MOHAMMED H ALYAWAR
PORTFOLIO
TABLE OF CONTENT GRADUATION PROJECT: (Restaurants Hub) (Develop Masharef District) (Commercial Complex Facade) (Holiday House,Villa Facade) (Row House) STUDIO 7: COMPETITION: INTERNSHIP PROJECTS: STUDIO 3: WORKING DRAWING 01 02 DR. TARIQ ALHABIB CASTEL: (FACADE AND LANDCAPE) (FACADE AND LANDCAPE) (FACADE DESIGN) VILLA (1) DESIGN: 01 02 VILLA (2) DESIGN: 03 03 04 05 06 PROFESSIONAL PROJECT ACADEMIC PROJECT
PERSONAL INFORMATION
Name: Mohammed Hatem Alyawar
Date of Birth: 06/18/1995 Nationality: Saudi Martial Status: Single
CONTACT
Address: Obhur-alshamaliyah Jeddah City, Saudi Arabia Email: m7mmdyawar@gmail.com cell: +966566606695
BUSINESS SKILLS
- leadership. - Responsible. - Adaptable. - Initiative. - Communication skills. - Teamwork.
- Achieving under work pressure.
TECHNICAL SKILLS
- Revit.
- Auto Cad. - Lumion.
- Illustrator.
- Photoshop.
LANGUAGE
- Microsoft office. - Arabic (Native) - English (Advanced)
Bachelor of Architecture , King Abdulaziz University Jeddah ,sa.
(2022 II GPA: 3.40/5.00)
High School Certificate - Almajd Private School Jeddah ,sa.
( GPA: 97.00%) ( 2016)
EDUCATION EXPERIENCE
English Language Diploma - Loyola University Chicago, usa.
Intensive English Course - Kaplan Language School Chicago, usa.
( 2015)
Architect in Asdaf Real-Estate Company
(THREE MONTHS, 2022)
-Performing routine of architectural , interior design , and landcape.
-Preparing and presenting design proposal for the proposed project..
-Performing and designing by using diffierent programs (AutoCad, Revit, Lumion , illustrator)
Internship in rwaseem consultant office (RWASEEM)
(TWO MONTHS, 2022)
-Performing routine of architectural , interior design , and landcape.
-Monitoring, inspecting, and measuring for the proposed project.
-Preparing and presenting design proposal for the proposed project.
-Preparing Scope of works, scheduling and coasting.
-Working independently under limited direction o proposed assignement project.
-Performing and designing by using diffierent programs (AutoCad, Revit, Lumion , illustrator)
Internship in tya office & associates (TYA OFFICE)
(TWO MONTHS, 2020)
-Performing routine of architectural , interior design , and landcape.
-Preparing and presenting design proposal for the proposed project.
-Working independently under limited direction o proposed assignement project.
-Performing and designing by using diffierent programs (AutoCad, Revit, Lumion , illustrator)
Volunteer at the quality and development department at king abdulaziz university
(THREE MONTHS, 2018)
-Preparing Scope of works, scheduling and coasting.
-Working independently under limited direction o proposed assignement project.
-Performing and designing by using diffierent programs (AutoCad, Revit, Lumion , illustrator)
Volunteer at Formula 1Jeddah ,sa. As a product manger in Entrecôte Relais De Paris
( 2022)
Competing in tya office For a Facade Design Of Complex(2020)
-LEAD A PROJECT FACE OF OUTPATIEN CLINICS, HOSPITAL , HOTEL , AND GYM.
Competing in the college exhibition, MARSAM 1 (2017)
-Project selected to be on the competition of college gallery
Competing in the college exhibition, MARSAM 2 (2018)
-Project selected to be on the competition of college gallery
COMPETITION AND EXHIBITIONS COURSES
Saudi Umran Courses:
- How to use Revit
- How to use lumion
- How to use illustrator
C.V
ARCHITECT
MOHAMMED ALYAWAR
ACADEMIC PROJECTS
Develop Masharef District
(STUDIO 7)
Project Brief : 01.0
Urban Design : is the art of making safe, comfortable and inviting places for people. It includes the way places look, work and feel. Urban design includes the connections between places and buildings; the character of the built environment and the processes used for ensuring successful villages, towns and cities.
(Graduation
(Studio 7)
DEVELOP MASHAREF DISTRICT
Project)
In general, there are many problems that exist in the neighborhoods of the Kingdom of Saudi Arabia that hinder and limit the process of feeling satisfied and belonging to this small community and the lack of services needed by the individual and society and wrong planning for these ser-vices in several aspects:
Such as: Quality architecture design, gatherings, lack of green spaces and lack of housing diversi-ty in the area and the high prices of land ownership and residential rents in areas that do not deserve the material and moral value of the individual and society they did not apply the concept of neighbor-hood, which is the most important point in which social ties and social convergence . Concept
Problem Statement PROJECT GUIDELINES
APPROACH PROCESS - STUDIES
01.0
Lore GENERAL RESEARCH URBAN D E S I G N FOUCUS RESEARCH URBAN D E S I G N C A S E S T U D I E S URBAN D E S I G N S T E A N A L Y S I S URBAN D E S I G N School 20 % 60 % 100 % 40 % 80 % OUT LET URBAN D E S I G N
DESIGN DEVELOPMENT Variety of uses Hotel Increasing green spaces and creating new spaces Creating walking spaces as well as bicycle paths Diversity of housing Intersection Geometry We Have To Increase The Safety In The Neighborhood And To Increase It We Must Create More (T) Shape Intersections To Control Speed In The Area Street Section Design Streets Width Range From 7m To 16m And Consist Of Three Main Zones: 1 - Walking Zone 2 - Aminety Zone 3 - Vehicles Zone 2 3 Cycling Bicycle Lane Width Range From 1.5m To 3m And We Have To Craete Lanes In Each Street To Improve Transportation And Provide Bicycle Parking In Each Resedential Block & Public Areas Public Transport From The Goals We Wanted To Achieve Is To Decrease The Car Movement In The Neighborhood Thats So We Have To Increase Public Transportation And Create Taxi Station And Bus Station Near Public Areas & Mixed Use Building 6 7 Network Connictivity To Improve Connictivity In The Neighborhood We Have To Create Shortcuts Such As Pedestrian Crosswalks & Alleys To Decrease Walking Distance And Improve Walkability 1 Alleys To Improve Walkabilty We Have To Create More Alleys Between The Resedential Blocks And Between Mixed Use Building And To Improve The Connictivity Between The Front Yard And The Back Yard 5 Mixed use Mixed use 7.00 m 7.00 m 7.00 m1.20 m 1.20 m 1.2m 7.00 m 3.50 m 3.50 2.00 m7.00 m 7.00 m 3.50 m 3.50 7.00 m 1.20 m 1 2 1 2 Mixed use Mixed use Parking Area 4 As We Know Form The Analysis That The Avarege Of Cars To Each Family Is (1.38) Car And To Provide Car Parking We Must Create Basement Parking To Provide As Many Parking Lots In The Area
NEIGHBORHOOD CONCEPT DEVELOPEMENT STAGE 2 STAGE 3 STAGE 2 LAND USES Commercial and offices Types of villas Community centre and schools Residential commercial The work of a joint community center between neighboring neighborhoods in the area to enhance the social environment in the neighborhood Creating two residential areas, a somewhat isolated area, in addition to a common one with a commercial area, and increasing housing options in the neighborhood. In addition to a commercial office building to enhance the economic environment in the region LAND USES Buffer area Buffer area as park A separation area between the residential and commercial residential area Where people entertain themselves away from commercial places Supported with multiple entertainment options as well as multiple activities options such as sitting, walking, exercising and playing Making plaza Create an open space and views of buildings, shops and plazas to enhance the social life of the neighborhood Torrent stream as plaza Public space Public space
SITE PLAN
ISOMETRIC
02.0
SECTION
PRESPECTIVES
PRESPECTIVES
PRESPECTIVES
GRADUATION PROJECT (Restaurants Hub)
(Graduation Project)
Project Brief : 01.0
RESTAURANTS HUB
The main objective of this project is to develop the technical foundations and skills to create individual designs of cultural and entertainment centers with clearly defined image charac-teristics, and an ideal functional and structural improve-ment in the architectural environment.
(Graduation Project)
Problem Statement
- Less places that offer a retail hub and other activities in a vertical building
- Less places that offer a multi uses With the application of some sustainability criteria.
- People have diffirenet opinions about choosing restaurants or a place to visit .
Concept
The design idea came from getting people buildings to a new shape that gives the feeling of an open area by disassembling floor shapes, to terraces and to give the users The Feeling of Freedom .
01.0
DESIGN STRATEGIES
Human comfort Beautiful surroundings Aesthetics Human scale Sence of place New Type of Retail
“FREEDOM” LESS WALLS VIEWS FOR EACH T Green Partions Space-Within-A-Space Paths of Travel Different levels Less Obstacles Terraces Plaza Court Yards Creat Fun Environment VISUAL CONNECTION ENVIROMENTAL CONNECTION Glass Facades Different Levels More Terraces Scale and Proprtion Comfort Well - Being Native Plants Exotic Plants 1 1.1 1.2 1.3 2.1 2.2 2.3 3.1 3.2 3.3 4.1 4.2 4.3 5.1 5.2 5.3 6.1 6.2 2 3 4
GOALS
DESIGN DEVELOPMENT PHASE 1 PHASE 2 PHASE 4 PHASE 3 02.0 14.454m 171m 3 m 84m
SITE PLAN
N
GROUND FLOOR N 1 - Entrance 3 - Cinema Lobby 5 - Coffe Shop 7 - Restaurant 9 - Storage 11 - Terrace 13 - Rest Room 15 - koshk Circulation 2 - Fast Food Restaurant 4 - ENTRANCE 6 - Services 8 - Plaza 10 - Kitchen 12 - Indoor Seating 14 - Offices 1 2 2 3 4 15 13 13 14 13 13 14 5 10 10 10 10 9 10 9 10 9 10 9 9 9 9 9 10 9 10 10 11 12 12 13 13 14 14 10 5 5 5 5 5 6 6 7 7 8 - 1.20 9 9 0.0 0.0 0.40
FIRST FLOOR SECONED FLOOR 1 2 2 4 4 7 8 9 10 6 6 7 3 N N 3 4 4 4 8 10 11 11 7 8 1 1 4 4 11 5.00 5.00 5.00 5 - Storage 1 - Restaurant 7 - Kitchen 3 - Terrace 4 - Rest Room Circulation 6 - Services 8 - Cold room 10 - Staff room 2 - Indoor Seating 15 - Storage 11 - Restaurant 17 - Kitchen 19 - Office 21 - Bridge 13 - Terrace 14 - Rest Room 16 - Services 18 - Cold room 20 - Staff room 12 - Indoor Seating 1 10 6 12 12 4 8 9 6 10 6 12 11 11 2 5 3 7 4 8 0.00 5.20 5.20 3.40 0.00 1 - Lobby 3 - Snack bar 5 - Staff room 7 - Mech room 9 - Cleaning room 11 - Storage 12 - Back stage 2 - Ticket area 4 - Control room 6 - Show room 8 - Rest room 10 - Check point
SOUTH ELEVATION
NORTH ELEVATION
SECTION
Parking Lvl -3.00 GROND FL Lvl 0.00 Second Lvl 4.00 Third Lvl 5.00 Sec Top Lvl 9.00 Third Top Lvl 10.00
COMPETITION: (INTERNSHIP) (Commercial
Complex Facade)
Problem Statement
Building façades play an important role in building aesthetics and in protecting the structural system and contents from deterioration due to exposure to an aggressive environment. Well-designed façades can also help improve the durability and energy efficiency of the building as well as elevating the level of human comfort. In general, façade design and detailing have not received the same level of rigor and overall scrutiny as the load-bearing components of buildings.
Concept
A honeycomb inspired the hexagonal shape on the facade and this shape allows a better solution for planes and curves situation. The coating was used in some moments in an opaque way and in others as semi-translucent, evoking movement between straight and curved angles. At the same time, shaping the openings sometimes explicit like in the main window and it alludes itself more discretely at times to incite visitation.
GROSHOPPER TOOL (RHINO)
HEXAGONAL LADYBUG TOOL
SITE PLAN
BOX VOID FINAL
HOSPITAL HOTEL GYM
OUTPATIENT CLINIC
In general, there are many problems that exist in the neighborhoods of the Kingdom of Saudi Arabia that hinder and limit the process of feeling satisfied and belonging to this small community and the lack of services needed by the individual and society and wrong planning for these ser-vices in several aspects:
Such as: Quality architecture design, gatherings, lack of green spaces and lack of housing diversi-ty in the area and the high prices of land ownership and residential rents in areas that do not deserve the material and moral value of the individual and society they did not apply the concept of neighbor-hood, which is the most important point in which social ties and social convergence . Concept
Problem Statement PROJECT GUIDELINES
01.0
Lore GENERAL RESEARCH URBAN D E S I G N FOUCUS RESEARCH URBAN D E S I G N C A S E S T U D E S URBAN D E S I G N S T E A N A L Y S S URBAN D E S I G N 20 % 60 % 100 % 40 % 80 % OUT LET URBAN D E S G N APPROACH PROCESS
DESIGN DEVELOPMENT Variety of uses Hotel Increasing green spaces and creating new spaces Creating walking spaces as well as bicycle paths Diversity of housing Intersection Geometry We Have To Increase The Safety In The Neighborhood And To Increase It We Must Create More (T) Shape Intersections To Control Speed In The Area Street Section Design Streets Width Range From 7m To 16m And Consist Of Three Main Zones: 1 - Walking Zone 2 - Aminety Zone 3 - Vehicles Zone 2 3 Cycling Bicycle Lane Width Range From 1.5m To 3m And We Have To Craete Lanes In Each Street To Improve Transportation And Provide Bicycle Parking In Each Resedential Block & Public Areas Public Transport From The Goals We Wanted To Achieve Is To Decrease The Car Movement In The Neighborhood Thats So We Have To Increase Public Transportation And Create Taxi Station And Bus Station Near Public Areas & Mixed Use Building 6 7 Network Connictivity To Improve Connictivity In The Neighborhood We Have To Create Shortcuts Such As Pedestrian Crosswalks & Alleys To Decrease Walking Distance And Improve Walkability 1 Alleys To Improve Walkabilty We Have To Create More Alleys Between The Resedential Blocks And Between Mixed Use Building And To Improve The Connictivity Between The Front Yard And The Back Yard 5 Mixed 7.00 m 7.00 m 7.00 m1.20 m 1.20 m 1.2m 7.00 m 3.50 3.50 m 2.00 m7.00 m 7.00 m 3.50 m 3.50 7.00 m 1.20 m 1 2 1 2 Mixed use Mixed use Parking Area 4 As We Know Form The Analysis That The Avarege Of Cars To Each Family Is (1.38) Car And To Provide Car Parking We Must Create Basement Parking To Provide As Many Parking Lots In The Area
- STUDIES
PRESPECTIVES
PRESPECTIVES
PRESPECTIVES
(Graduation
(STUDIO 3)
Project) ROW HOUSE
ROW HOUSE
The project is a Row house design for a typical Saudi family to accommodate their daily activities such as living, studying, cooking and sleeping. The project should have room for at least five family members, space efficiency is essential here as the lack of bulit up area should not compromise the quality and function of the space.
(STUDIO 3 )
Project
The project is a row house design for a typical Saudi family to accommodate their daily activities such as living, studying, cooking and sleeping.
ISOMETRIC
04.0
Description SECTON - AA
The project should have room for at least five family members, space efficiency is essential here as the lack of bulit up area should not compromise the quality and function of the space.
SITE
Land Area 20.00m x 25.00m (500sqm) which will have 3 row houses 06.60m x 25.00m (165sqm) Concept
PLAN
Natural Light
4.00 m 5.95 m 25.00 m
5.20 m 3.60 m 2.25 m 1.20 m
2.45 m 4.75 m 1.00 m
+
1.80 m
3.70
2.50
3.60
2.20
2.15
3.10 m 25.00 m
2.25
1.45
1.50
25.00
3.40
4.75
3.60
2.50
PLANS Ground floor plan Ground floor plan Ground floor plan 3.00 m
6.50 m
2.95 m
1.45 m 1.20 m
0.15 4.20 m 2.10 m
4.80 m 1.50 m
m
m
m
m
m
2.95 m 2.90 m
m
m 4.75 m 6.50 m
m 3.70 m
m 4.75 m 3.00 m
m
m
m
m 2.25 m 20.00 25.00 Neighbor Neighbor
(Graduation Project) HOLIDAY HOUSE (INTERNSHIP)
Project Brief : 05.0
HOLIDAY HOUSE
Holiday House represents a different approach to space. By day, during a holiday, people tend to spend more time together and there’s less need for private spaces.
(INTERNSHIP )
Project Description
is accommodation used for holiday vacations, corporate travel, and temporary housing often for less than 30 days. Such properties are typically small homes, such as cottages, that travelers can rent and enjoy as if it were their own home for the duration of their stay.
Concept
The client wished for a contemporary living experience that is blended into the surrounding landscape The result is a surprising habitat that reflects the way the family lives incorporating design quality, sustainability and functionality in everyday life . The L-House is an avant-garde architectural gem that merges the needs of it’s residents with the environment. L-Form
05.0
SITE PLAN
PLAN 10 m 5 m 3 m 21 m 2 m 2 m 5 m 3 m 2 m 2 m 4 m 4 m 4 m 3 m 4 m 2 m 6 m 10 m 2 m 7 m 2 m 3 m 2 m 2 m 3 m 5 m 2 m 6 m 2 m 2 m 3 m 3 m 3 m 2 m 9 m 2 m 1 m 5 m PARKING
ISOMETRIC
PRESPECTIVES
WORKING DRAWINGS 06.0 GF FF ROOF 0.00 1.20 2.26 4.15 3.30
WORKING DRAWINGS
06.0
GF FF ROOF
PROFESSIONAL PROJECTS
This section containts three selected projects designed in a Real-estate company. Which are Resedential Realistic Projects and Realistic clients.
Villa Design (FACADE DESIGN)
01
Villa Design (FULL DESIGN) 02
03
DR. TARIQ ALHABIB CASTLE (FACADE AND LANDCAPE)
MOHAMMED H ALYAWAR PORTFOLIO Email: m7mmdyawar@gmail.com cell: +966566606695