Portfolio 23' -updated

Page 1

Site Plan of the Bergen Arches

Playground SkateparkSandFilters

Upgraded Parkings

Planting Zones

Main Focus-The Arches

Circulation&Entries

All-weatherPathway Buffer EntryPlaza

Water Storage

CommunityGreenhouse&CommercialCenterUpgradedParkingLot&CommunityOpenSpace

BasketballCourt

About 50’ below its urban context, this sunken landscape is ignored by even people living next to it. To create more connections to surrounding communities and give people easy access to the Arches, I soften the southern edge of with cut and fill and created several ridges and valleys. The ridges will connect to the previous underutilized parking lots and form entries for communities. The valleys will function as bio-swales and treat runoff from those communities.

Grey & Green Infrastructure System

In this proposal, grey and green infrastructures work together to manage storm water. Underground, the old railway tunnels will be connected to the re-oriented storm drain system and become cisterns for runoff. Inside the cisterns, the gross firstflush will get a centralized treatment before getting into the irrigation system. Above ground, the landscape are terraced and planted with different species so as to absorb different pollutants from the water.

Concept Formation

Step 1: Locate underutilized parking lots

Step 2: Cut and fill to creat ridges and valleys

Step 3: Terrace the ground and plant according to soil humidity

Step 4: Lay out pathways and entries

Infrastructure Systems

Longitudinal Section of the Bergen Arches

Grey & Green Infrastructure Layout

After Normal Rain Event

After Intense Rainstorm

Planting Strategy

Shrub Buffer: Capture dust and other larger particles

Grass Mat: Infiltrate smaller particles

Deep Root Grove: Stablize pollutants

Rainfall Intensity in 100yr Rain Event= 3.0 inches/hour

Proposed Drainage Area= 870,000 ft sq

Peak Water Volume= 21,500,000 gal

Drainage
Tube
Proposed
Area
Typology
Storm Drain Pipe Sand Filter Observation Deck Cistern Collection Tube All-weather Pathway
Irrigation
Working Model Tubes for Water Management
Section Perspective 1
Tubes for Recreation Activity
Section Perpective 2
Views from Observation Deck and Pathway Tube

Termite Control Strategies

According to the studies on termite habit, the main foraging zone of termites is 10m-40m from the mound, where the soil suffers from nutrient depletion. However, the soil in the inner circle (within 10 meters from the mound) is free of foraging and stays nutrition-rich. The difference in soil condition results in completely different vegetation types. Therefore, my strategy is to create termite-repellent landscape in the outer circle, meanwhile set up symbiotic relationship between termite and plants in the inner circle.

How to live along with termites?

Mound with closed ventilation system

Inner Zone with shallow passages underlain by deep radial passages

Main Foraging Zone with network of radial and cross passages

Peripheral Zone with small passages after ending blindly

How to deal with the mounds?

Remove the mounds + Spread mound soil to enrich surrounding area

Offer adequate alternative food sources

Compost Plant Litters

Keep the mounds

+ Set up symbiotic relationships

Raize the termite resistance of the landscape

Manure

Use termite-repellent plants

Intercrop repellent and susceptible species

Rotate between repellent and sesceptible species

Build physical barrier with sand/concrete/ raised planters

1m 5m-10m 30m-40m 50m

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.