Architecture Portfolio /Personal Archvie

Page 102

The 26.000 m2 area on the upper level of the D-100 Highway has been pedestrianized. This area was re-functionalized and new metro and metrobus stops, urban gardens, parks, pedestrian paths and bicycle paths were designed. New axles have been designed between Bakırköy and Bahçelievler in connection with these functions. These pedestrian axles are the continuation of Yeniyol Street, Baharözü Street and Şenyuva Street. The hard ground continues at the intersection points. The slope in the topography was reduced by ramps and stairs. The underground D-100 highway continues in 6 lanes and the metrobus continues in 2 lanes. The road was tunneled and filled with soil. In this way, tree planting will be done. Pedestrian roads have been rearranged in Şenyuva Street and Begonyalı Street. Pedestrian circulation with stairs and ramps will provide access to the hospital, school and home. Thanks to the soil filling made in the Begonian street, - + 38 street elevation +43 elevation was leveled. Instead of the underpass view on Şenyuva Street, stairs and green areas and both passage and gathering areas were designed. As can be seen in the cross-section, the connection between Begonyalı Street and Şenyuva Street has facilitated the circulation of pedestrians and connected the functions of the streets.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.