How to prevent and treat termites for new construction ?

In the midst of India's burgeoning infrastructure sector, the question of how to effectively prevent and treat termites during new construction looms large for homeowners. With the investment in property being a once-in-a-lifetime endeavor for many, safeguarding against the pervasive threat of termites is paramount In this blog, we'll delve into the intricacies of pre-construction anti-termite treatment, breaking down complex technical specifications into understandable terms for all.
Importance of Pre-Construction Termite Treatment
Your property is your most valuable asset, and protecting it from termites begins from the ground up Constructing a new house presents a prime opportunity to implement preventive measures against termite damage. The most effective termite treatment occurs during the early stages of construction, laying the foundation for long-term protection.
Pre-Construction Termite Treatment Chemicals
The cornerstone of pre-construction termite treatment lies in utilizing approved termiticides recommended by regulatory bodies These chemicals undergo rigorous testing to ensure efficacy under Indian climatic conditions. Key termiticides include Clorpyrifos 20% E.C, Lindane 20% E.C, and Imidacloprid 30.5% S.C, each prescribed at specific concentrations for optimal effectiveness.
Scope of Work for Pre-Construction Anti-Termite Treatment
The process involves meticulous attention to detail, beginning with assessing soil moisture levels before treatment. Weather conditions play a crucial role, with a rain-free period of at least 24 hours post-treatment being imperative Major treatment stages encompass treating foundation trenches, backfill, wall-floor junctions, plinth filling, and the external perimeter of the building
Deviation from Standard Practices
In cases where construction is already underway, deviations from standard treatment practices may occur due to various factors, including lack of awareness or time constraints Collaboration between site personnel and treatment teams is crucial to address missed stages effectively
Cost Estimation
The cost of pre-construction termite treatment varies depending on factors such as the built-up area and the region's soil characteristics Professional services typically range from Rs 95 to 125 per square meter, inclusive of major treatment stages Additional charges may apply for minor stages or miscellaneous treatments.