PA R T O N E
DB ENTITY INFORMATION collaborate to deliver. The Black & Veatch design team’s approach is based on taking advantage of our combined talents and working side-by-side with the City and its consultants to collaboratively deliver a new WRF at the best value that provides performance at the lowest achievable operating cost.
The replacement of Morro Bay’s aging wastewater treatment facility near the City’s waterfront with a state-of-the art water reclamation facility (WRF) located miles inland, is an enormous challenge in terms of project siting, scoping, funding, design, permitting and delivery. With most of the up-front challenges addressed, the City is proceeding to the design, permitting and construction phase using a design-build (DB) delivery model. The collaboration that is the foundation of DB offers unmatched opportunities to create value through innovation. The Filanc-Black & Veatch (FB&V) design build team’s overall approach is based on taking full advantage of our combined talents and working side-by-side with the City and its consultants to collaboratively deliver a new WRF at the best value that provides robust and reliable performance at the lowest achievable operating cost. We have carefully reviewed the RFP requirements and documentation, as well as information gained through the proprietary meetings with City staff and through additional
CALLOUT HEADER Text here as a filler working side-by-side with the City and its consultants to collaboratively deliver a new WRF at the best value that provides robust and reliable performance yadda yadda yadda yadda.
DIGESTED SLUDGE DEWATERING FACILITY PROJECT CPMS #7758
B LAC K & VEATCH | 1.1