KEY NOTES 4 1
7 RHB-1 3" WASTE UP TO 2ND FLOOR
HB-1 10
FCO
FCO STAFF TOILET 207
WC-2
L-2
4
TP WC-2
2"V
L-2
11
4"
4" W
4" V DN IN WALL
24
12
11
WC-1 10 2" V UTR
23
4" 2"
2%
WC-2
FCO 2"V UP TO 2ND FLR
3
1/4" = 1'-0"
MEN'S RESTROOM 133
3
B
4
4" 4" 8
L C
2%
2" 9
WOMEN'S RESTROOM 134 4"
WC-2
FD-1
FD-1
FD-1
32
TP
STAFF TOILET 137
2" VTR
FCO
WC-2
L-2
WC-1
WC-1
2
15
8 P-500
WH-1
2%
WC-1
16
TP
TP
3" V UP TO 2ND FLR
2"
26
L-1
11 2%
WCO
1 1/2"
29
4
2-1/2" CW UP TO 2ND FLOOR
5
2" HW UP TO 2ND FLOOR
6
3/4" CW DN IN WALL TO DF
7
3/4" CW AND 3/4" HW DN IN WALL TO SERVE SERVICE SINK
8
3/4" CW AND 3/4" HW DN IN WALL TO SERVE LAV AND HB
9
1-1/2" CW, 3/4" HW DOWN IN WALL, PROVIDE SOV AND ACCESS PANEL, RUN 1-1/2" CW TO WC, 3/4" CW & HW TO LAV AND 1/2" CW TO TRAP PRIMER
10
1-1/2" CW DN IN WALL TO WC, PROVIDE SOV AND ACCESS PANEL, RUN 1-1/2" CW TO WC & 1/2" CW TO TRAP PRIMER
11
4" VENT UP TO 2ND FLOOR
12
3/4" CW, 3/4" HW DOWN IN WALL TO SERVE LAV
13
1-1/4" CONDENSATE DRAIN DOWN IN WALL AND CONNECT TO TAILPIECE ADAPTER
14
1" CONDENSATE DRAIN DOWN IN WALL CONNECT TO TAILPIECE ADAPTER
15
3/4" HW DOWN IN WALL TO SERVE LAV
16
4" WASTE DOWN FROM 2ND FLOOR
17
4" GAS UP IN WALL, OFFSET ABOVE CEILING
18
EARTHQUAKE SOV
19
GAS PRESSURE REGULATING VALVE
20
4" GAS BELOW GRADE, FOR CONTINUATION SEE SITE PLAN
21
4" WASTE BELOW GRADE, FOR CONTINUATION SEE CIVIL DRAWING
22
1" CONDENSATE DRAIN DOWN IN WALL CONNECT TO TAILPIECE ADAPTER
23
1-1/4" CONDENSATE DRAIN DOWN IN WALL CONNECT TO TAILPIECE ADAPTER
24
1-1/2" CW & 3/4" HW DOWN TO FIRST FLOOR
25
4" WASTE DOWN TO FIRST FLOOR
26
2" HW DOWN TO FIRST FLOOR
27
2-1/2" CW UP FROM FIRST FLOOR
28
4" VENT DN TO FIRST FLOOR AND UP THRU ROOF
29
3" WASTE DOWN TO FIRST FLOOR
30
1-1/2" CW & HW DN TO WH
31
3" PVC SUPPLY AIR UP THRU ROOF TERMINATE WITH RAIN CAP AND DOWN TO WH
32
3" PVC VENT AIR UP THRU ROOF TERMINATE WITH RAIN CAP AND DOWN TO WH
CSDA Architects, Inc. 4061 Glencoe Ave, Suite B Marina del Rey, CA 90292 design@csdarchitects.com T:310.821.9200 F:310.821.9201
ARCHITECT STAMP
CONSULTANT
CREATIVE DESIGN
CONSULTING ENGINEERS 336 NORTH CENTRAL AVE SUITE 10B GLENDALE, CA 91203 TEL: (818) 507-7522
CONSULTANT STAMP
WC-1
WC-2
NOT FOR CONSTRUCTION USE
AUTHORITY APPROVAL IDENTIFICATION STAMP DIVISION OF THE STATE ARCHITECT
04-112249 FLS
AC DATE
SS
L-2
27
31
STAFF TOILET 136
2 1/2"
11
2 1/2"
3
15 10
TP
SCHOOL DISTRICT:
2%
2-1/2" SOV IN YARD BOX 2%
WC-2
A
12
4" V DN IN WALL
FD-1
28
VICTOR VALLEY UNION HIGH SCHOOL DISTRICT
A 4"
4"
DF-1 CO
2"W DN TO 1ST FLR
16350 MOJAVE DRIVE VICTORVILLE, CA 92395
21
SCHOOL ADDRESS:
1
B
FIRST FLOOR RESTROOM 133, 134 2 1/2"
2-1/2" CW DOWN IN WALL TO 2-1/2" CW HEADER, RUN 1-1/2" CW TO EACH WC & 1/2" TO TRAP PRIMER, PROVIDE SOV AND ACCESS PANEL
HB-1
L-2
30
3
DF-1
1" HW UP TO 2ND FLR
SS-1
2-1/2" CW UP IN WALL, OFFSET ABOVE CEILING
6 2%
7 SECOND FLOOR RESTROOM 207
2
TP
7 SS-1
1/4" = 1'-0"
2"W UP TO 2ND FLR
FD-1 12
2-1/2" CW BELOW GRADE, TERMINATE 5'-0" FROM EXTERIOR WALL, FOR CONTINUATION SEE CIVIL DRAWING
L-1
25
FCO
FIRST FLOOR RESTROOM 159
8
L-2
UR-2
FD-1
TOILET 159
5
UR-1
TP FD-1
4"
1
4
8
3/4" HWR
1/4" = 1'-0"
1
VICTOR VALLEY HIGH SCHOOL - NEW ADMINISTRATION & LIBRARY BUILDING
16500 MOJAVE DRIVE VICTORVILLE, CA 92395 KEY PLAN
1" HW DN. TO 1ST FLR
G
15
22
10
10
15 TP
TP
L-2
20
G WC-2
17
21
2%
FCO 8
FD-1
L-1
L
FD-1
TP
L-1
TP
3
WC-2
STAFF TOILET 108
L-2
4"
FD-1 STAFF TOILET 4" 109
L-1
FCO 4" V UTR & DN TO 1ST FLR
CD
FD-1
L-1
3
1"CD
WOMEN'S RESTROOM 212
HB-1
WC-1 UR2
2%
HB-1
G
19
RHB-1
8
L-2
18
L-2 MEN'S RESTROOM 211
WC-1 WC-1
4" W DOWN TO FIRST FLOOR
UR-1
WC-1
UR1
WC-1
FD-1
TP
FCO
L-2
FD-1
15
WC-2
TP
TP
06/11/12 DSA BACKCHECK 12/29/11 DSA SUBMITTAL MARK: DATE: DESCRIPTION: DRAWN BY: PP CHK'D BY: VO
12
COPYRIGHT: CSDA ARCHITECTS 2011
FD-1
SHEET TITLE
STAFF TOILET 106 WC-2
WC-2
A
WCO
F
ENLARGED PLUMBING PLAN ORIGINAL SCALE 0
8
4
SECOND FLOOR RESTROOM 211, 212 1/4" = 1'-0"
5
JOB NO.: SHEET NUMBER:
9
FIRST FLOOR RESTROOM 106, 108, 109 1/4" = 1'-0"
1"
2
P-410
2"