SHOWIN’ OUR STUFF
Magnetic Building Solutions “Goes Hollywood” — Home Renovation Programs Showcase MBS!
Magnetic Building Solutions (MBS) technology was developed by the World Floor Covering Association to facilitate safe and efficient surface installations. The magnetic underlay system can be utilized with almost all types of flooring and wall surfaces.
N
o adhesives or click locking systems are required for installation. Products with the MagneBuild™ brand of MBS technology stay in place using magnetism: a flexible
sheet magnetic underlayment attracted to the top surface layer containing a ferrite powder. For the installer, that means an easier and faster installation without the mess, smell, and VOCs that are a common by-product of traditional floor or wall covering replacements. Our experience shows that once the MagneBuild concept is embraced and given a try, it is used repeatedly. Metroflor has done a fantastic job of providing stylish designs in their product offering. For all of these advantages and more, it’s easy to see why the MagneBuild brand continues to gain recognition, and now it has gone Hollywood! Several “Home Renovation” networks came to MBS unsolicited when they heard about these unique attributes of the magnetic system branded MagneBuild. Check these out!
Food Network: Restaurant Impossible Metroflor Corporation’s Déjà New with Attraxion Magnetic Attachment Technology was the fast-installing flooring solution in the restaurant-makeover Restaurant Impossible cable TV series. Restaurant Impossible Host/Chef Robert Irvine tries to turn around restaurants across America facing an impending demise if things don’t improve. With a $10,000 budget and two days to work, Irvine uses his creativity and resourcefulness to turn the eatery’s fortunes around — including making aesthetic changes — in preparation for the grand reopening the following day. Restaurant Impossible started using MagneBuild products about a year ago, and the hits to our website continue to grow. The reduced installation time and flexibility in design were key factors in their decision to use our product. While 48 hours is typical for a Restaurant Impossible renovation, it’s not for the vast majority of projects. But speed and ease of installation is an important feature for any commercially installed flooring.
Restaurant Impossible started using MagneBuild™ products about a year ago, and the hits to our website continue to grow. The reduced installation time and flexibility in design were key factors in their decision to use our product. 36 Premier Flooring Retailer | Digital 3 2020