LIPI SHARMIL MAUN
Email : lipismaun@gamil.com
Phone : 9664779313
I am a 22-year-old fresher Architect from Ahmedabad. I hold a bachelors of architecture from Manipal School of Architecture and Planning, Manipal. I have internship experience from Studio Naqshbandi, Auroville.
I enjoy working in collaborative, explorative, experimentive places where there is a constant give and take of learnings, new ideas, new experiences. An enthusiast & curious by nature I am constantly on the look for new ideas and things to explore around the world. I think architecture should not be static and should be ever evolving. I believe in the architecture of form, space and idea.
CURRICULUM VIATE
Education
Bachelor of Architecture , Manipal School of Architecture and Planning, MAHE, Manipal , India
Completed | CGPA 9.5
Umeå School Of Architecture , Umeå , Sweden
Student Exchange - 7th Semester
Secondary Education , Nirma Vidyavihar & JG International School Ahmedabad
Additional Certificate Courses
The Architectural Imagination
Harvard University
Archaeoastronomy
Politecnico Di Milano
Asain Enviornmental Humanities - Landscapes in Transition
University of Zurich
Fundamentals Of Graphic Design
California Institute Of the Arts
Experience
AndBlack , Ahmedabad , India 1 Month Internship
Solar Decathlon India Competition Finalist
Studio Naqshbandi, Auroville 6 Month Internship
Participation in the international conference on Sustainable Infrastructure: Innovations, Opportunities, and Challenges (SIIOC 2024) by NITK, Surathkal, India
Softwares
Autodesk CAD
Autodesk Revit
Twinmotion , Lumion
Illustrator , Photoshop , Indesign
Powerpoint , Word Excel
Autodesk Revit , SketchUp
Languages
Fluent
1
Fluent Fluent
Native English Gujarati Hindi
2019- 2024 2021 2020 2020 2021 2021 CAD Rendering Microsoft Office BIM Adobe CC 3D Modelling 2022 2023 2024 2022 2016- 2018
ANTARDRISHTI, CAMPUS FOR VISUALLY IMPAIRED,DHARWAD
EKAI RESORT, GOA
ON- SITE CONSTRUCTION WORKER HOUSING, FARIDABAD
TRACES, ROBERTSFORS
INTERNSHIP WORK, STUDIO NAQSHBANDI
WORKING DRAWINGS, MANIPAL MATERIAL EXPLORATION
2
INDEX 2024 3-5 6-8 9-10 11-13 14-15 16 17-18 2020 2021 2022 2023 2022 2019-24
ANTARDRISHTI: CAMPUS FOR VISUALLY IMPAIRED,
Nature of Work: Individual
About the Project:The Dharwad Campus for the Visually Impaired, spanning 30,000 sqm, prioritizes accessibility and inclusivity by offering tailored education, vocational training, and community engagement to foster holistic development. The campus includes diverse spaces such as an auditorium, sensory garden, amphitheater, food stop and toilets, maze, school, school parking, skill development center, dining hall, three hostels, general parking, and service areas.
The design concept focuses on creating inclusive environments for blind and visually impaired children through cognitive mapping and multi-sensory experiences. Architectural elements such as diffused light, clerestory windows, angled roofs, landscapes, and courtyards enhance spatial awareness. Materials are chosen for their sensory impact: concrete, steel, glass, wood, and tactile flooring provide a range of acoustic, tactile, and visual qualities. This approach ensures the built environment supports navigation, independence, and overall learning for visually impaired users.
3
2024 | Thesis Project | Antardristhi SITE PLAN | 1:1000 SITE ELEVATION | 1:1000 1. AUDITORIUM 2. SENSORY GARDEN 3. AMPHITHEATRE 4. FOOD STOP & TOILET 5. MAZE 6. SCHOOL 7. SCHOOL PARKING 8. SKILL DEVELOPMENT CENTRE 9. DINING 10. HOSTEL 1 11. HOSTEL 2 12. HOSTEL 3 13. PARKING 14. SERVICES 2 3 5 6 8 10 13 14 11 12 9 7 FUTURE EXTENSION ENTRY/EXIT SERVICEENTRY/EXIT 4 TOTAL SITE AREA: 29,500 Sq.m/ 7.2 Acres TOTAL BUILT-UP AREA 7000 Sq.m F.A.R 2.3 TOTAL LANDSCAPE AREA 6500 Sq.m TOTAL PARKING 65 CAR PARKING, 40 2-WHEELER PARKING
DHARWAD
SKILL DEVELOPMENT CENTRE
SCHOOL
The skill development centre is A facility for training, mobility, rehabilitation, and technical and industrial education. Design focusing on natural lighting, optimal acoustics, and ergonomic design, cultivates an environment conducive to learning & skill acquisition.
The school features a geometric layout,easy identification of class locations based on sensory cues. Outdoor classrooms are provided to promote interactive learning experiences. On the ground floor, four extensions are incorporated, each tailored to stimulate different senses.
BUILT-UP AREA:
4 6 6 6 6 6 30 8 8 8 24 6 6 6 6 6 30 8 8 8 24 8 6 8 6 ADMIN 5.8 X 2.85 m STORAGE 3.7 1.7 DIRECTOR'S OFFICE 5.8 2.85 m TOILET 4.4 X 3.3 m LVL +0.6 LECTURE HALL 9.9 X 7.8 m STAFF ROOM 5.8 X 5.9 m ENTRANCE F 3 4 5 COURTYARD X 11m PANTRY & DINING AREA 5.8 2.85 m LVL +0.6 DRINKING WATER & SITTING AREA 5.8 X 2.85 m TOILET 4.4 X 3.3 m LVL +0.6 LECTURE HALL 9.9 X 7.8 m 6 A B C D E LIFT SEATING PIT 3.4 5 m RECEPTION 5.8 X 5.9 m STAIRCASE 3 4 5 6 A B C D VOID 11m LIFT EYECARE TRAINING 5.8 5.9 m TOILET 4.4 3.3 m MOBILITY TRAINING 9.9 7.8 m PANTRY & DINING AREA 5.8 X 2.85 m LVL +3.6 m DRINKING WATER & SITTING AREA 5.8 X 2.85 m TOILET 4.4 3.3 m LVL +3.6 SEWING TRAINING 9.9 X 7.8 m CRAFTS TRAINING X 4 m 2 ENTRANCE 2 LVL +0.6 COMPUTER LAB 13.7 9.2 m EXHIBITION & STORE AREA 7.8 X 17.8 m STAIRCASE LECTURE HALL 6 5 SECOND FLOOR 4250 SILL LEVEL 2 5050 EXHIBITION & STORE 8000 PLINTH LEVEL 600 SECOND FLOOR 4250 THIRD FLOOR 7900 FOUNDATION -2350 2 3 8000 FLOOR SLAB THK 150 cm BEAM THK 300 cm ROOF SLAB THK 150 cm RISER 150 cm TREAD 300 cm NOSING 4cm RAILING 900 cm ROOF 11700 25
BUILT-UP AREA: 1400 Sq.m NO. OF USERS: 150 users
GROUND FLOOR PLAN | 1:200 VIEWS A’ A’ A A SECTION AA’ | 1:200 ELEVATION | 1:200 STAIRCASE DETAIL | 1:50 2024 | Thesis Project | Antardristhi
950
users
Sq.m NO. OF USERS: 150
GROUND FLOOR PLAN | 1:300 VIEWS SECTION AA’ | 1:300 ELEVATION | 1:300
AUDITORIUM
Three hostels, two cater to school-going children, while the third serves students focusing on skill development. Within each hostel, there are six dormitories, each accommodating six individuals who share a connected washroom.
One of the versatile spaces on campus is the auditorium, which can serve multiple purposes. It is available for use and rental by external parties, allowing the organization to generate revenue while also benefiting students through its various functions.
BUILT-UP AREA: 1250 Sq.m NO. OF USERS: 450 users
5 5.5 3.9 5.5 6.05 20.95 16.2 4.875 6.45 4.875 5.5 3.9 5.5 6.05 20.95 16.2 4.875 6.45 4.875 5.5 3.9 16.2 4.875 6.45 4.875 LIFT STAIRCASE A B C D 1 2 3 4 5 CARETAKERS ROOM 2.6 X 5 M DORMITORY 1 4.675 X 15 M TOILET 2.5 X 7.5 COURTYARD 6.3 X 6.3 m LOBBY & WAITING AREA 9 X 6 m DORMITORY 4.675 X 15 M TOILET 2.5 X 7.5 LIFT STAIRCASE A B C D 1 2 3 4 5 DORMITORY 3 4.675 X 15 M TOILET 2.5 X 7.5 DORMITORY 4 4.675 X 15 M TOILET 2.5 X 7.5 A B C D 2 GUEST ROOM 2.6 X M DORMITORY 5 4.675 X 15 M TOILET 2.5 X 7.5 LIBRARY AREA 9 X 6 m DORMITORY 6 4.675 X 15 M TOILET 2.5 X 7.5 COURTYARD 6.3 X 6.3 m 20 19 18 24 25 26 29 30 32 22 20 15 14 23 26 27 42 45 LVL +0.6 m ENTRANCE LVL +0.0 m GUEST ROOM 1 ROOF 13200 A B C D LAUNDRY ROOM 4875 6450 4875 6900 LINTEL LEVEL 5950 DORMITORY 3 TOILET LINTEL LEVEL PLINTH LEVEL 600 SILL LEVEL 1400 SECOND FLOOR 3750 SILL LEVEL 2 4550 THIRD FLOOR 6900 2800 LINTEL LEVEL 5950 A B LINTEL LEVEL PLINTH LEVEL 600 SILL LEVEL 1400 SECOND FLOOR 3750 2800 GROUND LEVEL 0
BUILT-UP AREA: 900 Sq.m NO. OF USERS: 200 users HOSTELS GROUND FLOOR PLAN | 1:200 VIEWS SECTION AA’ | 1:200 ELEVATION | 1:200 DORMITORY DETAIL | 1:50 2024 | Thesis Project | Antardristhi 4 4 4 4 5 5 3 4 5 6 7 30 A B C D 4 4 6.3 42.15 H G F 15.3 4.2 4.2 4.2 RECEPTION +2.1 EXHIBITION AREA STORE AREA 3.8 2m LVL +0.0 LVL -0.45m LVL +0.0 LVL +0.0 m ENTRANCE GREEN ROOM (M) 8.8 m AHU ROOM 3.8 m LOBBY 3.8 m EQUIPMENT ROOM 3.8 m GREEN ROOM (F) 8.8 X 4 m TOILET (M) 3.5 X 3.2 m TOILET (F) 3.5 X 3.2 m TOILET (M) TOILET (M) VIP ROOM X 3.8 m OFFICE X 3.8 m STAFF ENTRY STAFF ENTRY 8 15 LVL+0.9m LVL+0.9m 4
1:300 VIEWS SECTION AA’ | 1:300 ELEVATION | 1:300 A’ A’ A A
GROUND FLOOR PLAN |
EKAI RESORT, GOA
Nature of Work: Partnership
About the project: The climate-responsive resort in Mandrem, Goa, features a hotel, suites, villas, restaurants, recreational areas, and staff quarters, built with sustainable materials like rammed earth, CSEB, ferrocement, Mangalore tiles, and red oxide flooring.
The design concept emphasizes unity and seamlessly blending into the surrounding foliage. Architectural strategies focus on creating courtyards, high-volume spaces, and interactive indoor-outdoor areas to enhance user comfort and attraction. The resort design centers on a core space, connecting various functions such as entertainment, dining, and administration through convergence and divergence. Consistent visual connections are established using openings, fenestrations, green roofs, and a harmonious palette of materials and colors. This cohesive visual language integrates the design with the landscape, creating visual pockets that enhance the overall user experience.
6 A’ A 2020 | 4th Semester | Ekai Resort
1. MAIN ENTRY 2. SECURITY CABIN 3. 2W PARKING (16) 4. BUS PARKING (2) 5. 4W PARKING (16) 6. MAIN BLOCK 7. STAFF QUARTERS 8. RESIDENTIAL GUEST BLOCK 9. ENTERTAINMENT BLOCK 10. VILLA 1 11. VILLA 2 12. CONSTRUCTED WETLAND 13. DG SET 14. TRANSFORMER 15. WATER TANK SITE PLAN | 1:1000 SITE SECTION | 1:1000 MAIN BLOCK AREA: 1030 S.Q.M RESIDENTIAL GUEST BLOCK AREA: 845 S.Q.M VILLAS AREA: 485 S.Q.M ENTERTAINMENT BLOCK AREA: 500 S.Q.M STAFF QUARTER’S AREA: 450 S.Q.M PARKING: 402 S.Q.M LANDSCAPE AREA: 10,115 S.Q.M NO. OF USERS: 80
Four luxurious one-bedroom villas, each equipped with a living area,kitchen, and private swimming pool with a balcony. These villas are strategically positioned to face the mountains, providing guests with both privacy and breathtaking views, enhancing their overall stay.
BUILT-UP AREA: 65 Sq.m NO. OF USERS: 2 users
Two luxurious two-bedroom villas, each equipped with a living area,kitchen, and private swimming pool with a balcony. These villas are strategically positioned to face the mountains, providing guests with both privacy and breathtaking views, enhancing their overall stay.
7 VILLA 1 2020 | 4th Semester | Ekai Resort
FLOOR
SECTION AA’ | 1:50
GROUND
PLAN | 1:50 VIEWS
FLOOR PLAN
1:50
SECTION AA’ | 1:50
VILLA 2 GROUND
|
VIEWS
A’ A’ A A
BUILT-UP AREA: 100 Sq.m NO. OF USERS: 4 users
ADMIN BLOCK
The admin block, which is the first building guests encounter upon entering the resort, is designed to provide a welcoming and functional space for visitors. It provides a hospitable space with various dining options and event facilities, enriching the overall guest experience.
BUILT-UP AREA: 1030 Sq.m NO. OF USERS: 200 users
RECREATIONAL BLOCK
The entertainment block offers spaces for recreational activities including a courtyard, arcade, yoga, gym, and swimming pool. This facility provides diverse leisure options, promoting relaxation and fitness, and enhancing the resort’s appeal as a comprehensive destination for guests.
BUILT-UP AREA:
8 2020 | 4th Semester | Ekai Resort GROUND FLOOR PLAN | 1:200 VIEWS SECTION AA’ | 1:200
GROUND FLOOR PLAN | 1:100 VIEWS SECTION AA’ | 1:100
500
80
A’ A’ A A
Sq.m NO. OF USERS:
users
SOLAR DECATHLON: ON-SITE CONSTRUCTION WORKER HOUSING, FARIDABD
Nature of Work: Group
About the project: As part of the 5th semester project, participation in the Solar Decathlon involved working on the On-Site Construction Worker Housing project. Fourteen members from architecture and civil backgrounds made up ‘Team Samanvit’, aiming to create sustainable built environments that promote circularity.Partnering with Apeejay Logistics, the team focused on net-zero water, net-zero energy, resilient housing, and affordable housing for construction workers, utilizing Duffy’s six shearing layers. The project demonstrated a 19% profit over 4 years.
The modular structure can be implemented as either a build-own-operate model, where the structure is built, owned, and operated, or a build-own-lease model, where it is built, owned, and leased out.
9
2021 | Solar Decathlon Competition | Construction Worker Housing Total Project Site Area: 339040.10 SQ.M Construction Worker Housing Site Area 14,305 SQ.M Proposed/ Estimated Built-up Area: 1150 SQ.M Number of people: 120(Male:100 Female:20) SITE PLAN| 1:1000 SITE SECTION | 1:1000
ENGINEERING OPERATIONS
The Load distribution patter has been calculated and analyzed for all the blocks along with Seismic vulnerability assessment.
The beams and columns are Fiber reinforced channels which are joined using nuts and bolts connections to the (GFRG) Glass Fiber Reinforced Gypsum Panel. Since the structure is single story and the lateral load to stories is 10.72kN, the single unit is safe from seismic load.
RESILIENCE
ENERFY PERFORMANCE
The EPI achieved for the overall site for this case is 42.1 kWh/m2 .
Naturally ventilated: all blocks
Mixed-mode ventilated: dormitory and housing are equipped with radiant panels to provide cooling and heating to the space.
WATER PERFORMANCE
1. Tyre Foundation can act as dampers in situations such as earthquakes and heavy wind flows
2. GFRG panels are structural stable in such situations because of there self weight
3. Steel joineries with nuts and bolts are used for stronger stability
4. Bracing are used in contoured regions for extra support from the foundation level
5. FRP beams and columns as they have good young’s module of elasticit .
Net-zero water cycle achieved by using systems such as Rain water harvesting , Grey water recycling system , Low-flow fixtures. Annual water demand of 37,67,520 litres met through these systems. Reduction of water usage from base case by 35.33%
10 2021 | Solar Decathlon Competition | Construction Worker Housing
Load distribution on a slab. Single unit block plan with load distribution on roof
naturally
site Zone Energy
mixed-mode ventilated site
Surface temperature for
ventilated
Analysis for
RICHARD LONG: TRACES, ROBERTSFORS
Nature of Work: Individual
About the Project: Designing a residence in Robertsfors, Västerbotten County, Sweden, for Richard Long, a British artist celebrated for his sculptures, land art, environmental art, and textual works. Long’s artistic process involves walking through landscapes, crafting sculptures as he goes, documenting them through photographs, and transforming his walks into textual compositions. His art revolves around leaving marks in nature, be they transient or lasting, as a reaction to the environment around him.
The building location was chosen based on viewpoints, accessibility, and privacy. View 2 was selected for its wide viewpoint.Inspired by Richard Long’s work with nature, the building is raised on stilts, using the sheltered space below as a studio.Spaces are divided into private (bedroom and bathroom) and public (living, dining, and kitchen). Both areas are accessible via a raised slope.
11
SITE PLAN | 1:500 SECTION AA’ | 1:500 2022 | Student Exchange Umeå universitet | Traces 2022 | Student Exchange Umeå universitet | Traces Total Project Site Area: 1200 SQ.M Site Area: 200 SQ.M Built-up Area: 75 SQ.M Number of people: 2
RICHARD LONG’S STUDIO
12 SECTION AA’ | 1:50 DETAIL A DETAIL B 2022 | Student Exchange Umeå universitet | Traces 1 2 3 4 5 A B C A A' GROUND PLAN | 1:50
Roof Structural Beams False ceiling Knauf Insulation Exterior - 430mm Wooden Slope Structural Columns Wooden Beams Foundation AXONOMETRIC VIEW
13 2022 | Student Exchange Umeå universitet | Traces B B FOUNDATION DETAIL| 1:25
| 1:25
ROOF DETAIL
Cement Screed
Rigid Insulation
Concrete
MS Steal beam(150x150) False ceiling Timber Blocks (150x150mm)
Grout
Dado
MS Steel plate
DETAIL B MODEL SECTION | 1:50
7
Damp proofing
DETAIL A
DETAILS
SUNDARANANDA, AHMEDABAD
PROJECT INFORMATION
Client: Lawyer & Architect couple
Status: Ongoing
Location: Ahmedabad, Gujarat
14 1150 LAP POOL ±0.00 #6 –90 PEDESTRIAN –90 G G' H' A1 A1' Waste Water Tank Below #6 89 117 582 642 140 882 168 30 80 23 140 103 90 30 113 97.7 30 180 30 100 30 349.5 113 120 196 52.5 218 218-N Q N
2023 | Internship | Studio Naqshbandi
Area: 358 m²
SCOPE OF WORK & CONTRIBUTION : 1. Ribbon window & Cupboard 2. Concrete counter detailing 3. Ferrocemnet shelves detailing 4. Lap pool working drawing 5. Laundry room layout and electrical drawing 6. Door and Window detailing 7. Furniture design LAP POOL PLAN GROUND FLOOR PLAN SECTION AA LAP POOL SECTION 25 18.5 #16 245 0.00 297.5 GROUND FLOOR LVL SPLIT LVL (LIBRARY) FLOOR LVL SPLIT LVL (KITCHENETTE) FLOOR LVL SPLIT LVL STAIRWELL ROOF LVL (LIKELY TO CHANGE) SHAFT ROOF LVL (earlier 331.5) BASEMENT FFL 108.5 STREET LVL 359.5(earlier 361.5) COURTYARD FFL SOUTH –296 SOUTHERN PROJECTION –326 1279.5 226 324 30 520 75 150 12.5 256 294 354 256 30.4 150 140 150 150 550 30 60 165 90 V7 66 210 BEDROOM BEDROOM LAUNDRY LIFT SHAFT KITCHENETTE LIBRARY LOBBY LIVING BALCONY WORK ENTRY 17.5 CONFERENCE NORTH BALCONY VERANDAH 100 126 264 120 76 SR.NO. REVISION DATE Drawings issued R3 -Update split level bench height -Basement conference storage lifted 15cm towards conference Drawings issued R2 09.09.2022 REVISION TABLE-N A A SUNDARANANDA Co-Living SECTION CC' VINOD SHAH Consulting Engineers Pvt. Ltd., Ahmedabad PH: (079)27683046 COLUMN SIZES •23x30cm- C4, C9 NOTES DRW NO. BSH_A4_03_R3 29.12.2022 [for discussion] 1150 175 45 14 20 10 14 20 LAP POOL 120CM DEEP 10 48.5 10 T R = 30 = 15 #6 ±0.00 –90 –90 DUCT DUCT WB NT BC ±0.00 T R = 30 = 15 #6 296 30 296 30 296 60 140 30 30 256 30 1524 30 197 202 MG Science Boundary wall G E L Y a n r a A u r o v e 6 0 5 1 1 1 e o g D I NOTES •All dimensions, unless specified, are in •Dimensions to be read, not measured from sheet • •All dimensions or height refer to the level of structure with finish unless otherwise specified. COLUMN SIZES •30x30cm•23x30cm•23x23cm20 10 15 17 30 15 75 19 23 30 19 30 30 30 30 30 1000 20 10 10 17 23 30 19 1150 58 53 120 15cm G.L 215 90 305 20 10 15 17 30 15 75 19 23 30 19 30 30 30 30 30 1000 20 10 10 17 23 30 19 1150 58 53 120 15cm G.L 152.5 152.5 305 394.2 490.8 25.0 634.2 332.2 1150.0 SR.NO. REVISION M O Y a n E m a N A LIPI DRW NO. SUNDARANANDA Co-Living 0 LAP WALL STRUCTURAL VINOD Pvt. Ltd., PH: (079)27683046 COLUMN •30x30cm•23x30cm•23x23cmNOTES •All dimensions, •Dimensions All dimensions structure LEGEND WALL 14cm(23 24 (60 30cmDATE OPTION 1 OPTION 2
Built-Up
Type: Residence (Co-Living)
DK RESIDENCE, AUROVILLE
Client:
Status:
Built-Up
Type:
BATHROOM ELEVATION
CONTINUATION OF BATHROOM ELEVATION
15 LIVING AREA ENTRANCE 3.9 4.5m -0.19m DINING ROOM 1.25 2.43m SIT OUT -0.09m ENTRANCE KITCHEN EQUIPMENT VERANDAH KITCHEN STORE POND ROOM ROOM 196 GUEST BATHROOM GUEST BEDROOM POND-Q A REV NO. DK RESIDENCE RENOVATION AUROVILLE GROUND FLOOR PLAN NOTES: specified are CENTIMETERS. measured sheets. queries/discrepancies dimensions heights refer unless otherwise specified. R0 1:8 NO: R0
2023 | Internship | Studio Naqshbandi
INFORMATION
PROJECT
D.K & R.S
Ongoing
Tamil Nadu
Location: Auroville,
Area: 300 m²
Residence SCOPE OF WORK & CONTRIBUTION : 1. Layouts- Powder room, Laundry room, store-room, Bathroom on F.F and Library. 2. Electrical and Plumbing drawings- Powder room, Laundry room and Bathroom on F.F. 3. Window and Door detailing 4. 3D Model GROUND FLOOR PLAN BATHROOM PLAN W8 W9 D6 FC Channels SB:2.75/2.93m GYM 3.7 X 5.0m Flat Ceiling SB:1.96m +3.02m 134 W9 284 25 85 270 350 355 645 44 120 BB:2.108m FC Channels Flat Ceiling +3.02m D7 +3.15m Flat Ceiling SB:2.39m Flat Ceiling SB:3.00m 150 35 E C 124 75 50 75 50 75 50 75 50 75 45 B D 45 +45 45 50 10 16.5 +3.02m +3.02m 60 Opening closed 15cm wall added for support Opening closed Opening closed SEPTIC TANK 5' dia 4.6' depth "Ø 35 10 +3.02 Existing Water SLOPE SLOPE 4"Ø cm) SW PIPE 60 30-A S A D REV NO. DK RESIDENCE RENOVATION RUTH'S BATHROOM PLAN PLUMBING NOTES: specified are in CENTIMETERS. measured off sheets. queries/discrepancies to be All dimensions heights refer to unless otherwise specified. Ceiling Height Height the corridor be Ceiling Height Bathroom to be 3.00m. bathroom to be +3.02m except the Bathtub which will be R1 DRW BY: CHK BY: SCALE: SHEET: A3 BATHROOM PLAN 1:4 LEGEND Waste water line (1 "Ø) Sewage line (4"Ø) water line "Ø) New Construction Existing REV. DESCRIPTION DATE R0 15.04.2023 R1 19.04.2023 Bathtub Corridor Windows Ceiling Heights –– BOTTLE TRAP SH SHOWER HEAD 55 44 149 30 10 150 239 50 39 IPS OF MUDDY PINK FINISH (DARKER) IPS OF WHITE FINISH BT HF BV 50 10 46 56 80 AV 40 58 20 4 58 85 80 BC +90 BV WC HF SH 15 90 210 10 105 160 160 64 25 25 75 50 75 50 75 50 259 620 120 185 50 355 145 120 265 50 A B C D 5X5 cm CERAMIC TILES 75 50 75 20 184 29 150 39 50 26 150 239 44 90 149 45 45 5 210 30 NICHE 30 10 85 15 75 65 55 95° 95° R5 R5 15 10 140 10 20 110 30 R10 110°R10 100° BV 10 BV WC HF SH 15 90 210 10 SH 45 55 154 90 180 239 50 145 120 30 80 225 D E F A 30 NICHE 5X5 cm CERAMIC TILES 59 190 OPENING NICHE Water Heater 85 15 75 65 55 95° 95° R5 R5 15 10 140 10 20 110 30 R10 110°R10 100° M O Y a E m N DATE REV DK RENOVATION AUROVILLE RUTH'S ELEVATIONS NOTES: · All are · Dimensions measured · All clarified · All the unless DRW LIPI GOOD LEGEND BC BV BT AV WB CD ELEVATION - CONTINUATION ELEVATION REV. NO: R0 R1 55 44 149 30 30 10 150 239 50 39 IPS OF MUDDY PINK FINISH (DARKER) IPS OF WHITE FINISH BT HF BV 50 10 46 56 80 AV 40 58 20 4 58 85 80 BC +90 BV WC HF SH 15 90 210 10 105 160 160 64 25 25 75 50 75 50 75 50 259 620 120 185 50 355 145 120 265 50 A B C D 5X5 cm CERAMIC TILES 75 50 75 20 184 29 150 39 50 26 150 239 44 90 149 45 45 5 210 30 NICHE 30 10 85 15 75 65 55 95° 95° R5 R5 15 10 140 10 20 110 30 R10 110°R10 100° BV 10 BV WC HF SH 15 90 210 10 SH 45 55 90 180 239 30 80 225 D E F A 30 NICHE 5X5 cm CERAMIC TILES 59 190 OPENING 30 NICHE Water Heater 85 65 55 10 140 10 110° 100° M O Y a E m N DATE REV DK RENOVATION AUROVILLE RUTH'S ELEVATIONS NOTES: · All are · Dimensions measured · All clarified · All the unless DRW LIPI GOOD LEGEND BC BV BT AV WB CD ELEVATION - CONTINUATION ELEVATION REV. NO: R0 R1 55 44 149 30 30 10 150 239 50 39 IPS OF MUDDY PINK FINISH (DARKER) IPS OF WHITE FINISH BT HF BV 50 10 46 56 80 AV 40 58 20 4 58 85 80 BC +90 BV WC HF SH 15 90 210 10 105 160 160 64 25 25 75 50 75 50 75 50 259 620 120 185 50 355 145 120 265 50 A B C D 5X5 cm CERAMIC TILES 75 50 75 20 184 29 150 39 50 26 150 239 44 90 149 45 45 5 210 5 NICHE 30 10 85 15 75 65 55 95° 95° R5 R5 15 10 140 10 20 110 30 R10 110°R10 100° BV 10 BV WC HF SH 15 90 210 10 SH 45 55 154 90 170 180 239 50 145 120 265 30 80 225 115 20 110 14 80 130 444 D E F A 30 NICHE 5X5 cm CERAMIC TILES 59 190 OPENING 30 NICHE Water Heater 193 15 75 65 55 95° 95° R5 R5 15 10 20 110 30 R10 110°R10 100° C T O R - P o v e - 6 a @ a u o v N A Q S H B A DATE REV NO. : DK RESIDENCE RENOVATION AUROVILLE RUTH'S BATHROOM ELEVATIONS NOTES: · All dimensions, unless are in CENTIMETERS. · Dimensions to be read, measured off sheets. · All queries/discrepancies clarified with Architects. · All dimensions or heights the level of structure with unless otherwise specified. 19.04.2023 R1 DRW BY: LIPI CHK BY: MONA SCALE: GOOD FOR CONSTRUCTION – BIB COCK – BALL VALVE – BOTTLE TRAP LEGEND BC BV BT AV WB – WASH BASIN BEIGE CERAMIC ( 5X15 cm) FISH SCALE (6 inch) CD – CHANNEL DRAIN – ANGLE VALVE ELEVATION
1:5 REV. NO: DESCRIPTION R0 15.04.2023 R1 19.04.2023 Bathtub + Corridor Windows + Ceiling Heights 55 44 149 30 30 10 150 239 50 39 IPS OF MUDDY PINK FINISH (DARKER) IPS OF WHITE FINISH BT HF BV 50 10 46 56 80 AV 40 58 20 4 58 85 80 BC +90 BV WC HF SH 15 90 210 10 105 160 160 64 25 25 75 50 75 50 75 50 259 620 120 185 50 355 145 120 265 50 A B C D 5X5 cm CERAMIC TILES 75 50 75 20 184 29 150 39 50 26 150 239 44 90 149 45 45 5 210 5 30 NICHE 30 10 85 15 75 65 55 95° 95° R5 R5 15 10 140 10 20 110 30 R10 110°R10 100° BV 10 BV WC HF SH 15 90 210 10 SH 45 55 154 90 170 180 239 50 145 120 265 30 80 225 115 20 110 14 80 130 444 D E F A 30 NICHE 5X5 cm CERAMIC TILES 59 190 OPENING 30 NICHE Water Heater 193 85 15 75 65 55 95° 95° R5 R5 15 10 140 10 20 110 30 R10 110°R10 100° M O N A D O C T O R - P Y a n a A u r o v e - 6 E m a - m o n a @ a u o v N A Q S H B A DATE REV NO. : DK RESIDENCE RENOVATION AUROVILLE RUTH'S BATHROOM ELEVATIONS are in CENTIMETERS. · Dimensions to be read, measured off sheets. · All queries/discrepancies clarified with Architects. · All dimensions or heights the level of structure with unless otherwise specified. 19.04.2023 R1 DRW BY: LIPI CHK BY: MONA SCALE: GOOD FOR CONSTRUCTION – BIB COCK – BALL VALVE – BOTTLE TRAP LEGEND BC BV BT AV WB – WASH BASIN BEIGE CERAMIC ( 5X15 cm) FISH SCALE (6 inch) CD – CHANNEL DRAIN – ANGLE VALVE
CONTINUATION
1:5 REV. NO: DESCRIPTION R0 15.04.2023 R1 19.04.2023 Bathtub + Corridor Windows + Ceiling Heights 55 44 149 30 30 10 150 239 50 39 IPS OF MUDDY PINK FINISH (DARKER) IPS OF WHITE FINISH BT HF BV 50 10 46 56 80 AV 40 58 20 4 58 85 80 BC +90 BV WC HF SH 15 90 210 10 105 160 160 64 25 25 75 50 75 50 75 50 259 620 120 185 50 355 145 120 265 50 A B C D 5X5 cm CERAMIC TILES 75 50 75 20 184 29 150 39 50 26 150 239 44 90 149 45 45 5 210 30 NICHE 30 10 85 15 75 65 55 95° 95° R5 R5 15 10 140 10 20 110 30 R10 110°R10 100° 170 50 145 120 265 30 80 225 115 20 110 14 80 130 444 D E F A 5X5 cm CERAMIC TILES NICHE 193 85 15 75 65 55 95° 95° R5 R5 15 140 10 20 110 30 110°R10 100° M O N A D O C T O R - P N G E L Y a n r a A u r o v e - 6 0 5 1 1 1 N A Q S H B A N D I NOTES: · All dimensions, unless specified are in CENTIMETERS. · Dimensions to be read, not measured off sheets. · All queries/discrepancies to be clarified with Architects. · All dimensions or heights refer to the level of structure with finish unless otherwise specified. SHEET: – BIB COCK – BALL VALVE – BOTTLE TRAP LEGEND BC BV BT AV WB – WASH BASIN BEIGE CERAMIC TILES ( 5X15 cm) FISH SCALE TILE (6 inch) CD – CHANNEL DRAIN – ANGLE VALVE ELEVATION REV. NO: DESCRIPTION DATE R0 15.04.2023 R1 19.04.2023 Bathtub + Corridor Windows + Ceiling Heights 3D MODEL PHOTOS
- CONTINUATION ELEVATION
ELEVATION -
ELEVATION
DIXIT HOUSE, MANIPAL
16 LIVING ROOM 4 3.8m CLOSET 2m MUSIC ROOM 4m STUDY/OFFICE 3.7m OUTDOOR SEATING AREA 3.23 4.23m TOILET 3 1.8m TOILET 1.8m MASTERBEDROOM 4 4m PARENTS BEDROOM 5 * 4m DINING ROOM 4m POOJA ROOM 2m STORE ROOM 3X1.5m KITCHEN 5 4m TOILET 1.8m STAIRCASE PORCH 2 2.5 CORRIDOR 2.3m CORRIDOR 1.7m CORRIDOR 2m CORRIDOR 1.5m COURTYARD 6 5m W1 D3 D1 D4 UTILITY AREA A 2230 4230 2200 3230 1000 4230 2230 2000 2030 2230 3230 1730 1530 2470 2435 W1 D1 D3 W2 W2 O3 O3 18 14 20 22 +2.10 +0.450 +0.450 2450 455 1685 800 800 815 1577.5 1652.5 1450 800 1070 1160 890 1310 2000 2000 2000 1980 1980 845 2370 1015 4230 4000 3960 4230 16420 845 2540 845 415 1815 845 3540 845 4230 2230 5230 18150 3230 3230 3385 845 2115 2115 865 865 4230 4230 2230 1730 4000 16420 945 2285 945 55 4230 1815 415 2230 945 3340 945 5230 4230 2230 18150 1615 2615 B D E H 2 4 6 7 5 3 G C F 8 9 W2 W2 1:200 GROUND FLOOR PLAN A 2230 4230 2200 3230 1000 4230 2230 2000 2030 1 2230 3230 1730 1530 2470 25000 20000 4423.49 8406.28 5982.12 5322.2 3925 715 885 715 715 715 715 715 715 715 715 885 750 750 715 715 1530 885 750 715 715 715 715 715 715 715 715 885 715 715 885 715 885 715 885 285 115 115 285 285 115 115 115 115 285 115 115 115 115 285 115 285 115 115 115 115 285 115 115 285 115 115 150 150 150 150 B D E H 2 4 6 7 5 3 G C F 8 9 F1 (A,1) 1600x1430 F1 (B,1) 1430x1600 F1 (D,1) 1430x1600 F1 (E,1) 1430x1600 F1 (F,1) 1430x1600 F1 (H,1) 1600x1430 F1 (A,3) 1600x1430 F1 (B,3) 1430x1600 F1 (E,3) 1430x1600 F2 (F,3/4) 1430x3430 F1 (H,3) 1600x1430 F1 (G,3) 1600x1430 F3 (D,4) 1500X1500 F4 (D,6/7/8) 1500X4868 F3 (F,6) 1500X1500 F1 (A,5) 1430x1600 F1 (B,5) 1430x1600 F1 (H,5) 1430x1600 F1 (G,5) 1430x1600 F1 (A,7) 1430x1600 F1 (B,7) 1600x1430 F5 (E,7/8) 1430x3130 F1 (F,7) 1430x1600 F1 (H,7) 1430x1600 F1 (A,9) 1430x1600 F1 (B,9) 1600x1430 F1 (F,9) 1430x1600 F1 (H,9) 1430x1600 (J,10) 2 SCHEDULE COLUMN NUMBER DIMENSION B F1 23 1600X1430 715 MM 885 MM F2 1 R150MM 715 MM 885,750 F3 2 1430X3430 750 MM 750 MM F4 1 1500X4868 750 MM 750,885 F5 1 1430X3130 715MM 885 MM 1:200 FOOTING LAYOUT 1 WINDOW WINDOW WINDOW VENTILATOR DOOR DOOR DOOR DOOR PANELLED SLIDING PANELLED PANELLED GLAZED GLAZED GLAZED GLAZED D1 D2 D3 D4 W1 W2 W3 4 5 0 4 5 9 2 1X2.1 2X2.1 0.8X2.1 1.2X2.1 1.2X1.3 0.6X0.6 1X1.3 1.5X1.3 MARK ITEM TYPE SIZE NO.S OPENING OPENING OPENING O1 O2 O3 1.3X2.1 1.7X2.1 2X1.3 1 2022 | 6th Semester | Working Drawings A B D E H G C F LVL -250 mm LVL -250 mm LVL -250 mm LVL -2730 mm LVL -250 mm LVL -250 mm LVL -250 mm 1:100 ELEVATION 1 1 150 MM R.C.C SLAB 150 MM R.C.C SLAB 150 MM THK R.C.C CHAJJA 150 MM THK R.C.C CHAJJA 800 MM CLERESTORY 800 MM CLERESTORY 1000 MM PARAPET WALL 1300 1500 800 2100 1300 1500 800 LVL 0.00 mm LVL +350 mm LVL +350 mm LVL -2130 LVL +350 mm LVL +350 mm LVL -2130 LVL +350 mm LVL +350 mm LVL +350 mm 150 MM THK R.C.C CHAJJA 2 3 1 2 3 1 450 LEVEL GROUND FFL 0.000m LEVEL 00 FFL 0.450m SILL LEVEL 01 LINTEL LEVEL 01 CLERESTORY LEVEL LEVEL 01 FFL 3.750m SILL LEVEL 02 4.550m LINTEL LEVEL 02 LEVEL 03 FFL 7.500m TOP OF PARAPET 8.500m CLERESTORY LEVEL C1 C1 C2 W1 W1 W1 W1 W1 LEGEND 1 TROWELED FINISH 2 SMOOTH COLOR FINISH-PLASTER 3 EXPOSED CONCRETE FINISH A B D E H G C F LIVING ROOM FORMAL SEATING ROOM BATHROOM ENTRANCE BATHROOM KITCHEN GUEST ROOM LEVEL GROUND FFL 0.000m LEVEL 00 FFL 0.450m SILL LEVEL 01 LINTEL LEVEL 01 CLERESTORY LEVEL LEVEL 01 FFL 3.750m SILL LEVEL 02 4.550m LINTEL LEVEL 02 LEVEL 03 FFL 7.500m TOP OF PARAPET 8.500m CLERESTORY LEVEL W4 W4 C2 W1 W1 1300 1500 800 2100 1300 1500 800 450 1:100 SECTION AA' 2 450 mm PLINTH SLAB 230 mm BRICK WALL 12 mm TILE FLOORING 150 MM R.C.C SLAB 150 MM R.C.C SLAB 150 MM THK R.C.C CHAJJA 150 MM THK R.C.C CHAJJA 800 MM CLERESTORY 800 MM CLERESTORY 1000 MM PARAPET WALL 800 mm 2150 mm 7000 mm 5400 mm ST ST CINDER FILL (300mm) P.C.C (100mm) MORTAR (35mm) FLOORING (15mm) WASHBASIN MIRROR LED LIGHT DOOR (800mm) VENTILATOR (460X600mm) SOAP HOLDER SHOWER HEAD SPROUT MIXER/ DIVERTER NAHANI TRAP 60 mm SS PIPE CERAMIC TILE (300X600mm) CERAMIC TILES (300X300 mm) FAUCET CLOSET SPROUT MIXER/ DIVERTER CERAMIC TILE (300X600mm) (460X 600 mm) HOLDING TRAY SINGLE SWITCH TILING (6mm) TILING (6mm) NAHINI TRAP 600 412.5 600 1500 600 900 900 410 700 540 1240 1310 900 6000 WASHBASIN BRUSH HOLDER WATER CLOSET SOAP HOLDER WATER TAP WATER HEATER VENTILATOR (460 X600mm) HOLDING TRAY TOWEL HANGER 1860 600 525 580 1520 600 3340 3905.9 700 600 400 3825 3825 TOILET PAPER HOLDER SS PIPE (60mm) PATCH FITTING ATTACHED TO WALL TOUGHENED GLASS (8mm) PATCH FITTING TO HOLD GLASS PATCH FITTING TO HOLD GLASS TOUGHENED GLASS (8mm) 1:50 GLASS DOOR DETAIL 2 1:50 PLAN 1 1:50 ELEVATION 3 4 1:50 ELEVATION 1 3 CINDER FILL (300mm) P.C.C (100mm) MORTAR (35mm) FLOORING (15mm) m -0.030 m BATHROOM LAYOUT 3 WINDOW WINDOW VENTILATOR DOOR DOOR DOOR PANELLED PANELLED PANELLED GLAZED GLAZED GLAZED D1 D3 D4 V W1 W3 M 0.8M 1.2M 1.2M 0.6M 1.5M SIZE(W) NO.S CLERESTORY CLERESTORY GLAZED GLAZED C1 C2 3.54M 4.54M CLERESTORY GLAZED C4 2.85M WINDOW GLAZED W4 0.5M 2.1M 2.1M 2.1M 1.3M 0.6M 1.3M SIZE(H) 0.8M 0.8M 0.8M 1.124M LEGEND GREY-WATER PIPELINE DOMESTIC WATER PIPE(80mm) WASTE WATER PIPE(220mm)
MUD EXPLORATION : HAUS RAUCH
OF HAUS RAUCH
WOOD EXPLORATION : TRACES
PATTERN & MOVEMENT
LIGHT & SHADOW
17 2019-24 | 1-10th Semester | Material Exploration
PERSPECTIVE VIEW DETAIL PLAN Timber Block Reinforcement in Trass Lime Concrete Slab Rammed Earth Fired clay tiles Fired clay tiles Bitumen ATMOSPHERE
SECTION
18
2019-24 | 1-10th Semester | Material Explorations
VIEW ELEVATION INTERIOR VIEW INTERIOR VIEW
BAMBOO EXPLORATION: PAVILLION DESIGN
PERSPECTIVE