Shaylor_Pigeon

Page 1

The Pigeon, a misunderstood creature.


The Pigeon, a bird with beautiful plumage but often known for other characteristics? Well, they have a place in this great world and for thousands of years they have played a vital role as messengers delivering often important communication. Shaylor’s Business Development Team wants to communicate with you but we don’t want to become a distraction as our feathered friend can occasionally be. You see, just like the pigeon we actually have a lot more to offer than first perceived, in fact we have an array of construction expertise that we really thought you should see. Why not sit back and take two minutes to flick through the following pages and next time one of our Business Development Team ring, you’ll know why they’re so keen.

SHAYLOR GROUP BUILDING A BETTER FUTURE | CONSTRUCTION | REFURBISHMENT | INTERIOR FIT OUT | REPAIR AND MAINTENANCE


1

2

3

4

5

6

7

8

9


1

King Edwards School New Performing Arts Centre Client: King Edwards School Value: ÂŁ7.2 million Shaylor are currently constructing a new 4 storey structure to provide a 500 seat auditoria, a 140 seat studio theatre, a multi-use rehearsal room, several teaching suites, a feature foyer and associated landscaped grounds. Shaylor assisted the client in reducing budget by over ÂŁ1 million pounds to achieve their target cost.


4

2

University of Wales, Powys Gregynog Hall Client: University of Wales Value: ÂŁ60,000 Minor refurbishment works along with new heating and electric system. External works to DPC plus ceiling works and relaying paving slabs. The project also included full internal decoration to the Music Room.


3

CoRE Centre of Refurbishment Excellence Client: Stoke on Trent City Council Value: £2.4 million The £2.4 million CoRE project will create a skills and learning facility, visitor hub and will be part of a unique group of “living” demonstration buildings on the 6,000 m² site. With funding from the Department of Children, Schools and Families (DCSF), the first phase of this unique development began on site on 7 February 2011.


4

Colmore Gate Birmingham Client: CIP Property ( AIPT ) Ltd Aviva Investors Value: ÂŁ1 million Design & Build project to refurbish the main reception and lift lobby of a city centre office block, including external cladding & glazing.


5

35 Calthorpe Road Birmingham Client: Calthorpe Estates Value: ÂŁ845,000 Complete refurbishment of this Grade II* listed building with a new build two storey extension in keeping with the style of the existing building. A full mechanical and electrical refit throughout has been carried out incorporating modern lighting, air conditioning and heating. The majority of the work in this building has been restoration, with specialist rendering work a necessity. Internal restorations were carried out in accordance with the planning and conservation requirements, which incorporated traditional lime and horsehair plaster works and specialist paints in accordance with heritage listing requirements.


6

Highways Agency The Cube Birmingham Client: Buildability Value: ÂŁ1.3 million Formation of flagship Cat A & B office accommodation for our client and the Highways Agency. The works included fit out of the reception to a high standard with oak panel finishes to walls & ceilings, glass feature walls and reception desk.

7


7

100 Hagley Road Birmingham Client: Calthorpe Estates Value: ÂŁ6.4 million A Design & Build project to rebuild & remodel an existing five storey concrete framed office building to BREEAM Very Good Rating. The Build required a close working relationship with client to deliver on time and on budget.


8

Hillingdon Libraries London Client: London Borough of Hillingdon Value: ÂŁ1 million Shaylor Interiors multi-site refurbishment programme for the London Borough of Hillingdon. Projects included: Yiewsley Library Oaklands Gate Library Kingshill Library Ickenham Library


9

Goals Soccer Centre Speke, Liverpool Client: Goals Soccer Centres Plc Value: ÂŁ1.7 million The project consists of the construction of 8 five-a-side and 2 seven-a-side all weather floodlit football pitches. The construction of the amenities provides the Changing Rooms, Showers, Toilets, Bar/Lounge area, Meeting room, Staff office, Kitchen, chilled cellar and plant room. All of the facilities are DDA compliant for disabled access and use. Access roads, footpaths, parking bays have been constructed to incorporate cycle shelters and motor bike parking.


Cooh, Cooh... Like what you see? If so and you have a project you would like to discuss then give Ben Burton or Ian Kilvington a call on: 0121 633 5800 Alternatively you can email them: ben.burton@shaylorgroup.com ian.kilvington@shaylorgroup.com

SHAYLOR GROUP BUILDING A BETTER FUTURE | CONSTRUCTION | REFURBISHMENT | INTERIOR FIT OUT | REPAIR AND MAINTENANCE


GROUP www.shaylorgroup.com

SHAYLOR GROUP BUILDING A BETTER FUTURE | CONSTRUCTION | REFURBISHMENT | INTERIOR FIT OUT | REPAIR AND MAINTENANCE


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.