Maggie Cochrane, AIA - Sample Portfolio

Page 1


SECTORS by HOURS WORKED

PHASES by HOURS WORKED

PROFESSIONAL WORK FROM O|X STUDIO

Marian High School

Educational || Bloomfield Hills, MI

Manton School

Educational || Manton, MI

Mill Creek Flats

Multifamily || Dexter, MI

South State Commons II - Summary

Workplace || Ann Arbor, MI

Barr Engineering

Workplace || Ann Arbor, MI

Ross School of Business

Workplace || Ann Arbor, MI

Orbitform

Workplace || Jackson, MI

CURRENT ROLE: ARCHITECT

MARIAN HIGH SCHOOL

JUL. 2024-FEB 2026 || RENOVATION

SECTOR: EDUCATION || BLOOMFIELD HILLS, MI

ROLE: PROJECT ARCHITECT, C.A. LEAD

Marian High School, a Catholic girls’ school in Eastern Michigan, sought to refresh their Science and Art wings. Untouched since the 1960s, the science wing will be updated to a sleek, industrial look with equipment and systems better preparing young women for college. An underutilized corridor will be renovated into the school’s art wing to support its already robust ceramics program, fine arts program, and digital arts program. My responsibilities include schematic design, renderings, drafting, project coordination, specifications (three-part), Construction Administration Lead.

LAB & PLANTERS

RENDERINGS BY AUTHOR

MARIAN HIGH SCHOOL

MANTON SCHOOL

SEP 2023 - SEP 2025 || RENO & ADDITION

SECTOR: EDUCATION || MANTON, MI

PHASE: PROJECT ARCHITECT, C.A. LEAD

Efforts at Manton Consolidated Schools are separated into two areas: firstly, a new band room addition to house the school’s ever-popular band program, and secondly, a revisioning of student restrooms to promote visibility for teachers. Among many acoustical considerations, the band addition’s irregular shape discourages echo created by parallel walls. A consistent datum line of acoustic wood paneling disguises a variety of acoustical techniques. At the restrooms, the school wished to create a visible communal sink area with gender-neutral toilet compartments. My responsibilities include assisting with space planning, creating renderings, drafting, selecting finishes, specifications (book), Construction Administration lead.

FINISHES (SCHOOL COLORS BLACK & ORANGE)

MANTON SCHOOL

EXTERIOR PLAN DETAILS, BRICK CORBELING DETAILS, RESTROOMS

Responsible for coordinating and drafting these details amongst others in the set.

MILL CREEK FLATS

JUN 2022 - SEPT 2023 || NEW CONSTRUCTION

SECTOR: MULTIFAMILY || DEXTER, MI

ROLE: PROJECT ARCHITECT

Mill Creek Flats is a proposed apartment complex in Dexter, a town experiencing a multifamily boom. Aimed at young working professionals, Mill Creek Flats provides a mix of studio, one-bedroom and two-bedroom apartments with in-unit amenities and effiecient parking. The site plan responds to Dexter’s newly udpated form-based code and at the time of design was the first multifamily complex to do so. The project went through several rounds of design based on estimated construction costs. The project was paused at the end of 2023 due to funding. My responsibilities included site plan design and coordination with civil; floor plan module and apartment design; client presentations; and conceptual renderings.

RENDERINGS BY AUTHOR, ELLISON TURPIN, & SYDNEY SINCLAIR

MILL CREEK FLATS

SOUTH STATE COMMONS II

LEVELS 1, 2, & 3

MAY 2022 - PRESENT || (SUMMARY)

SECTOR: WORKPLACE || ANN ARBOR, MI

South State Commons II is a four-story office building located in the heart of Ann Arbor. O|X Studio has a longstanding agreement with the building’s owner and we were tasked with design execution for three of the floors beginning in 2022. I have been part of each project from DD through closeout, gaining a comprehensive understanding of the processes and pitfalls of TI. After three years of experience working with this property manager and a variety of clients, I am the Project Manager for the Level 1 renovation due to be complete in November 2025.

LEVEL 4 (No work)

LEVEL 3

University of Michigan RossExecutive Education

Jan 2024 - Feb 2025

TI SF: 26,600

Role: Project Architect

LEVEL 2

HDR, Inc. May 2022 - Jan 2023

TI SF: 21,000

Role: Drafter

LEVEL 1

Barr Engineering

Dec 2024 - Projected Nov. 2025

TI SF: 24,700

Role: Project Manager

RFM55751813

(Accent Carpet Tile 2) Ege; Collection: Canvas Collage Collection Tiles; Pattern: Rewoven Mono

CPT-3: (Accent Carpet Tile 2) Ege; Collection: Canvas Collage Collection Tiles; Pattern: Rewoven Mono RFM55751810

PT-1: (Typical White) Sherwin Williams, SW 7005 Pure White

CSTCONCRETE SURFACE TREATMENTS

PT-2: (Open Office Accent: Warm Neutral) Sherwin Williams, SW 7043 Worldly Gray

SOUTH STATE COMMONS II

PT-3: (Office Accent: Light Blue) Sherwin Williams, SW 6249 Storm Cloud

FIN-3: Ameripolish; PG-7k Polishable Grout Coating System

CONC FIN-3: Ameripolish; PG-7k Polishable Grout Coating System

PT-4: (Conference Room and Open Office Accent; Gray) Sherwin Williams, SW 9163 Tin Lizzie

PT-5: (Accent; Dark Blue) Sherwin Williams, SW 7602 Indigo Batik

CTACERAMIC TILE - ACCESSORIES

PT-6: (Accent; Charcoal) Sherwin Williams, SW7674 Peppercorn

1/2"x1/2"

L 1 - BARR ENGINEERING

anodized, adhered

Schluter Systems; QUADEC-MBW, matte white textured color-coated aluminum for outside corner

096500 RBRESILIENT BASE

CTA-1: Schluter Systems; QUADEC-MBW, matte white textured color-coated aluminum for outside corner transitions and outside edges

and outside edges

(cove or non-cove type indicated in spec)

CPT-1

RB-1: (Typical, Charcoal) Flexco; Coved at Resilient Flooring, Straight at Carpet; 4" High; Color: 078 Umber

Collection: Granite Mountain Collection; Pattern: Rock Springs Color: Nickel

CTBCERAMIC TILE - BASE

ARKTURA SOFTGRID WAVE, SOFTSOUND ESSENTIALS WHITE

CPT-2

CTF-1/CTB-1

CTF-1/CTB-1

DEC 2024 - NOV 2025 || TENANT IMPROVEMENT

INTERFACE, GRANITE

CTW-1

CTW-1

CPT-3

CTW-2

CTW-2

RB-2: (Blue to match FWC-1 and PT-5) Flexco; Straight at Carpet; 4" High; Color: 099 Midnight Blue

Rubble Tile; Mosa; Cove base to match CTF-1; Grout color: Bostik French Gray H142

CTB-1: Rubble Tile; Mosa; Cove base to match CTF-1; Grout color: Bostik French Gray H142

CTFCERAMIC TILE - FLOOR

096500 RSFRESILIENT SHEET FLOORING

Collection: Canvas Collage Collection Tiles; Pattern: Rewoven Blue Collection: Canvas Collage Collection Tiles; Pattern: Rewoven Mono

ROLE: PROJECT MANAGER

MOUNTAIN COLLECTION, ROCK SPRING, NICKEL GNEISS

RUBBLE TILE, MOSA, TERRA MAESTRICHT, 216 ANTHRACITE

SECTOR: WORKPLACE || ANN ARBOR, MI

RUBBLE TILE, MOSA, TERRA MAESTRICHT, 216 ANTHRACITE

EGE, CANVAS COLLAGE COLLECTION TILES, REWOVEN BLUE

EGE, CANVAS COLLAGE COLLECTION TILES, REWOVEN MONO

Rubble Tile; Mosa; 12"x12" porcelain tile smooth texture (V); Terra Maestricht, 216 Anthracite; Grout Bostik French Gray H142

CTWCERAMIC TILE - WALL

CTF-1: Rubble Tile; Mosa; 12"x12" porcelain tile smooth texture (V); Terra Maestricht, 216 Anthracite; Grout color: Bostik French Gray H142

RSF-1: Forbo, Marmoleum (sheet linoleum); Pattern: Real; Color: Serene Grey

RSF-2: (Accent Sheet Linoleum); TBD pending final accent carpet specification 064000

R AND S-2: Chrome closet rod within millwork shelf

CTW-1: (Backsplash & Unisex accent wall) Daltile; Color Wheel Classic; Size: 3x6; Color: Galaxy; Finish: Glossy, Vertical Stack; Grout color: Arctic White #640

(Backsplash & Unisex accent wall) Daltile; Color Wheel Classic; Size: 3x6; Color: Galaxy; Finish: Vertical Stack; Grout color: Arctic White #640

CTW-2: (Unisex) Kate-lo Tile & Stone; Style: Subway Classics; Color: Archtic White; Size: 4" x 12"; Surface: Matte, Vertical Stack, Grout color: Arctic White #640

064000 SSFSOLID SURFACE FABRICATION

(Unisex) Kate-lo Tile & Stone; Style: Subway Classics; Color: Archtic White; Size: 4" x 12"; Surface: Vertical Stack, Grout color: Arctic White #640

SSF-1: (Single User Restrooms, Field & Safety Room) Caesarstone, 9141 Ice Snow

FWCFABRIC WALL COVERING

WALL COVERING

CPT-1

CPT-2

SSF-2: (Work Café Kitchen, Coffee, and Mother's Room) Swanstone, Night Sky

FWC-1: (Booth Back wall) Momentum; Pattern: NuFelt Manchester; Color: Navy

Looking to expand, Barr is leasing South State Commons II Level 1 for its visibility to the street, the chance to upgrade their client-facing amenities, and to have more of a connection to the outdoors. Project is currently in Construction Documents. Initial space planning completed by HGA, Barr’s design architect. As Project Manager, my responsibilities include communicating with MEP and furniture consultants, establishing and maintaining deadlines, and distributing work to three members of staff. Additionally, this is the first project at O|X which utilizes Autodesk Construction Cloud. I have taken on learning the software, teaching team members how to use it, and managing resources and uploads with consultants.

CPT-3

CTF-1/CTB-1

FWC-1

CTW-1

DALTILE, COLOR WHEEL CLASSIC, 3X6, GALAXY GLOSSY, VERTICAL STACK FWC-2

KATE-LO, SUBWAY CLASSICS, 4/12, ARCTIC WHITE, MATTE, VERTICAL STACK

KATE-LO, SUBWAY CLASSICS, 4/12, ARCTIC WHITE, MATTE, VERTICAL STACK

CTW-2

097200VWCVINYL WALL COVERING

INTERFACE, GRANITE MOUNTAIN COLLECTION, ROCK SPRING, NICKEL GNEISS

HDWRHARDWARE

HDWRHARDWARE

(Booth Back wall) Momentum; Pattern: NuFelt Manchester; Color: Navy (Mothers Room) Carnegie Xorel; Paper Backing. Pattern: Sahara Matte 6089; Color: 605

FWC-2: (Mothers Room) Carnegie Xorel; Paper Backing. Pattern: Sahara Matte 6089; Color: 605

VWC-1: Momentum; Wallcovering On Pointe Petite; AZ53596 Moondance; Type II

EGE, CANVAS COLLAGE COLLECTION TILES, REWOVEN BLUE

RUBBLE TILE, MOSA, TERRA MAESTRICHT, 216 ANTHRACITE

EGE, CANVAS COLLAGE COLLECTION TILES, REWOVEN MONO

MOMENTUM, NUFELT, MANCHESTER, NAVY

DALTILE, COLOR WHEEL CLASSIC, 3X6, GALAXY GLOSSY, VERTICAL STACK FWC-2

CARNEGIE XOREL, SAHARA MATTE 6089, 605 FWC-1

MOMENTUM, NUFELT, MANCHESTER, NAVY

DALTILE, COLOR WHEEL CLASSIC, 3X6, GALAXY GLOSSY, VERTICAL STACK

KATE-LO, SUBWAY CLASSICS, 4/12, ARCTIC WHITE, MATTE, VERTICAL STACK

OWSOPERABLE WALL SYSTEMS

OWSOPERABLE WALL SYSTEMS

Richelieu #BP5632596 900 Contemporary Metal Pull, 96mm, Matte Black Cabinet Pull

HDWR-1: Richelieu #BP5632596 900 Contemporary Metal Pull, 96mm, Matte Black Cabinet Pull

PLAMPLASTIC LAMINATE

OWS-1: (Large Conference room panel doors, manually operated) Design Intent, or Similar: Hufcor; Product: Low Profile Acoustic Glass Wall System; framed acoustical glasswall GF2 pair panel

(Large Conference room panel doors, manually operated) Design Intent, or Similar: Hufcor; Product: Profile Acoustic Glass Wall System; framed acoustical glasswall GF2 pair panel PLAMPLASTIC LAMINATE

(Kitchen/Coffee Millwork Box/Doors; Light Gray) Pionite, Mercury SG204 Suede

CTF-1/CTB-1

CTW-1

(Typical Box/Doors at all Copy/Print; Wood Grain) Formica, 00118-58 Finnish Oak 118-58, Matte

PLAM-1: (Kitchen/Coffee Millwork Box/Doors; Light Gray) Pionite, Mercury SG204 Suede PLAM-2: (Typical Box/Doors at all Copy/Print; Wood Grain) Formica, 00118-58 Finnish Oak 118-58, Matte Finish

FWC-1

CTW-2

PLAM-1

PLAM-1

FWC-2

(Typical Countertop at all Copy/Print; Dark Gray) Formica, ColorCore 2, 912C-58 Storm, Matte

RUBBLE TILE, MOSA, TERRA MAESTRICHT, 216 ANTHRACITE

DALTILE, COLOR WHEEL CLASSIC, 3X6, GALAXY GLOSSY, VERTICAL STACK AST-1

PLAM-3: (Typical Countertop at all Copy/Print; Dark Gray) Formica, ColorCore 2, 912C-58 Storm, Matte Finish

TILES, REWOVEN MONO

(codes followed by "KD" on drawings require knock-down finish, SDC-5) (Typical White) Sherwin Williams, SW 7005 Pure White

PTPAINT (codes followed by "KD" on drawings require knock-down finish, SDC-5)

PT-1: (Typical White) Sherwin Williams, SW 7005 Pure White PT-2: (Open Office Accent: Warm Neutral) Sherwin Williams, SW 7043 Worldly Gray PT-3: (Office Accent: Light Blue) Sherwin Williams, SW 6249 Storm Cloud

PT-5: (Accent; Dark Blue) Sherwin Williams, SW 7602 Indigo Batik

MOMENTUM, NUFELT, MANCHESTER, NAVY

KATE-LO, SUBWAY CLASSICS, 4/12, ARCTIC WHITE, MATTE, VERTICAL STACK

PIONITE, MERCURY SG204 SUEDE

PIONITE, MERCURY SG204 SUEDE

CARNEGIE XOREL, SAHARA MATTE 6089, 605

PT-4: (Conference Room and Open Office Accent; Gray) Sherwin Williams, SW 9163 Tin Lizzie

PT-6: (Accent; Charcoal) Sherwin Williams, SW7674 Peppercorn

(Open Office Accent: Warm Neutral) Sherwin Williams, SW 7043 Worldly Gray (Office Accent: Light Blue) Sherwin Williams, SW 6249 Storm Cloud (Conference Room and Open Office Accent; Gray) Sherwin Williams, SW 9163 Tin Lizzie (Accent; Dark Blue) Sherwin Williams, SW 7602 Indigo Batik (Accent; Charcoal) Sherwin Williams, SW7674 Peppercorn

RBRESILIENT BASE

BASE

or non-cove type indicated in spec)

(Typical, Charcoal) Flexco; Coved at Resilient Flooring, Straight at Carpet; 4" High; Color: 078 Umber

RB-2: (Blue to match FWC-1 and PT-5) Flexco; Straight at Carpet; 4" High; Color: 099 Midnight Blue

non-cove type indicated in spec) (Typical, Charcoal) Flexco; Coved at Resilient Flooring, Straight at Carpet; 4" High; Color: 078 Umber (Blue to match FWC-1 and PT-5) Flexco; Straight at Carpet; 4" High; Color: 099 Midnight Blue

MOMENTUM, NUFELT, MANCHESTER,

SHEET FLOORING

Forbo, Marmoleum (sheet linoleum);

CARNEGIE XOREL, SAHARA MATTE 6089, 605

smooth
(V); Terra Maestricht, 216 Anthracite; Grout wall) Daltile; Color Wheel Classic; Size: 3x6; Color: Galaxy; Finish:
White #640
Style: Subway Classics; Color: Archtic White; Size: 4" x 12"; Surface: White #640
Pattern: NuFelt Manchester; Color: Navy Xorel; Paper Backing. Pattern: Sahara Matte 6089; Color: 605
Metal Pull, 96mm, Matte Black Cabinet Pull

SOUTH STATE COMMONS II

L 1 - BARR ENGINEERING

ENLARGED PLANS AND ELEVATIONS

F2Work

P19SK-1,

P20SK-2,

P21LAV-1,

P22WC-1, ADA Water Closet.

P23SH-1,

SOUTH STATE COMMONS II

L 3 - ROSS EXEC. ED.

JAN 2024 - FEB 2025 || TENANT IMPROVEMENT

SECTOR: WORKPLACE || ANN ARBOR, MI

ROLE: PROJECT ARCHITECT

Tenant improvement renovation for the Ross School of Business’ Executive Education Program. Considered a temporary lease, this project involved extensive examination of existing conditions and considerations for what could be salvaged and reused in the space. O|X took over in Design Development with initial space planning completed by the University of Michigan’s architect. My responsibilities included DD drafting, CDs including power/data/switching, Construction Admin / submittal review, and Project Manager takeover from October 2024 through project completion.

ITEMS SALVAGED, COORDINATED, RELOCATED

• Lighting salvaged and relamped

• Portions of ceiling grid

• Certain doors and hardware

• Custom felt panel divider from prev. tenant

• Acoustic ceiling tectum panels and corresponding lighting

• Servery equipment relocated and reused

RENDERINGS BY ELLISON

Matrix Hanging Space Divider

ORBITFORM OFFICES

JAN 2022 - SEPT 2022 || RENOVATION

SECTOR: WORKPLACE || JACKSON, MI

ROLE: DRAFTER

Orbitform, a metal fastenings manufacturing company, reached out to O|X in need of an office space refresh. We worked with the client from pre-design through construction documents and CA. From the initial space planning to finish selection to renovation detailing, Orbitform’s new office space now reflects the modern innovations they create in their workshop. The Orbitform drawing set has become a Reference Set for the O|X Office as an exemplary precedent for office renovation work. My responsibilities included initial space planning, rendering assistance, and drafting in DD and CDs.

ORBITFORM OFFICES ELEVATIONS AND FINAL PHOTOS

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.