THE POSITIVENESS OF HSE 7
CONSTRUCTION SITES WASTE MANAGEMENT
2016
2017
2018
Non hazardous (tons)
401,717
928,294
944,366
584
990
381
402,301
929,284
944,747
Recycling
88,392
109,660
129,532
Landfill
313,695
818,739
814,926
214
885
289
402,301
929,284
944,747
Recovery (%)
22.0%
11.8%
13.7%
Disposal (%)
78.0%
88.2%
86.3%
Hazardous (tons) Total weight of waste (tons)
Other (to be specified) Total weight of waste by disposal method (tons)
and manage the Subcontractors waste procedures and behaviors, in cooperation with specialized waste companies according to local laws. The percentage of waste disposal (and therefore the percentage of recovery) is affected, in some cases, by the rules of the construction site applied at the industrial site
owned by the end user. The percentage of recovery increased in 2018 compared to 2017, from 11.8% to 13.7%. For Tecnimont S.p.A. subsidiary the percentage of waste recycled increased significantly during the last 3 years, passing from 4 % in 2015 to 12% in 2018 (increasing 5% from 2017 to 2018).
11.4 10.6
7.1
WASTE PRODUCED/WORKED MAN-HOURS kg of waste/worked man-hours
2016
2017
2018
11.4
10.6
7.1
As shown in the above graph, the ratio between waste produced and manhours worked on site saw a steady decrease from 11.4 in 2016, to 10.6 in 2017 and to 7.1 in 2018.
2018 SUSTAINABILITY REPORT
123