Architecture Portfolio & Work Experiences

Page 1

Architecture Portfolio

Thinakrehs Photthiwong | Universiti Sains Malaysia (USM) B. Sc. Architecture (Honours) | Selected Project | Work Experience

PHOTTHIWONG A/L CHIK

Contact Number : 0198778751 Email : kitptwong@gmail.com Website : issuu.com/kitptwong

THINAKREHS

Young passionate candidate with project management background in a small young firm based in Penang with the ability to work under pressure and less supervision required. Since I am a solo staff in this small firm, I learned many things in short-time period and effeciently following all the submission’s dateline.

Skills

• Architectural technical drawing, 3D mod elling, rendering/visualisation, business development and proposing writing, plus project management thru all architectural process which include clients, authority, consultants, and contractors and preparing tender drawing, detail and construction drawing, as build drawing and contract admin.

• Print and digital communication design

• Presention / Photography

• General office administration and basic human resource management.

Languages Educations

Thai ( Mothertongue)

Bahasa Melayu Englsih

Software 3D 2D

(

)

Selected Previous Works

Bachelor of Science Architecture | School of Housing, Building and Planning (HBP) USM | 2018 - 2021 CGPA 3.15 | Scored A, A- on Studio Subject

Malaysian Higher School Certificate (STPM) | 2016 - 2017 CGPA 3.75

Ritz Pmc Sdn Bhd | Seberang Jaya | 2019 - Present Internship to Permanent Manpower

• Masjid Permatang Janggus, Permatang Pauh, SPT, Pulau Pinang. | Jun 2018 - Present

Involve in proposing layout, 3D, and visualisation to attending meeting for presentation to AJK Mosque during internship

Involve in preparing construction drawing and documentation Involve on site checking from time to time

Involve in termating contractor by clause Change / ammend drawing following certain issue Construction process at 75 %

• Taman Ilmu Fasa 8/4, Nibong Tebal, Pulau Pinang | 2018 - Present Involve in tender drawing preparation Still on tendering process

• 2 Storey Banglo House with 1 Basement Level, Gelugor, DTL, Pulau Pinang | 2021 - Present

Preparation for PKM thru ILCS system and hardcopy Prepare drawing for PB Submission stage

• Ship Hangar, Gading Marine Industry, Manjung, Perak. | 2021 - 2022

As-build drawing preparation

PKM, PB and Bomba drawing until submission Submission stage

• IKS Bond Indutrial, Seberang Jaya, SPT, Pulau Pinang. | 2022 - Present

As-build drawing preparation

PB and Bomba drawing preparation Submission stage

• RFP UDA, Tanjong Tokong, DTL, Penang | 2020

Involve in Proposal Preparation ( Render & Interior Design )

• RMM UDA, Tanjong Tokong, DTL, Penang | 2021- Present

Involve in Proposal Preparation ( Facility Area, Interior & Facade ) MOA and consultant meeting stage.

THINAKREHS PHOTTHIWONG Assistant Architect/Architecture Part 1 | Bach. of Science (Hons) | 019-8778751 | kitptwong@gmail.com
• Autocad • Adobe Photoshop • Adobe Illustrator • Indesign • Word • Powerpoint • Sketchup • Revit
Intermediate
CONTENT 2018-2019 | Summer Villa 2019-2020 | Georgetown Tourist Center 2020-2021 | Urban Farming Hub 2020-2021 | Taiping Retirement Village 2020-2022 | Work Experience
RELATED WORK EXPERIENCE TECHNICAL DRAWING & 3D MODELING WITH RENDERS (SELECTED)
SIMPANG DUA KG. KOH SITIAWAN FROM LUMUT KG. ACHEH KG. SITIAWAN TOAYER TAWAR TAPAK CADANGAN sg.semawan 59 59 60 61 58 59 60 57 56 55 61 SCALE N.T.S KEY PLAN SCALE 1:200 SITE PLAN up up D2 D6 D7 D7 D7 D9 W4 W5 W6 W7 W7 W7 KORIDOR LOBI KORIDOR LOBI PANTRI SETOR 2 LELAKISURAU2 BILIK QHSE PEJABAT 1 PEJABAT 2 LOBI PEJABAT 3 RUANG PERBINCANGAN KAUNTER PEJABAT 4 D4 PK 148.243 103°10'30" 122.360 190°46'00" 3000 3000 GARISAN SEMPADAN LOT GARISAN ANJAKAN BANGUNAN 3000MM GARISAN SEMPADAN LOT GARISAN ANJAKAN BANGUNAN 3000MM TO FINAL DISCHARGE 1107111070 15500 15501 15502 11072 SUNGAI SETIAWAN PK 11069 PK PK PK PK PK PK PK PK PK PK PK 51.36055°57'40" 47.35510°49'30" 230.819152°19'40" 46.360226°56'10" 141.159 190°51'50" 147.736 280°52'20" 148.243 8°54'00" 148.243 103°10'30" 122.360 190°46'00" 19.253 100°49'40" 9858 15507 15617 INDUSTRIAL CONCRETE PRODUCTS BERHAD EXISTING JALAN PELABUHAN 9 FINAL DISCHARGE SCALE 1:750 LOCATION PLAN TAPAK CADANGAN JALAN BERKONKRIT SEDIADA HANGAR BARU 3309.73 mp PUMP HOUSE WATERTANK H HANGAR 1 SEDIADA

INVOLVEMENT

STATUS:

NO. LUKISAN: Skala Disemak oleh Tarikh 1 : 100 RITZ JULY 2022 Dilukis oleh RITZ 9 Juruukur : TAJUK PROJEK : GADING MARINE INDUSTRY (M) SDN BHD TANDATANGAN PEMILIK TANAH & BANGUNAN TANDATANGAN PENYEWA TANAH DAN BANGUNAN TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN : TAJUK LUKISAN : LEMBAGA ARKITEK MALAYSIA Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p : 019 4000 250 Tel 04 331 9045 Fax : 04 330 9026 Email ritz2.archidesign@gmail.com Adrianta Aziz Architect AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 1 PELAN KUNCI, LOKASI & TAPAK PELAN BOMBA PB/GMI/MAC2022_REV02 PERMOHONAN PELAN BANGUNAN SERENTAK BAGI BINAAN 1 UNIT RUANG TAMBAHAN BANGUNAN TERSEDIA JENIS TERBUKA DI ATAS SEBAHAGIAN LOT 15502 ( PLOT A2) KAMPUNG ACHEH, MUKIM LUMUT 32000 SITIAWAN, PERAK DARUL RIDZUAN up D2 D6 D18 D18 W1 W5 W6 W6 W6 W7 KORIDOR TANDAS1 BILIK KOSONG 1 SETOR SURAU LELAKI SURAU PEREMPUAN PEJABAT JURUTERA 1 BILIK PRODUKSI PEJABAT JURUTERA 2 D4 W6 W6 W7 D4 PK 3000 HANGAR BARU 4309.73 mp H HANGAR 2 SEDIADA * JBPM LEGEND H S 1.0/2.0 hr.
AS BUILT DRAWING PKM PERTAPAKAN PB PELAN BOMBA
PKM APPROVED PB APPROVED PELAN BOMBA SUBMISSION
DN 50 DN 50 up up DN 100 DN 100 DN 100 DN 100 up up W3 D1 D2 D2 D4 D4 D4 D4 D4D4 D5 D6 D6 D6 D7 D7D7 D18 D18 D8 D9 W1 W1 W4 W4 W5 W5 W5 W5 W6 W6 W6 W6 W6 W6 W7W7 W7 W7 W12 D8 KORIDOR LOBI KORIDOR LOBI KORIDOR PANTRI TANDAS1 BILIK KOSONG 1 SETOR 2 SETOR 1 SURAU LELAKI SURAU PEREMPUAN SURAU LELAKI 2 BILIK QHSE PEJABAT 1 PEJABAT 2 PEJABAT JURUTERA 1 LOBI PEJABAT 3 BILIK PRODUKSI PEJABAT JURUTERA 2 RUANG PERBINCANGAN KAUNTER PEJABAT 4 D3 KE TITIK AKHIR SALIRAN D4 SETOR 2 SEDIAADA HANGAR 1 SEDIAADA HANGAR 2 SEDIAADA HANGAR 5 SEDIA ADA SETOR 1 SEDIADA Y 3 4 5 6 7 8 A B C D E F G H J K 21 A' H' 37618 16072 3592 16072 8944 1650 31850 59784 2500 10000 PELAN LANTAI TINGKAT BAWAH DARI RUMAH 230MM TBL DUA JAM DINDING BATA RINTANGAN KEBAKARAN DGN 18MM TBL LEPAAN SIMEN KEDUA BELAH DINDING 230MM TBL DUA JAM DINDING BATA RINTANGAN KEBAKARAN DGN 18MM TBL LEPAAN SIMEN KEDUA BELAH DINDING 230MM TBL DUA JAM DINDING BATA RINTANGAN KEBAKARAN DGN 18MM TBL LEPAAN SIMEN KEDUA BELAH DINDING D4 NK
NO. LUKISAN: Skala Disemak oleh Tarikh : 1 100 : RITZ JULY 2022 Dilukis oleh RITZ 9 Juruukur : TAJUK PROJEK GADING MARINE INDUSTRY (M) SDN BHD TANDATANGAN PEMILIK TANAH & BANGUNAN TANDATANGAN PENYEWA TANAH DAN BANGUNAN TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN : TAJUK LUKISAN : LEMBAGA ARKITEK MALAYSIA Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p : 019 4000 250 Tel 04 331 9045 Fax 04 330 9026 Email ritz2.archidesign@gmail.com Adrianta Aziz Architect AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 2 PELAN LANTAI TINGKAT BAWAH PELAN BOMBA PB/GMI/MAC2022_REV02 PERMOHONAN PELAN BANGUNAN SERENTAK BAGI BINAAN 1 UNIT RUANG TAMBAHAN BANGUNAN TERSEDIA JENIS TERBUKA DI ATAS SEBAHAGIAN LOT 15502 ( PLOT A2) KAMPUNG ACHEH, MUKIM LUMUT 32000 SITIAWAN, PERAK DARUL RIDZUAN JBPM LEGEND H S D4 W6 W6 W6 W6 W7 D4 SETOR 4 SEDIADA SETOR 3 SEDIAADA HANGAR BARU 1 HANGAR BARU 2 X Y 100mm KETEBALAN LANTAI KONKRIT DI ATAS 100MM KETEBALAN 'HARDCORE' RUJUK BUTIRAN JURUTERA TERMASUK 0.25MM TBL 'DAMP PROOF MEMBRANE POLYTHENE SHEET' 309.73 mp 309.73 mp X 9 10 11 12 13 14 15 17340 PAM
DN DN 50 DN 50 up up W3 D14 D13 W7 W16W16 W16W16 W3 W3 D1 D1 D17 D17 D17 D17 D8 D8 D10 D15 D15 D16 D16 W1 W1 W2 W2 W2 W3 W5 W5 W6 W6 W6 W6 W6 W7 W7 W7 W10 W12 DN up SETOR 1 TANGGALOBI KORIDOR BILIK KOSONG 3 BILIK KOSONG 4 BILIK REHAT BILIK KOSONG 2 PEJABAT NAVY1 PEJABAT NAVY2 TANDAS 2 TANDAS 3 BILIK PENYIMPANAN RUANG PERBINCANGANKELAS 1 KELAS 2 KELAS SETOR 3 W12 STORE 5 PELANTAR PELANTAR SEDIAADA NK SEDIADA SEDIADA Y 3 4 5 6 7 8 A B C D E F G H J K 21 A' H' 37618 16072 3592 16072 8944 1650 31850 59784 2500 10000 VOID VOID VOID PELAN LANTAI TINGKAT SATU 230MM TBL DUA JAM DINDING BATA RINTANGAN KEBAKARAN DGN 18MM TBL LEPAAN SIMEN KEDUA BELAH DINDING 230MM TBL DUA JAM DINDING BATA RINTANGAN KEBAKARAN DGN 18MM TBL LEPAAN SIMEN KEDUA BELAH DINDING 230MM TBL DUA JAM DINDING BATA RINTANGAN KEBAKARAN DGN 18MM TBL LEPAAN SIMEN KEDUA BELAH DINDING

PERMOHONAN PELAN BANGUNAN SERENTAK BAGI BINAAN

UNIT RUANG TAMBAHAN BANGUNAN TERSEDIA JENIS

DI ATAS SEBAHAGIAN

KAMPUNG ACHEH, MUKIM LUMUT

DARUL RIDZUAN

15502

SITIAWAN,

SETOR 8 SEDIADASETOR 7 SEDIADASETOR 6 SEDIADA X Y X 9 10 11 12 13 14 15 17340 VOID VOID NO. LUKISAN: Skala Disemak oleh Tarikh : 1 100 : RITZ JULY 2022 Dilukis oleh RITZ 9 Juruukur : TAJUK PROJEK GADING MARINE INDUSTRY (M) SDN BHD TANDATANGAN PEMILIK TANAH & BANGUNAN : TANDATANGAN PENYEWA TANAH DAN BANGUNAN TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN : TAJUK LUKISAN : LEMBAGA ARKITEK MALAYSIA Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p : 019 4000 250 Tel 04 331 9045 Fax 04 330 9026 Email ritz2.archidesign@gmail.com Adrianta Aziz Architect AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 3 PELAN LANTAI TINGKAT SATU PELAN BOMBA PB/GMI/MAC2022_REV02
1
TERBUKA
LOT
( PLOT A2)
32000
PERAK
JBPM LEGEND H S
VOID KERATAN X-X Y VOID PANDANGAN SISI KANAN Y 14° 14° EFGHJK H' 37618 359216072250010000 EFGHJK H' 37618 359216072250010000 4° 2550 100 2826 2826 3152 KERATAN Y-Y KORIDORLOBI TANDAS1SETOR 2 LOBI PEJABAT NAVY2 TANDAS 3 LOBI TANDAS 7KORIDOR D4 SETOR 2SETOR 1 SETORSTORE 5 PELANTAR TANGGA TANGGA 3 4 5 6 7 82 1 9094 1650 31850 230MM TBL DUA JAM DINDING BATA RINTANGAN KEBAKARAN DGN 18MM TBL LEPAAN SIMEN KEDUA BELAH DINDING Y Y
3600 100 5587 100mm KETEBALAN LANTAI KONKRIT DI ATAS 100MM KETEBALAN 'HARDCORE' RUJUK BUTIRAN JURUTERA TERMASUK 0.25MM TBL 'DAMP PROOF MEMBRANE POLYTHENE SHEET' 3600 100 5587 100mm KETEBALAN LANTAI KONKRIT DI ATAS 100MM KETEBALAN 'HARDCORE' RUJUK BUTIRAN JURUTERA TERMASUK 0.25MM TBL 'DAMP PROOF MEMBRANE POLYTHENE SHEET' 14° 14° ABCD A' 16072 ABCD A' 16072 DARI RUMAH PAM NO. LUKISAN: Skala Disemak oleh Tarikh : 1 : 100 : RITZ : JULY 2022 Dilukis oleh : RITZ 9 Juruukur : TAJUK PROJEK : GADING MARINE INDUSTRY (M) SDN BHD TANDATANGAN PEMILIK TANAH & BANGUNAN TANDATANGAN PENYEWA TANAH DAN BANGUNAN TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN : TAJUK LUKISAN : LEMBAGA ARKITEK MALAYSIA Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office : No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p 019 4000 250 Tel : 04 331 9045 Fax : 04 330 9026 Email : ritz2.archidesign@gmail.com Adrianta Aziz Architect AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 7 PANDANGAN SISI KANAN PELAN BOMBA PB/GMI/MAC2022_REV02 PERMOHONAN PELAN BANGUNAN SERENTAK BAGI BINAAN 1 UNIT RUANG TAMBAHAN BANGUNAN TERSEDIA JENIS TERBUKA DI ATAS SEBAHAGIAN LOT 15502 ( PLOT A2) KAMPUNG ACHEH, MUKIM LUMUT 32000 SITIAWAN, PERAK DARUL RIDZUAN KERATAN X-X , KERATAN Y-Y D4W6 W6W6 SETOR 4SETOR 3 HANGAR BARU 3 SETOR 8SETOR 76 100mm KETEBALAN LANTAI KONKRIT DI ATAS 100MM KETEBALAN 'HARDCORE' RUJUK BUTIRAN JURUTERA TERMASUK 0.25MM TBL 'DAMP PROOF MEMBRANE POLYTHENE SHEET' 9 10 11 12 13 14 15 3600 100 5587 17340 4060 4060 4060 4060 X X
PANDANGAN HADAPAN 2550 100 2826 2826 PANDANGAN SISI KIRI PANDANGAN BELAKANG W6 PELANTAR VOID VOID VOID VOID VOID VOID VOID VOID VOID VOID A B C D E FA' 37618 16072 3592 16072 3 4 5 6 7 8 921 8944 1650 31850 59784 6789101112131415 59784 4060 4060 4060 4060 1100 31850 X X DARI RUMAH PAM Y Y

PERMOHONAN PELAN BANGUNAN SERENTAK BAGI BINAAN 1 UNIT RUANG TAMBAHAN BANGUNAN TERSEDIA JENIS TERBUKA DI ATAS SEBAHAGIAN LOT 15502 ( PLOT A2) KAMPUNG ACHEH, MUKIM LUMUT 32000 SITIAWAN, PERAK DARUL RIDZUAN

3600 100 5587 VOID 3600 100 5587VOID VOID VOID VOID G H J KH' 2500 10000 10 11 12 13 14 15 17340 345 2 1 1650 8944 X X NO. LUKISAN: Skala Disemak oleh Tarikh : 1 100 : RITZ JULY 2022 Dilukis oleh RITZ 9 Juruukur : TAJUK PROJEK GADING MARINE INDUSTRY (M) SDN BHD TANDATANGAN PEMILIK TANAH & BANGUNAN : TANDATANGAN PENYEWA TANAH DAN BANGUNAN TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN : TAJUK LUKISAN : LEMBAGA ARKITEK MALAYSIA Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p : 019 4000 250 Tel 04 331 9045 Fax 04 330 9026 Email ritz2.archidesign@gmail.com Adrianta Aziz Architect AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 8 PANDANGAN SISI KIRI PELAN BOMBA PB/GMI/MAC2022_REV02
PANDANGAN HADAPAN , PANDANGAN BELAKANG
SKALA 1 : 1000 PELAN LOKASI N PELAN KUNCI SKALA : N.T.S N K K 1 2 3 4 5 6 7 1 2 3 4 5 6 7 EL ELK EL EL K K DP 13821747 E D C B A 7486 7486 7486 1797 7486 29943 PELAN LANTAI BAWAH B B 1 2 3 4 5 6 7 1234 598959895989 22034 A A 4069 5 TERES 12345 6 7 8 9 8 9 10 11 2189

KELUASAN

KELUASAN

INVOLVEMENT

DRAWING

- PELAN TAPAK - PELAN LOKASI - PELAN KUNCI SKALA AS SHOWN 27 DISEMBER 2021 ​B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Phone: 03-7887 8211 Email: hq@arradarchitects.com Fax: 03-7887 2511 (LLP0000383-LGN) 1260 Mk4, Permatang Janggus, 13500 Permatang Pauh, Bukit Mertajam Pulau Pinang, Malaysia Phone: :019-400 0250 (En. Farizal ) Email: ritz.archidesign@gmail.com North Office : Headquarters Office : NOTA - NOTA PROJEK : TANDATANGAN PENYEWA BANGUNAN T/TANGAN SAKSI DAN ARKITEK PELUKIS PELAN BANGUNAN BERDAFTAR TAJUK LUKISAN : DILUKIS OLEH MAT DISEMAK OLEH TARIKH RPMC NO. PROJEK : NO. LUKISAN AA-RITZ-IKSBIS / 2021 / 01 / BP / MBSP 01 / 03 A R K I T E K P R O F E S I O N A L AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 LEMBAGA ARKITEK MALAYSIA CADANGAN PINDAAN DAN TAMBAHAN UNTUK 1 UNIT RUANG IKS 1 1/2 TINGKAT JENIS BERKEMBAR NO. 16, PT 6000 JALAN CASSIA SELATAN 3/1 , TAMAN PERINDUSTRIAN BATU KAWAN, MUKIM 13, 14100 BANDAR CASSIA, SEBERANG PERAI SELATAN, PULAU PINANG. UNTUK TETUAN : BOND INDUSTRIAL SUPPLY SDN. BHD. NO. PELAN BANGUNAN : SKOP KERJA ARKITEK SKALA 1 : 200 PELAN TAPAK N JBPM LEGEND :
LANTAI SEDIADA KELUASANBIL. RUANG 1 2 495.01 105.02 LANTAI BAWAH LANTAI ATAS JUMLAH KELUASAN LANTAI KELUASAN LANTAI TAMBAHAN
LANTAI SEDIADA JUMLAH KELUASAN LANTAI SEDIADA DAN TAMBAHAN KELUASAN LANTAI TAMBAHAN 600.03 5327.94 1130.43 6458.37 ( mp ) ( kp ) KELUASANBIL. RUANG 1 2 300.62 147.15 LANTAI BAWAH JUMLAH KELUASAN LANTAI 447.77 3235.29 1583.90 4819.19 ( mp ) ( kp ) KELUASANBIL. RUANG 1 2 600.03 447.77 JUMLAH KELUASAN LANTAI 1047.80 6458.37 4819.19 11277.56 ( mp ) ( kp ) LANTAI ATAS
AS BUILT
PB PELAN BOMBA STATUS: PB SUBMISSION BOMBA SUBMISSION
EL KEL EL NAIK EL K K DP DP TANDAS TANDAS 13851750 E D C B A 7500 7500 7500 1800 7500 30000 B B 1 2 3 4 5 6 7 4321 600060006000 22076 A A 4076 5 TERES 54321 6 7 8 9 8 9 10 11 NAIK 2193 PELAN LANTAI ARAS BAWAH S K A L A 1 : 250
- PELAN LANTAI ARAS ATAS - PELAN LANTAI ARAS BAWAH SKALA AS SHOWN 27 DISEMBER 2021 ​B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Phone: 03-7887 8211 Email: hq@arradarchitects.com Fax: 03-7887 2511 (LLP0000383-LGN) 1260 Mk4, Permatang Janggus, 13500 Permatang Pauh, Bukit Mertajam Pulau Pinang, Malaysia Phone: :019-400 0250 (En. Farizal ) Email: ritz.archidesign@gmail.com North Office : Headquarters Office : NOTA NOTA : PROJEK TANDATANGAN PENYEWA BANGUNAN T/TANGAN SAKSI DAN ARKITEK PELUKIS PELAN BANGUNAN BERDAFTAR TAJUK LUKISAN : SKOP KERJA ARKITEK DILUKIS OLEH MAT DISEMAK OLEH : TARIKH RPMC NO. PROJEK NO. LUKISAN AA-RITZ-IKSBIS / 2021 / 01 / BP / MBSP 02 / 03 A R K I T E K P R O F E S I O N A L AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 LEMBAGA ARKITEK MALAYSIA NO. PELAN BANGUNAN PELAN LANTAI ARAS ATAS S K A L A 1 : 250 CADANGAN PINDAAN DAN TAMBAHAN UNTUK 1 UNIT RUANG IKS 1 1/2 TINGKAT JENIS BERKEMBAR NO. 16, PT 6000 JALAN CASSIA SELATAN 3/1 , TAMAN PERINDUSTRIAN BATU KAWAN, MUKIM 13, 14100 BANDAR CASSIA, SEBERANG PERAI SELATAN, PULAU PINANG. UNTUK TETUAN : BOND INDUSTRIAL SUPPLY SDN. BHD. 21 20 19 18 17 16 15 14 13 4321 6000 EL K DP EL EL K EL 60006000 22062 13851710 7500 E D C B A 7500 1800 30000 A A B B 7500 7500 TURUN 5 4064 24382438 2438 1000 5110 915 K DP DP K 19 22 K
D B E C B A 7500 7500 7500 1800 7500 30000 B A A 4321 600060006000 22058 5 4061 SISTEM PENGUMPULAN AIR HUJAN BUTIRAN SPAH S K A L A 1 : 200 PELAN BUMBUNG S K A L A 1 : 200 A 7500 9300 1500 2100 3600 3600 APL 7.500 APL 3.900 APL 0.300 APL 0.000 E 75005435 F KERATAN B S K A L A 1 : 200 4000 3850 4321 1500 26751500150015001500150015001500 22238 5 4238 6000 915 488 PANDANGAN HADAPAN S K A L A 1 : 200 1 1425 2100 1500 3600 300 3600 9300 APL 7.500 APL 3.900 APL 0.300 APL 0.000 KERATAN S K A L A
- PANDANGAN HADAPAN - KERATAN A - A - PANDANGAN BELAKANG - PELAN BUMBUNG SKALA AS SHOWN 27 DISEMBER 2021 ​B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Phone: 03-7887 8211 Email: hq@arradarchitects.com Fax: 03-7887 2511 (LLP0000383-LGN) 1260 Mk4, Permatang Janggus, 13500 Permatang Pauh, Bukit Mertajam Pulau Pinang, Malaysia Phone: :019-400 0250 (En. Farizal ) Email: ritz.archidesign@gmail.com North Office : Headquarters Office : NOTA - NOTA : PROJEK : TANDATANGAN PENYEWA BANGUNAN T/TANGAN SAKSI DAN ARKITEK / PELUKIS PELAN BANGUNAN BERDAFTAR TAJUK LUKISAN : DILUKIS OLEH MAT DISEMAK OLEH TARIKH RPMC NO. PROJEK NO. LUKISAN AA-RITZ-IKSBIS / 2021 / 01 / BP / MBSP 03 / 03 A R K I T E K P R O F E S I O N A L AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 LEMBAGA ARKITEK MALAYSIA NO. PELAN BANGUNAN - KERATAN B - B - PANDANGAN SISI KANAN SKOP KERJA ARKITEK - BUTIRAN SPAH BCDE 35436 7500 7500 7500 F 5436 6000 4321 1500 26751500150015001500150015001500 22238 5 4238 3325 9300 D C B A 35435 1500 2100 3600 3600 750075007500 APL 7.500 APL 3.900 APL 0.300 APL 0.000 488 915 6000 6000 915 2465 654 1000 2099 2447 1597 2775 1950 1310 1300 650 PANDANGAN SISI KIRI S K A L A 1 : 200 B - B 200 PANDANGAN BELAKANG S K A L A 1 : 200 CADANGAN PINDAAN DAN TAMBAHAN UNTUK 1 UNIT RUANG IKS 1 1/2 TINGKAT JENIS BERKEMBAR NO. 16, PT 6000 JALAN CASSIA SELATAN 3/1 , TAMAN PERINDUSTRIAN BATU KAWAN, MUKIM 13, 14100 BANDAR CASSIA, SEBERANG PERAI SELATAN, PULAU PINANG. UNTUK TETUAN : BOND INDUSTRIAL SUPPLY SDN. BHD. 10800 1500 2100 3600 3600 300 APL 7.500 APL 3.900 APL 0.300 APL 0.000 2 3 4 750 60006000 23593 267519001425 5 5593 850 2100 2500 915 6000 300 1575 3850 4000 2100 2500 KERATAN A - A 1 : 200

PELAN TAPAK

1716 3021 [9'-11"] 3701 [12'-2"] 5400 [17'-9"] 16996 [55'-10"] 9096 [29'-10"] C D F 1 2 5 8 11 12 13 15 18 2905 [9'-6"] 1039 [3'-5"] 1867 [6'-2"] BA 17 1707 [5'-7"] 3693 [12'-2"] 1500 [4'-11"] 1000 [3'-3"] 3950 [13'] 1444 [4'-9"] 1488 [4'-11"] 1650 [5'-5"] 2300 [7'-7"] 1300 [4'-3"] 1721 [5'-8"] L1 N1 1221 [4'] 1450 [4'-9"] 12073 [39'-8"] 6068 [19'-11"] 4900 [16'-1"] 16996 [55'-10"] C PH J 1 18 1875 [6'-2"] R 192 [8"] 2905 [9'-6"] A L 4 10 7 6 3 14 16 E G N 9 2046 [6'-9"] 2508 [8'-3"] 1575 [5'-2"] 4014 [13'-2"] 6506 [21'-4"] 244 [10"] 3012 [9'-11"] 1000 [3'-3"] 1000 [3'-3"] 1012 [3'-4"] 3250 [10'-8"] 925 [3'] 2325 [7'-8"] Q 1537 [5'-1"] 125 [5"] 5500 KEMASAN DINDING BERSERAMIK DENGAN KETINGGIAN 1500MM PADA DINDING (DAPUR) 2000mm GARISAN BANGUNAN GARISAN SEMPADAN SISI KIRI TEMPAT GARISANSEMPADANBELAKANG GARISAN SEMPADAN SISI KIRI DAPUR BASAH DAPUR KERING RUANG BASUHAN BILIK AIR 1 3.08 MP 7.22 MP 4.36 MP 1200 1000 2250 2000mm GARISAN BANGUNAN GARISAN SEMPADAN SISI KIRI sh RUANG REHAT RUANG PAKAIAN 5.63 MP BILIK TIDUR UTAMA 14.20 MP RUANG KELUARGA 29.53 MP BIILIK TIDUR 2 BILIK TIDUR 3 BALKONI 11.96 MP BILIK AIR UTAMA 14.28 MP BILIK AIR 2 1200 2490 937 937 1283 2000mm GARISAN BANGUNAN 2000mm GARISAN BANGUNAN 6100mm GARISAN BANGUNAN 2000mmGARISANBANGUNAN TANGGA nk nk tn RAMP TANGGA DEPAN 4.51 MP RAMP 30.39 MP TANGGA DEPAN 4.51 MP FOYER papak konkrit 17.11 MP A A AA B B tn 18 19 KEMASAN DINDING BERSERAMIK MELIPUTI KESELURUHAN TINGGI DINDING (BILIK AIR) KEMASAN DINDING BERSERAMIK MELIPUTI KESELURUHAN TINGGI DINDING (BILIK AIR) KEMASAN DINDING BERSERAMIK MELIPUTI KESELURUHAN TINGGI DINDING (BILIK AIR) RAMP TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN PELASAN SIMEN. RUJUK BUTIRAN JURUTERA CERUN 12.2% RAMP TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN PELASAN SIMEN. RUJUK BUTIRAN JURUTERA CERUN 12.2% TANGGA TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN PELASAN SIMEN. RUJUK BUTIRAN JURUTERA R=153mm T=250mm TANGGA TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN PELASAN SIMEN. RUJUK BUTIRAN JURUTERA R=153mm T=250mm TANGGA TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN KAYU KOMPOSIT. RUJUK BUTIRAN JURUTERA R=177.5mm T=225mm 488 5908 3650169 IC2 gt IC3 IC4 3145 [22'-10"] 10810 [35'-6"] TIANG BESI HIASAN BERSAIZ 50mm x 150mm DGN JARAK SETARA 196mm DI ANTARA TIANG KE TIANG 19674 78 DINDING DAN PINTU KACA 'TEMPERED' BERKETINGGIAN 2100MM. PERINCIAN MENGIKUT PEMBEKAL. DINDING DAN PINTU KACA 'TEMPERED' BERKETINGGIAN 2100MM. PERINCIAN MENGIKUT PEMBEKAL. KEMASAN JUBIN PADA 'TABLE TOP' BERKETINGGIAN 900MM DARI ARAS LANTAI PELAN LANTAI TINGKAT 2 PELAN LANTAI CURAM BUMBUNG RATA KONKRIT (R.C) DGN KALIS AIIR. RUJUK BUTIRAN JURUTERA TIANG KONKRIT TETULANG BESI 300MMX300MM TIANG KONKRIT TETULANG BESI 300MMX300MM DINDING BATUBATA 115MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN. RUJUK BUTIRAN JURUTERA DINDING BATUBATA 230MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN TAMPAK KONKRIT. RUJUK BUTIRAN JURUTERA DINDING BATUBATA 115MM TBL. DGN. 18MM LEPAAN DI DALAM 43MM DI LUAR BESERTA KEMASAN TAMPAK KONKRIT.. RUJUK BUTIRAN JURUTERA DINDING BATUBATA 115MM TBL. DGN. 18MM LEPAAN DI DUA BELAH BESERTA KEMASAN TAMPAK KONKRIT. RUJUK BUTIRAN JURUTERA KEMASAN ALUR DINDING 50MM X 50MM. RUJUK BUTIRAN JURUTERA KEMASAN ALUR DINDING 50MM X 50MM. RUJUK BUTIRAN JURUTERA SKALA 1 : 100 SKALA 1 : 100 5400 [17'-9"] 6900 [22'-8"] 13 15 18 1867 [6'-2"] BA 17 1707 [5'-7"] 3693 [12'-2"] 1500 [4'-11"] 6250 [20'-6"] SSL ± 25.95 FFL: 27.60 RL: ± 25.30 RL: ± 25.3 FFL: ± 27.65 FFL: ± 31.40 FFL: ± 31.35 FFL: 31.35 FFL: ± 31.35 SSL ± 26.15 FFL: ± 27.65 FFL: ± 27.70 TAPAK CADANGANPELAN KUNCI TAPAK CADANGANBANDAR GELUGOR DTL PELAN LOKASI PELAN LANTAI UTAMA SKALA 1 : 100 236° 55' 20 16.462 58° 04' 10'' 18.389 GARISAN SEMPADAN SISI KANAN 151° 29' 10'' 19.368 GARISAN SEMPADAN HADAPAN 325° 48' 20 19.680 151° 29' 10'' 19.368 151° 29' 10'' 19.368 2385 800 800 300 300 800 600 300 800 450 300 600 600 900 900900 900 880 BUTIRAN PAGAR UTAMA/PANDANGAN HADAPAN DAN KERATAN B-B 22001800 5500 2200 2650 B SKALA 1 : 100 CADANGAN MEROBOH 1 UNIT RUMAH BANGLO 2 TINGKAT SEDIADA DAN MEMBINA SEMULA 1 UNIT RUMAH BANGLO 2 TINGKAT BESERTA 1 TINGKAT RUANG BAWAH TANAH DI ALAMAT NO 283K, JALAN PEKELILING DI ATAS LOT 2316, MUKIM BANDAR GELUGOR, PULAU PINANG. 1300nk 1200 1200 1200 2413 1000 2250 1300 2000mm GARISAN BANGUNAN 2000mmGARISANBANGUNAN 2000mm GARISAN BANGUNAN 6100mmGARISANBANGUNAN GARISAN SEMPADAN SISI KIRI tn RUANGLAPANG(LANSKAP 76.59MP TANGGA BASEMENT MP3.90 tn RAMPMP30.39 DEPANTANGGAMP4.51 16.09 MP34.35 MP11.75 MP6.38 ketinggian 2017 2017 IC2 IC1 gt IC3 IC4 [10'-4"] [21'-8"] [22'-10" 27.08 6587 GARISAN SEMPADAN KANAN LOT 2316

CADANGAN

Data Pembangunan

PELAN

YEE YEW CHUIN

L1 12073 [39'-8"] PH J M 1875 [6'-2"] RK Q 1537 [5'-1"] 3047 [10'] 1450 [4'-9"] 1253 [4'-1"] 3302 [10'-10"] 158 [6"] 159 [6"] N1 2014 [6'-7"] 1300nk 2650 2000mm GARISAN BANGUNAN 6100mm GARISAN BANGUNAN GARISANSEMPADANBELAKANG GARISAN SEMPADAN KANAN GARISAN SEMPADAN HADAPAN TEMPAT LETAK KERETA BAWAH TANAH BASEMENT 61.18 MP BILIK UTILITI 2000mmGARISANBANGUNAN RUANG MAKAN FOYER DEPAN BILIK TIDUR 1 18.96 MP 1200 1200 2413 1300 2000mmGARISANBANGUNAN 2000mm GARISAN BANGUNAN 6100mm GARISAN BANGUNAN GARISANSEMPADANBELAKANG GARISAN SEMPADAN HADAPAN nk tn tn RUANG LAPANG LANDSKAP 76.59 MP TANGGA BASEMENT TANGGA BASEMENT 3.90 MP RUANG HADAPAN 16.09 MP RUANG TAMU 34.35 MP 11.75 MP TANGGA 6.38 MP papak konkrit A B B A B B 18 19 TANGGA TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN KAYU KOMPOSIT. RUJUK BUTIRAN JURUTERA R=177.5mm T=225mm RAMP TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN PELASAN SIMEN. RUJUK BUTIRAN JURUTERA CERUN 12.9% RAMP TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN PELASAN SIMEN. RUJUK BUTIRAN JURUTERA CERUN 12.9% TANGGA TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN PELASAN SIMEN. RUJUK BUTIRAN JURUTERA R=176mm T=250mm TANGGA TETULANG PAPAK KONKRIT BERKERANGKA BESI DGN KEMASAN PELASAN SIMEN. RUJUK BUTIRAN JURUTERA R=176mm T=250mm 2017 2017 IC1 [21'-8"] LANTAI (BASEMENT) DINDING BATUBATA 115MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN. RUJUK BUTIRAN JURUTERA PAIP UPVC Ø 100mm DARI PERANGKAP AIR KE PAIP UTAMA TIANG BESI BULAT Ø 150mm RUJUK BUTIRAN JURUTERA TIANG KONKRIT TETULANG BESI 300MMX300MM TIANG KONKRIT TETULANG BESI 300MMX200MM DINDING KONKRIT TETULANG BESI 4550MMX300MM PERANGKAP AIR 400MMX600MM. RUJUK BUTIRAN JURUTERA. DINDING PENAHAN KONKRIT 150MM TBL. RUJUK BUTIRAN JURUTERA DINDING BATUBATA 115MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN TAMPAK KONKRIT. RUJUK BUTIRAN JURUTERA KEMASAN ALUR DINDING 25MM 10MM. RUJUK BUTIRAN JURUTERA DINDING BATUBATA 115MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN TAMPAK KONKRIT. RUJUK BUTIRAN JURUTERA 16524 [54'-3"] 4743 [15'-7"] RNG1 5531 [18'-2"] SSL 27.55 SSL ± 25.45 SSL ± 25.45 SSL 27.60 FFL: ± 27.65 FFL: ± 27.70
KUNCI, PELAN LOKASI, PELAN TAPAK PELAN TINGKAT BAWAH TANAH (BASEMENT), PELAN LANTAI TINGKAT 1, & PELAN LANTAI TINGKAT 2
MEROBOH 1 UNIT RUMAH BANGLO 2 TINGKAT SEDIADA DAN MEMBINA SEMULA 1 UNIT RUMAH BANGLO 2 TINGKAT BESERTA 1 TINGKAT RUANG BAWAH TANAH DI ALAMAT 283K, JALAN PEKELILING DI ATAS LOT 2316, BANDAR GELUGOR, DAERAH TIMUR LAUT, PULAU PINANG UNTUK : TETUAN LOKE CHEE KEONG NAMA : LOKE CHEE KEONG NO. K/P : 830504-07-5325 ALAMAT : NO 321, JALAN PEKELILING, 11700 GELUGOR PULAU PINANG No.21 Lorong Berjaya, Pulau Tikus 13050 Penang. Tel : 04-2299 343 Fax : O4--2299 O53 e-mail yycarch@pd.jaring.my YEE YEW CHUIN ARCHITECT No.21 Lorong Berjaya, Pulau Tikus 13050 Penang. Tel 04-2299 343 Fax : O4--2299 O53 e-mail : yycarch@pd.jaring.my
ARCHITECT 9'(2700mm)High Ceramic Full Wall Tiles Nippon ICI Paint With 4"(100mm) High Skirting (CT/PT) 1' X 1' (300 X 300 Mm) Homogeneous Tiles Cement Render 1' X 1' (300 X 300 Mm) Ceramic Tiles HT LEGEND FINISHES : CT 1' X 1' (300 X 300 Mm) Non-slip Homog. TilesNHT HHT 2' X 2' (600 X 600 Mm) Heavy-Duty Homog. Tiles CR PT 9'(H)CT SC PC Plaster Ceiling With Cornice / Pattern 2' X 4' Asbestos -free Cement Board Ceiling Skim CoatTimber StripTS RUANGAN KEMASAN CADANGAN TEMPAT LETAK KERETA ( BASEMENT DINDINGLANTAI SILING JADUAL DAFTAR KELUASAN DAN KEMASAN BANGUNAN LUAS LANTAI (MP) 61.18 PT 1' X 1' (300 X 300 Mm) Non-slip Ceramic TilesNCT 10'(3050mm)High Ceramic Full Wall Tiles10'(H)CT ARAS BASEMENT PCCR TANGGA BASEMENT 3.90 PT PCCR BILIK UTILITI 17.11 PTCR DAPUR KERING 11.69 HT PC9'(H)CT TANGGA 6.38 PT PCHT BILIK TIDUR 1 11.75 PT PCHT ARAS BAWAH RUANG TAMU 34.35 PT PCHT RUANG MAKAN 27.09 PT PCHT FOYER 2.14 PT PCHT DAPUR BASAH 7.22 HT PC9'(H)CT BILIK AIR 1 3.08 NHT 10'(H)CT PC ARAS ATAS RUANG KELUARGA 29.53 PT PCHT RUANG REHAT 14.52 PT PCHT RUANG PAKAIAN 5.63 PT PCHT BILIK TIDUR UTAMA 14.20 PT PCHT BILIK TIDUR 2 22.10 PT PCHT BILIK TIDUR 3 22.14 PT PCHT BILIK AIR UTAMA 14.28 PT PCHT BILIK AIR 2 5.16 PT PCHT LUAS KAWASAN (A) 313.45 MP RUANG TERBUKA RAMP 30.39 PTCR TANGGA DEPAN 4.51 PTCR RUANG HADAPAN 16.09 PTCR FOYER DEPAN 18.96 PTCR RUANG BASUHAN 4.36 PT AFNHT BALKONI 11.96 PT AFNHT LUAS KESELURUHAN 530.18 MP LUAS KAWASAN (B) 216.73 MP LUAS KESELURUHAN 2(KAW (A) + (B)) BUMBUNG RATA 130.46 CR PT JADUAL PENGUDARAAN DAN PENCAHAYAAN TANDATANGAN PEMILIK TANAH : DRAWING STATUS DRAWING TITLE PROJECT TITLE TANDATANGAN ARKITEK & SAKSI KEPADA TANDATANGAN PEMILIK TANAH & BANGUNAN : SCALE DATE 1:100 MAY 22 RPMC.K YYC.FRZ DRAWN CHECKED SHEET NO. REV. SUBMISSION JOB NO. MBPP.YYC.RPMC.LOKE_PB TANDATANGAN PEMILIK BANGUNAN & PEMOHON : MAJLIS BANDARAYA PULAU PINANG TANDATANGAN JURUTERA 1/2 NAMA : LOKE CHEE KEONG NO. K/P : 830504-07-5325 ALAMAT : NO 321, JALAN PEKELILING, 11700 GELUGOR PULAU PINANG UTAMA ( GRD LEVEL ) GARISAN SEMPADAN SISI KANAN 236° 55' 20 16.462 58° 04' 10'' 18.389 325° 48' 20 19.680 236° 55' 20 16.462 58° 04' 10'' 18.389 325° 48' 20 19.680 PT 800 450 300 300 300 300 300 275 250250250 ARAS LANTAI TINGKAT 1 ARAS BASEMENT 2150 =3. Zon Guna Tanah Perumahan Tetap Sediada 4. Cadangan Pemajuan Rumah Banglo Tiga Tingkat.
Jumlah Keluasan Tanah2. Tapak Cadangan1. a) Lot 2316 339.73 m.p. (3657 k.p.) a. Tingkat Besmen b. Aras 1 c. Aras 2 Keluasan Lantai (m.p.) Jumlah Keluasan 313.45 m.p. a) Lot 2316 82.19 103.70 127.56 LOT 2316, NO 283K, JALAN PEKELILING, SEKSYEN BUKIT GELUGOR D.T.L, PULAU PINANG. Keluasan Lantai (k.p.) 3,373.9 k.p. 884.68 1,116.21 1,373.04 MBPP/ILCS-OSC/PB/ /2022BUTIRAN '1' TANGKI SIMPANAN AIR HUJAN SKALA : N.T.S BUTIRAN BUMBUNG RATA SKALA : N.T.S INVOLVEMENT DESIGN PM1 PB1 ILCS SUBMISSION

KERATAN

VOID RUANG LAPANG LANDSKAP 76.59 MP papak konkrit SSL 27.55 kosong 4900 [16'-1"] 16996 [55'-10"] C P 1 18 1875 [6'-2"] R 2905 [9'-6"] A 14 16 9 1575 [5'-2"] 4258 [14'] 6262 [20'-7"] Q 488 [1'-7"] Q1 1049 [3'-5"] GARISANSEMPADANBELAKANG AA B B PELAN BUMBUNG BUMBUNG RATA KONKRIT (R.C) DGN KALIS AIIR. RUJUK BUTIRAN JURUTERA BUMBUNG RATA KONKRIT (R.C) DGN KALIS AIIR. RUJUK BUTIRAN JURUTERA BUMBUNG RATA KONKRIT (R.C) DGN KALIS AIIR. RUJUK BUTIRAN JURUTERA 100MM Ø RWDP. RUJUK BUTIRAN JURUTERA 100MM Ø RWDP. RUJUK BUTIRAN JURUTERA 100MM Ø RWDP. RUJUK BUTIRAN JURUTERA TANGKI AIR 350GAL HDPE DI ATAS PAPAK KONKRIT. RUJUK BUTIRAN PENGELUAR. SKALA 1 : 100 H JE G 2242 [7'-4"] 1150 [3'-9"] 2669 [8'-9"] 1450 [4'-9"] 4554 [14'-11"] TUKUP (COPING) KONKRIT TERTULANG RUJUK BUTIRAN JURUTERA SISIP ALUMINIUM HIASAN RUJUK BUTIRAN PENGELUAR SISIP ALUMINIUM HIASAN RUJUK BUTIRAN PENGELUAR PINTU PAGAR ALUMINIUM RUJUK BUTIRAN PENGELUAR PINTU GULUNG BERMOTOR RUJUK BUTIRAN PENGELUAR LANGKAN KACA 5MM 'TEMPERED' TINGGI 900MM DENGAN RAILING BESI RUJUK BUTIRAN PENGELUAR. LANGKAN KACA 5MM 'TEMPERED' TINGGI 900MM DENGAN RAILING BESI RUJUK BUTIRAN PENGELUAR. TIANG BESI HIASAN BERSAIZ 50mm 150mm DGN JARAK SETARA 196mm DI ANTARA TIANG KE TIANG TIANG BESI BULAT Ø 150mm RUJUK BUTIRAN JURUTERA BUMBUNG RATA KONKRIT (R.C) DGN KALIS AIR. RUJUK BUTIRAN JURUTERA KEMASAN ALUR DINDING 25MM X 10MM. RUJUK BUTIRAN JURUTERA DINDING BATUBATA 230MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN TAMPAK KONKRIT. RUJUK BUTIRAN JURUTERA kosong L1 12073 [39'-8"]3021 [9'-11"] C PD F H J M 1875 [6'-2"] R 2905 [9'-6"] 1039 [3'-5"] 1867 [6'-2"] BA K Q 1537 [5'-1"] 3047 [10'] 1450 [4'-9"] 1253 [4'-1"] 3302 [10'-10"] 158 [6"] 1300 [4'-3"] 1721 [5'-8"] 159 [6"] N1 2014 [6'-7"] 3700 [12'-2"] ARAS TANAH ARAS LANTAI TINGKAT BAWAH 3345 [11'] 355 [1'-2"] 9799 [32'-2"] ARAS SILING ATAS ARAS BUMBUNG 654 [2'-2"] 3045 [10'] 3699[12'-2"] ARAS BASEMENT PANDANGAN HADAPAN SKALA 1 : 100 kosong kosong BILIKRUANG KELUARGARUANG REHAT FOYERDAPUR BASAH RUANG MAKAN kosong KEMASAN SILING PLASTER RUJUK KEPADA BUTIRAN PENGELUAR KEMASAN SILING PLASTER RUJUK KEPADA BUTIRAN PENGELUAR DINDING BATUBATA 115MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN TAMPAK KONKRIT. RUJUK BUTIRAN JURUTERA DINDING BATUBATA 115MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN TAMPAK KONKRIT. RUJUK BUTIRAN JURUTERA TUKUP (COPING) KONKRIT TERTULANG 150MMX150MM RUJUK BUTIRAN JURUTERA RASUK TETULANG KONKRIT. RUJUK BUTIRAN JURUTERA L1 12073 [39'-8"]3021 [9'-11"] C D F H J 2905 [9'-6"] 1039 [3'-5"] 1867 [6'-2"] BA K 3047 [10'] 1450 [4'-9"] 1253 [4'-1"] 158 [6"] 1300 [4'-3"] 1721 [5'-8"] 159 [6"]
A-A SKALA 1 : 100 SISIP ALUMINIUM HIASAN RUJUK BUTIRAN PENGELUAR SISIP ALUMINIUM HIASAN RUJUK BUTIRAN PENGELUAR TUKUP (COPING) FIBERGLASS & SIMEN 50MMX50MM RUJUK BUTIRAN JURUTERA TUKUP (COPING) FIBERGLASS & SIMEN 50MMX50MM RUJUK BUTIRAN JURUTERA RASUK TETULANG KONKRIT. RUJUK BUTIRAN JURUTERA KEMASAN SILING PLASTER RUJUK KEPADA BUTIRAN PENGELUAR KEMASAN SILING PLASTER RUJUK KEPADA BUTIRAN PENGELUAR DINDING BATUBATA DAN 115MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN. RUJUK BUTIRAN JURUTERA kosong RUANG MAKAN RUANG KELUARGA KERATAN B-B SKALA 1 : 100 1 2 5 8 11 12 2300 [7'-7"] 1444 [4'-9"] 5351 [17'-7"] 3744 [12'-4"] 7851 [25'-9"] 3700 [12'-2"] ARAS TANAH ARAS LANTAI TINGKAT 1 ARAS SILING BAWAH 3345 [11'] 355 [1'-2"] [32'-2"] ARAS SILING ATAS ARAS BUMBUNG 654 [2'-2"] 3045 [10'] [12'-2"] ARAS BASEMENT SISIP ALUMINIUM HIASAN RUJUK BUTIRAN PENGELUAR BUMBUNG RATA KONKRIT (R.C) DGN KALIS AIR. RUJUK BUTIRAN JURUTERA TIANG BESI BULAT Ø 150mm RUJUK BUTIRAN JURUTERA DINDING BATUBATA 230MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN TAMPAK KONKRIT. RUJUK BUTIRAN JURUTERA TUKUP (COPING) KONKRIT TERTULANG RUJUK BUTIRAN JURUTERA TUKUP (COPING) KONKRIT TERTULANG 150MMX150MM RUJUK BUTIRAN JURUTERA TUKUP (COPING) FIBERGLASS SIMEN 50MMX50MM RUJUK BUTIRAN JURUTERA TUKUP (COPING) FIBERGLASS & SIMEN 50MMX50MM RUJUK BUTIRAN JURUTERA TUKUP (COPING) FIBERGLASS SIMEN 50MMX50MM RUJUK BUTIRAN JURUTERA kosong PANDANGAN BELAKANG SKALA 1 : 100 1 2 5 8 11 12 13 15 1707 [5'-7"] 2300 [7'-7"] 1444 [4'-9"] 5351 [17'-7"] 3744 [12'-4"] 7851 [25'-9"] PANDANGAN SISI KIRI SKALA 1 : 100 58° 04' 10'' 18.389 GARISAN SEMPADAN SISI KIRI 2000mm GARISAN BANGUNAN 2000mm GARISAN BANGUNAN 6100mm GARISAN BANGUNAN 2000mmGARISANBANGUNAN papak konkrit 825 168 CURAM 2° CURAM 2° CURAM 2° CURAM 2° CURAM 2° CURAM 2° CURAM 2° papak konkrit papak konkrit 236° 55' 20 16.462 151° 29' 10'' 19.368 325° 48' 20 19.680 GARISAN SEMPADAN KANAN GARISAN SEMPADAN HADAPAN 1317 600 2100 750 2100 900 21002100 1050 300 2050 300 2050 300 2050 300 2050 1200 600 800300300 2050 2105 600 600 600 600 2050 2050 905 2385 600600 600 176 1031 1100 2050 2400 7860 905 13215 21002200 2200 905 2150 RUJUK BUTIRAN BUMBUNG U-VALUE GARISAN SEMPADAN GARISAN BANGUNAN GARISAN BANGUNAN GARISAN SEMPADAN GARISAN BANGUNAN GARISAN BANGUNAN GARISAN SEMPADAN GARISAN BANGUNAN GARISAN SEMPADAN GARISAN SEMPADAN GARISAN BANGUNAN GARISAN SEMPADAN GARISAN BANGUNAN GARISAN BANGUNAN GARISAN SEMPADAN L1 12073 [39'-8"] 3021 [9'-11"] CP DFHJM 1875 [6'-2"] R 2905 [9'-6"] 1039 [3'-5"] 1867 [6'-2"] B AKQ 1537 [5'-1"] 3047 [10'] 1450 [4'-9"] 1253 [4'-1"] 3302 [10'-10"] 158 [6"] 1300 [4'-3"] 1721 [5'-8"] 159 [6"] N1 2014 [6'-7"] 1800

YEE YEW CHUIN ARCHITECT

YEE YEW CHUIN

PELAN BUMBUNG, KERATAN A-A, KERATAN B-B, PANDANGAN HADAPAN, PANDANGAN BELAKANG, PANDANGAN SISI KIRI, PANDANGAN SISI KANAN. CADANGAN MEROBOH 1 UNIT RUMAH BANGLO 2 TINGKAT SEDIADA DAN MEMBINA SEMULA 1 UNIT RUMAH BANGLO 2 TINGKAT BESERTA 1 TINGKAT RUANG BAWAH TANAH DI ALAMAT 283K, JALAN PEKELILING DI ATAS LOT 2316, BANDAR GELUGOR, DAERAH TIMUR LAUT, PULAU PINANG UNTUK : TETUAN LOKE CHEE KEONG NAMA : LOKE CHEE KEONG NO. K/P : 830504-07-5325 ALAMAT : NO 321, JALAN PEKELILING, 11700 GELUGOR PULAU PINANG No.21 Lorong Berjaya, Pulau Tikus 13050 Penang. Tel : 04-2299 343 Fax : O4--2299 O53 e-mail : yycarch@pd.jaring.my
ARCHITECT No.21 Lorong Berjaya, Pulau Tikus 13050 Penang. Tel : 04-2299 343 Fax : O4--2299 O53 e-mail : yycarch@pd.jaring.my
TANDATANGAN PEMILIK TANAH : DRAWING STATUS DRAWING TITLE PROJECT TITLE TANDATANGAN ARKITEK & SAKSI KEPADA TANDATANGAN PEMILIK TANAH & BANGUNAN SCALE DATE 1:100 MAY 22 RPMC.K YYC.FRZ DRAWN CHECKED SHEET NO. REV. SUBMISSION JOB NO. MBPP.YYC.RPMC.LOKE_PB TANDATANGAN PEMILIK BANGUNAN & PEMOHON : MAJLIS BANDARAYA PULAU PINANG TANDATANGAN JURUTERA 2/2 NAMA : LOKE CHEE KEONG NO. K/P : 830504-07-5325 ALAMAT : NO 321, JALAN PEKELILING, 11700 GELUGOR PULAU PINANG kosong BILIK AIR 2TIDUR 3 RUANG TAMU DINDING BATUBATA DAN 115MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN. RUJUK BUTIRAN JURUTERA KEMASAN DINDING BERSERAMIK MELIPUTI KESELURUHAN TINGGI DINDING (BILIK AIR) TUKUP (COPING) KONKRIT TERTULANG 150MMX150MM RUJUK BUTIRAN JURUTERA RASUK TETULANG KONKRIT. RUJUK BUTIRAN JURUTERA L1 PM 1875 [6'-2"] RQ 1537 [5'-1"] 3302 [10'-10"] N1 2014 [6'-7"] [12'-2"] ARAS SILING BAWAH ARAS LANTAI TINGKAT [11'] [1'-2"] 9799 [32'-2"] ARAS BUMBUNG [2'-2"] [10'] 3699[12'-2"] ARAS BASEMENT STRUKTUR TIANG KELULI KEPADA BUTIRAN JURUTERA SISIP ALUMINIUM HIASAN RUJUK BUTIRAN PENGELUAR KEMASAN ALUR DINDING 25MM X 10MM. RUJUK BUTIRAN JURUTERA KEMASAN ALUR DINDING 50MM 50MM. RUJUK BUTIRAN JURUTERA TUKUP (COPING) FIBERGLASS SIMEN 50MMX50MM RUJUK BUTIRAN JURUTERA TUKUP (COPING) FIBERGLASS & SIMEN 50MMX50MM RUJUK BUTIRAN JURUTERA TUKUP (COPING) FIBERGLASS SIMEN 50MMX50MM RUJUK BUTIRAN JURUTERA DINDING BATUBATA DAN 115MM TBL. DGN. 18MM LEPAAN DIKEDUA BELAH MUKA BESERTA KEMASAN. RUJUK BUTIRAN JURUTERA RASUK TETULANG KONKRIT. RUJUK BUTIRAN JURUTERA kosong kosong kosong BALKONI TEMPAT LETAK KERETA BAWAH TANAH (BASEMENT) 2500 [8'-3"] 13 15 1817 1707 [5'-7"] 3693 [12'-2"] 3700 [12'-2"] ARAS TANAH ARAS LANTAI TINGKAT BAWAH 3345 [11'] 355 [1'-2"] 9799 [32'-2"] ARAS SILING ATAS ARAS BUMBUNG 654 [2'-2"] 3045 [10'] 3699[12'-2"] ARAS BASEMENT 1817 3693 [12'-2"] PANDANGAN SISI KANAN SKALA 1 : 100 [12'-2"] ARAS TANAH ARAS LANTAI TINGKAT ARAS SILING BAWAH ARAS LANTAI TINGKAT 2 [11'] [1'-2"] 9799 [32'-2"] ARAS SILING ATAS ARAS BUMBUNG [2'-2"] [10'] 3699[12'-2"] ARAS BASEMENT 12581112131518 17 1707 [5'-7"] 3693 [12'-2"] 2300 [7'-7"] 1444 [4'-9"] 5351 [17'-7"] 3744 [12'-4"] 7851 [25'-9"] kosong 3700 [12'-2"] ARAS TANAH ARAS LANTAI TINGKAT ARAS SILING BAWAH 3345 [11'] 355 [1'-2"] 9799 [32'-2"] ARAS SILING ATAS ARAS BUMBUNG 654 [2'-2"] 3045 [10'] 3699[12'-2"] ARAS BASEMENT 300 2050 2100 905 1050 2100 900 800 300 2050 600 2050 2050 20502050 300 205020502050 450 2050 MBPP/ILCS-OSC/PB/ /2022 RAILING TEMPERED GLASS' KEPADA BUTIRAN PENGELUAR 169 GARISAN SEMPADAN GARISAN BANGUNAN GARISAN BANGUNAN GARISAN SEMPADAN GARISAN SEMPADAN GARISAN SEMPADAN GARISAN BANGUNAN GARISAN BANGUNAN GARISAN SEMPADAN
PETUNJUK : MH 4 5 ST MH1 TAPAK CADANGAN TAPAK CADANGAN SCALE : 8 RANTAI SEINCI LOCATION PLAN NO. LOT : 4775 N KEY PLAN SCALE : 1 BATU SEINCI ( 63360 ) N NO. LOT : 4775 SCALE 1 : 150 N SITE PLAN
CADANGAN JALAN KELUAR MASUK MH 4 OIL SPILL CONTAINER MH2 MH3 LOCATION PLAN SKALA AS SHOWN KEY PLAN T E N D E R D R A W I N G NOTA - NOTA: PROJEK : PEMILIK : TANDATANGAN PERUNDING JURUTERA BERTAULIAH : TAJUK LUKISAN : SKOP KERJA ARKITEK NOTE THIS DRAWING IS COPYRIGHT. CONTRACTORS MUST CHECK ALL DIMENSION ON SITE ONLY FIGURED DIMENSION ARE TO BE USED. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. DILUKIS OLEH MAT DISEMAK OLEH TARIKH RPMC NO. PROJEK NO. LUKISAN RITZ / DPRO / TNB.MPK / 2021-01 01 / 08 TENAGA NASIONAL BERHAD design pro consult sdn bhd ENVIROMENTAL CONSULTANCY CIVIL, STRUCTURAL, CHEMICAL & NO 3, TINGKAT 1, LORONG PJ 1/2, TEL 604-3985622 FAX : 604-3987622 TAMAN PAUH JAYA, 13700 PERAI, PULAU PINANG E-MAIL dpcsb@yahoo.com 23 MAC 2022 SITE PLAN MAIN BUILDING : INVOLVEMENT MEETING & AMMEND MENT WITH TNB TENDER DRAWING STATUS: TENDER
A B B 1 5 5978 3267 3269 3048 18000 7a 7 6 5 4 3 2 1 2000 2987 5013 4512 3488 1538 18000 A B C D E 4000 SCALE 1 : 150 GROUND FLOOR PLAN
A 2438 3000 3500 3000 6000 8000 8000 16000 9500 F G H I SKALA : AS SHOWN GROUND FLOOR PLAN NOTA - NOTA: PROJEK : PEMILIK : TANDATANGAN PERUNDING JURUTERA BERTAULIAH : TAJUK LUKISAN : SKOP KERJA ARKITEK NOTE : THIS DRAWING IS COPYRIGHT. CONTRACTORS MUST CHECK ALL DIMENSION ON SITE ONLY FIGURED DIMENSION ARE TO BE USED. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. DILUKIS OLEH MAT DISEMAK OLEH : TARIKH : RPMC NO. PROJEK : NO. LUKISAN : 02 / 08 TENAGA NASIONAL BERHAD design pro consult sdn bhd ENVIROMENTAL CONSULTANCY CIVIL, STRUCTURAL, CHEMICAL & NO 3, TINGKAT 1, LORONG PJ 1/2, TEL 604-3985622 FAX : 604-3987622 TAMAN PAUH JAYA, 13700 PERAI, PULAU PINANG E-MAIL dpcsb@yahoo.com RITZ / DPRO / TNB.MPK / 2021-01 MAIN BUILDING : 23 MAC 2022 T E N D E R D R A W I N G
CDEFGHI 13 20 15 A B C D E F SCALE 1 : 150 REAR ELEVATION SCALE 1 : 150 FRONT ELEVATION

TENAGA

1 10 AB G H I REAR ELEVATION SKALA AS SHOWN FRONT ELEVATION NOTA - NOTA: PROJEK : PEMILIK : TANDATANGAN PERUNDING JURUTERA BERTAULIAH : TAJUK LUKISAN : SKOP KERJA ARKITEK NOTE : THIS DRAWING IS COPYRIGHT. CONTRACTORS MUST CHECK ALL DIMENSION ON SITE ONLY FIGURED DIMENSION ARE TO BE USED. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. DILUKIS OLEH : MAT DISEMAK OLEH TARIKH RPMC NO. PROJEK NO. LUKISAN 06 / 08
NASIONAL BERHAD design pro consult sdn bhd ENVIROMENTAL CONSULTANCY CIVIL, STRUCTURAL, CHEMICAL & NO 3, TINGKAT 1, LORONG PJ 1/2, TEL 604-3985622 FAX 604-3987622 TAMAN PAUH JAYA, 13700 PERAI, PULAU PINANG E-MAIL dpcsb@yahoo.com RITZ / DPRO / TNB.MPK / 2021-01 MAIN BUILDING : 23 MAC 2022 T E N D E R D R A W I N G

ELEVATION

2800 4800 15 12345 2000 2987 5013 4497 18000 4000 7600 7600 2800 4800 7a 7 6 5 4 29875013449735031538 18000 SCALE 1 : 150 RIGHT
SCALE 1 : 150 LEFT ELEVATION

TENAGA

677a 3503 1538 3 2 1 2000 4000 LEFT ELEVATION SKALA AS SHOWN RIGHT ELEVATION NOTA - NOTA: PROJEK : PEMILIK : TANDATANGAN PERUNDING JURUTERA BERTAULIAH : TAJUK LUKISAN : SKOP KERJA ARKITEK NOTE : THIS DRAWING IS COPYRIGHT. CONTRACTORS MUST CHECK ALL DIMENSION ON SITE ONLY FIGURED DIMENSION ARE TO BE USED. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT BEFORE PROCEEDING. DILUKIS OLEH MAT DISEMAK OLEH TARIKH RPMC NO. PROJEK NO. LUKISAN 07 / 08
NASIONAL BERHAD design pro consult sdn bhd ENVIROMENTAL CONSULTANCY CIVIL, STRUCTURAL, CHEMICAL & NO 3, TINGKAT 1, LORONG PJ 1/2, TEL : 604-3985622 FAX : 604-3987622 TAMAN PAUH JAYA, 13700 PERAI, PULAU PINANG E-MAIL dpcsb@yahoo.com RITZ / DPRO / TNB.MPK / 2021-01 MAIN BUILDING : 23 MAC 2022 T E N D E R D R A W I N G

TIANG BESI BARU KEPADA BUTIRAN JURUTERA

TEMPAT MANDI JENAZAH

CADANGAN KEDUDUKAN TANGKI AIR BARU RUJUK PADA BUTIRAN JURUTERA

115MM TEBAL DINDING BATA BARU

LEPAAN

"VENT FAN" KEPADA BUTIRAN J'TERA M&E

TINGKAP JENIS KASMEN BARU RUJUK JADUAL TINGKAP

TINGKAP TETAP JENDELA ATAS BERBINGKAI ALUMINIUM BARU RUJUK JADUAL TINGKAP

100MM Ø SALIRAN AIR HUJAN BARU RUJUK BUTIRAN PENGELUAR

LONGKANG KONKRIT BARU RUJUK KEPADA BUTIRAN JURUTERA

DINDING MENGGUNAKAN 'VENTILATION BLOCK' JENIS VB190.68 (PBM) BARU RUJUK KEPADA BUTIRAN PENGELUAR

115MM TEBAL DINDING BATA BARU DENGAN 20MM LEPAAN SIMEN DIBAHAGIAN LUAR

LANDAS ANGKAT KONKRIT BARU RUJUK KEPADA BUTIRAN JURUTERA

LONGKANG SALIRAN AIR HUJAN BESERTA 'GRATING' BARU RUJUK BUTIRAN JURUTERA

TINGKAP JENIS KASMEN BARU RUJUK JADUAL TINGKAP

115MM TEBAL DINDING BATA BARU DENGAN 20MM LEPAAN SIMEN DIBAHAGIAN LUAR

TINGKAP JENIS KASMEN BARU RUJUK JADUAL TINGKAP

BINAAN KOLAH BARU RUJUK KEPADA BUTIRAN PERINCIAN

LANTAI JENIS 'PABBLEWASH

100MM Ø SALIRAN AIR HUJAN BARU RUJUK BUTIRAN PENGELUAR

PENUTUP LONGKANG KONKRIT BARU RUJUK KEPADA BUTIRAN JURUTERA

BATU BATA PEJALAN KAKI

2715 9500 A E F HC DB G 3846 6636 X 3 4 5 6 7 9 10 8 12 11 1204 3293 2830 5909 6699 5067 12944 6125 716 7706 2634 6248 2 1 3072 2718 13 1149 4 5 5 5 6 6 6 5 5 5 5 11 2640 KOLAH BARU RAMP 2728 ARAH ALIRAN AIR TERAKHIR LONGKANG DENGAN PENUTUP JENIS RC PINTU KACA JELAS DENGAN KETEBALAN 6MM JENIS SUNBLAST RUJUK JADUAL PINTU STRUKTUR RC DENGAN KEMASAN JUBIN
DENGAN 20MM
SIMEN DIBAHAGIAN LUAR
3080
5025 BARU LALUAN TANDAS
FINISHING
C B Y Y X 4832 Z Z RUJUK BUTIRAN C RUJUK BUTIRAN Q
BARU RUJUK BUTIRAN PENGELUAR RUJUK KERATAN DINDING D RUJUK BUTIRAN E RUJUK BUTIRAN M LONGKANG SALIRAN AIR HUJAN BESERTA 'GRATING' BARU RUJUK BUTIRAN JURUTERA 8849 6553 SETOR SEJADAH BARU FFC: ±300 24.22 MP PP FP CT RUANG JENAZAH BARU FFC: ±300 19.84 MP CT FP PW DAPURRUANG BARU 9.23 MP FFC: ±300 PP BFC PW PEJALANRUANG KAKI PP BFC PW FFC: ±300 RUANG SOLAT BARU 101.60 MP PP BFC FFC: ±300 RUANG SOLAT BARU 101.60 MP PP BFC PW FFC: ±300 WUDHU BARU KAWASAN VB BFC PW RUANG TAMBAHAN BARU VB BFC PW BILIK MESYUARAT 27.55MP FFC: ±300 PP FP CT BILIK KEGUNAAN PEGAWAI MASJID FFC: ±300 18.04 MP PP FP CT FFC: ±150 FFC: ±150 BANGKU DUDUK RC 17892 2800 2800 2800 2800 CT 497 904 500 W W 4522 5993 DINDING MENGGUNAKAN 'VENTILATION BLOCK' JENIS VB190.68 (PBM) BARU RUJUK KEPADA BUTIRAN PENGELUAR PENUTUP LONGKANG JENIS RC RUJUK BUTIRAN PENGELUAR
6090 1910 3480 4310 3480 4370 112708000 J K L M N O PELAN LANTAI Nota : NO. LUKISAN: TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN Skala Disemak oleh Tarikh : 1:100 : RADS This drawing is copyright. Contractors must check all dimensions on site. Only figured dimensions are to be worked on. Discrepancies must be reported immediately to the architect before proceeding. Dilukis oleh TAJUK LUKISAN : LEMBAGA ARKITEK MALAYSIA TANDATANGAN PEMILIK TANAH & BANGUNAN : PELAN LANTAI 1 CADANGAN TAMBAHAN RUANG SOLAT DAN WUDHUK DAN KERJA-KERJA BERKAITAN DI MASJID PERMATANG JANGGUS, 15500 PERMATANG PAUH, SEBERANG PERAI TENGAH, PULAU PINANG. (PEMBANGUNAN FASA 2) TAJUK PROJEK : AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 KMS Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office : No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p 019 4000 250 Tel : 04 331 9045 Fax : 04 330 9026 Email ritz2.archidesign@gmail.com Adrianta Aziz Architect SKALA 1:100 RUANG SOLAT WANITA SEDIADA FINAL REVISION 115MM TEBAL DINDING BATA BARU DENGAN 20MM LEPAAN SIMEN DIBAHAGIAN LUAR 115MM TEBAL DINDING BATA BARU DENGAN 20MM LEPAAN SIMEN DIBAHAGIAN LUAR 1800 x 2134MM PINTU KACA BERBINGKAI ALUMINIM KEPADA BUTIRAN BANGUNAN SEDIADA DIKEKALKAN BANGUNAN SEDIADA DIKEKALKAN A A C B RUJUK BUTIRAN P RUJUK BUTIRAN U RUJUK KERATAN DINDING F FEB 2022 23 GARIS DINDING LAMA BAHAGIAN DALAM BATU JENIS 'PEBBLE' (PEBBLE STONE) DENGAN KETEBALAN 150MM 21000 CERAMIC TILES DESCRIPTIONSYMBOL SKIM COAT & PAINT FIBROUS PLASTER CEILING LEGEND : CEILING FINISHES CEILING FINISHES WALL FINISHES FLOOR FINISHES LEGEND DESCRIPTIONSYMBOL PLASTER & PAINT LEGEND : WALL FINISHES SYMBOL NON-SLIP CERAMIC TILES LEGEND : FLOOR FINISHES CARPET DESCRIPTION CERAMIC TILES PEBBLE WASH CONCRETE RENDER PAVE WALKWAYPV CR CT1 PW C CT CT PP C B A SC FP BFC BAFFLE CEILING STRIP 2800 CONSTRUCTION DRAWING RIVER PEBBLE STONE FFC: ±300 85.73 MP RUANG SOLAT/ BACAAN QURAN BARU PP FP CT FFC: ±300 66.35 MP PP FP CT RUJUK BUTIRAN RUANG SOLAT / RUANG MUSAFFIR RUANG SOLAT BARU RUANG MUSAFIR INVOLVEMENT DESIGN LAYOUT & FACADE MEETING & AMMEND WITH QARIAH CONTRACT REVIEW TERMINATION MAIN CON. STATUS: CONSTRUCTION
3795 450 1200 503 1126 1538 1200 450 PANDANGAN SISI SKALA 1:100 B B C C 300 1350 1200 1350 1350 1350 1200 450 1200 450 600 1200 1200 2915 3931 6550 Y Y X X PANDANGAN HADAPAN SKALA 1:100 BUTIRAN S BUTIRAN T BUTIRAN U 1200 450 7280 613 300 1225 1350 300 300 2800 2936 1100 2287 2936 2287 2936 603 603 2719 854 503 2974 32764396 4094 32113060

CADANGAN TAMBAHAN RUANG SOLAT DAN WUDHUK

KERJA-KERJA BERKAITAN DI

MASJID PERMATANG JANGGUS, 15500

PAUH, SEBERANG PERAI TENGAH, PULAU PINANG.

FASA

436 1171 3482 7280 302 1200 A A BUTIRAN V Nota : NO. LUKISAN: TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN Skala Disemak oleh Tarikh : 1:100 : RADS This drawing is copyright. Contractors must check all dimensions on site. Only figured dimensions are to be worked on. Discrepancies must be reported immediately to the architect before proceeding. Dilukis oleh TAJUK LUKISAN : LEMBAGA ARKITEK MALAYSIA TANDATANGAN PEMILIK TANAH & BANGUNAN : PANDANGAN HADAPAN DAN PANDANGAN SISI 3
DAN
PERMATANG
(PEMBANGUNAN
2) TAJUK PROJEK : FEB 2022 AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 KMS Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office : No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p 019 4000 250 Tel : 04 331 9045 Fax : 04 330 9026 Email ritz2.archidesign@gmail.com Adrianta Aziz Architect REVISION NO.5 23 6550 2287 2936 2104 2926 1916 2926 2926 906 4824 2729 CONSTRUCTION DRAWING 32113060 2974 3276
30761627 3618 1294 1478 6686 3618 300 1006 1766 BUTIRAN Z 2100 1414

CADANGAN

WUDHUK

TENGAH,

JANGGUS,

SEBERANG

KERATAN X-X SKALA 1:100 NO. LUKISAN: TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN Skala Disemak oleh Tarikh : 1:100 : RADS This drawing is copyright. Contractors must check all dimensions on site. Only figured dimensions are to be worked on. Discrepancies must be reported immediately to the architect before proceeding. Dilukis oleh TAJUK LUKISAN : LEMBAGA ARKITEK MALAYSIA TANDATANGAN PEMILIK TANAH & BANGUNAN : KERATAN X-X DAN KERATAN B-B 4
TAMBAHAN RUANG SOLAT DAN
DAN KERJA-KERJA BERKAITAN DI MASJID PERMATANG
15500 PERMATANG PAUH,
PERAI
PULAU PINANG. (PEMBANGUNAN FASA 2) TAJUK PROJEK : AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 KMS Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office : No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p 019 4000 250 Tel : 04 331 9045 Fax : 04 330 9026 Email ritz2.archidesign@gmail.com Adrianta Aziz Architect FINAL REVISION FEB 2022 23 KERATAN B-B SKALA 1:100 5216 3931 CONSTRUCTION DRAWING

KERATAN

3000 300 540 5000 1150 3600 300 1760 KERATAN A-A SKALA 1:100 3600 300 1260 1500 3600 300 1260 1500
Y-Y SKALA 1:100 1233

KERATAN

CADANGAN TAMBAHAN RUANG SOLAT DAN WUDHUK DAN KERJA-KERJA BERKAITAN DI

MASJID PERMATANG JANGGUS, 15500 PERMATANG PAUH, SEBERANG PERAI TENGAH, PULAU PINANG.

FASA

KERATAN Z-Z SKALA 1:100 NO. LUKISAN: TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN Skala Disemak oleh Tarikh : 1:100 : RADS This drawing is copyright. Contractors must check all dimensions on site. Only figured dimensions are to be worked on. Discrepancies must be reported immediately to the architect before proceeding. Dilukis oleh TAJUK LUKISAN : LEMBAGA ARKITEK MALAYSIA TANDATANGAN PEMILIK TANAH & BANGUNAN : KERATAN A-A, KERATAN C-C, KERATAN Y-Y DAN KERATAN Z--Z 5
(PEMBANGUNAN
2) TAJUK PROJEK : AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 KIT Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office : No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p 019 4000 250 Tel : 04 331 9045 Fax : 04 330 9026 Email ritz2.archidesign@gmail.com Adrianta Aziz Architect REVISION NO.5 CONSTRUCTION DRAWING FEB 2022 23
C-C SKALA 1:100 KERATAN W-W
FFC: ±300 DEWAN SERBAGUNA BARU RUANG SOLAT BARU RUANG RAMADHAN 139.00 MP 1 1 PP FP CT 600 600 DEWAN SERBAGUNA BARU RUANG SOLAT BARU RUANG RAMADHAN FFC: ±300 DEWAN SERBAGUNA BARU RUANG SOLAT BARU RUANG RAMADHAN 139.00 MP 1 1 PP FP CT 600 600 DEWAN SERBAGUNA BARU RUANG SOLAT BARU RUANG RAMADHAN

CADANGAN

CADANGAN

STRIP LIGHT

18MM THK FIBER CEMENT BOARD

BAFFLE CEILING

WASH FLOOR

TAMBAHAN RUANG SOLAT DAN WUDHUK DAN KERJA-KERJA BERKAITAN DI MASJID PERMATANG JANGGUS, 15500 PERMATANG PAUH, SEBERANG PERAI TENGAH, PULAU PINANG (PEMBANGUNAN FASA 2) Adrianta Aziz Production Office No. 7084, Tingkat 1, Jalan 12200, Butterworth, Pulau H/p 019 4000 250 Tel 04-331 9025 Fax Email ritz2.archidesign@gmail.com LEMBAGA ARKITEK MALAYSIA AR. ADRIANTA BIN AZIZ TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN
TAMBAHAN RUANG SOLAT DAN WUDHUK DAN KERJA-KERJA BERKAITAN DI MASJID PERMATANG JANGGUS, 15500 PERMATANG PAUH, SEBERANG PERAI TENGAH, PULAU PINANG (PEMBANGUNAN FASA 2) LEMBAGA ARKITEK MALAYSIA AR. ADRIANTA BIN AZIZ TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN TANDATANGAN ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN : KERATAN W-W SKALA 1 : 50
3 X 3 INCH RHS CLC
TO MANUF'S DETAIL PABBLE
FINISHING LED
291°10'56.8" N QIBLA N QIBLA PELAN LOKASI PELAN KUNCI 291°10'56.8" N QIBLA PELAN TAPAK 1150 1150 2300 1150 1150 2300 1800 2000 1100 4900 7050 7050 7050 7050 6553 6553 13106 28200 41306 11 14 18 21 NAIK 14 18 NAIK 1850 1580 1170 900 EL DP DP DP DP EL K K K K EL 1200 1200 2250 1200 3 2 1 1 2 3 4 2 1830 9900 3 4 A B C D E F G 12192 2000 H 4241 1 5404 4 5 3a 3457 j 8434 A B B PELAN LANTAI BAWAH 3a

STATUS: SUBMISSION

-PELAN LOKASI -PELAN TAPAK

NO. LUKISAN: Skala Disemak oleh Tarikh : : 1:125 : : AR-RADS JUN 2022 This drawing is copyright. Contractors must check all dimensions on site. Only figured dimensions are to be worked on. Discrepancies must be reported immediately to the architect before proceeding. Dilukis oleh : MAT 3 1 A R K I T E K P R O F E S I O N A L AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM : A/A 172 LEMBAGA ARKITEK MALAYSIA Headquarters Office : B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office : No. 7085, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p : 019 4000 250 Tel : 04-331 9025 Fax : 04-330 9026 Email : ritz2.archidesign@gmail.com Adrianta Aziz Architect AA-RITZ-HSSSB/2022/01/BP/MBSP -PELN KUNCI -PELAN LANTAI BAWAH Perakuan pemohon berserta tandatangan dan nama : “Saya akan bertanggungjawab sepenuhnya jika perkara berbangkit bersabit dengan pembinaan ini dan membaikpulih segala kerosakkan yang mungkin timbul semasa kerja-kerja pembinaan ke atas premis bersebelahan saya tanpa melibatkan MPSP” " Saya berjanji / memperakui akan mematuhi Seksyen 70 (12) Akta Jalan, Parit dan Bangunan 1974 iaitu tidak menggunakan premis tersebut bagi maksud yang lain daripada maksud asal ia dibina iaitu untuk kediaman. Kegagalan mematuhi dengan kehendak kelulusan boleh disabitkan denda tidak lebih daripada dua puluh lima ribu (RM 25, 000.00 ) dan juga boleh dikenakan denda tambahan tidak lebih daripada lima ratus ringgit ( RM 500.00 ) bagi tiap-tiap hari kesalahan itu diteruskan"
INVOLVEMENT AS-BUILT PB PREPARATION BOMBA PREPARATION
KEDAH LORONG WAWASAN 6 LORONG WAWASAN 5 N SKALA 1" : 1 Batu N SKALA 1:1000 PELAN KUNCI PELAN LOKASI N SKALA : 1:750 PELAN TAPAK PANDANGAN HADAPAN LAPANG 7746 mp TAPAK LORONG WAWASAN LORONG LORONG WAWASAN SIMPANAN JALAN 40' 0" 1 LORONG BELAKANG 16 '0" 37 49 19 100 (TIDAK DISERAH) KEDAI PEJABAT2TGKT 336.88mp KEDAI/PEJABAT2TGKT TAPAK PENJAJA1020MP 481MP 8026 mp 1678 mp 974 mpSAMPAHSETOR (37.55')11.445m FASA 1D-2 PT.2450 PT.2449 PT.2448 PT.2447 PT.2446 PT.2445 PT.2444 PT.2443 PT.2439 PT.2438 PT.2437 PT.2436 PT.2435 PT.2434 PT.2433 PANDANGAN SISI
PELAN LANTAI BAWAH PELAN LANTAI TINGKAT ATAS
PT.2440
LORONG WAWASAN 7 Di Lukis No. Kerja Di semak Skala Tarikh 1/1 No. Helaian PROJEK : Nota FEBUARI 2022 KIT PENGESAHAN JIRAN 5. Notis Mula Kerja (Borang B) perlu dikemukakan sebelum memulakan kerja-kerja pembinaan di tapak. ramp, tactile (guilding blocks), PBAPP Specification For Water Efficient Products. 100 TAJUK LUKISAN : PELAN LANTAI TINGKAT BAWAH ,PELAN LANTAI TINGKAT ATAS, PANDANGAN HADAPAN ,PANDANGAN BELAKANG, KERATAN A-A, KERATAN B-B This drawing is copyright. Contractors must check all dimensions on site. Only figured dimensions are to be worked on. Discrepancies must be reported immediately to the architect before proceeding.
TANDATANGAN
ARKITEK & SAKSI KEPADA PEMILIK TANAH & BANGUNAN LEMBAGA ARKITEK MALAYSIA A R K I T E K P R O F E S O N A L AR. ADRIANTA BIN AZIZ No. Pendaftatan LAM A/A 172 Adrianta Aziz Architect Headquarters Office B-2-03, Jalan PJU 1A/41B, NZX Commercial Centre, Ara Damansara, 47301 Petaling Jaya, Selangor Darul Ehsan. Adrianta Aziz Architect Production Office : No. 7084, Tingkat 1, Jalan Kampung Gajah, 12200 Butterworth, Pulau Pinang. H/p 019 4000 250 Tel : 04 331 9045 Fax : 04 330 9026 Email ritz2.archidesign@gmail.com KERATAN A-AKERATAN B-B T.TANGAN PEMUNYA TANAH DAN BANGUNAN CADANGAN PINDAAN DAN TAMBAHAN BAGI 1 UNIT RUMAH KLUSTER KOS RENDAH 2 TINGKAT DI ATAS PT 2440, LORONG WAWASAN 5, TAMAN BERTAM PERDANA 2, MUKIM 6, DAERAH SEBERANG PERAI UTARA, 13700 KEPALA BATAS PULAU PINANG UNTUK TETUAN : VIJENDARAN A/L ASOGHAN RITZ SISTEM PENGUMPULAN AIR HUJAN (SPAH) PELAN LANTAI TINGKAT ATAS 15° INVOLVEMENT PB PREPARATION SUBMISSION STATUS:CONSTRUCTION
2820 1146 5183 5225 4932 4127 2435 KEY PLAN SCALE : NTS SITE PLAN SCALE : 250 TAPAK CADANGAN SCALE 1 : 2500 TAPAK CADANGAN GROUND FLOOR PLAN SCALE 1 : 100 EXISTING FLOOR AREA : 220.67 SQM. ADDITIONAL FLOOR AREA : 58.38 SQM. A A FIRST FLOOR PLAN SCALE 1 : 100 new rc roof new rc roof EXISTING FLOOR AREA : 109.03 SQM. A A 3967 5183 2500 6096 1102 1246 2782 5225 4774 4685 6096mm Building Line 2000mm Setback Line ADDITIONAL FLOOR AREA :FALL 6° FALL 6° FALL 6° FALL 6° bedroom 1 bath 1 bedroom 2 bath 2bedroom 3 bath 3 voidex living area ex dining ex guest room ex bath foyer ex dry kitchen powder room maid room maid bath ex wet kitchen lift store 1 store 2ex terrace ex swimming pool ex terrace lift lobby new extended porch new extended porch 4285 9058 2685 2000 2000mm SetbackLine 533 1865200 4028 5225 3588 ex car porch 6105 2729 5796 2287 1584 6561 3318 9560 1666 3768 2691 5364 11650 11650 2250 LOCATION PLAN New Rc Column refer Engr. Detail Existing Alum. frame casement window Existing wall New fiber cement deck Propose clayroof with 6° fall Existing alum. frame casement window Existing wall Existing alum. frame sliding door ex pooldeck Boundary Line Boundary Line 2000 1597
roofrcnew roofrcnew FALL 6° FALL 6° FALL 6° FALL 6° 2500 2734 PLAN 250 Ar. YEE YEW CHUIN B.Sc. (HBP) HONS. B. ARCH. USM ² SECOND FLOOR PLAN SCALE 1 : 100 new gym area EXISTING FLOOR AREA : 106.03 SQM. A A ADDITIONAL FLOOR AREA : 22.87 SQM FALL 6° lift lift lobby ac study room master bedroom master bath wardrobe lift lift lobby 4158 5378 3670 9048 6891 lift lift lobby TANDATANGAN PEMILIK TANAH : DRAWING STATUS DRAWING TITLE PROJECT TITLE TANDATANGAN ARKITEK & SAKSI KEPADA TANDATANGAN PEMILIK TANAH & BANGUNAN : SCALE DATE 1:100 AUG 22 RPMC.K YYC.FRZ DRAWN CHECKED SHEET NO. REV. SUBMISSION JOB NO. MBPP.YYC.RPMC.LIM_PB TANDATANGAN PEMILIK BANGUNAN & PEMOHON : MAJLIS BANDARAYA PULAU PINANG TANDATANGAN JURUTERA : 1/2 MBPP/ILCS-OSC/PB/ /2022 ARKITEK DAN SAKSI KEPADA TANDATANGAN PEMILIK TANAH DAN BANGUNAN YEE YEW CHUIN A R C H I T E C T 21,Lorong Berjaya, 10350 Geogetown, Pulau Pinang Tel: 04-2299343 Fax: 04-2299053 Email : yycarch@pd.jaring.my CADANGAN PINDAAN DAN TAMBAHAN BAGI 1 UNIT RUMAH BERKEMBAR SESEBUAH 3 TINGKAT DI NOMBOR 10, DENAI BAYU 2 SERI TANJUNG PINANG, BANDAR TANJONG PINANG, SEK. 1, DI ATAS LOT PT1133 (LOT 556), 10470 TANJUNG TOKONG, DAERAH TIMUR LAUT, PULAU PINANG. UNTUK TETUAN : LIM KEAN YAP & JULIE LOU NAME LIM KEAN YAP NO. K/P 661231-07-5551 NAME JULIE LOU NO. K/P 660926-07-5094 ALAMAT : NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG. ALAMAT NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG. NAME LIM KEAN YAP NO. K/P 661231-07-5551 NAME JULIE LOU NO. K/P 660926-07-5094 ALAMAT : NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG. ALAMAT NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG. KEY PLAN, LOCATION PLAN, SITE PLAN, GROUND FLOOR PLAN, FIRST FLOOR PLAN AND SECOND FLOOR PLAN 3893 4625 11325 2808 Existing alum. frame casement window New alum. frame casement window Existing wall Propose clayroof with 6° fall TAPAK CADANGAN INVOLVEMENT AS-BUILT PB PREPARATION ILCS SUBMISSION
ROOF PLAN SCALE 1 : 100 EXISTING ROOF AREA : 196.20 SQM. ADDITIONAL ROOF AREA : 119.38 SQM. FRONT ELEVATION SCALE 1 : 100 LEFT ELEVATION SCALE 1 : 100 SECTION A-A SCALE 1 : 100 REAR ELEVATION SCALE 1 : 100 3657 3657 3657 300 A A 5840 10177 7145 8185 1721 9209 19115 GROUND LEVEL GROUND LEVEL FIRST LEVEL SECOND FLOOR LEVEL 4334 SECOND FLOOR LEVEL ROOF LEVEL 3657 3657 3657 300 GROUND LEVEL GROUND LEVEL FIRST LEVEL SECOND FLOOR LEVEL 4334 SECOND FLOOR LEVEL ROOF LEVEL 3657 3657 3657 300 GROUND LEVEL GROUND LEVEL FIRST LEVEL SECOND FLOOR LEVEL 4334 SECOND FLOOR LEVEL ROOF LEVEL 3657 3657 3657 300 GROUND LEVEL GROUND LEVEL FIRST LEVEL SECOND FLOOR LEVEL 4334 SECOND FLOOR LEVEL ROOF LEVEL BOUNDARY LINE BOUNDARY LINE 6° 6° FALL 6° FALL 6° FALL 6° FALL 6° FALL 6° 15605 15605 15605 15605 new car porch powder room dry kitchen bedroom 2 bath masterwardrobe FALL 6° FALL 6° FALL 6° FALL 6°New rooftiles ( Clay ) to manuf's detail Existing clayroof new rc roof new rc roof Existing copping Existing alum. frame fixed glass Proposed RC roof to Engr detail 9623 New RC Slab Roof refer to Engr's Detail BOUNDARY LINE BUILDING LINE BOUNDARY LINE BUILDING LINE BOUNDARY LINE BUILDING LINE

BUTIRAN PAGAR

KERATAN

HADAPAN

Data Pembangunan

JADUAL PENGUDARAAN DAN PENCAHAYAAN

CADANGAN PINDAAN DAN TAMBAHAN BAGI 1 UNIT RUMAH BERKEMBAR SESEBUAH 3 TINGKAT DI

10, DENAI BAYU 2

TANJUNG PINANG, BANDAR TANJONG PINANG, SEK. 1, DI ATAS LOT PT1133 (LOT 556), 10470 TANJUNG TOKONG, DAERAH TIMUR LAUT, PULAU PINANG.

NAMA

NAMA

BUTIRAN BUMBUNG

5709 2435 1261 New Alum. Frame Casement Window To be demolised and replace with new brickwall plastered on bothsides New Awning refer to manuf. New RC Slab Roof refer to Engr's Detail 6° 6° (new) 115mm thk. brickwork with plastering on both side kitchen dining living area 2 bath 1 bedroom 1 study areanew gymnasiumbedroom SAYA/KAMI SEBAGAI TUAN TANAH DAN PEMILIK BANGUNAN KEPADA PERMIS___________________________________________________________ (Alamat Jiran Berkongsi Dinding Dituan) MENGESAHKAN BAHAWA SAYA/KAMI TIDAK MEMPUNYAI SEBARANG BANTAHAN TERHADAP KERJA-KERJA PINDAAN DAN TAMBAHAN YANG AKAN DIJALANKAN KEPADA PREMIS NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG.(Alamat Permis Tapak Pemajuan) SEPERTIMANA YANG DITUNJUKKAN DALAM PELAN INI. Tandatangan, Nama & No. IC * Pemilik Tanah / Pemilik Bangunan Lot Jiran Berkongsi Dinding * Potong yang tidak berkenaan.
LIM KEAN YAP NO. I/C : 661231-07-5551 ALAMAT NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG.
JULIE LOU NO. I/C : 660926-07-5094 ALAMAT 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG. Ar. YEE YEW CHUIN B.Sc. (HBP) HONS. B. ARCH. USM
TANDATANGAN PEMILIK TANAH : DRAWING STATUS DRAWING TITLE PROJECT TITLE TANDATANGAN ARKITEK & SAKSI KEPADA TANDATANGAN PEMILIK TANAH & BANGUNAN : SCALE DATE 1:100 AUG 22 RPMC.K YYC.FRZ DRAWN CHECKED SHEET NO. REV. SUBMISSION JOB NO. MBPP.YYC.RPMC.LIM_PB TANDATANGAN PEMILIK BANGUNAN & PEMOHON : MAJLIS BANDARAYA PULAU PINANG TANDATANGAN JURUTERA : 2/2
UTAMA/PANDANGAN
DAN
B-B 3. Zon Guna Tanah Perumahan Tetap Sediada 4. Cadangan Pemajuan Rumah Banglo Tiga Tingkat.
Jumlah Keluasan Tanah2. Tapak Cadangan1. a) Lot 556 465 m.p. (4908.34 k.p.) a. Ground Floor b. First Floor c. Second Floor Keluasan Lantai (m.p.) Jumlah Keluasan 550.13 m.p. / 5921.55 k.p. a) Lot 556 299.08 132.43 118.62 LOT 556, NO 10, DENAI BAYU 2 SERI TANJUNG PINANG, BANDAR TANJUNG PINANG, SEKSYEN 1, TANJUNG TOKONG, DTL, PULAU PINANG Keluasan Lantai Tambahan (m.p.) 111.22 m.p. / 1197.16 k.p. 100.8 10.42 SKALA 1 : 100 MBPP/ILCS-OSC/PB/ /2022
RATA SKALA : N.T.S ARKITEK DAN SAKSI KEPADA TANDATANGAN PEMILIK TANAH DAN BANGUNAN YEE YEW CHUIN A R C H I T E C T 21,Lorong Berjaya, 10350 Geogetown, Pulau Pinang Tel: 04-2299343 Fax: 04-2299053 Email : yycarch@pd.jaring.my NAME LIM KEAN YAP NO. K/P 661231-07-5551 NAME JULIE LOU NO. K/P 660926-07-5094 ALAMAT : NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG. ALAMAT NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG. NAME LIM KEAN YAP NO. K/P 661231-07-5551 NAME JULIE LOU NO. K/P 660926-07-5094 ALAMAT : NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG. ALAMAT NO. 10, DENAI BAYU 2, SERI TANJUNG PINANG, 10470 TANJUNG TOKONG, PULAU PINANG. ROOF PLAN, SECTION A-A, LEFT ELEVATION, FRONT ELEVATION AND REAR ELEVATION
NOMBOR
SERI
UNTUK TETUAN : LIM KEAN YAP & JULIE LOU Existing alum. frame sliding door Existing copping Existing alum. fin for ac. unit B 1700 2900 5862 14271465 Double folding gate with hydraulic power RC flat roof to Engr details Jumlah Keluasan Keseluruhan Baru Lantai5. 661.35 m.p. / 7118.71 k.p. New rooftiles Clay ) to manuf's detail New rooftiles ( Clay ) to manuf's detail BOUNDARY LINE BUILDING LINE BOUNDARY LINE BUILDING LINE BUILDING LINE BOUNDARY LINE
DEVELOPMENT OF TANJUNG TOKONG, DESIRAN TANJUNG & WARISAN TANJUNG, SEKSYEN 1,DAER AH TIMUR LAUT, PULAU PINANG. LUXURY APARTMENT PROPOSAL INVOLVEMENT : INTERIOR DESIGN & POCKET GARDEN (3D MODELLING AND RENDER) TEAMMATE : RITZ PMC SDN BHD CREDIT FOR EXTERIOR MODELLING AND RENDER : MOHD ASYRAFF
INVOLVEMENT : INTERIOR DESIGN& POCKET GARDEN(3D MODELLING AND RENDER) TEAMMATE : RITZ PMC SDN BHD CREDIT FOR EXTERIOR MODELLING AND RENDER : MOHD ASYRAFF
INVOLVEMENT : INTERIOR DESIGN& POCKET GARDEN(3D MODELLING AND RENDER) TEAMMATE : RITZ PMC SDN BHD CREDIT FOR EXTERIOR MODELLING AND RENDER : MOHD ASYRAFF
DEVELOPMENT OF TANJUNG TOKONG, DESIRAN TAN JUNG & WARISAN TANJUNG, SEKSYEN 1,DAERAH TIMUR LAUT, PULAU PINANG. MID-COST APARTMENT PROPOSAL INVOLVEMENT : FACILITY LEVEL (3D MODELLING ONLY) TEAMMATE : ARRAD ARCHITECT PLT CREDIT FOR EXTERIOR MODELLING AND RENDER : MOHD ASYRAFF STATUS : CONSULTANT MEETING AND INPUT FROM CLIENT
CADANGAN PENAMBAHBAIKAN RUANG SOLAT DI MASJID KAMPUNG KUBANG BUAYA, BUTTERWORTH, PENANG INVOLVEMENT : ASBUILT, DESIGN PROPOSAL, PRESENTATION (PREPARE&PRESENT) TEAMMATE : WITH CO-WORKER ON AS-BUILT DRAWING STATUS : FUND RAISING
SELECTED DESIGN STUDIO

PROJECT BRIEF | IDEA | DESIGN CONCEPT

This project has aimed to create a urban farming hub in the middle of the Bukit Mertajam city, Penang. Due to shortage of food during pandemic, the designer has choose to propose urban farming hub to be use as the first indoor vertical garden to effectively produce high quality food with the high amount to fulfill the demand on the future. To accomplished that, designer decided to make this building as precedent study for the community around Bukit Mertajam. The middle courtyard inside the building and the green facade will stamp this building as the center for farmer all around Penang.

Location : Bukit Mertajam, Pulau Pinang.

URBAN FARMING HUB, BUKIT MERTAJAM, PENANG

RETIREMENT VILLAGE 001, TAIPING

PROJECT BRIEF | IDEA | DESIGN CONCEPT

This project has aimed to create a retirement village for the senior. As the site is located at Bukit Jana, Perak, the propose location are surround by trees and slope which allowing freeze air from the top to the bottom of the hill. The zoning that are located at the front of the site are housing area which are silent and peace and make this location the best location to create a retirement village which has the aim to avoid from city noise and chaos. One of the unique and fabelous things about this location are Sungai Jana, a natural river which allowing the visitor to come and enjoying the scenery of the forest and waterfall. Because of the historical architecture style that are around, the designer choose to blend the building with the surrounding by using natural material such as bamboo and concrete while maintaning the height of the building as same as surround area and creating natural lighting to the building by using glass and opening on the roof.

Location : Bukit Jana, Taiping, Perak.

TOURIST CENTER

PROJECT BRIEF | IDEA | DESIGN CONCEPT

This project has aimed to create a one stop center for tourist who come visit the heritage town, Georgetown, Penang. To achieved that aim, the de signer are chosing to use the simple rectangle form with steel and concrete as the main component in showing the modern temporary style building. It is because the contrast style between the two era of architectural style, this building will iconicly became the sign of one stop center in the middle the town of Georgetown.

GEORGETOWN
Location : Jalan Pesara King Edward, Georgetown, DTL, Pulau Pinang
1 BUS STOP JalanPengkalanWeld 1 1 1 OFFICE 2 2 2 WATER TANK AREA 3 3 3 PERFORMANCE AREA 4 4 MUSEUM AREA 7 7 VOID 8 8 BALCONY 6 RENT SPACE 5 TRAINING ROOM 4 FIRE STAIRCASE 3 MALE / FEMALE TOILET 2 ADMINISTRATION 1 LIFT 2 2 ENTRANCE / MUSEUM 3 PODIUM / STAGE 4 GROCERIES / SHOP 5 SOUVENIERS 6 6 FIRE STAIRCASE 7 7 COFFEE SHOP / BAKERY 8 8 LEISURE AREA 9 9 STAFF AREA 10 10 GREEN SPACE 11 11 MALE / FEMALE RESTROOM 12 12 SURAU
COFFEE SHOP / BAKERY MALE / FEMALE RESTROOM 2 ADMINISTRATION 2 WATER TANK AREA
EXTERNAL PERSPECTIVE
AERIAL PERSPECTIVE VIEW

PROJECT BRIEF | IDEA | DESIGN CONCEPT

This project has an aim to create a summer house for a small new family. As the location of the project is in Gelugor, Penang, Malaysia the designer use the climate of tropical country , existing 90's resident area and apply passive design strategy such as cross ventilation and middle courtyard at the middle of the house to reduce the temperature during the day meanwhile creating a tropical atmosphere inside the house. Designer use lot of bricks as to allow cross ventilation inside the courtyard and selected area such as kitchen which can reduce the smell during cooking and living room area which allow a lot of natural air and to cross inside the building. As the site has slope, designer use the advantage of it to create multi-level building which can create a dynamic plan to the house and apply Malay-Traditional house's characteristic.

ENDED

PORTFOLIO

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.