
Client: Private Construction Costs: £450,000 + VAT Status: Completed in December 2018
Location: Queen’s Park, London GIFA: 195 sqm
Role: Project Architect, responsible for all stages of the RIBA Plan of Work, from client briefing up until completion and handover
Existing Plans
Ground Floor Plan
Proposed
Proposed First Floor Plan
Second Floor
Third Floor Plan
Proposed
Plan Proposed
Proposed South Elevation and Transversal Section
Section
Proposed
Longitudinal
Proposed Kitchen Drawings
Proposed Staircase Drawings
Cressy Road
Program: Complete refurbishment and extension, including loft, of a four-story dwelling in a Conservation Area
Client: Private
Existing Plans
Proposed Ground Floor Plan External Wall Types
Internal Wall Types
Proposed First, Second and Third Floor Plans
Proposed Rear Elevation & Walls Joint Detail
Proposed 3D Rear View
MVHR
Proposed Perspective Section
Solar Panels with microinverters Additional Insulation
Layer
Source Heat Pump
PV
Airtightness
Air
Unit with external combined grille
Proposed Loft Bathroom Plans & Visual
Stadium Brewery
Program: Small brewery, co-working space, placemaking and restoring Wealdstone Brook surroundings in Wembley, London
Client: Private Construction Costs: £2,400,000 + VAT
Status: On-hold since 2020
GIFA: 2,500 sqm
Role: Senior Architect, stages 0-2 of the RIBA Plan of Work
Turner.Works precedent images, Pop Brixton
Planting Schedule precedent from Ecosistema Urbano, Heidelberg project
Water diagram based on precedent from Ecosistema Urbano.
Proposed Bird´s Eye View
EXISTING PARKING SPACES
This area is the same as 13 FIVE-A-SIDE FOOTBALL PITCH-
ACTIVATING THE CAR PARKS
PERCENTAGE
CAR PARKS
BROCKWELL PARK CRAFT MARKET?
TED HOLLAMBY MUSEUM?
BIKE SHOP/ NURSERY?
BUSINESS CENTRE?
YOUTH CENTRE/ DAY CENTRE?
LAUNDRY? GYM/ SPORT FACILITIES?
5,700 m2/ 58,879 ft2 TOTAL PARKING SPACE AREA There is a lot of space in the car parks that could be better used to generate more income and to subsidise maintenance and repairs EXISTING CAR PARKING COULD BE USED IN A MORE INTERESTING WAY What is the car park space like today?Can the car parks be used in a better way? What other uses could be found for the car park space? Could this be a way to bring new uses to the estate? HOUSING, YOUTH FACILITIES, LAUNDRY, NURSERY, DAY CENTRE FOR ELDERLY PEOPLE, LIBRARY, COMMUNITY AREAS, GP SURGERY, ETC. STUDIOS, HACK SPACE, EXHIBITION, GARDEN, SPORTS: GYM, BOXING, TABLE TENNIS, ETC URBAN MARKET, HAND-CRAFTS, MICROBUSINESS INCUBATOR, RETAIL, BED & BREAKFAST, ETC Can you think of any more? Existing usage New uses to serve the community 42m + 25m
The car parks at Cressingham Gardens are not used to their full potential. If we reconsider how these spaces are used, we could develop them into an income generator. The funds could go towards subsidising the maintenance and repair costs of the estate. PROJECT: Proposal for the underused car park in Cressingham Gardens, London CLIENT: Private AREA: 5700m2 ROLE: Feasibility study, design development, image production, client presentation. RIBA STAGES: A-C
50% TOTAL
OF
PARKING SPACE? PARKING SPACE? USED
ORCHARD? 1.SOCIAL2.CULTURAL3.COMMERCIAL
APPROX.
What can we do to make the most of the car park space?
Could it be possible to enliven the estate with these new uses?
Community discussionBuilding
Retro t new space
The rst new uses are put in place
How the space could be developed?
More new uses are added to them More new uses are put in place
Cars can still be parked in a more compact way Business Centre
Tulse Hill
0123 0123
0123
Playground for children?
How could we take advantage of the car park spaces?
Local businesses enliven the street
Activity and people make spaces safe
Could there be a library or a nursery beside Brockwell park?
BROCKWELL PARK
Access to Brockwell park
New lively street at the rear of Crosby Walk
Weekend market?
Sup.TérminoMunicipal:10890Ha Dens.TérminoMunicipal:90.5Hab/km2
AÑODECLARACIÓN
CONJUNTOHISTÓRICO SUPERFICIEYDENSIDADDEPOBLACIÓN
OFICINADE REHABILITACIÓNPOBLACIÓNVIVIENDA
Sup.TérminoMunicipal:2425.3Ha Dens.TérminoMunicipal:557.5Hab/km2
2004 2003.Oficinade Rehabilitacióndel CascoHistórico
2002.OficinaÁreade RehabilitaciónIntegral [ARI]deRibadeo
Sup.TérminoMunicipal:650Ha Dens.TérminoMunicipal:280.3Hab/km2
ha ha
PLANEAMIENTO ESPECIAL DEPROTECCIÓN [14/03/77] PXOU [26/06/96]
[02/12/92]
1970 2008.Áreasde Rehabilitaciónde CascosHistóricos
1985 1994.Ampliación
39.00
61.00
PlanEspecialde Proteccióny Ordenación delCascoHistórico [09/04/91]
PlanEspecialdel ConjuntoHistórico [24/03/97]
Normassubsidarias dePlaneamiento [13/01/89]
Santiagode compostela
1940.DeclaraciónConjunto HistóricoArtístico 1951.“Condiciones Particularesynormasque regiránenlaEdificación enclavadaenlaCiudad Monumental” 1964y1976.Ampliaciónde ladelimitación
1994
Sup.TérminoMunicipal:19950Ha Dens.TérminoMunicipal:97.7Hab/km2
Monforte DELEMOS
Sup.TérminoMunicipal:8850Ha Dens.TérminoMunicipal:34.4Hab/km2
PazoSDE ARENTEIRO
Sup.TérminoMunicipal:10910Ha Dens.TérminoMunicipal:2710.4Hab/km2
1946
Sup.TérminoMunicipal:22060Ha Dens.TérminoMunicipal:427.6Hab/km2 3.51Ha 100 45.3Hab/ha
1994.Oficinade Conservacióny Rehabilitacióndela CiudadHistórica
PlanEspecialde Proteccióny Rehabilitacióndela CiudadHistóricaPE-1
2003.Oficina Municipalde Rehabilitaciónde MonfortedeLemos
1946 2006.Ampliación
2000.“Oficinade Rehabilitacióndel Ayuntamientode Vigo” 2005.“Consorciodel CascoViejodeVigo”
Sup.TérminoMunicipal:8539Ha Dens.TérminoMunicipal:66.6Hab/km2
RIBADEO BETANZOS Corcubión Vigo Allariz
Sup.TérminoMunicipal:3448Ha Dens.TérminoMunicipal:347.3Hab/km2
Baiona
1971 1994
1996.Oficinade Rehabilitacióndel CascoHistórico
[12/04/07]
PlanEspecialde Proteccióny ReformadelCasco ViejodeVigo [09/05/95]
PlanEspecialdel CascoHistórico [PEPCHAB10/07]
PlanEspecialde Proteccióndel ConjuntoHistórico Artístico[documento inicialaaprobación]
Normassubsidarias dePlaneamiento [26/04/90] PXOU [01/10/85] Normassubsidarias dePlaneamiento [03/04/91]
Normassubsidarias dePlaneamientode Ourense [29/04/93]
PXOU
[09/04/03]
PXOM [30/05/94]
PXOU
FICHARESUMEN TEXTO
PLANEAMIENTO ACTUAL
Densidaddepoblaciónhab/Km2 <100 100-500 500-1000 >1000 1662 148 1662Viv. NumerodeviviendasTM
ha ha ha
Densidaddepoblaciónhab/Km2 <100 100-500 500-1000 >1000
,CONCELLODEALLARIZ
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
23
7
0
22 17
73
14 45 53
37 2
18 9 54 4 99 76 93 73 31 132 166 243 228 43 18 29 0 00 4 8
4 15 00 64 1 12 43 6 28
71
50 100 150 200 250 300 18 29 99
77 80 108
95 133 178 286 234 4 4 26 93
75
24 89 108 202 81 VIVENDACH 0004823415006411243628 VIVIENDANU 426931414553753722489108202817 VIVUN+TM 1829991895476937343113216624322843 TOTAL 182999221777801087349513317828623471 nºdelicenciasobramayor 12,00 10,00 8,00 6,00 4,00 2,00 0,00 -2,00 199319962002 2008 1999 2005 3,60% 3,48% 6,28% 11,40% 10,24% -1,71% -1,74% -0,32% 2,58% 2,51% -0,85% -0,86% 0,84% 4,22% 4,05% -4,00 52935248520352475690 8588899199771089 4435 4360 4284 42704380 4490 1200 5468 CH TM TOTAL nºhabitantes %incrementoporperiodostrienalesdelapoblación 6000 5000 4000 3000 2000 1000 19% 0 16% 18% 21% 1049 4481 5530 837 940 1200 4486 4233 4490 5323 5173 5690 1981 19912001 2008 81% 84% 82% 79% -20,21% 12 31% 27,66% evolucióndelapoblación
Ourense
Allariz
1993199419951996199719981999200020012002200320042005200620072008 0 0 0 4 8 23 4 15 0 0 64 1 12 43 6 28 24,76% 35% 13,36% 7,08% 3,60% 858hab 858 hab 889hab 919hab 977hab 1089hab 1200hab 1200 hab 18 29 99 18 9 54 76 93 73 4 31 132 166 228 43 1,32% -1,19% -3,77% 4380hab 4490hab 4490 hab -3,45% -1,71% 4435hab 4435 hab 1993199419951996199719981999200020012002200320042005200620072008 4360hab 4284hab 4270hab Premioporel“ProyectodeRecuperación integraldelConjuntoHistóricoArtístico deAllarizysurío” PlanEspecialdelCasco Histórico[09/05/95] OficinadeRehabilitacióndel CascoHistórico FirmaconveniodeRehabilitacióndelCascoHistórico Normassubsidariasde PlaneamientoUrbanístico DeclaraciónÁreadeRehabilitaciónIntegrada 243 PXOM.PlanGeneraldeOrdenación Municipal[09/04/2003] CTE.CódigoTécnicodelaEdificación [obligadocumplimiento] NormasdelHábitatGallego CTE.CódigoTécnicodelaEdificación 100 200 0 300 licenciasviviendaCH 100 200 0 300 licenciasviviendaTM incrementopoblaciónCH incrementopoblaciónTM 40,00%
[10,24%] [3,48%] [6,28%] [11,40%] [-1,74%] [-0,32%] [2,58%] [2,51%]
deAllariz
30,00% 20,00% 10,00% 0,00%
20,00% 10,00% 0,00% 25,00% 35,00% -5,00% 5,00% 15,00% 15,00% 5,00%