My name is Moustafa Hassan, my colleagues often refer to me as Huss. Throughout my educational journey, I have developed the skills and knowledge I need to set goals. The main goal I have is to design and create something remarkable in order to leave my footprint as a respectable, determined and hardworking individual who is always looking at new ways to challenge myself.

1

MOODY MOON PAGE 3-12 OYSTER PAGE 13-20 KOONOOWAARA

WORKING DRAWINGS

OYSTER PAGE 29-32

TYPE C PAGE 33-36

TRIANGLE HOUSE PAGE 37-42

2 CONTENTS
ECOOLOGY
55.00 79° 00' 00" 40.00 m 79° 00" Existing 7m high commercial building Concrete Carpark Driveway Vehicle engineer's Proposed Warehouse 7.78m high Site Boundary Proposed Office 5.16m high Existing 7.5m high commercial building WP Existing 3.5m high commercial building Existing 3.5m high commercial building CHECKED DATE PHONE EMAIL CONSTRUCTION 200 SITE & ROOF PLAN 450010 TYPE -C 13/11/2020 Author Checker A002 200 SITE PLAN & ROOF PLAN LEGEND BG BGS BH BOL BR COL CRD DP DW EL FED FHR FRD GB HLW HW LCK LPD MC MR REF RWH SC SF SL SS SWP VB VRC WC WT Box Gutter Box Gutter Sump Bulkhead Bollard Bike Rack Steel Column Commercial Roller Door Down Pipe Dishwasher Space Exterior Light Fire Escape Door Fire Hose Reel Fire Rated Door Garden Bed Highlight Window Habitable Window Lockers Legal Point Discharge Metal Capping Metal Roof Refridgerator Space Rainwater Head Saw Cut Strip Footing Skylight Shower Seat Stormwater Pipe Ventilated Ridge Cap Vanity Basin Toilet Water Tank FFL 0.00 Top Finished Floor Level SFL 0.00 Top Structural Floor Level NewSewer Pipe Datum Level (0.00 denotes Stormwater Drainage EX1 Exiting car space be retained DM1 Exiting car space be demolished EX2 Exiting Tree be DM2 Exiting tree DM3 Exiting curb to NOTES THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL DRAWINGS/DETAILS AND WITH ANY OTHER WRITTEN INSTRUCTIONS ISSUED IN THE COURSE OF THE CONTRACT. ALL DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALE. THE BUILDER AND SUBCONTRACTOR SHALL ENSURE THAT ALL STORMWATER DRAINS, SEWER PIPES AND THE LIKE ARE LOCATED AT SUFFICIENT DISTANCE FROM ANY BUILDINGS FOOTING AND/OR SLAB EDGE BEAMS SO AS TO PREVENT GENERAL MOISTURE PENETRATION, DAMPNESS, WEAKENING AND UNDERMINING OF ANY BUILDING AND ITS FOOTING SYSTEM. THE BUILDER AND SUBCONTRACTORS SHALL CHECK AND VERIFY ALL DIMENSIONS, SETBACKS, LEVELS AND SPECIFICATIONS AND OTHER RELEVANT DOCUMENTATION PRIOR TO THE COMMENCEMENT OF ANY WORKS. REPORT ALL DISCREPANCIES TO THIS OFFICE FOR CLARIFICATION. THE BUILDER SHALL TAKE ALL STEPS NECESSARY TO ENSURE THE STABILITY AND GENERAL WATER TIGHTNESS OF ALL NEW AND/OR EXISTING STRUCTURES DURINGALL WORKS. CONSTRUCTION, PAVING AND LANDSCAPING. EXCAVATE FOR FOOTINGS AND SERVICE TRENCHES TO GIVE CORRECT DIMENSIONS SLABS AND FOOTINGS AND ALL CONCRETING MUST BE PREPARD AND POURED IN ACCORDANCE WITH AS 3600 CONCRETE STRUCTURES AND AS 3610 FORM WORK FOR CONCRETE ALL FALLS CONRETE MUST BE AT MINIMUM SLOPE OF 1:200 ALL METAL CLADDING AND ITS INSTALLATION TO COMPLY WITH AUSTRALIAN STANDARD AS: 1562 DESIGN AND INSTALLATION OF SHEET ROOF AND WALL CLADDING ALL PLUMBING TO COMPLY WITH AUSTRALIAN STANDARD: AS/NZ 3500 NATIONAL PLUMBING AND DRAINAGE CODE. CONDUTC ALL NEGOTIATIONS, OBTAIN ALL APPROVALS AND PAY ALL FEES AND CHANGES DUE TO CONTROLLING AUTHORITIES. PROVIDE MIN. 90mmØ DOWN PIPES AT 12M CENTRES TO THE OFFICE BUILDING. EXPOSED DOWNPIPES TO BE ZINCALUME OR SELECTED COLOURBOND FINISH. PROVIDE 200mmØ DOWN PIPES FOR WAREHOUSE PROVIDE 400mmØ HEAVY DUTY pvc DRAIN WITH MIN. 1:100 FALL WHERE AUSTRALIAN STANDARDS ARE REFERENCED, COMPLY WITH RELEVANT PROVISIONS OF THE APPLICABLE CURRENT EDITION AS PRESCRIBED IN THE BUILDING CODE OF AUSTRALIA AND APPLICABLE WHEN THE BUILDING PERMIT ISSUED. PARKING STRIPE, STOPPER 525mm FROM BACK EDGE DENOTES PARKING BAY NUMBER 2900W 5400L PARKING SPACE PARKING STRIPE, 150mm WHEEL STOPPER 525mm FROM BACK EDGE. 2400W SHARED ZONE ADJACENT TO A DWELLING DEAKIN ROAD DEAKIN ROAD DECKING SYMBOLS NOTES PHONE CONSTRUCTION H As indicated SITE PLAN 00002 OZ HOMES 16/05/2023 M.HASSAN MICHEAL/MATT A0.01 Site Plan A
CENTRE PAGE 21-27
DESGIN

THE MOODY MOON

My design intent was to create a modernized architecture that will standout but also act as a superb structure for the community. This design will enable the community to come together, live, work and play in harmony. Further this structure will minimize the impact upon the environment. My concept and design thinking were based around a brutalist design, to take the characteristics of raw materials and unusual shapes to create a modern twist.

The design will promote a sense of place and community by providing many opportunities to create and interact with the spaces from within and outside of the community .

3
The site is located in Geelong corner of Moorabool st and Little Ryrie st. MOORABOOL ST LITTLE RYRIE ST LITTLE RYRIE ST BAYLIE PL BAYLIE PL
4 1 2 3 4 5 1 Site 2 University Hospital Geelong 3 The Gordon Geelong City Campus 4 Geelong Train Station 5 Deakin University Geelong Waterfront Campus
5 level 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 16 18 19 20 21 22 23 1. 201 dwell 2. 202 dwell 3. 203 dwell 4. 204 dwell 5. 205 dwell 6. 206 dwell 7. 207 dwell 8. 208 dwell 9. 209 dwell 10. 210 dwell 11. balcony 12. balcony 13. balcony 14. balcony 15. balcony 16. balcony 17. balcony 18. balcony 19. balcony 20. balcony 21. storage 22. fire stairs 23. lift level 1 1 1 1 11 15 14 3 2 4 5 6 16 17 8 9 10 7 7 12 13 1. Social area 2. video room 3. video room 4. Conference room 5. conference room 6. dark room 7. functional work area 8. open work area 9. studio 10. studio storage 11. lecture 12. stairs 13. stairs 14. female toilet 15. male toilet 16. lift 17. fire stairs 1. Reception 2. exhibit 3. library 4. learning area 5. library reception 6. storage 7. male toilet 8. female toilet 9. exhibit storage 10. stairs 11. stairs 12. lift 13. fire stairs ground floor 5 3 1 6 7 8 10 9 2 13 12 4 11
SOCAIL AREA VIDEO ROOM VIDEO ROOM CONF ROOM CONF ROOM OPEN WORK AREA FUNCTIONAL WORK AREA FUNCTIONAL WORK AREA DARK ROOM STUDIO MALE TOILET FEMALE TOILET LECTURE ROOM VIOD SOCAIL AREA SOCAIL AREA 6

This building encourages technological advancement, but aslo keeping in touch with historical backround and surroundings.

The building aims to symbolise a modern but also minimalist theme with its from and shape.

Connections between spaces and understanding how the building flowed was a very important factor in my design proccess. Once I figured out the building spaces, I focused on the size of my spaces, and how they flow with each other.

Here is where i began my journey to create a building that can bring the comminity toegther vissualy and spiritually. I aimed to do this by creating multipule diagrams and experimenting with the spaces.

final concepet of the building.

The roof folds into the first level creating a balcony for the residence and also creating a spectacular shape to the building.

Understanding building flow and relation to room spaces.

Main typology of the community hub. building with a rectangular shape.

7
8
9
10

ENTRANCE functional work area

11

THE MODEL

this model SHOWcases the raw materials, unusual roof shape and the relation with the design spaces and how they interact with each other.

12

THE oYSTER

My design intent was to CREATE a building that will bring the community together with its remarkable architecture but to also be appropriate for the working people and permanent residence. this design will enable the public to connect with no discordance with one another and to create a safe haven for all.

Final concept of the oyster. Adding colour and matertial to client specifications and budget.

Adding entrances and spaces to the building. Adjusing heights to the needs of the client and the experience of spaces.

Organising the building levels and placement.

13
14
15
apartment - ensuite bathroom apartment - kitchen
STREET
BURKE
MOUNT
MOUNT STREET BURKE ROAD
ROAD
DEAN STREET
16
MOUNT ALBERT STREET
17 1. appartment 1 2. kitchen 3. walk in pantry 4. service area 5. balcony 6. powder room 7. bedroom 3 8. walk in wardrobe 9. bedroom 4 10. walk in wardrobe 11. open dining 12. living room FIRST FLOOR 1. service area 2. main office 3. conference room 4. drafting office 5. office 2 6. breakroom 1 7. breakroom 2 8. office 3 9. office 2 10. document safe 11. main office 12. conference 13. reception 14. female w/c 15. male w/c 16. disabled w/c 17. storage 18. cold room ground floor 1. SERVICE AREA 2. PLANT ROOM 3. LIFT 4. STAIRS 5. STAIRS 6. BICYCLE PArking 7. waste area 8. storage area 9. storage area BASEMENT 1 2 3 4 6 7 5 8 9 1 25 24 13 2 3 4 6 7 5 8 12 9 10 11 14 15 16 17 18 19 21 20 22 23 19. green grocer 20. stairs 21. kitchen 22. storage 23. cafe 24. stairs 25. lift 4 3 2 5 10 11 9 6 7 13 12 16 15 17 20 14 8 19 21 22 23 13. study room 14. bathroom 15. laundry 16. master bedroom 17. walk in wardrobe 18. ensuite 19. bedroom 2 20. walk in wardrobe 21. ensuite 22. lobby 23. stairs 24. lift apartment 1 & 2 1 18 24
18
19
20

koonoowaara ecology centre

My design intent was to create a modernized architecture that will standout but also act as a superb structure for the community. This design will enable the community to come together, live, work and play in harmony. Further this structure will minimize the impact upon the environment. My concept and design thinking were based around a brutalist design, to take the characteristics of raw materials and unusual shapes to create a modern twist.

The design will promote a sense of place and community by providing many opportunities to create and interact with the spaces from within and outside of the community .

bellarine hwy bellarine hwy SITE PLAN 1 2 3 4 5 6 7 8 BELLARINE HWY BELLARINE HWY BELLARINEHWY 9 10 SWAN BAY BIKE PATH BIKEPATH RAIL WAY RAIL WAY RAIL WAY 21

MASTER PLAN

22 3 2 1
1. SITE 2. MARINE AND FRESHWATER DISCOVERY CENTRE 3. YMCA CAMP WYUNA

TARAZED FLOOR PLAN

the Tarazed building is the main recreational area of the site. i have carried through the organic shapes into the tarazed building and included a circular stage in the lecture spaces to create a less impactful construction design.

12 9 10 1 11 8 6 5 4 3 2 7
1. ENTRY 2. OFFICE 1 3. OFFICE 2 4. MEETING ROOM 9. ACC-WC MALE 10. ACC-WC FEMALE 11. WORKSHOP STORAGE ROOM 12. WORKSHOP 13. CORRIDOR 5. AUDITORIUM 1 6. STORAGE ROOM 1 7. STORAGE ROOM 2 8. AUDITORIUM 2 23

ALSHAIN HUTS FLOOR PLAN

I have carefully considered the layout so the view of swan bay is obtained and the environment is complimented by the HUTS. the wadawurrung symbol has been highlighted in the landscaping for the yarning circle. the shape of the HUTS HAVE been SPREADED around THE SITE. THE shapes OF THE HUTS SYMBOLIZES THE swans WINGS AND THE DIFFERENT SIZES ARE SMALLER SWANS TRAVELING IN A GROUP.

1 2 11 13 12 10 14 9 7 8 6 4 3 5
1. ENTRANCE 2. RECEPTION 3. STAFF OFFICE 4. STAFF LUNCH ROOM 5. CAFE 6. OUTSIDE SEATING 7. READING NOOK 8. ACC MALE BATHROOM 9. ACC FEMALE BATHROOM 10.READING NOOK 11.RECLAIMED WETLAND 12. LIBRARY 13. BIRD WATCHING HUT 14. YARNING CIRCLE 24

PASSIVE DESIGN STRATEGIES

the eaves are a minumem length of 1m as a passive design strategy for the north side of the building and huts both create a connection to the vfa building and shade the windows and allow the building to regulate its temperature effectively. Night purging is a method used in construction that allows a room within a building or a whole building itself to be pre-cooled during the night, allowing the area to remain cool during the following day. The second facade was made up of locally sourced logs and blocks out noise from the busy main roads near the site’s location Queenscliff is in an area that is affected by mainly South Easterly winds, so to combat the effects of these winds, trees were placed along the South of the building. Triple glazed windows and trees and façade were also used to block out noise

EAST ELEVATION SECTION A-A SECTION B-B

ISOMETRIC VIEW

I have highlighted the major surrounding buildings THAT I think are THE MOST important for the overall context of MY building and the proposed site. the local

DETAILED SECTION

the elevation is the best view to appreciate the different shapes incorporated into the roof but also the passive design in the huts.

SOUTH ELEVATION WEST ELEVATION SUMMER SUN WINTER SUN HEAT CROSS VENTILATION FROM COOL BREEZE NORTH ELEVATION
26

RECEPTION VIEW

AUDITORIUM VIEW

CONCLUSION

In MY journey, i decided to create a design that not just blends with the surroundings but also appears to be hidden in the environment. by having one main building and smaller huts i get to achieve the design i wanted. i also wanted to incorporate a contrast of color and explore different types of materials that are both sustainable and have an aging affect that changes over time. my biggest gaol was to touch the earth lightly using materials and construction methods that have a minimal impact on the environment. have also considered the railway and created a design that

27
CONCEPTS
MEETING ROOM VIEW

WORKING DRAWINGS

28

THE oYSTER

29
30 A A B B C C D D 1 1 2 2 3 3 4 4 5 5 6 6 STORAGE EXIST REFER REFER TO F.F.L 65.950 POLISHED CONCRETE BASEMENT 856 SQM 21 CAR SPACES 2400 2400 300 ALL SPACES 5387mm 2400mm UNLESS OTHERWISE SPECIFIED 5387 VEHICLDIE TRUNING CYCLE VEHICLE TRUNING CYCLE ENTRANCE STONE TILES 1200X1500MM ENTRANCE WD-A013 D2 7500 7500 7500 7500 7500 2800 10570 5470 7500 7500 7500 7500 7500 2800 10570 5470 150 5050 150 33050 90 4360 150 1100 150 4202 150 150 5100 150 WALLS 150 5593 90 6310 19490 150 5050 150 19250 150 700 150 2400 150 4920 150 1780 150 10700 90 2512 150 150 9400 150 150 4243 150 1000 1200 1371 1200 1371 1200 1457 1200 10814 1340 793 820 5063 820 11048 820 1584 20390 48602 EXIST 48925 SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION 100 BASEMENT 350010 OYSTER 17/08/2020 MOUSTAFA HASSAN WD-A006 Enter address here 1 100 BASEMENT 1 DN DN UP UP A A B B C C D D 3 3 4 4 5 5 6 6 COLDROOM DRAFTING OFFICE OFFICE BREAKROOM MAIN OFFICE CONFERENCE ROOM CONFERENCE ROOM OFFICE OFFICE BREAKROOM MAIN OFFICE FEMALE (T) MALE (T) DISABLED (T) KITCHEN STORAGE LIFT CAFE TILES HALLWAY 2800 10570 5470 7500 7500 7500 7500 7500 7500 7500 7500 7500 7500 1762 1546 1829 110 2423 D21 D35 D34 150 5625 2090 90 10099 90 3000 90 3000 90 3061 90 2386 90 13770 150 4250 90 3990 90 6735 90 2659 90 9241 90 10476 150 1100 150 4394 126 FEMALE MALE(T) DISABLED 820 3417 820 150 6225 90 6885 150 6200 150 700 150 2400 150 4920 150 2141 150 5710 7474 10876 90 2064 90 17042 90 13478 90 1500 90 3752 90 8486 1450 622820 9447 1829 1513 2000 2326 900 1660 1339 713820 4033 15700 43870 43870 4060 150 1273 150 150 668 1475 150 2400 150 9229 90 1131 90 1210 1814 1853 4135 3136 7189 820 4745 820 230 820 895 820 8656 820340820 2280 820 4113 900296769 7631 820 7134 D11 3931 140 820 820 8641 820 4641 820 D33 20390 F.F.L 68.800 20390 4850 SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION 100 GROUND FLOOR 350010 OYSTER 17/08/2020 MOUSTAFA HASSAN WD-A007 Enter address here 1 100 GROUND FLOOR 1 A A B B C C D D 1 1 2 2 3 3 4 4 5 5 6 6 BED WIW BED STUDY BATHROOM BED ENSUITE MASTER FLOORBOARD ENSUITE KITCHEN LOBBY APARTMENT BED WIW BED STUDY BED ENSUITE FLOORBOARD ENSUITE KITCHEN POWDER ROOM LIVING WIW LAUNDRY BALCONY APARTMENT WD-A012 1224 7500 7500 7500 7500 7500 2800 10570 5470 D46 D44 7500 7500 7500 7500 7500 150 3735 150 4825 90 2400 90 3200 90 4090 90130090 2000 150 2000 90130090 4090 90 3200 90 2400 90 4825 150 2855 5992 90 3398 90110090 4053 90 1637 1501637 90 3728 90 234 90 1100 90 4000 90 5390 BATHROOM LAUNDRY BATHROOM 820 9875 820 13449 820 9931 820 160 3509 90 1100 90 2500 90 3251 90 1100 90 6020 2150 150 150 2400 150 3080 90 1300 90 3431 90 3700 90 3509 20390 150 3735 150 7717 90 3398 90 2880 90 4000 150 4000 90 1630 150 110090 4000 90 7115 150 2855 6130 7945 90 1490160 700 150 2400 150 4920 1501500 90 7032 3923 2855 21105 1340 880 915 19330 2000 150 2000 150 4548 1472 90 1100 90 3251 90 2500 90 1100 90 3519 2000 150 2400 170 3000 150 1300 90 3431 90 3693 97 3509 830 1000 2762 915 4152 820 235 820 2960 820 2626 2626 820 2970 820 235 820 11799 5610 4730 4300 901390150139090 4300 7470 WALLS WIW W10 F.F.L 72.530 43870 43870 20390 SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION 100 FIRST FLOOR 350010 OYSTER 17/08/2020 MOUSTAFA HASSAN WD-A008 Enter address here 100 FIRST FLOOR 1
31 MB WR 3000 870 2730 2850 9450 3000 870 2730 2850 9450 Average Building Height 10920 0 Average Building Height 10920 3000 870 2730 2850 9450 9450 3000 870 5580 GROUND FLOOR F.F.L 68.800 GROUND FLOOR CEILING F.F.L 71.530 FIRST FLOOR CEILING F.F.L 75.600 GROUND FLOOR CEILING F.F.L 71.530 FIRST FLOOR CEILING F.F.L 75.600 Average Building Height 10920 Average Building Height 10920 MAXIMUM BUILDING HEIGHT ALLOWED 11M MAXIMUM BUILDING HEIGHT ALLOWED 11M SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION 100 E & W ELEVATION 350010 OYSTER 17/08/2020 MOUSTAFA HASSAN WD-A009 Enter address here 1 100 East Eelevation 1 1 100 West Eelevation 2 EXTERNAL MATERIALS AND FINISHES: BR BLACK RENDER WR WHITE RENDER CW ALUMINUM CARTIAN WALL CB WHITE COLORBOND BR ALUMINIUM BASE ROLLER GRILLE WF BLACK & WHITE WOODEN FACADE GL DARK GLAZED WINDOWS GU GUTTERS 125mm "D" Gutter. DP ROUND PROFILE DOWNPIPE 90MM D PL CONCRETE PANEL WALL 150MM WR GL 9450 3000 870 2730 2850 9450 FIRST FLOOR CEILING F.F.L 75.600 GROUND FLOOR CEILING F.F.L 71.530 DP DP DP DP DP DP DP Average Building Height 10920 Average Building Height 10920 9450 5580 870 3000 9450 2850 3600 3000 Average Building Height 10920 MAXIMUM BUILDING HEIGHT ALLOWED 11M Average Building Height 10920 MAXIMUM BUILDING HEIGHT ALLOWED 11M SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION 100 S & N ELEVATIOINS 350010 OYSTER 17/08/2020 MOUSTAFA HASSAN WD-A010 Enter address here 1 100 South Elevation 1 1 100 North Elevation 2 BR BLACK RENDER WR WHITE RENDER CW ALUMINUM CARTIAN WALL CB WHITE COLORBOND BR ALUMINIUM BASE ROLLER GRILLE WF BLACK & WHITE WOODEN FACADE GL DARK GLAZED WINDOWS EXTERNAL MATERIALS AND FINISHES: GU GUTTERS 125mm "D" Gutter. DP ROUND PROFILE DOWNPIPE 90MM D PL CONCRETE PANEL WALL 150MM

EXTERNAL MATERIALS AND FINISHES:

BR BLACK RENDER

WR WHITE RENDER

CW ALUMINUM CARTIAN WALL

GL DARK GLAZED WINDOWS

CB WHITE COLORBOND

BR ALUMINIUM BASE ROLLER GRILLE

WF BLACK & WHITE WOODEN FACADE

GU GUTTERS 125mm "D" Gutter.

DP ROUND PROFILE DOWNPIPE 90MM D

PL CONCRETE PANEL WALL 150MM

32 1 2 3 4 5 6 1 WD-A013 1 WD-A013 BLACONY OPEN DINING KITCHEN WIP LOBBY WIP KITCHEN OPEN DINING BLACONY DRAFTING OFFICE HALLWAY RECPTION & LOBBY CAFE STORAGE 2 BINS & WATER TANK BICYCLE 870 2730 2850 3000 9450 FC 1 WD-A014 2 WD-A014 PL CB CB CW BR PL BR PL 3000 870 2730 2850 9450 LEVELS OVERALL LEVELS OVERALL OVERALL OVERALL BASEMENT F.F.L 65.950 GROUND FLOOR F.F.L 68.800 GROUND FLOOR CEILING F.F.L 71.530 FIRST FLOOR F.F.L 72.600 FIRST FLOOR CEILING F.F.L 75.600 BASEMENT F.F.L 65.950 GROUND FLOOR F.F.L 68.800 GROUND FLOOR CEILING F.F.L 71.530 FIRST FLOOR F.F.L 72.600 FIRST FLOOR CEILING F.F.L 75.600 1 WD-A016 3 WD-A015 WD-A016 WD-A016 WD-A016 WD-A016 WD-A016 SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION 1 100 SECTION A-A 350010 OYSTER 17/08/2020 MOUSTAFA HASSAN
Enter address here 1 100 WD SECTION A 1
WD-A012

type - c

ALL PLUMBING TO COMPLY WITH AUSTRALIAN STANDARD: AS/NZ 3500 NATIONAL PLUMBING AND DRAINAGE CODE. CONDUTC ALL NEGOTIATIONS, OBTAIN ALL APPROVALS AND PAY ALL FEES AND CHANGES DUE TO CONTROLLING AUTHORITIES.

PROVIDE MIN. 90mmØ DOWN PIPES AT 12M CENTRES TO THE OFFICE BUILDING. EXPOSED DOWNPIPES TO BE ZINCALUME OR SELECTED COLOURBOND FINISH. PROVIDE 200mmØ DOWN PIPES FOR WAREHOUSE PROVIDE 400mmØ HEAVY DUTY pvc DRAIN WITH MIN. 1:100 FALL

WHERE AUSTRALIAN STANDARDS ARE REFERENCED, COMPLY WITH RELEVANT PROVISIONS OF THE APPLICABLE CURRENT EDITION AS PRESCRIBED IN THE BUILDING CODE OF AUSTRALIA AND APPLICABLE WHEN THE BUILDING PERMIT IS ISSUED.

NOTES

THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT STRUCTURAL ENGINEERS AND ALL OTHER CONSULTANTS' DRAWINGS/DETAILS AND WITH ANY OTHER WRITTEN INSTRUCTIONS ISSUED IN THE COURSE OF THE CONTRACT.

ALL DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALE.

THE BUILDER AND SUBCONTRACTOR SHALL ENSURE THAT ALL STORMWATER DRAINS, SEWER PIPES AND THE LIKE ARE LOCATED AT A SUFFICIENT DISTANCE FROM ANY BUILDINGS FOOTING AND/OR SLAB EDGE BEAMS SO AS TO PREVENT GENERAL MOISTURE PENETRATION, DAMPNESS, WEAKENING AND UNDERMINING OF ANY BUILDING AND ITS FOOTING SYSTEM.

THE BUILDER AND SUBCONTRACTORS SHALL CHECK AND VERIFY ALL DIMENSIONS, SETBACKS, LEVELS AND SPECIFICATIONS AND OTHER RELEVANT DOCUMENTATION PRIOR TO THE COMMENCEMENT OF ANY WORKS. REPORT ALL DISCREPANCIES TO THIS OFFICE FOR CLARIFICATION.

THE BUILDER SHALL TAKE ALL STEPS NECESSARY TO ENSURE THE STABILITY AND GENERAL WATER TIGHTNESS OF ALL NEW AND/OR EXISTING STRUCTURES DURINGALL WORKS.

EXCAVATE OVER THE SITE TO GIVE CORRECT LEVELS AND PROFILES FOR CONSTRUCTION, PAVING AND LANDSCAPING. EXCAVATE FOR FOOTINGS AND SERVICE TRENCHES TO GIVE CORRECT DIMENSIONS SLABS AND FOOTINGS AND ALL CONCRETING MUST BE PREPARD AND POURED IN ACCORDANCE WITH AS 3600 CONCRETE STRUCTURES AND AS 3610 FORM WORK FOR CONCRETE ALL FALLS IN CONRETE MUST BE AT A MINIMUM SLOPE OF 1:200

ALL METAL CLADDING AND ITS INSTALLATION TO COMPLY WITH AUSTRALIAN STANDARD AS: 1562 DESIGN AND INSTALLATION OF SHEET ROOF AND WALL CLADDING

SITE & ROOF PLAN 450010 TYPE -C

CONSTRUCTION

33
55.00 m 79° 00' 00" 37.00 m 11° 00' 00" 26.00 m 79° 00' 00" 19.00 m 11° 00' 00" 4.00 m 11° 00' 00" 26.00 m 79° 00' 00" 22.00 m 11° 00' 00" 40.00 m 79° 00' 00" 12240 6728 6000 3000 Existing 7m high commercial building 2617 1100 Landscaping -refer landscape plan Landscaping -refer landscape plan Landscaping refer landscape plan Landscaping refer landscape plan Landscaping refer landscape plan 1900mm Wide Concrete Access Path 1900 Concrete Carpark and Driveway South Carpark and Entrance: Heavy Vehicle slab to engineer's specifications FALL FALL PIT MC BOL DP BGS DP DP DP DP BGS BGS BGS BGS BGS BGS BGS BGS BGS Proposed Warehouse 7.78m high SL SL SL SL SL SL SL SL 5.0 SLOPE 1900mm Wide Concrete Access Path New 1800mm colourbond Fence Site Boundary Site Boundary New 1800mm colourbond Fence DP DP DP Proposed Office 5.16m high 9758 New 1800mm colourbond Fence Shared Zone BOL FALL FALL FALL FALL 16 17 South Carpark and Entrance: Heavy Vehicle slab to engineer's specifications EX1 EX1 EX1 EX1 EX1 EX1 EX1 EX1 EX1 EX1 EX1 EX1 EX1 EX1 DM2 DM2 DM2 DM2 EX2 EX2 EX2 EX2 EX2 Existing 7.5m high commercial building Access Road Easement SWP SWP SWP SWP SWP SWP SWP SWP SWP SWP SWP LPD PIT 13615 Setback Setback Setback 3091 5737 Existing 3.5m high commercial building Existing 3.5m high commercial building SFL 420.20 HW HW HW HW HW HW HW HW HW HW HW SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL
1 : 200
13/11/2020 Author Checker
Enter address here 1 : 200 SITE PLAN & ROOF PLAN 0 LEGEND BG BGS BH BOL BR COL CRD DP DW EL FED FHR FRD GB HLW HW LCK LPD MC MR REF RWH SC SF SL SS SWP VB VRC WC WT Box Gutter Box Gutter Sump Bulkhead Bollard Bike Rack Steel Column Commercial Roller Door Down Pipe Dishwasher Space Exterior Light Fire Escape Door Fire Hose Reel Fire Rated Door Garden Bed Highlight Window Habitable Window Lockers Legal Point of Discharge Metal Capping Metal Roof Refridgerator Space Rainwater Head Saw Cut Strip Footing Skylight Shower Seat Stormwater Pipe Ventilated Ridge Cap Vanity Basin Toilet Water Tank FFL 0.00 Top of Finished Floor Level SFL 0.00 Top of Structural Floor Level Existing Sewer Pipe New Sewer Pipe New Stormwater Pipe Contour Line (0.00 denotes height of land) Legal Point of Discharge Datum Level (0.00 denotes height of datum) as per AHD 600W 600L 900D Stormwater Drainage Pit 1200W x 1200L x 900D Stormwater Drainage Pit 7500H External Carpark Light Pedestrian Crossing EXISTING/DEMOLITION LEGEND: EX1 Exiting car space to be retained DM1 Exiting car space to be demolished EX2 Exiting Tree to be maintained DM2 Exiting tree to be demolished DM3 Exiting curb to be domolished
A002
DISABLED PARKING BAY 2600W 5400L PARKING SPACE WITH 20mm PARKING STRIPE, 150mm WHEEL STOPPER AT 525mm FROM BACK EDGE DENOTES PARKING BAY NUMBER 2900W x 5400L PARKING SPACE WITH 20mm PARKING STRIPE, 150mm WHEEL STOPPER AT 525mm FROM BACK EDGE 0 DENOTES PARKING BAY NUMBER PARKING BAY PLACED AT END OF AISLE TO ALLOW FOR BLIND AISLE 2600W X 5400 ADA ACCESSIBLE PARKING SPACE WITH 20mm PARKING STRIPE, 150mm WHEEL STOPPER AT 525mm FROM BACK EDGE. 2400W SHARED ZONE ADJACENT TO PARK WITH 150Ø BOLLARD 1300mm ABOVE GROUND WITH ROUNDED TOP. PAINT SAFETY YELLOW
34 A A B B C C E d d 2 2 1 1 3 3 F G H 95 13823 15240 12195 15240 499 4945 130 1809 31890 1836 90 3572 307 150 989 90 342 90 5066 307 90 3980 90 2575 256 307 2252 90 1520 90 1094 7000 7000 7000 7000 28511 256 11268 0 11741 600 2390 700 4610 787 2390 793 23009 12386 1852 90 1920 90 2233 90 1836 307 3372 90 4648 90 3572 307 174 133 11772 95 212 400 12386 400 13186 6000 6000 3671 914 210 800 800 571 800 530 800 1120 800 990 307 6490 90 3030 90 2000 150 12574 390 1400 90 13750 390 16020 1090 400 290 1440 1190 102 1579 100 1050 90 1841 1520 90490 W7 W5 W1 W2 W21 D14 D18 1 A006 COL CO COL COL CO COL COL CO CO SL SL SL SL SL SL SL SL EM EM EM EM EM 8000X4000LB Entrance Entrance W3 W5 W6 W8 Reception Conference Room W9 W10 W11 M W/C Hallway Store Conference Room Office Tea Room EXIT FED FED Warehouse 433.96 m2 Concrete SFL 420.00 Air Lock 9.19 m2 Timber Floor HLW HLW ceiling lock refer details Air Lock 9.19 m2 Timber Floor Store 6.67 m2 Timber Floor Conference Room 24.55 m2 Timber Floor Office 32.54 m2 Timber Floor Manger's Office 7.27 m2 Tiles Tea Room 13.01 m2 Tiles Male WC 2.27 m2 Tiles Fem W/C 2.27 m2 Tiles Dis W/C 6.05 m2 Tiles BOL Manger's Office 7.91 m2 Carpet W12 W13 W14 W15 W16 Tea Room Male W/C Fem W/C 3265 90 6265 Tea Room Hallway Disabled W/C D9 Disabled W/C Hallway Change Warehouse Main Office BOL Ceiling Height 2700mm FEX FSW Change 6.03 m2 Tiles 2 A006 MAX Type 1 Warehouse Interior Exterior Concrete Panel Wall 150mm Pre-cast concrete tilt-up panel wall to Engineer's details. FRL: 60/60/60 150 40 90 27 MAX MAXMAXMAX 150mm concrete blockwork with 10mm plasterboard fixed as per regulations. 40mm air infiltration barrier. 90mm steel studs at 450 ctrs with Bradford insulation batts to cavity. 27mm Strammit Longspan Metal Cladding fixed as per specifications. For specific metal finish refer to Finishes Schedule Type 2 Reverse Brick Veneer Wall Office Interior Exterior Office Interior Office Interior 90 Type 3 Interior Stud Wall 90mm timber studs one layer each side 10mm gyprock plasterboard at 60mm with Bradford insulation batts to cavity. Select paint to finish SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION As indicated GROUND FLOOR 450010 TYPE -C 13/11/2020 Author Checker A003 Enter address here 1 100 GROUND FLOOR 1 LEGEND BG BGS BH BOL BR COL CRD DP DW EL FED FHR FRD GB HLW HW LCK LPD MC MR REF RWH SC SF SL SS SWP VB VRC WC WT Box Gutter Box Gutter Sump Bulkhead Bollard Bike Rack Steel Column Commercial Roller Door Down Pipe Dishwasher Space Exterior Light Fire Escape Door Fire Hose Reel Fire Rated Door Garden Bed Highlight Window Habitable Window Lockers Legal Point of Discharge Metal Capping Metal Roof Refridgerator Space Rainwater Head Saw Cut Strip Footing Skylight Shower Seat Stormwater Pipe Ventilated Ridge Cap Vanity Basin Toilet Water Tank FFL 0.00 Top of Finished Floor Level SFL 0.00 Top of Structural Floor Level ROOM NAME FLOOR FINISH FLOOR AREA Conference Room Timber Floor 24.55 m² Reception Timber Floor 24.29 m² Air Lock Timber Floor 9.19 m² Change Tiles 6.03 m² Store Timber Floor 6.67 m² Dis. W/C 6.05 m² Fem. W/C 2.27 m² Male W/C 2.27 m² Tea Room 13.01 m² Manager's Office Timber Floor 7.27 m² Office Timber Floor 32.54 m² Hallway Timber Floor 11.02 m² Manager's Office Carpet 7.91 m² Warehouse Concrete 433.96 m² Tiles Tiles Tiles Tiles WALL TYPES: NOTES: THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT STRUCTURAL AND ALL OTHER CONSULTANTS. DRAWINGS/DETAILS AND WITH ANY OTHER WRITTEN INSTRUCTIONS ISSUED IN THE COURSE OF THE CONTRACT. ALL DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALE. THE BUILDER AND SUBCONTRACTOR SHALL ENSURE THAT ALL STORMWATER DRAINS, SEWER PIPES AND THE LIKE ARE LOCATED AT SUFFICIENT DISTANCE FROM ANY BUILDINGS FOOTING AND/OR SLAB EDGE BEAMS SO AS TO PREVENT GENERAL MOISTURE PENETRATION, DAMPNESS, WEAKENING AND UNDERMINING OF ANY BUILDING AND ITS FOOTING SYSTEM. ALL MATERIALS AND WORK PRACTICES SHALL COMPLY WITH BUT NOT LIMITED TO THE BUILDING REGULATIONS 2015. THE BUILDINGCODE OF AUSTRALIA 2015 AND ALL RELEVANT CURRENT AUSTRALIAN STANDARDS (AS AMENDED) REFERRED TO THERE IN. THE BUILDER SHALL TAKE ALL STEPS NECESSARY TO ENSURE THE STABILITY AND GENERAL WATER TIGHNESS OF ALL NEW AND/OR EXISTING STRUCTURES DURINGALL WORKS. ALL STORWATER TO BE TAKEN TO THE LEGAL POINT OF DISCHARGE TO THE RELEVANT AUTHORITIES APPROVAL. INSTALLATION OF ALL SERVICES SHALL COMPLY WITH THE RESPECTIVE SUPPLY AUTHORITY REQUIREMENTS. LIGHT SWITCHES, DOOR HANDLES ETC TO ALL DOORS/WALLS TO BE LOCATED BETWEEN 900MM AND 1100MM ABOVE F.F. SARKING-TYPE MATERIALS USED FOR WEATHERPROOFING OF ROOFS AND WALLS TO COMPLY WITH AS/NZS 4200 PARTS AS 3740. 1680.0-1998 ALL DOORS WITHIN AN EXIT PATH MUST BE OPENABLE FROM WITHIN WITHOUT KEY BY A SINGLE DOWNWARD HAND ACTION OR PUSHING DEVICE LOCATED BTN 900 1200mm FROM FLOOR LEVEL ALL TIMBER DOORS TO COMPLY WITH AUSTRALIAN STANDARD AS: 2688 TIMBER DOORS ALL ALUMINIUM WINDOWS TO COMPLY WITH AUSTRALIAN STANDARD: AS 2047 ALUMINIUM WINDOWS FOR BUILDINGS AND AS 2048 CODE OF PRACTICE FOR INSTALLATION AND MAINTENANCE OF ALUMINIUM WINDOWS IN BUILDINGS ALL GLAZING TO COMPLY WITH AUSTRALIAN STANDARD: AS 1288 GLASS IN BUILDINGS SELECTION AND INSTALLATION GLASS SHALL BE OF THE BEST QUALITY AND FREE FROM IMPERFECTION. ALL PAINTING WORKS TO COMPLY WITH AUSTRALIAN STANDARD AS: 2311 THE PAINTING OF BUILDINGS WHERE AUSTRALIAN STANDARDS ARE REFERENCED, COMPLY WITH RELEVANT PROVISIONS OF THE APPLICABLE CURRENT EDITION AS PRESCRIBED IN THE BUILDING CODE OF AUSTRALIA AND APPLICABLE WHEN THE BUILDING PERMIT IS ISSUED. X Refers to grid-to-grid dimensions Refers to all other dimensions
35 01 GROUND FLOOR 01 GROUND FLOOR 02- OFFICE CEILING 2700 02- OFFICE CEILING 2700 04- PORTAL FRAME 7530 04- PORTAL FRAME 7530 05- PARAPET WALL TOP 7780 05- PARAPET WALL TOP 7780 CTP FED 1010 DP MC AJ AJ MC 13186 22609 5995 01 GROUND FLOOR 01 GROUND FLOOR 02- OFFICE CEILING 2700 02- OFFICE CEILING 2700 04- PORTAL FRAME 7530 04- PORTAL FRAME 7530 05- PARAPET WALL TOP 7780 05- PARAPET WALL TOP 7780 2 1 3 AJ AJ AJ AJ SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION 100 N & W ELEVATION 450010 TYPE -C 13/11/2020 Author Checker A004 Enter address here 100 NORTH ELEVATION 1 100 WEST ELEVATION 2 01 GROUND FLOOR 0 01 GROUND FLOOR 0 02- OFFICE CEILING 2700 02- OFFICE CEILING 2700 04- PORTAL FRAME 7530 04- PORTAL FRAME 7530 05- PARAPET WALL TOP 7780 05- PARAPET WALL TOP 7780 A B C D E d F G H CTP AB GB MWC AJ AJ AJ AJ AJ AJ AJ 29019 7030 24321214312412342431241213124212 01 GROUND FLOOR 01 GROUND FLOOR 02- OFFICE CEILING 2700 02- OFFICE CEILING 2700 04- PORTAL FRAME 7530 04- PORTAL FRAME 7530 05- PARAPET WALL TOP 7780 05- PARAPET WALL TOP 7780 2 1 3 CTP BOL BOL 321 23143212342321 MWC DP SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION 100 S & E ELEVATION 450010 TYPE -C 13/11/2020 Author Checker A005 Enter address here 1 100 SOUTH ELEVATION 3 1 100 EAST ELEVATION 4
36 01 GROUND FLOOR 0 01 GROUND FLOOR 0 02- OFFICE CEILING 2700 02- OFFICE CEILING 2700 04- PORTAL FRAME 7530 04- PORTAL FRAME 7530 05- PARAPET WALL TOP 7780 05- PARAPET WALL TOP 7780 A B C D E d F G H FHR FED 1010 Warehouse TP3 TP4 TP4 TP4 TP4 TP4 TP4 TP4 TP5 TP6 TP7 FED 960 FHR 200mm Downpipe From Box Gutter Sump Steel wall bracing as per engineer's specifications Infill slab engineer's specifications. Refer slab setout plan Concrete pad footing to engineer's specifications Refer slab setout plan 2201 2700 2480 100 5350 400mm wide Alucobond parapet fascia to be installed to manufacturer's specifications Metal capping to top of parapet wall Steel truss to support parapet wall 4-bay multiple pyramid skylight to be installed manufacturers specifications 7 A1-10 A1-10 01 GROUND FLOOR 0 01 GROUND FLOOR 0 02- OFFICE CEILING 2700 02- OFFICE CEILING 2700 04- PORTAL FRAME 7530 04- PORTAL FRAME 7530 05- PARAPET WALL TOP 7780 05- PARAPET WALL TOP 7780 2 1 3 Warehouse Change Store Office W23 D10 2700 684 Bradford Ceiling Insulation as per energy report 90mm Metal Downpipe Metal Gutter and Fascia Rondo Suspended Ceiling installed to manufacturer's specifications Rafter R2 as per schedule Steel truss to support parapet wall 4-bay mulyiple pyramid skylight be installed to manufacturer's specifications Deg Pitch Strammit Metal speed deck roof laid over Bradford anticon insulation and safety mesh as per energy report and manufacturer's specifications Metal Capping to parapet wall Box Gutter with Sump to do downpipes as per detail Rafter R1 as per schedule Haunch HC as per schedule Column C1 as per schedule 150mm per-cast concrete tilit-panel wall Concrete pad footing and slab to engineer's specifications. Refer to concrete details 4 A1-10 SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION 1 : 100 SECTION A-A & B-B 450010 TYPE -C 13/11/2020 M.H A006 Enter address here 1 100 SECTION A-A 1 1 100 SECTION B-B 2

TRIANGLE HOUSE

DEAKIN ROAD DEAKIN ROAD

37
WH 8494 A0.05 1 4 3 A C B 4804 2000 2000 3400 2000 3400 2000 20.00 m 0° 00' 00" 15.00 m 90° 00' 00" 20.00 m 0° 00' 00" 20.00 m 0° 00' 00" 15.00 m 90° 00' 00" 20.00 m 0° 00' 00" ADJOINING DWELLING PROPOSED DWELLING CONCRETE DRIVEWAY 6475 SETBACK W G
818 856 1638 1706 856 818 1818 1818 PIT 3 PIT 4 PIT 2 PIT 20 20 2000 2000 FALL FALL FALL FALL RETAINING WALL FENCE RETAINING WALL FENCE RETAINING WALL FENCE RETAINING WALL FENCE FALL FALL 15.00 m 90° 00' 00" 15.00 m 90° 00' 00" DECKING BALCONY FDK01 FCB01 FCO01 ADJOINING DWELLING W4.02 W4,01 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15 1000 EASEMENT LINE SL SL SESW GS MW SE SE SE SE SE SE SE SE SE SE SE SE SE GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW GS MW DP DP DP DP GT GT FOOTPATH FOOTPATH FOOTPATH SWP SWP SWP SWP SWP SWP SWP SWP SWP HW HLW HLW HW HW HW HLW HLW HW HW LPOD 2000 SWPSWP SWP SWP SWP FALL FALL FALL FALL FALL FALL FALL FALL sw sw sw sw sw sw sw sw sw sw sw sw sw sw sw sw sw sw sw 3099 3571 1571 2499 SETBACK SETBACK SETBACK 4804 BOUNDARY LINE BOUNDARY LINE BOUNDARY LINE BOUNDARY LINE D 2 CROSSOVER FCO01 UP 3959 10179 RL RL 2105 3140 3085 2765 2260 1555 4920 SETBACK EASEMENT EASEMENT LINE EASEMENT LINE 3104 3275 RL RL DP FFL FCL FL GT G HW HLW RL SFL SL SWP NGL W WH DOWNPIPE FINISHED FLOOR LVL FINISHED CEILING LVL FLOOR LEVEL GUTTER GAS METER HABITABLE WINDOW HIGHLIGHT WINDOW REDUCED LEVEL STRUCTUAL FLOOR LVL SKYLIGHT STORM WATER PIPE NATURAL GROUND LVL WATER METER HOT WATER TANK ABBREVIATIONS FINISHES FDK01 FCB01 FCO01 MERBAU DECKING COLORBOND CONCRETE SYMBOLS SWSW SESE MWMW GSGS TREES ELECTRICAL METER BOX STORM WATER MAIN SEWAGE MAIN WATER MAIN GAS MAIN LEGAL POINT OF DISCHARGE DATUM POINT 1i WINDOW TAG 1 A101 Ref DETAIL SECTION TAG STORM WATER PITS PIT1 PIT2 PIT3 PIT4 600MM X 600MM 600MM X 600MM 900MM X 900MM 600MM X 600MM NOTES ALL DOWNPIPES ARE TO BE CONNECTED TO STORMWATER AND DISCHARGED TO LPOD SITE AREA BUILT AREA GARDEN AREA SITE AREA AREA FLOOR AREA GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR DECKING AREA M M 300 42.41 73.4 33 42 42 35 105.29 SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION H SHEET NAME ADRESS ISSUE FOR As indicated SITE PLAN 00002 OZ HOMES 16/05/2023 M.HASSAN MICHEAL/MATT A0.01 DEAKIN RD GEELONG 3220 VIC 1 50 Site Plan A TAP
38 WH OPEN ROOM FTB01 TOILET FTL01 ENTRANCE FTB01 C DO.01 D0.01 WA1 WA1 WA5 WA1 D0.02 W0.03 W0.01 W0.02 1 4 3 A C D0.01 B OVERALL WALLS WINDOWS & DOOR OVERALL WALLS WINDOWS & DOOR WALLS WINDOWS & DOORS WALLS & DOORS OVERALL WINDOWS OVERALL WALLS & DOORS OVERALL WALLS OVERALL WALLS W0.02 W0.03 W0.01 D0.02 TOILET OPEN ROOM Stairs OPEN ROOM TOILET ENTRANCE STAIRS WA3 WA3 WA4 WA4 1.2.3.4.5.6.7.8.9. 10. 11. 12. 13. 14. 390 1630 90 3035 200 1505 90 1000 390 8330 390 2670 915 665 260 1900 90 2260 390 4900 4900 260 1000 90 1185 200 1775 390 340 915 1205 900 890 460 813 4142 915 1220 390 7550 390 8330 959 RL DP DP DP LINE OF BEAM ABOVE LINE OF FLOOR OVER BS TO 3428 115 3778 UP UP D 2 2105 3140 3085 E0.02 W E0.01 S E0.02 E E0.01 N DP LINE OF BEAM ABOVE LINE OF BEAM ABOVE LINE OF FLOOR OVER B A0.05 TOILET FTL01 ENTRANCE FTB01 BED 1 FTB01 BED 2 FTB01 CORRIDOR FTB01 1 4 3 A C D1.01 D1.02 D1.03 D1.04 D1.05 W1.01 W1.02 W1.03 W1.04 VOID 390 3540 90 3920 390 8330 440 915 985 900 2055 915 900 440 1277 813 425 915 2370 2103 864 4603 2423 900 573 915 990 8330 390 2295 90 1085 90 2240 390 6580 390 0 1090 2380 90 2240 390 6580 B OVERALL WALLS & DOORS WALLS WINDOWS & DOORS OVERALL WALLS & DOORS OVERALL WINDOWS & DOORS OVERALL WALLS WINDOWS DOORS OVERALL WALLS WINDOWS & DOORS OVERALL WALLS WINDOWS DOORS OVERALL WALLS WINDOWS & DOORS D1.01 TOILET ENTRANCE STAIRS W1.04 D1.03 BED BED 2 W1.03 W1.02 W1.01 D1.02 STAIRS BED 2 BED 1 CORRIDOR ENTRANCE D1.04 D1.05 WA1 WA1 WA1 WA1 WA4 WA4 WA3 WA3 WA3 WA3 WA3 1.2.3.4.5.6.7.8.9. 10. 11. 12. 13. 14. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15 RL3959 DP DP DP DP UP UP BS TO SH D 2 2105 3140 3085 UP 2765 2260 1555 390 1625 90 1595 90 3060 90 1000 390 E0.02 W E0.01 S E0.02 E E0.01 N NOTES • ALL DOWNPIPES ARE TO BE CONNECTED TO STORMWATER AND DISCHARGED TO LPOD BS CK DP FFL FCL FL GT G HW HLW RL SFL SH SK SL SWP NGL TO W WH BASIN COOK TOP DOWNPIPE FINISHED FLOOR LVL FINISHED CEILING LVL FLOOR LEVEL GUTTER GAS METER HABITABLE WINDOW HIGHLIGHT WINDOW REDUCED LEVEL STRUCTUAL FLOOR LVL SHOWER SINK SKYLIGHT STORM WATER PIPE NATURAL GROUND LVL TOLIET WATER METER HOT WATER TANK ABBREVIATIONS SYMBOLS ELECTRICAL METER BOX 1i WINDOW TAG 101 ? 1t DOOR TAG MATERIAL TAG WALL TAG VOID SECTION TAG FINISHES FDK01 FTL01 FTB01 MERBAU DECKING TILES FLOORBORAD B A0.05 TOILET FTL01 BED 3 FTB01 LAUNDRY FTL01 LIVING ROOM FTB01 STUDY FTB01 1 4 3 A C B W2.01 W2.05 W2.04 W2.03 W2.02 D2.03 D2.02 D2.01 WA1 WA1 WA1 WA1 2163 915 4493 2514 762 574 915 1035 940 915 265 900 2000 1200 1330 1250 900 1645 915 1090 W2.01 W2.05 D2.01 D2.03 D2.02 W2.04 W2.03 W2.02 390 1610 90 1840 90 2830 90 1000 390 390 3540 90 3920 390 390 2240 90 1130 90 2250 390 TOILET STAIRS TOILET LAUNDRY BED 3 STAIRS LIVING ROOM LIVING ROOM BED 8330 6580 8330 6580 VOID OVERALL WALLS WINDOWS DOORS OVERALL WALLS WINDOWS & DOORS OVERALL WINDOWS & DOORS OVERALL WALLS & DOORS OVERALL WINDOWS OVERALL WALLS WINDOWS DOORS OVERALL WALLS WINDOWS & DOORS OVERALL WALLS WINDOWS & DOORS 390 0 1090 4710 390 WA3 WA3 WA3 WA3 WA3 WA3 WA4 WA4 1.2.3.4.5.6.7.8.9. 10. 11. 12. 13. 14. STUDY WALLS RL6959 DP DP DP DP UP UP D 2 2105 3140 3085 2765 2260 1555 BS TO SK E0.02 W E0.01 S E0.02 E E0.01 N B A0.05 KITCHEN FTL01 BALCONY 1 4 3 A C B W3.01 W3.02 D3.01 W3.03 WA2 WA2 WA2 WA2 VOID W3.03 D301 W3.02 W3.01 700 915 5858 3658 396 6702 OVERALL WALLS WINDOWS DOORS OVERALL WALLS OVERALL WALLS OVERALL WALLS WINDOWS & DOORS KITCHEN OVERALL WALLS WINDOWS & DOORS WALLS OVERALL OVERALL WALLS WINDOWS & DOORS WA4 396 4815 200 2458 8265 1.2.3.4.5.6.7.8.9. 10. 11. 12. 13. 14. 8265 KITCHEN RL9959 CT SK DP DP DP DP UP UP SKYLIGHT SKYLIGHT D 2 2765 2260 1555 2105 3140 3085 6702 1800 915 2941 915 902 396 1000 90 1185 200 3435 396 396 7473 396 396 5910 396 WA4 WA4 SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION H SHEET NAME ADRESS ISSUE FOR As indicated FLOOR PLANS OZ HOMES 16/05/2023 M.HASSAN MICHEAL/MATT A0.06 7 DEAKIN RD GEELONG 3220 VIC 1 50 FFL G C 1 50 FFL 1 D 1 : 50 FFL 2 1 1 : 50 FFL 3 2
39 FFL G 959 FCL G 3659 FFL 1 3959 FFL 3 9959 FCL 2 9659 FFL 2 6959 FCL 1 6659 FCL 3 12829 B A0.05 1 4 3 W3.02 W3.01 W2.01 D1.01 WA5 WA1 WA1 WA2 2700 300 2700 300 2700 300 2870 3085 5245 SL SL DP GT FCPO1 FTC01 2 14631 OVERALL DP GT FFL G 959 FCL G 3659 FFL 1 3959 FFL 3 9959 FCL 2 9659 FFL 2 6959 FCL 1 6659 FCL 3 12829 B A0.05 1 4 3 FCPO1 FTC01 WA2 WA2 WA1 WA1 W3.03 W2.04 W2.03 W1.02 W1.03 D0.01 W0.02 D3.01 3085 5245 SL SL WH GT DP 2 14631 OVERALL GT DP 2870 300 2700 300 2700 300 2700 DP FFL FCL FL GT G HW HLW RL SFL SL SWP NGL W WH DOWNPIPE FINISHED FLOOR LVL FINISHED CEILING LVL FLOOR LEVEL GUTTER GAS METER HABITABLE WINDOW HIGHLIGHT WINDOW REDUCED LEVEL STRUCTUAL FLOOR LVL SKYLIGHT STORM WATER PIPE NATURAL GROUND LVL WATER METER HOT WATER TANK ABBREVIATIONS NOTES • ALL DOWNPIPES ARE TO BE CONNECTED TO STORMWATER AND DISCHARGED TO LPOD SYMBOLS ELECTRICAL METER BOX 1i WINDOW TAG 101 ? 1t DOOR TAG MATERIAL TAG WALL TAG VOID SECTION TAG FINISHES FCP01 FTC01 COPPER CLADDING TIMBER CLADDING SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION H SHEET NAME ADRESS ISSUE FOR As indicated ELEVATIONS NE+SE OZ HOMES 16/05/2023 M.HASSAN MICHEAL/MATT E0.01 7 DEAKIN RD GEELONG 3220 VIC 1 : 50 North Elevation N 1 : 50 South Elevation S
40 FFL G 959 FCL G 3659 FFL 1 3959 FFL 3 9959 FCL 2 9659 FFL 2 6959 FCL 1 6659 FCL 3 12829 A C B WA1 WA1 WA1 WA2 W2.02 W1.01 W0.01 W4,01 D3.01 2260 2765 SL WA2 2700 300 2700 300 2700 300 2870 GT DP FCPO1 FTC01 D 1555 14631 OVERALL DP WH FFL G 959 FCL G 3659 FFL 1 3959 FFL 3 9959 FCL 2 9659 FFL 2 6959 FCL 1 6659 FCL 3 12829 A C B W4.02 WA2 WA1 WA1 WA1 W0.03 W1.04 W2.05 2765 2260 SL 2700 300 2700 300 2700 300 2870 GT DP FCPO1 FTC01 D 1555 14631 OVERALL GT DP DP FFL FCL FL GT G HW HLW RL SFL SL SWP NGL W WH DOWNPIPE FINISHED FLOOR LVL FINISHED CEILING LVL FLOOR LEVEL GUTTER GAS METER HABITABLE WINDOW HIGHLIGHT WINDOW REDUCED LEVEL STRUCTUAL FLOOR LVL SKYLIGHT STORM WATER PIPE NATURAL GROUND LVL WATER METER HOT WATER TANK ABBREVIATIONS NOTES ALL DOWNPIPES ARE TO BE CONNECTED TO STORMWATER AND DISCHARGED TO LPOD FINISHES FCP01 FTC01 COPPER CLADDING TIMBER CLADDING SYMBOLS ELECTRICAL METER BOX 1i WINDOW TAG 101 ? 1t DOOR TAG MATERIAL TAG WALL TAG VOID SECTION TAG SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION H SHEET NAME ADRESS ISSUE FOR As indicated ELEVATIONS WE+EE OZ HOMES 16/05/2023 M.HASSAN MICHEAL/MATT E0.02 7 DEAKIN RD GEELONG 3220 VIC 1 : 50 East Elevation E 1 : 50 West Elevation W
41 FFL G 959 FCL G 3659 FFL 1 3959 FFL 3 9959 FCL 2 9659 FFL 2 6959 FCL 1 6659 FCL 3 12829 A DO.01 B DO.01 D1 DO.01 C DO.01 A C B 2765 2260 LIVING ROOM FTB01 KITCHEN FTL01 CORRIDOR FTB01 BED 2 FTB01 OPEN ROOM FTB01 NGL D CRUSHED ROCK AND AG DRAIN REINFORCED CONCRETE CAST IN-SITU TO BE POURED WITH THE FOOTINGS REFER TO STRUCTURAL ENGINEERS DETAILS BACKFILLED WITH SOIL SPECIFIED TIMBER FLOOR REFER TO STRUCTURAL ENGINEERS DETAILS STRUCTURAL BEAM REFER TO STRUCTURAL ENGINEERS DETAILS REINFORCED CONCRETE STRIP FOOTING REFER TO STRUCTURAL ENGINEERS DETAILS NGL SPECIFIED COLORBOND ROOFING @ 20 DAGREE PITCH ON 70 X 35MM BATTENS SPECIFED ALUMINUM LINING REFER TO STRUCTURAL ENGINEERS DETAILS SPECIFIED WEATHERBOARD CLADDING ON CLT PANEL SPECIFED COPPER CLADDING ON CLT PANEL REFER TO STRUCTURAL ENGINEERS DETAILS 1555 100MM AG DRAIN SFL 535 1096 2743 876 SPECIFED COPPER FLASHING REFER TO STRUCTURAL ENGINEERS DETAILS SPECIFIED COPPER FLASHING REFER TO STRUCTURAL ENGINEERS DETAILS SPECIFIED TIMBER FLOOR 425 2700 300 2700 300 2700 300 2870 600 900 300 SPECIFED CONCEALED CONNECTIONS REFER TO STRUCTURAL ENGINEERS DETAILS SPECIFIED TIMBER FLOOR ALL CLT INTERNAL CEILINGS AND WALLS TO HAVE A RAW FINISH SPECIFED ALUMINUM LINING REFER TO STRUCTURAL ENGINEERS DETAILS 800 900 700 X 700 MM LIGS TO BE TIED TO L BARS REFER TO STRUCTURAL ENGINEERS DETAILS 400 CENTRE ROUND BARS 100MM INSULATION REFER TO STRUCTURAL ENGINEERS DETAILS AND SPECIFICATION FOR INSTALLATION DP FFL FCL FL GT G HW HLW RL SFL SL SWP NGL W WH DOWNPIPE FINISHED FLOOR LVL FINISHED CEILING LVL FLOOR LEVEL GUTTER GAS METER HABITABLE WINDOW HIGHLIGHT WINDOW REDUCED LEVEL STRUCTUAL FLOOR LVL SKYLIGHT STORM WATER PIPE NATURAL GROUND LVL WATER METER HOT WATER TANK ABBREVIATIONS FINISHES FDK01 FCB01 FCO01 MERBAU DECKING COLORBOND CONCRETE SYMBOLS SWSW SESE MWMW GSGS TREES ELECTRICAL METER BOX STORM WATER MAIN SEWAGE MAIN WATER MAIN GAS MAIN LEGAL POINT OF DISCHARGE DATUM POINT 1i WINDOW TAG 1 A101 Ref DETAIL SECTION TAG NOTES ALL DOWNPIPES ARE TO BE CONNECTED TO STORMWATER AND DISCHARGED TO LPOD COLOUR CODING CROSS LAMINATED TIMBER GLASS TIMBER CONCRETE EARTH CRUSHED ROCK SCALE CHECKED BY DRAWN BY DATE CONSTRUCTION SHEET NAME ADRESS ISSUE FOR As indicated SECTION A-A OZ HOMES 16/05/2023 M.HASSAN MICHEAL/MATT A0.05 DEAKIN RD GEELONG 3220 VIC 1 25 SECTION A-A B
42 150 F.F.L F.C.L ALUMINIUM CONCEALED BEAM PLATE TIMBER BOLT 150MM LONG TIMBER BOLT 270MM LONG 200 CLT WALL CLT FLOOR PANEL 200 CLT COLUMN ALUMINIUM CONCEALED BEAM PLATE ANCHOR BOLT 150MM LONG CLT FLOOR PANEL 80 CONCRETE EDGE BEAM SPECIFIED INSULATION 4 BAR TRENCH MESH SEALENT 300 80 TIMBER SKIRTING 20MM V JOINT TIMBER BOARD 12MM UNDERLAY BARRIER 1.5MM PLYWOOD SUBFLOOR 15MM WET SCREED 25MM RUBBER NOISE INSOLATION 5MM WOOD FIBER THERMAL ISOLATION 5MM VAPOR BARRIER 1.5MM F.F.L F.C.L SELF-DRIVING SCREW 450MM 90x45 TOP PLATE CORNICE 10MM PLASTERBORAD 90x45 NOGGING 50MM INSTULATION CLT FLOOR PANEL 90 220 2702 535 RL SFL 11360 NGL NGL AREA TO BE CUT TO SFL SFL 535 2167 WALL TYPES EXTERNAL WALL TYPES INTERNAL 260 80 35 15 261 100 36 260 90 90 WA1 WA2 WA5 WA4 WA3 CLT TIMBER CLADDING LOAD BEARING • 260MM CLT PANEL • 1.5MM WATERPROOF MEMBRANE • 80MM WOOD FIBRE INSULATION • 1.5MM VAPOR BARRIER • 35MM TIMBER BATTENS • 15MM TIMBER PANELS CONSTRUCTION CLT COPPER CLADDING LOAD BEARING • 260MM CLT PANEL • 1.5MM WATERPROOF MEMBRANE • 80MM WOOD FIBRE INSULATION • 1.5MM VAPOR BARRIER • 35MM TIMBER BATTENS • 15MM TIMBER PANELS CONSTRUCTION CONCRETE CAST IN-SITU LOAD BEARING BASIC TIMBER STUD WALL NON-LOAD BEARING 10MM PLASTERBOARD WITH SPECIFIED PAINT FINISH 90MM TIMBER FRAMING STUDS @ 450 CTRS 10MM PLASTERBOARD WITH SPECIFIED PAINT FINISH CONSTRUCTION CLT PANEL LOAD BEARING 90MM CLT PANEL TO SUPPORT STAIRS CONSTRUCTION 10 110 10 SCALE CHECKED BY DRAWN BY DATE CONSULTANT ADDRESS PHONE EMAIL CONSTRUCTION H SHEET NAME ADRESS ISSUE FOR As indicated DETAILS OZ HOMES 16/05/2023 M.HASSAN MICHEAL/MATT DO.01 7 DEAKIN RD GEELONG 3220 VIC 1 : 10 DETAIL -CLT COLUMN TO FLOOR CONNECTION B 1 : 10 DETAIL -COLUMN FOUNDATION CONNECTION C 1 : 10 DETAIL -TIMBER FLOOR A 1 : 10 Non-Bearing wall (CLT TO Celling ) D 1 50 CUT & FILL SECTION C1 1 : 10 WALL TYPE DETAILS W

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
PORTFOLIO by m.hs - Issuu