BIM Portfolio by Omkar Chalke

Page 1

BIM PORTFOLIO...

BIM ENGINEER

Chalke
Omkar M.

ABOUT ME

As an Engineer, I'm deeply passionate about the transformative power of Building Information Modeling. From visualizing complex projects in 3D to streamlining workflows and promoting sustainability, BIM's potential to revolutionize the construction industry excites and drives me.

I am committed to continuous learning and innovation, dedicatedtocontributingtoamoreefficient,collaborative, andsustainablefutureinconstructionthroughBIM.

04 05 06 07 08 10 11 21 25 26 27
PROJECT
INDEX PROJECT DETAILS RIBA
STAGES DESIGN PROCESS CONCEPT DEVELOPMENT
RENDERING SITE DETAILS
4D SIMULATION QUANTIFICATION 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
DRAWING DETAILS COORDINATION & COLLABORATION CLASH DETECTION

PROJECT DETAILS

PROJECT OVERVIEW

Project Location: Hong Kong China

Project Type: Mixed Used Building (Office & Apartment)

PROJECT BRIEF

Client:

Enzyme APD Ltd 806, Arion

Commercial Center, 2-12 Queen's Road West Sheung Wan, Hong Kong

Softwares Used:

Modelling: Revit

Clash resolution: Navisworks

_

Rendering: Twinmotion

To redevelop an existing building that was built back in 70's which is located at the intersection between Wellington's Street & Queen's Road Central in the Central District of Hong Kong China. However, the building doesn't maximize the currently allowed GFA for the plot. Despite underutilized GFA, it would be set to study the possibility of another building volume that can give a better ROI, also making it a landmark in a critical urban point. So, it is to extend the existing building to 21 storeys with mixed-use offices & service apartments.

HEIGHT REQUIREMENT

Full Site Occupation: 17 Storeys

With Setback: 21 Storeys

AREA BREAKDOWN

1430.7

Area Ratio: 13.8

Total GFA Acheived: 2792 Sq. Mtr. Total FAR Acheived: 13.7

Sq. Mtr. Current
GFA:
Sq. Mtr.
Floor
Site Area: 203.7
Utilized
Gross Floor Area: 2800 Sq. Mtr.

RIBA PROJECT STAGES

00 _Strategic Definition

Goal: Identify the client's requirements and project objectives. This stage involves understanding the project s purpose, feasibility, and initial budget considerations. Key decisions on the project's viability are made during this phase.

01 _Preparation and Briefing

Goal: Assemble the project team and define the project s structure, team roles, and responsibilities. The client s brief is developed further, and a more detailed project plan is established. Preliminary cost estimates and timelines are discussed.

02 _Concept Design

Goal: Begin working on the concept design of the project. Design ideas are explored, and initial sketches and 3D representations are created. The focus is on generating creative solutions that align with the client s vision.

03 _Design Development

Goal: Develop the chosen concept design further into more detailed drawings and plans. Technical aspects, materials, and systems are explored in greater depth. The design is refined to meet the client's requirements and building regulations.

04 _ Technical Design

Goal: Create construction drawings and technical details necessary for the actual construction phase. Detailed specifications and documentation are prepared for tendering and construction purposes.

05 _Manufacturing and Construction

Goal: Construction begins onsite based on the approved technical designs and drawings Contractors and suppliers are engaged, and the building is constructed according to the specifications and schedule

06 _ Handover & Close Out

Goal: The completed building is handed over to the client Any final adjustments or snagging issues are addressed. All necessary documentation, operation manuals, and as-built information are provided to the client

07 _ In Use

Goal: The building is now occupied and utilized as intended. Post-occupancy evaluations may be conducted to assess the building's performance and address any remaining issues.

g g g GFA, increasing the final number of stories Stage 02 _ Creating a series of set-backs allowed as per local
Axonometric View Conceptual Model 02

RENDERING

Rendered Model Concept

RENDERING

Rendered Model Building
SITE DETAILS
A Typical_Architectural Plan _ Floor 15
02
01 A Typical_Axonometric View _ Floor 15
Office
Office
Typical_Axonometric View _ Floor 16 Typical_Architectural Plan _ Floor 16 Terrace Garden Office 02 Office 01
Floor
F1 _ 1:5
Floor
F2 _ 1:5
Floor F3 1:5 Zone 03 _
Fire Door Section _ 1:25 Zone 03 _
Office Door Elevation _ 1:25 Zone 03 _

FRAMING PLANS

A Typical_Framing Plan _ Floor 15 Typical_Framing Plan _ Floor 16 A Typical_Framing Schedule _ Floor 15 Typical_Framing Schedule _ Floor 16

Ceiling Light Flat Round 100W to 120W

Pendant Light_Disk_100W to 120W Legends_

Compound

Ceiling

Structural Beam System
REINFORCEMENT DETAILS yp _ cement Details _ Floor 15 Beam Reinforcement _ 1 20 Slab Reinforcement _ 1:20 Column Reinforcement _ 1:20
_
SECTION DETAILS Part Section
Part Section _
Part 01
Part Section _
Part 02
Part Section _
Building Elevation _ Elevation Details _ Facade
COORDINATION
Collaborated Model Coordination between 03 discipline Structure _ Partial structure model Architecture _ Partial Architecture Model MEP _ Partial MEP Model
& COLLABORATION

CLASH DETECTION MATRIX

Clash Detection Matrix _

Search sets & Clash detection tests are based on provided Clash detection Matrix

CLASH DETECTION

Search Sets _ Creating search sets for Architectural, Structural & MEP for Clash Detection

Clash Detective _ Setting up clash detective to run different test combinations in between all coordinated models

CLASH DETECTION

Clash Report_

T01 [ARC]-SET01-[STR]-Set01

Clash Report_

T01 [ARC]-SET01-[MEP]-Set01

Clash Report_

T01 [MEP]-SET01-[MEP]-Set01

CLASH RESOLUTION

Clash Report_Resolved_

T01_[ARC]-SET01-[STR]-Set01

Clash Report_Resolved_

T01_[ARC]-SET01-[MEP]-Set01

Clash Report_Resolved_

T01_[MEP]-SET01-[MEP]-Set01

4D SIMULATION

Zone 03 _
03 _ Sets
4D Simulation Movie
Zone
Zone 03 _ Task Timeliner with Gantt Chart

QUANTIFICATION

Zone 03

Quantification Model

Zone 03 Sets

Zone 03 _

Quantification Workbook _ WBS

Zone 03 _

Quantification Workbook

BIM PORTFOLIO 8329993494 / 9405957690 omkarchalke73@gmail.com www.manageworms.com C O N T A C T THANK YOU...! https://www linkedin com/in/omkar-chalke-4ba15a186/ Mulund, Mumbai-400081

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
BIM Portfolio by Omkar Chalke by Omkar Chalke - Issuu