Mubarak Shah's Tomb

Page 1

STRUCTURAL CRACKS SURFACE CRACKS

BIOLOGICAL GROWTH (ALGAE)

BIOLOGICAL GROWTH (PLANTS)

TOMB OF MUBARAK SHAH SAYYID KOTLA MUBARAKPUR, NEW DELHI

RESTORATION & RETROFITTING OF MUBARAK SHAH SAYYID’S TOMB

CONDITION MAPPING FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI

SPA/NS/AC/968

NEW

SCHOOL OF PLANNING & ARCHITECTURE, NEW DELHI

BROKEN
SALT DEPOSIT
DAMPENING PIGEON DROPPINGS PEELING SCALE NOTES 1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for which it has been loaned. 2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the architects in case of any discrepancy. 3. Drawing to be referred to with any other relevant details or documents. 4. Drawing is not to be scaled. Written dimensions are to be followed
BLACKENING
DATE October, 2021 1:100 ROOFTOP PLAN SCHOOL OF PLANNING AND ARCHITECTURE,
DELHI CONDITION ASSESSMENT Key Plan N DRG NO. T t l e LEGEND MARIA KHAN | SEM. 01 | AC-034 ROOFTOP MARIA

BRIEF DESCRIPTION

METHODOLOGY

MEDALLION ON DOME CEILING

AIM:

To prepare an integrated conservation management plan for Mubarak Shah’s Tomb and increase awareness of the builtheritage.

CEILINGTYPEA

OBJECTIVES:

• To study the historical evolution ofKotlaMubarakpur.

• To study the evolution of tomb architectureinDelhi.

• Establish the historical significanceofthetomb.

CEILINGTYPEB

RATIONALE:

• There are no architectural remains of the Sayyid dynasty except Mubarak Shah’s Tomb andMuhammadShah’sTomb.

SQUINCHONCEILINGB

PRIMARY STUDIES

SECONDARY STUDIES

UNDERSTANDING THE HISTORICAL BACKGROUND

SITE VISITS

SKETCHES & PHOTOS DOCUMENTATION

MEASURED DRAWINGS SITE PHOTOGRAPHS

IDENTIFYING THE MATERIALS

IDENTIFYING THE DEFECTS

BOOKS & MAPS

REPORTS & PUBLICATIONS

NEWSPAPER ARTICLES

BLOGS

ESTABLISHING THE SIGNIFICANCE OF THE TOMB

STUDY OF THE SAYYID DYNASTY AND THEIR ARCHITECTURAL REMAINS

EVOLUTION OF ARCHITECTURAL AND RELATED FEATURES DELHI SULTANATE ONWARDS

Three types of ornamented ceiling in the colonnaded archway. Type A being mildly vaulted, type B being a shallow dome with inscribed medallion in the middle and supported by squinches which are also ornamented by inscribed medallion,andtypeCbeing in the floral form and supportedbysquincheson4 sides and ornamented via means of inscribed medallions Dome ceiling incised with bandsofredsandstonewith a stucco medallion having inscriptions.

STUDY OF TOMBS TYPOLOGY IN DELHI

STUDY OF OCTAGONAL TOMBS IN DELHI

DRAW COMPARISONS BETWEEN THE EXISTING TOMBS FROM SAYYID DYNASTY

N DRG NO.

ISSUES

PROPOSAL

CEILINGTYPEC

RESTORATION

MARIA KHAN | SEM. 01 | AC-034

REFLECTED CEILING PLAN LVL +4580 LVL +6065 LVL +4580 LVL +13650 LVL ±00 DOME TYPE C TYPE C TYPE CTYPE C TYPE A TYPE A TYPE A TYPE A TYPE ATYPE A TYPE ATYPE A TYPE BTYPE B TYPE BTYPE B 0.5 1.00 2.0 3.0 5M 300 2150 450 2221 450 2150 300 655 655 9320 22500 6590 6590 300 2150 450 2221 450 2150 300 9320 22500 6590 6590 655 300 2150 450 2221 450 2150 655300 SCALE NOTES 1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for which it has been loaned. 2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the architects in case of any discrepancy. 3. Drawing to be referred to with any other relevant details or documents. 4. Drawing is not to be scaled. Written dimensions are to be followed MEASURED DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI DATE December, 2021 1:100 REFLECTED CEILING PLAN SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI MEASURED DRAWINGS
Key Elevation T i t l e
• Second octagonal tomb built in Delhi(1433)
& RETROFITTING OF MUBARAK SHAH SAYYID’S TOMB, KOTLA MUBARAKPUR, NEW DELHI
6590 SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI MARIA KHAN | SEM. 01 | AC-034
ON DOME CEILING INTRODUCTION RESTORATION & RETROFITTING OF MUBARAK SHAH SAYYID’S TOMB, KOTLA MUBARAKPUR, NEW DELHI
MEDALLION
COLONNADE
SOUTH-WEST VIEWTOMB CHAMBER
RESTORATION & RETROFITTING OF MUBARAK SHAH SAYYID’S TOMB, KOTLA MUBARAKPUR, NEW DELHI
CHATTRI AND PARAPET DETAIL

EVOLUTION OF TOMB STRUCTURES

EVOLUTION OF TOMB STRUCTURES

Three types of ornamented ceiling in the colonnaded archway. Type A being mildly vaulted, type B being a shallow dome with inscribed medallion in the middle and supported by squinches which are also ornamented by inscribed medallion,andtypeCbeing in the floral form and supportedbysquincheson4 sides and ornamented via means of inscribed Dome ceiling incised with bandsofredsandstonewith a stucco medallion having

1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for 2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the 3. Drawing to be referred to with any other relevant details or documents.

Image source: Aga Khan Trust for Culture

December, 2021 SCHOOL

300 2150 450 2221 450 2150 300 9320 22500 6590 6590 655 300
OF PLANNING
AND ARCHITECTURE, NEW DELHI MARIA KHAN | SEM. 01 | AC-034 BRIEF DESCRIPTION
AD 1231 Sultan Garhi AD 1325 Ghiyas ud din Tughlaq’s Tomb AD 1433 Mubarak Shah Sayyid’s Tomb AD 1518 Sikander Lodhi’s Tomb AD 1547 Isa Khan’s Tomb AD 1572 Humayun’s Tomb
RESTORATION & RETROFITTING OF MUBARAK SHAH SAYYID’S TOMB, KOTLA MUBARAKPUR, NEW DELHI

Three types of ornamented ceiling in the colonnaded

REFLECTED CEILING PLAN 300 2150 450 2221 450 2150 300 9320 22500 6590 6590 MEASURED DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI BRIEF
DESCRIPTION
RESTORATION & RETROFITTING OF MUBARAK SHAH SAYYID’S TOMB, KOTLA MUBARAKPUR, NEW DELHI LOCATION AND ACCESSIBILITY

SIGNIFICANCE

ARCHITECTURAL

Being the second octagonal tomb in Delhi and the earliest that has survived in its entirety, this was probably also the earliest tomb to have its own enclosure containing a mosque to its west. It is not clear whether the enclosure itself was rectangular or octagonal in shape since all the surrounding walls have disappeared and only parts of the western and southern gates are now visible.

The octagonal tomb sits on its own plinth and has a very solid and domineering appearance from outside.

One feature that distinguishes this dome from others built during this period is that it is crowned by an unusual red sandstone lantern rather than the lotus finial.

The columns that support these arches are made from single blocks of stone but they are carved in such a manner that they appear to be twin columns. The corners of the octagon are sloping buttresses that are a common feature of this type of tomb; domes that span the verandahs are of alternating simple and flower-petal design. There are also decorative medallions on the flat squinches that support these domes.

EDUCATIONAL VALUE

SOCIAL VALUE

Three types of ornamented ceiling in the colonnaded archway. Type A being mildly vaulted, type B being a shallow dome with inscribed medallion in the middle and supported by squinches which are also ornamented by inscribed medallion,andtypeCbeing in the floral form and supportedbysquincheson4 sides and ornamented via means of inscribed Dome ceiling incised with bandsofredsandstonewith a stucco medallion having

APPROACH TOWARDS THE TOMB

MIXED USE

TYPE CTYPE C TYPE ATYPE A TYPE ATYPE A TYPE BTYPE B TYPE BTYPE B 1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for 2. The contractor for the work is responsible for counter-checking all details & MEASURED DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI December, 2021 SCHOOL OF PLANNING AND
RESTORATION & RETROFITTING OF MUBARAK SHAH SAYYID’S TOMB, KOTLA MUBARAKPUR, NEW DELHI 20 m
PARK KOTLA
DDA
PARK SOUTH EX. I
PARK PARK
MUBARAK SHAH SAYYID’S TOMB
&
SITE
SURROUNDING CONTEXT

MEASURED

Accessible via narrow roads of Kotla Mubarakpur,asprawling urbanvillagefromsouth viaramp,openingintoa colonnaded verandah.

Further opening leading towards the tomb chamber.

Jali on all sides except the west where the mihrabislocated.

NOTES

1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for which it has been loaned.

2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the architects in case of any discrepancy.

3. Drawing to be referred to with any other relevant details or documents.

4. Drawing is not to be scaled. Written dimensions are to be followed

SCHOOL OF PLANNING AND ARCHITECTURE, NEW

LVL +330 LVL +430 PLAN CUT 950 MM FROM PLINTH LEVEL GROUND FLOOR PLAN LVL +580 LVL +430 1100 2217 935 750 1010 2400 1780 1380 TOMB CHAMBER COLONNADED ARCHWAY COLONNADED ARCHWAY COLONNADED ARCHWAY 0.5 1.00 2.0 3.0 5M LVL ±00 LVL +215 LVL +430 300 2150 450 2221 450 2150 300 655 655 9320 22500 6590 6590 UP 9475 300 2150 450 2221 450 2150 300 9320 22500 6590 6590 655 300 2150 450 2221 450 2150 655300 MIHRAB
DELHI MEASURED DRAWINGS Key Elevation N DRG NO. T i t l e SCALE
December,
1:100
FLOOR PLAN MARIA KHAN | SEM. 01 | AC-034 COLONNADE JALI
STRUCTURE
THE URBANSETTING
DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
DATE
2021
GROUND
TOMB
IN
BRIEF DESCRIPTION

MEDALLION ON DOME CEILING

CEILINGTYPEA

CEILINGTYPEB

SQUINCHONCEILINGB

BRIEF DESCRIPTION

Three types of ornamented ceiling in the colonnaded archway. Type A being mildly vaulted, type B being a shallow dome with inscribed medallion in the middle and supported by squinches which are also ornamented by inscribed medallion,andtypeCbeing in the floral form and supportedbysquincheson4 sides and ornamented via means of inscribed medallions Dome ceiling incised with bandsofredsandstonewith a stucco medallion having inscriptions.

CEILINGTYPEC

REFLECTED CEILING PLAN LVL +4580 LVL +6065 LVL +4580 LVL +13650 LVL ±00 DOME TYPE C TYPE C TYPE CTYPE C TYPE A TYPE A TYPE A TYPE A TYPE ATYPE A TYPE ATYPE A TYPE BTYPE B TYPE BTYPE B 0.5 1.00 2.0 3.0 5M 300 2150 450 2221 450 2150 300 655 655 9320 22500 6590 6590 300 2150 450 2221 450 2150 300 9320 22500 6590 6590 655 300 2150 450 2221 450 2150 655300 SCALE NOTES 1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for which it has been loaned. 2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the architects in case of any discrepancy. 3. Drawing to be referred to with any other relevant details or documents. 4. Drawing is not to be scaled. Written dimensions are to be followed MEASURED DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI DATE December, 2021 1:100 REFLECTED CEILING PLAN SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI MEASURED DRAWINGS Key Elevation N DRG NO. T i t l e MARIA KHAN | SEM. 01 | AC-034

NOTES

1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for which it has been loaned.

2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the architects in case of any discrepancy.

3. Drawing to be referred to with any other relevant details or documents.

4. Drawing is not to be scaled. Written dimensions are to be followed

TERRACE FLOOR PLAN

DATE December, 2021

MEASURED

SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI

ROOF TOP PLAN FLOOR PLAN ELEVATION CHATTRI 1120 792 792 1422 1006 1006 3434 1120 792 792 2704 SECTION 60 300 920 285 995 1405 475 60 300 920 285 995 1405 475 LVL +6665 PLAN CUT 7400 MM FROM PLINTH LEVEL 450 650 1120 LVL +6725 TERRACE FLOOR PLAN CHATTRI A CHATTRI B CHATTRI C CHATTRI D CHATTRI E CHATTRI F CHATTRI G TOMB CHAMBER CHATTRI H 0.5 1.00 2.0 3.0 5M 9847 6963 6963 900 DN SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE
SCALE
DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
1:100
Elevation
i t l
KHAN
SEM. 01
AC-034 PHOTOGRAPHS CHATTRI KIOSK
MEASURED DRAWINGS Key
N DRG NO. T
e MARIA
|
|

BRIEF DESCRIPTION

8 chattris on top, one on each side at a raised platformof60cm.

16 turrets, one each at thekiosktop.

Dome crowned by an unusual red sandstone lantern.

NOTES

1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for which it has been loaned.

2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the architects in case of any discrepancy.

3. Drawing to be referred to with any other relevant details or documents.

4. Drawing is not to be scaled. Written dimensions are to be followed

MEASURED DRAWINGS

ROOFTOP PLAN

DATE December, 2021 1:100

SCALE

SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI

LVL +10815 SLOPE LVL +11115 LVL ± 00 LVL +6665 LVL +14850 ROOF TOP PLAN CHATTRI A CHATTRI B CHATTRI C CHATTRI D CHATTRI E CHATTRI F CHATTRI G CHATTRI H SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE 0.5 1.00 2.0 3.0 5M 9847 6963 6963
MEASURED DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
T i t l e
KHAN | SEM. 01
Key Elevation N DRG NO.
MARIA
| AC-034 ROOFTOPAERIALVIEW TURRET KHURRA AS SEEN FROM PARAPET

BRIEF DESCRIPTION

The lower floor opens into a verandah via 3 pointed arches,accessiblevia ramp. Quartzite columns extending to form arches above. Facade finished with lime-surkhi plaster. The corners are strengthened by sloping buttresses. The local grey stone chajjas are supported by brackets. The parapet of the upper floor/ terrace is ornamented by kangooras. Over the roof, in the middle of each side stand chattris. The corners are strengthened by sloping buttresses. Its broad low domerisesfromthe16sided battlemented drum with a turretoneachcorner andis crownedbyaredsandstone lantern.

SOUTH ELEVATION LVL ±00 LVL +430 LVL +4880 LVL +6065 LVL +6665 LVL +7195 LVL +7890 LVL +11630 LVL +11840 LVL +15100 LVL +10225 0.5 1.00 2.0 3.0 5M INACCESSIBLE SCALE
1:100
ELEVATION
MEASURED DRAWINGS Key Plan N DRG NO. T i t l e MARIA KHAN | SEM. 01 | AC-034 SOUTHELEVATION
ON PARAPETSURFACE CHATTRI
CHATTRI
MEASURED
DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
DATE December, 2021
SOUTH
SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI
ORNAMENTATION
ORNAMENTATIONON

LVL +11840

LVL +11630

LVL +7890

LVL +6065

LVL +4880

NOTES

1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for which it has been loaned.

2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the architects in case of any discrepancy.

3. Drawing to be referred to with any other relevant details or documents.

4. Drawing is not to be scaled. Written dimensions are to be followed

i t l e

SECTION A-A

LVL +430

LVL +15100 SECTION

INACCESSIBLE 0.5 1.00 2.0 3.0 5M

SCALE

MARIA KHAN |

SCHOOL OF PLANNING AND ARCHITECTURE,

NEW

MEASURED DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI

LVL ±00
A-A
LVL +13650 SECTION B ORIENTATION TYPE 01 JALI PATTERN GEOMETRY ORIENTATION TYPE 02
DATE December, 2021 1:100
DELHI
MEASURED DRAWINGS
N
SEM. 01 | AC-034 AA B JALI CHAMBERINTERIOR
Key Plan
DRG NO. T
BRIEF DESCRIPTION
Light and ventilation is brought in by the sandstone jalisthatareinstalledonmost openings towards the verandah.

DEFECTS IN THE STRUCTURE

CRACKS STRUCTURAL SURFACE CRACKS

MOISTURE RELATED PROBLEMS

RISING DAMPNESS WATER SEEPAGE

EFFLORESCENCE

BLACKENING OF SURFACE

BIOLOGICAL GROWTH ALGAL GROWTH

PLANT GROWTH

PLASTER RELATED PROBLEMS FLAKING OF PLASTER SPALLING OF PLASTER MISSING PLASTER

MISSING/ BROKEN ELEMENTS MISSING DETAILS BROKEN ELEMENTS

DUST WEATHERING EXPOSED MASONRY

PIGEON DROPPINGS

MATERIAL EXTANT LOCAL GRAY STONE SANDSTONE

SURKHI-LIME PLASTER LIME PLASTER

MATERIAL & CONDITION MAPPING

GROUND

DATE

LVL +330 LVL +430 LVL ±00 PLAN CUT 950 MM FROM PLINTH LEVEL LVL +580 COLONNADED ARCHWAY COLONNADED ARCHWAY COLONNADED ARCHWAY 0.5 1.00 2.0 3.0 5M
AND
DELHI
Elevation N DRG NO. T i t l e
SCHOOL OF PLANNING
ARCHITECTURE, NEW
Key
SCALE
December,
2021 1:100
KHAN | SEM. 01 | AC-034
FLOOR PLAN MARIA
LEGEND
MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
MATERIAL & CONDITION MAPPING FOR
COLONNADE
CHAMBER
TOMB CHAMBER ENTRANCE TOMB

REFLECTED CEILING PLAN

CRACKS STRUCTURAL SURFACE CRACKS

MOISTURE RELATED PROBLEMS RISING DAMPNESS WATER SEEPAGE EFFLORESCENCE BLACKENING OF SURFACE

BIOLOGICAL GROWTH ALGAL GROWTH PLANT GROWTH

PLASTER RELATED PROBLEMS FLAKING OF PLASTER SPALLING OF PLASTER MISSING PLASTER

MISSING/ BROKEN ELEMENTS MISSING DETAILS BROKEN ELEMENTS

PIGEON DROPPINGS DUST WEATHERING EXPOSED MASONRY

MATERIAL EXTANT LOCAL GRAY STONE SANDSTONE SURKHI-LIME PLASTER LIME PLASTER

MATERIAL & CONDITION MAPPING

GROUND FLOOR RCP

DATE December, 2021 1:100

SCALE

SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI

LVL +4580 LVL +6065 LVL +4580 LVL +13650 DOME TYPE C TYPE C TYPE CTYPE C TYPE A TYPE A TYPE A TYPE A TYPE ATYPE A TYPE ATYPE A TYPE BTYPE B TYPE BTYPE B 0.5 1.00 2.0 3.0 5M
DEFECTS IN THE STRUCTURE
i t l e
N DRG NO. T
MARIA KHAN | SEM. 01 | AC-034
LEGEND
TYPE A
B
TYPE C
MATERIAL & CONDITION MAPPING FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI Key Elevation CEILING
CEILING TYPE
CEILING
CEILING: DOME

DEFECTS IN THE STRUCTURE

CRACKS STRUCTURAL SURFACE CRACKS

MOISTURE RELATED PROBLEMS RISING DAMPNESS WATER SEEPAGE

EFFLORESCENCE

BLACKENING OF SURFACE

BIOLOGICAL GROWTH ALGAL GROWTH

PLANT GROWTH

PLASTER RELATED PROBLEMS FLAKING OF PLASTER SPALLING OF PLASTER MISSING PLASTER

MISSING/ BROKEN ELEMENTS MISSING DETAILS BROKEN ELEMENTS

TERRACE FLOORING

ROOF TOP VIEW

TERRACE PLAN

PLAN CUT 7400 MM FROM PLINTH LEVEL

T

PIGEON DROPPINGS

DUST WEATHERING EXPOSED MASONRY

MATERIAL EXTANT LOCAL GRAY STONE SANDSTONE SURKHI-LIME PLASTER LIME PLASTER

TERRACE PLAN

DATE December, 2021 1:100

N DRG NO.

MARIA KHAN | SEM. 01 | AC-034

NEW DELHI

0.5 1.00 2.0 3.0 5M
SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI i t l e
SCALE
LEGEND MATERIAL & CONDITION MAPPING FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR,
MATERIAL & CONDITION MAPPING
Key Elevation

CRACKS STRUCTURAL SURFACE CRACKS

MOISTURE RELATED PROBLEMS RISING DAMPNESS WATER SEEPAGE EFFLORESCENCE BLACKENING OF SURFACE

BIOLOGICAL GROWTH ALGAL GROWTH PLANT GROWTH

PLASTER RELATED PROBLEMS FLAKING OF PLASTER SPALLING OF PLASTER MISSING PLASTER

MISSING/ BROKEN ELEMENTS MISSING DETAILS BROKEN ELEMENTS

DUST WEATHERING EXPOSED MASONRY

PIGEON DROPPINGS

MATERIAL EXTANT LOCAL GRAY STONE SANDSTONE SURKHI-LIME PLASTER LIME PLASTER

MATERIAL & CONDITION MAPPING

TERRACE

DEFECTS IN THE STRUCTURE SCHOOL

LVL +6665 PLAN CUT 7400 MM FROM PLINTH LEVEL TERRACE RCP CHATTRI E TOMB CHAMBER 0.5 1.00 2.0 3.0 5M
OF PLANNING AND ARCHITECTURE, NEW DELHI N DRG NO. T i t l e SCALE
December, 2021 1:100
DATE
RCP MARIA KHAN | SEM. 01 | AC-034
LEGEND MATERIAL & CONDITION MAPPING FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI Key Elevation CHATTRI A CEILING CHATTRI F CEILING

DEFECTS IN THE STRUCTURE

CRACKS STRUCTURAL SURFACE CRACKS

MOISTURE RELATED PROBLEMS RISING DAMPNESS WATER SEEPAGE EFFLORESCENCE

BLACKENING OF SURFACE

BIOLOGICAL GROWTH ALGAL GROWTH PLANT GROWTH

PLASTER RELATED PROBLEMS FLAKING OF PLASTER SPALLING OF PLASTER MISSING PLASTER

MISSING/ BROKEN ELEMENTS MISSING DETAILS BROKEN ELEMENTS

BIOLOGICAL COLONISATION ON CHATTRI, DOME & KIOSK

BROKEN CHAJJA

ORNAMENTATION ON KIOSK

PIGEON DROPPINGS

DUST WEATHERING EXPOSED MASONRY

MATERIAL EXTANT LOCAL GRAY STONE SANDSTONE SURKHI-LIME PLASTER LIME PLASTER

T i t l e

MATERIAL & CONDITION MAPPING

ROOF TOP PLAN

DATE December, 2021 1:100

SCALE

N DRG NO.

Key Elevation

MARIA KHAN | SEM. 01 | AC-034

SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI

LVL +10815 SLOPE LVL +11115 LVL ± 00 LVL +6665 LVL +14850 ROOF TOP PLAN CHATTRI A CHATTRI B CHATTRI C CHATTRI D CHATTRI E CHATTRI F CHATTRI G CHATTRI H SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE 0.5 1.00 2.0 3.0 5M
LEGEND MATERIAL & CONDITION MAPPING FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
VIEW
TOP

CRACKS

STRUCTURAL SURFACE CRACKS

MOISTURE RELATED PROBLEMS RISING DAMPNESS WATER SEEPAGE

EFFLORESCENCE BLACKENING OF SURFACE

BIOLOGICAL GROWTH ALGAL GROWTH PLANT GROWTH

LVL +15100

LVL +11840

LVL +11630

LVL +10225

LVL +7890

LVL +7195

LVL +6665

LVL +6065

LVL +4880

LVL +430

LVL ±00

PLASTER RELATED PROBLEMS FLAKING OF PLASTER SPALLING OF PLASTER MISSING PLASTER

MISSING/ BROKEN ELEMENTS MISSING DETAILS BROKEN ELEMENTS

DUST WEATHERING EXPOSED MASONRY

MATERIAL EXTANT LOCAL GRAY STONE SANDSTONE SURKHI-LIME PLASTER LIME PLASTER

T i t l e

N DRG NO. LEGEND

PIGEON DROPPINGS

MATERIAL & CONDITION MAPPING

DATE December, 2021 1:100

MARIA

KHAN | SEM. 01 | AC-034 LANTERN TURRET KIOSK DOME WEST FACING VIEW

MATERIAL & CONDITION MAPPING FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI

SOUTH ELEVATION
0.5 1.00 2.0 3.0 5M
ARCHITECTURE, NEW
DEFECTS IN THE STRUCTURE SCHOOL OF PLANNING AND
DELHI
Key Plan
SCALE
SOUTH ELEVATION

DEFECTS IN THE STRUCTURE

CRACKS STRUCTURAL SURFACE CRACKS

MOISTURE RELATED PROBLEMS RISING DAMPNESS WATER SEEPAGE

EFFLORESCENCE

BLACKENING OF SURFACE

BIOLOGICAL GROWTH ALGAL GROWTH

PLANT GROWTH

LVL +15100

LVL +13650

MATERIAL

LVL +11840

LVL +11630

PLASTER RELATED PROBLEMS FLAKING OF PLASTER SPALLING OF PLASTER MISSING PLASTER

MISSING/ BROKEN ELEMENTS MISSING DETAILS BROKEN ELEMENTS

LVL +7890

LVL +6065

LVL +4880

PIGEON DROPPINGS

DUST WEATHERING EXPOSED MASONRY

MATERIAL EXTANT LOCAL GRAY STONE SANDSTONE

SURKHI-LIME PLASTER LIME PLASTER

MATERIAL & CONDITION MAPPING

SECTIONAL ELEVATION

LVL ±00 LVL +430
SECTION A-A
0.5 1.00 2.0 3.0 5M
Plan N
T i t l e
SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI Key
DRG NO.
SCALE DATE December, 2021 1:100
KHAN | SEM. 01
AC-034
MARIA
|
LEGEND
& CONDITION MAPPING FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
TOMB CHAMBER INTERIOR
COLUMN
TOMB CHAMBER WALLS CHATTRI INTERIOR

2 Surface cracks

TREATMENT OF ISSUES AS OBSERVED VIA CONDITION MAPPING ASSESSMENT

MOISTURE

Caused by neglect, biological colonisation and heavy urban settlement.

Monitoring & inspection of cracks/ Grouting.

If not sealed, can cause weakening and ultimately dilapidation of the dome.

Damage and improper waterproofing of the layer. Grouting. damage by expanding

BIOLOGICAL GROWTH

ALGAL GROWTH

PLANT GROWTH

PLASTER RELATED PROBLEMS FLAKING OF PLASTER SPALLING OF PLASTER MISSING PLASTER

MISSING/ BROKEN ELEMENTS MISSING DETAILS

Rising damp, water ingress, water accumulation and penetration.

algal growth

Gradual cutting of growth or tested chemicals to stunt the growth that do not affect the material of the structure.

Gentle scarping or brushing the surface.

If not removed can lead to severe structural issues and further weaken the structure posing threat to the stability of the structure.

Not a major threat. However, regular monitoring is required.

Careful removal of old plaster and re-plastering. Threat to the aesthetic

Excessive rainwater causing water soluble salts to deposit themselves on the surface.

Poultice method, proper investigation.

Threat to aesthetic value. MEDIUM DESIRABLE

WEATHERING EXPOSED MASONRY

MATERIAL EXTANT

LOCAL GRAY STONE SANDSTONE

SURKHI-LIME PLASTER LIME PLASTER

MATERIAL & CONDITION MAPPING

SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI PROPOSAL Key Plan N DRG NO. T i t l e LEGEND SCALE IDENTIFICATION & TREATMENT OF ISSUES FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR DATE December, 2021 N.A MARIA KHAN | SEM. 01 | AC-034 SOURCE OF ISSUE/ POSSIBLE CAUSE SOLUTION CONSEQUENCES/ THREAT LEVEL OF THREAT High Medium Low PRIORITY Urgent Immediate Desirable
HIGH URGENT
MEDIUM IMMEDIATE
HIGH URGENT
LOW DESIRABLE
LOW
DESIRABLE
LVL ±00 LVL +430 LVL +4880 LVL +6065 LVL +7890 LVL +11630 LVL +11840 LVL +15100 SECTION A-A LVL +13650 0.5 1.00 2.0 3.0 5M
STRUCTURAL SURFACE CRACKS
CRACKS
RELATED PROBLEMS RISING DAMPNESS WATER SEEPAGE EFFLORESCENCE BLACKENING OF SURFACE
BROKEN
DUST
ELEMENTS PIGEON DROPPINGS
DEFECTS IN THE STRUCTURE
1:100 SECTIONAL ELEVATION
LEGEND MATERIAL & CONDITION MAPPING FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
CHAMBER INTERIOR TOMB CHAMBER WALLS CHATTRI INTERIOR COLUMN
TOMB
ISSUES AND TREATMENT -N.A-

AIM

STRUCTURAL ISSUES

CONSERVATION MANAGEMENT PLAN

To preserve and restore the materials and elements in the building.

MEDALLION ON DOME CEILING

MEASURES

1. Structural repairs.

2. Surface repairs.

3. Maintenance.

SITE LEVEL ISSUES SERVICES

To improve the overall usage and spaces within.

1. Enforce appropriate guidelines to avoid further encroachment around the structure.

2. Introduce waste management plan to avoid waste to collect in and around the structure.

CEILINGTYPEA

WORKS TO BE CARRIED OUT

CEILINGTYPEB

A. Repairs in structural cracks.

B. Gradual removal of vegetation.

C.Providing waterproofing.

D. Removal of algal growth.

E. Careful removal of defected plaster.

F. Re-plastering of surfaces.

G. Restoring the missing elements.

H. Proper illumination of the structure.

I. Monitoring the structure and its response to the repairs.

To provide the required facicilities.

1. Proper illumination of the structure.

Three types of ornamented ceiling in the colonnaded archway. Type A being mildly vaulted, type B being a shallow dome with inscribed medallion in the middle and supported by squinches which are also ornamented by inscribed medallion,andtypeCbeing in the floral form and supportedbysquincheson4 sides and ornamented via means of inscribed medallions

Dome ceiling incised with bandsofredsandstonewith a stucco medallion having inscriptions.

STAGES OF WORK

SQUINCHONCEILINGB

Works to be carried out can be grouped in chronological manner as per the priority and technical processes involved.

CEILINGTYPEC

ITEM TIME PERIOD

Sweeping/ cleaning. Daily

Getting rid of waste in an around the structure. Daily

Clearing of drainage openings. Monthly

Check for vandalism and encroachment. Monthly

Structural and surface repairs. Annually

REFLECTED CEILING PLAN LVL +4580 LVL +6065 LVL +4580 LVL +13650 LVL ±00 DOME TYPE C TYPE C TYPE CTYPE C TYPE A TYPE A TYPE A TYPE A TYPE ATYPE A TYPE ATYPE A TYPE BTYPE B TYPE BTYPE B 0.5 1.00 2.0 3.0 5M 300 2150 450 2221 450 2150 300 655 655 9320 22500 6590 6590 300 2150 450 2221 450 2150 300 9320 22500 6590 6590 655 300 2150 450 2221 450 2150 655300 SCALE NOTES 1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for which it has been loaned. 2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the architects in case of any discrepancy. 3. Drawing to be referred to with any other relevant details or documents. 4. Drawing is not to be scaled. Written dimensions are to be followed MEASURED DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI DATE December, 2021 1:100 REFLECTED CEILING PLAN SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI MEASURED DRAWINGS
T i t l e
KHAN | SEM.
Key Elevation N DRG NO.
MARIA
01 | AC-034
BRIEF DESCRIPTION
RESTORATION & RETROFITTING OF MUBARAK SHAH SAYYID’S TOMB, KOTLA MUBARAKPUR, NEW DELHI
PHASE 01 A B C D PHASE 02 E F G PHASE 03 H I
PROJECT INCEPTION
MAINTENANCE & MONITORING
SCHEDULE
MAINTENANCE & MONITORING

BRIEF DESCRIPTION

SWOT ANALYSIS

STRENGTHS

- Easy accessibility via public transport. Approximately 1.2 kms walk from South Extension metro station.

- Other prominent built heritage present in the region.

WEAKNESSES

- Subject to perpetual encroachment and vandalism.

- Enveloped between dense urban fabric, which makes the tomb a hidden marvel.

- Structure not widely known to common public

Three types of ornamented ceiling in the colonnaded archway. Type A being mildly vaulted, type B being a shallow dome with inscribed medallion in the middle and supported by squinches which are also ornamented by inscribed medallion,andtypeCbeing in the floral form and supportedbysquincheson4 sides and ornamented via means of inscribed Dome ceiling incised with bandsofredsandstonewith a stucco medallion having

OPPORTUNITIES

- Restoration of the structure will cater to the long and short term employment opportunities.

1. This drawing is copyright & property of MARIA KHAN; is not to be reproduced, copied or handed over to a 3rd party or used for any other purpose than that for 2. The contractor for the work is responsible for counter-checking all details & dimensions prior to the commencement of work & seek clarifications from the 3. Drawing to be referred to with any other relevant details or documents. 4. Drawing is not to be scaled. Written dimensions are to be followed

- Once restored and taken proper care of, will make the monument as well as the area around safe for common public.

December, 2021

- Has the potential to become a tourist spot and can boost the local economy.

THREATS

- Despite being a significant structure, it largely remains unheard of by the public.

- Lack of maintenance of the structure and perpetual encroachment has caused distress and deterioration of the built heritage. If continued, we may lose it forever.

MARIA KHAN | SEM. 01 | AC-034

1:100 SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI

MEASURED
MUBARAKPUR, NEW
DRAWINGS FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA
DELHI
RESTORATION & RETROFITTING OF MUBARAK SHAH SAYYID’S TOMB, KOTLA MUBARAKPUR, NEW DELHI �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� PROTECTED AREA
BOUNDARY
BOUNDARY ��
PROHIBITED
REGULATED

METRO

B. BADE KHAN’S TOMB

D. BHUREY KHAN’S TOMB

PAUSE POINTS

INFORMATION BOARDS

SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI PROPOSAL Key Plan N DRG NO. T i t l e LEGEND SCALE HERITAGE TRAIL PROPOSAL FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
December, 2021 1:100 MARIA KHAN | SEM. 01 | AC-034
MUBARAK SHAH’S TOMB
DATE
LOCATIONS A.
C.CHOTEY KHAN’S TOMB
E.DARYA KHAN TOMB
STATION
F. KALE KHAN 50 m
&
50 M
SIGNAGE
A. MUBARAK SHAH’S TOMB
B. BADE KHAN’S TOMB C. CHOTEY KHAN’S TOMB E. DARYA KHAN’S TOMB P1 P2 P3 P4 F. KALE KHAN’S TOMB SOUTH EXTENSION METRO STATION 11 mins 200 m 5 mins 450 m 12 mins 1000 m 10 mins 750 m 6 mins 550 m … WALKING DISTANCE AND TIME -N.A-
D. BHUREY KHAN’S TOMB

Signage & infromation boards (image source: behance.net)

Location for panels and pamphlets holders inside the metro station

SCHOOL
DRG NO. LEGEND HERITAGE TRAIL PROPOSAL FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW
December, 2021 1:100 50 m 1
OF PLANNING AND ARCHITECTURE, NEW DELHI
DELHI
Image source: Google images
SCHOOL OF PLANNING AND ARCHITECTURE, NEW DELHI LEGEND HERITAGE TRAIL PROPOSAL FOR MUBARAK SHAH SAYYID'S TOMB, KOTLA MUBARAKPUR, NEW DELHI
December, 2021

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.