Building Our Vision

Page 1

Building Our Vision

BUILT ENVIRONMENT MASTERPLAN

Introducing the Masterplan

Kinross Wolaroi School is embarking on the delivery of a staged masterplan for its built environment that will provide modern, integrated infrastructure designed to meet the needs of our students and staff for many decades: a plan that will commence in 2023.

In a staged process that progressively opens up new zones for redevelopment, the project will provide a physical manifestation of our vision for learning and responds to the needs and aspirations of our school community.

The masterplan is focused on upgrading the school’s academic precinct, in response to strong enrolments and an increasing demand for teaching spaces.

The masterplan also recognises the importance the boarding community plays in the overall fabric of the school.

This blueprint, devised in conjunction with architects, McIldowie Partners, represents a carefully planned, multi-million-dollar investment which is an expression of both the exceptional confidence we have in the future of our school and our deep commitment to excellence in education.

Dr Andrew Parry Principal Kinross Wolaroi School Rev. Andrew Cunningham Chair of Council Kinross Wolaroi School

Stage 1 WOLAROI BOARDING HOUSE SECOND WING

In June 2023 work will commence to complete the longawaited second wing of the Wolaroi Boarding House. This will primarily accommodate boy boarders in Years 7, 8 and 9. Development of the new boarding house wing represents a unique opportunity to continue to fulfill the long-term vision for boarding and to enhance our boys’ boarding experience. This fulfills the objective to attract and retain students in the boarding program, consistent with the school’s Strategic Plan, but is also an enabling move: by relocating boarders from Tower House and Trathen House, we unlock opportunities for redevelopment in the academic precinct of the school. The design has a focus on wellbeing, delivered by incorporating a strong connection to the outdoors, optimising natural light and ventilation with fresh air. Materials will be selected to be natural and tactile. Connection will be fostered through a variety of spaces to suit small or large groups, as well as smaller nooks for retreat. Provision of a space for parents to refresh

after travel and connect with their sons will also be incorporated. The boarding house is conceived as a ‘home away from home’ for the boarders and will be sympathetic to both the character of the school and the surrounding urban landscape.

Across two floors, with Year 7 at ground level and Years 8 and 9 on level one, the new building will offer accommodation for 64 students in rooms of four cubicles, each featuring privacy screens, king single beds, personal desk and ample storage. A further four sets of paired single rooms, each with a shared full bathroom will accommodate students from Years 11 and 12. A large shared common room for the two floors is complemented by nine additional small breakout spaces, designed to provide home-like kitchen and lounge areas for relaxation. The new wing will also feature a home and office for the Head of House, accommodation for residential staff, a mudroom, laundry, and parent lounge.

WOLAROI BOARDING 2ND WING - FIRST FLOOR

18 11 10 16 15 13 10 m² BATHROOM YR 11 12 BEDROOM 12 m² 12 m² KITCHENETE 22 m² TUTOR QUAD QUAD QUAD m² ACC. WC (LH) QUAD QUAD QUAD 21 m² BEDROOM BEDROOM 13 m² BEDROOM 20° FALL 14 m² STAFF BREAKOUT 16 m² STORAGE POTENTIAL FOR YR 9 COMMON ROOM IF REQUIRED. 11 m² AMENITIES 13 m² 10 m² YR 11 12 10 m² YR 11 12 5 m² BATHROOM 10 m² YR 11 12 31 m² QUAD 6 m² m² KITCHENETTE 33 m² QUAD 20° FALL UP FROM GR. SL DOOR BAL. BAL. BAL. PROPOSED GUTTER ROOF OUTLINE OVER PROPOSED ROOF PROPOSED GUTTER SUNSHADING SCREEN SUNSHADING SUNSHADING SUNSHADING SUNSHADING SCREEN OVER SUNSHADING 4 m² BATH ROOF FALL 3° SUNSHADING SCREEN DDA COMPLIANT JOINERY SERVICES SERVICES CPBD ROOF OUTLINE ROOF OUTLINE OVER SUNSHADING SCREEN SUNSHADING SCREEN SUNSHADING SUNSHADING DDA ROOM ROOF OUTLINE ROOF OUTLINE OVER UP FROM GROUND FLOOR ROOF OUTLINE OVER EX. BOUNDARY FENCE 10 m² AMENITIES SCREEN OVER OVER SUNSHADING SCREEN SUNSHADING SUNSHADING SUNSHADING SCREEN SCREEN SCREEN SUNSHADING SCREEN SUNSHADING CANOPY OVER ROOM DIMENSIONS BLUE DASHED LINE INDICATES ADJACENT TO BOARDING HOUSE VOID FHR 20 m² FHR FIRE EXT. EXISTING BOARDING HOUSE ROOF OUTLINE FFL 0000 FINISHED FLOOR LEVEL, FCL, RL EXISTING WALL PROPOSED NEW WALL LEGEND: PROJECT ADDRESS REV. JOB No. DATE PRINTED CHECKED DATE @ A1 T/ +61 3 8695 0300 info@mcildowiepartners.com.au Level 2, 325 Flinders Lane Melbourne, Vic 3000 Rev Date By Description DO NOT SCALE PRINTS. USE FIGURED BE CHECKED ON SITE BEFORE COMMENCING ANY WORK OR MAKING ANY SHOP DRAWINGS DRAWINGS TO BE PRINTED IN COLOUR. DEVELOPMENT APPLICATION As indicated 20/01/2023 9:45:09 AM House_detached.rvt P1 Kinross Wolaroi School 59-67 Bathurst Rd, Orange NSW 2800 Boarding House DA104 First Floor Plan - Part A 3195 EXISTING BUILDING NOT PART OF SCOPE OF WORKS P1 22.12.22 SP DA submission

Stage 2 TOWER BUILDING/ WOLAROI MANSION

TOWER BUILDING/WOLAROI MANSION - FIRST FLOOR

Following completion of the Wolaroi Boarding House project, a major renovation of the Tower Building/ Wolaroi Mansion will commence. The Tower Building/ Wolaroi Mansion, with its deep links to our history, is integral to the school’s identity and will be restored to become a showcase and signature building for the school. The renovation will include refurbishment of heritage features throughout, including a new roof and restoration of the iconic tower.

The update will create spaces that are flexible and adaptable to support the school’s vision of developing independent and adaptable learners who thrive both socially and academically in an engaging learning environment. Renovation of the top floor will deliver three new flexible classrooms connected to an expansive breakout area, as well as amenities for students and staff.

The historic front section of the building will provide additional office and meeting spaces. Access to the upper floors will be via a new external stair to the north-eastern side of the building, and new accessibility provisions will include a lift and ramps.

On the ground floor, an expanded boarders’ dining room will offer seating capacity for the entire boys boarding community or a complete school year group, with greatly improved access from a new verandah and a series of double doorways.

STAFF 15 m² 17 m² OFFICE OFFICE 21 m² MEETING 10 m² OFFICE 48 m² NEW DOUBLE SWING DOOR EXTERNALLY ACCESSED 91 m² STUDIO 80 m² STUDIO 77 m² STUDIO PROPOSED EXTERNAL ACCESSWAY CLEANER 5 m² ACC. W/C 5 m² LIFT GREY WALL INDICATES EXISTING WALL BLACK WALL INDICATES PROPOSED WALL PROPOSED EXTERNAL STAIR UPGRADE EXISTING STAIR UPGRADE EXISTING STAIR EXISTING VERANDAH DN TO GROUND 8 m² ACC. W/C 4 m² FEMALE 4 m² MALE W/C 13 m² OFFICE 24 m² OFFICE OFFICE STABLES DN DN DN TO GROUND KITCHENETTE TEA AA TP300 INFILL WALL & DOOR EX. WALL OVER INFILL WALL & DOOR EX. WALL OVER INFILL WALL & DOOR CLIENT DRAWING NUMBER SCALE REV. JOB No. DATE PRINTED DRAWN @ A1 NORTH POINT CONTRACTORS T/ +61 3 8695 0300 info@mcildowiepartners.com.au Level 2, 325 Flinders Lane Melbourne, Vic 3000 DO NOT SCALE PRINTS. USE FIGURED DIMENSIONS ONLY. ALL DIMENSIONS MUST BE CHECKED ON SITE BEFORE SHOP DRAWINGS DRAWINGS TO BE PRINTED IN COLOUR. © COPYRIGHT MCILDOWIE PARTNERS 2020 1 100 29/11/2022 2:15:33 PM Autodesk Docs://3196 KWS Tower Building/3196_KWS Tower Buildi Kinross Wolaroi School DEVELOPMENT APPLICATION 59-67 Bathurst Rd, Orange NSW 2800 Tower Building TP102 Proposed - First Floor Plan 3196 HB EG

Stage 3 ENGAGEMENT OFFICE & UNIFORM SHOP PRECINCT

In 2025, additional teaching spaces will be made available in the War Memorial Building when a new administration service area is created on the main drive, opposite the Tower Building/Wolaroi Mansion. The former Principal’s residence at the top of the driveway will be repurposed as accommodation for Admissions and Marketing offices, featuring dedicated areas for the school’s archives and alumni for the first time.

The residence directly opposite the Tower Building will be refitted as a retail space to accommodate the school’s uniform shop. An area between the two buildings will provide convenient parking for visitors to this precinct. Moving the uniform shop will clear the ground floor of the old stables for a new and conveniently located day house home room.

Stage 4 AN EXCITING NEW LEARNING PRECINCT Sustainability

The completion of the Tower Building/Wolaroi Mansion restoration will enable the implementation of plans for Trathen House and the Bennett Building to be demolished and replaced. This exciting opportunity to plan future-

ready teaching spaces for the academic precinct adjacent to the Mathematics and Science blocks has been a longstanding objective that is now in sight.

With a commitment to sustainable design principles across the full development, all projects will encompass best practice and innovation including the following principles:

• Natural ventilation to circulate fresh air

• Thermally efficient design

• Harvesting and management of rainwater

• Use of sustainable and recycled materials where appropriate

AllenbyRoad CoxAve BathurstRoad SYDNEY ORANGE Library DPA Wolaroi (Main) Oval Sharp Oval Ex Students Oval Sally Kennett Playing Fields P Wolaroi Mansion New Admissions & Marketing offices New Uniform Shop New Visitor Parking STAGE 3 Proposed New Learning Precinct STAGE 4

The PLC Campus A WORK IN PROGRESS

Girls’ boarding at the PLC campus continues to be a focus for attraction and retention of students. Major upgrades have taken place during 2022 and 2023, including the refurbishment and redecoration of all House common areas, as well as recarpeting and painting across the site.

A highlight has been the refitting of the Dorothy Knox Hall as a central recreation facility able to accommodate all girl boarders, including a kitchen and movie screen. Plans are underway for the school to commence construction of new townhouse accommodation for the Heads of Houses and their families. The additional space this releases will enable us to create new boarding house spaces for students.

The PLC campus is currently the subject of its own separate built environment masterplanning process. With the benefit of beautiful and generous grounds, as well as extensive existing infrastructure, we intend to capture this unique opportunity to create a landmark girls’ boarding facility.

Since its foundation, the PLC campus has established a proud tradition of girls boarding. A boarding house is a place to live and grow for our students; boarding enriches our school culture and our boarders establish life-long connections to each other and the school. Our aim is to advance the development of PLC as a world-class boarding facility. Completion of the PLC Masterplan is expected in December 2023.

59-67 Bathurst Road, Orange NSW 2800 | Phone + 61 2 6392 0300 Email reception@kws.nsw.edu.au | www.kws.nsw.edu.au
Dorothy Knox Hall Dorothy Knox Hall

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Building Our Vision by Kinross Wolaroi School - Issuu