Carport Konsport - Assembly instructions

Page 1

CARPORT Instruction for constructing a CARPORT

ASSEMBLYINSTRUCTIONS:

The following STAGES and steps are to be performed for constructing a CARPORT

1 – BUILDING THE FOUNDATION

STEP 1.1 – footing arrangement

STEP 1.2 – preparation of each footing using a protective pipe and hoop iron

STEP 1.3 – casting concrete footing

2 – POST BASES

STEP 2.1 – drilling holes in the footings

STEP 2.2 – mounting post bases

3 – LOAD BEARING STRUCTURE: POSTS, TRANSOMS

STEP 3.1 – mounting post connectors, mounting posts

STEP 3.2 – mounting transoms

STEP 3.3 – joining transoms

4 and 5 – LOAD BEARING STRUCTURE: PURLINS AND BRACING

Depending on the sheathing:

STEEL – TR18 0.55 sheet metal sheathing:

4a – PURLINS

5a – stężenie krzyżowe

POLYCARBONATE

4b – PURLINS

5b – cross bracing

6 - INSTALLATION OF PV PANELS

STEP 6.1 - Installation of extensions

STEP 6.2 - Installation of channels

STEP 6.3 - Installation of connectors to channels

STEP 6.4 - Installation of PV panels

7 – SHEATHING

7a – STEEL according to detailed information (not included in the instructions)

7b – POLYCARBONATE according to detailed information

(not included in the instructions)

3

1

BUILDING THE FOUNDATION

It is necessary to make 6 pcs of footings with the following dimensions:

60x60 cm, min. 80 cm deep.

STEP 1.1 – footing arrangement

Arranging the footings according to the construction drawing. In order to facilitate precise execution of footings, you may:

·make use of taut string lines laid out accordingly

·mark the upper, target face of the combined footing, e.g., using boards assembled into a 60x60 square; level the boards and verify their vertical height with a water level

The goal is to obtain precisely made footings using dimensions as provided in the construction drawing. The upper face of the footing should be horizontal, the elevation of all 4 footings should preferably be the same.

3
rys. 1.

Spacing of foundation footings

4

1 – BUILDING THE FOUNDATION

STEP 1.2 – preparation of the footing using a protective pipe and hoop iron

Any of the 6 footings should have:

·a centrally located protective pipe with a diameter of ~40mm (to pull the cables through)

·20x3 mm galvanised sheet metal hoop iron recessed into the footing

rys. 2.

5

1 – BUILDING THE FOUNDATION

STEP 1.3 – casting concrete footing

Instructions:

·using a minimum C25/30 grade concrete; water tightness grade of W8

·pour the concrete directly into the ground

·min. 80 cm deep or to frost depth

After pouring the foundation, wait for the concrete to set completely 1 – BUILDING THE FOUNDATION is complete

6
rys. 3.

2 – POST BASES

STEP 2.1 – drilling holes in the footings:

After the footings have cured (the concrete has set completely), drill 4 holes in each footing. Diameter of holes according to the specification of the used bonded anchor fi12 (according to the manufacturer's guidelines); anchor made of at least A2 steel, using mortar e.g. FISCHER Injection system FIS V Plus.

Embed O12mm 8.8 grade anchor rods to a depth of min. 150mm in the foundation footing.

7
rys. 4.

2 – POST BASES

STEP 2.2 – installation of post bases

Fix the post bases leaving a gap of ca. 20-30mm from the face of the concrete footing.

Level the set of footings very precisely, e.g. using a water level or levelling instrument, so that they all sit at the same height and the anchor plate remains level.

After levelling and final verification of the position of the bases, prepare grout with non-shrink assembly mortar e.g. CERESIT CX-15.

8
rys. 5.

2 – POST BASES

Completed STAGE 2: a set of 6 levelled steel bases for mounting the structure. The steel bases are permanently joined with the foundation footings.

rys. 6.

9

STEP 3.1 – installation of brackets on posts, mounting posts

STEP 3.1 – mounting post connectors, mounting posts

rys. 7.

10

3 – LOAD BEARING STRUCTURE: POSTS, TRANSOMS

STEP 3.1 – mounting post connectors, mounting posts

After the assembly mortar has cured, take the following steps for each post:

- on top of each post, mount a connector for 8pcs of M10 bolts

- at the appropriate location (depending on the height), mount the post on the steel bases using 8pcs of M10 bolts;

11
rys. 8.

LOAD BEARING STRUCTURE: POSTS, TRANSOMS

STEP 3.2 – mounting transoms

rys. 9.

3 –
12

LOAD BEARING STRUCTURE: POSTS, TRANSOMS

STEP 3.3 – joining transoms

rys. 10.

3 –
13

LOAD BEARING STRUCTURE: POSTS, TRANSOMS

STEP 3.2 – mounting transoms

According to the construction drawing

The transoms consist of a total of 8 pcs of identical C profiles

Attach the transoms to the post connectors sequentially (1 piece of each C

STEP 3.3 – joining transoms

According to the construction drawing.

An additional steel plate mounted above the central post on both sides.

3 –
14
rys. 11.

LOAD

BEARING

STRUCTURE: POSTS, TRANSOMS

STEP 3.3 – joining transoms

According to the construction drawing. An additional steel plate mounted above the central post on both sides.

3
12. 15
rys.

LOAD BEARING STRUCTURE: POSTS, TRANSOMS

Completed STAGE 3 rys.

3 –
16
13.

4 and 5 – LOAD BEARING STRUCTURE: PURLINS AND BRACING

4a – PURLINS – TR18 0.55 sheet metal sheathing

4a.1 prepare 8 pcs of purlins according to the construction drawing (L assembly at the ends of each purlin)

rys. 14.

17
x8

4 and 5 – LOAD BEARING STRUCTURE: PURLINS AND BRACING

4a – PURLINS – TR18 0.55 sheet metal sheathing

4a.2 mounting the purlins to the structure – mount purlins in the direction shown in the construction drawing (C facing the inside of the carport plan)

rys. 15.

18

4 and 5 – LOAD BEARING STRUCTURE: PURLINS AND BRACING

4b – PURLINS – polycarbonate sheathing

4b.1 prepare:

- 5 pcs of purlins (TYPE A):

- 1 pc of purlin (TYPE B): rys. 16.

x5, typA x1 typ B
19
x2, typ C

4 and 5 – LOAD BEARING STRUCTURE: PURLINS AND BRACING

4b – PURLINS – polycarbonate sheathing

rys. 17.

B A A C A A A C 20

4 and 5 – LOAD BEARING STRUCTURE: PURLINS AND BRACING

4b – PURLINS – polycarbonate sheathing

4b.2 mounting the purlins to the structure – mount purlins in the direction shown in the construction drawing (C facing the inside of the carport plan)

rys. 18.

21

INSTALLATION OF PV PANELS

STEP 6.1 - Installation of extensions

Prepare and install 16 pcs of extensions according to the construction drawing ( L assembly at the ends of each purlin)

rys. 19.

6
-
22

INSTALLATION OF PV PANELS

20.
21. 23
rys.
rys.
6 -

INSTALLATION OF PV PANELS

STEP 6.2 - Installation of channels

Install thechannels included in the kit on the purlins and extensions.

rys. 22.

rys. 23.

6
-
24

6 - INSTALLATION OF PV PANELS

STEP 6.3 - Installation of connectors to channels

Screw the connectors of the channels

rys. 24.

rys. 25.

25

INSTALLATION OF PV PANELS

STEP 6.3 - Installation of connectors to channels

The channels should be installed with spacing adequate to the width of the panels used

rys. 26.

rys. 27

6 -
26

INSTALLATION OF PV PANELS

STEP 6.4 - Installation of PV panels

Proceed to install the PV panels. The set includes rhombus nuts with an m8 hole for mounng clamps to channels. Install the panels and ghten each of them with clamps

rys. 28.

rys. 29

6 -
27

INSTALLATION OF PV PANELS

STEP 6.4 - Installation of PV panels

rys. 30.

rys. 31.

6
-
28

MONTAŻ PANELI

STEP 6.4 - Installation of PV panels

In order to seal the structure, the frame of the PV panels can be addionally covered with an EPDM (micro rubber) gasket. (gasket not included)

rys. 32.

6 –
29
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.