PORTFOLIO KIANYANG LAU Architecture Graduate VOL.02 Architecture & Urban Design Works 2019-2023
KIANYANG LAU CURRICULUM VITAE
EXPERIENCE
2016 Architect Intern, ST Yew Han Architect, Malaysia (Sep 2016 - Dec 2016) 3 Months
2018 Architect Assistant at SFS Architecture, Malaysia (Nov 2018 - May 2019) 6 Months
EDUCATION
2014 Foundation in Science
Universiti Tunku Abdul Rahman / UTAR, Malaysia
2015 - 2018
Bachelor of Science (Hons) in Architecture
Universiti Tunku Abdul Rahman / UTAR, Malaysia
2019 - 2023
Master of Architecture
Universiti Tunku Abdul Rahman / UTAR, Malaysia
SKILLS
CAD AutoCAD | SketchUp | Revit
Rendering Lumion | Enscape
Adobe CC Photoshop | InDesign | Illustrator
CONTACT Klang, Selangor, Malaysia Email: kianyang95@gmail.com Tel: +60 163262629
/CONTENT
01 02 03 04
MANGROVE REHABILITATION
2022 | Year 02 | Pulau Ketam, Malaysia
LANDSCAPE DESIGN
2022 | Year 02 | Pulau Ketam, Malaysia
RESIDENTIAL HOUSING
2020 | Year 01 | Pudu, Malaysia
MIXED DEVELOPMENT
2019 | Year 01 | Pudu, Malaysia
PULAU KETAM_
MANGROVE REHABILITATION _
REINVIGORATES AGING FISHING VILLAGE.
INFO Place: Pulau Ketam, Selangor, Malaysia
Year: 2022
Type: Mangrove Rehabilitation
Lecturer: Ar.Quake Huey Tin, Ar Ch’ng Sao Inn
Pulau Ketam, literally translated, means “crab island” is a small island located at the coast of Klang, Selangor and it is well known for its fishing activities, seafood, locals’ products and tourism activities.
The project is to develop possible design strategies that can be adopted to solve the issue facing (Economical & Environment) facing by Pulau Ketam while at the same time, preserve the unique elements that contribute to the sense of place to Pulau Ketam for future.
The design concept “Living Community Path” takes inspiration from the existing pedestrian path culture of Pulau Ketam, and the innovative use of waste materials as building materials. The design seeks to create a sustainable and resilient community by repurposing waste materials to enhance the pathway experience and create new spaces for the community.
01.
01 2022 | Year 02 | Pulau Ketam, Malaysia
2022 | Year 02 | Pulau Ketam, Malaysia 02
03 2022 | Year 02 | Pulau Ketam, Malaysia
2022 | Year 02 | Pulau Ketam, Malaysia 04
05 2022 | Year 02 | Pulau Ketam, Malaysia
2022 | Year 02 | Pulau Ketam, Malaysia 06
07 2022 | Year 02 | Pulau Ketam, Malaysia
2022 | Year 02 | Pulau Ketam, Malaysia 08
09 2022 | Year 02 | Pulau Ketam, Malaysia
2022 | Year 02 | Pulau Ketam, Malaysia 10
11 2022 | Year 02 | Pulau Ketam, Malaysia
2022 | Year 02 | Pulau Ketam, Malaysia 12
STEEL RIDGE CAP AND SHEET METAL FASTERNER TO MANUF'S DETAIL 75mm x 30mm STEEL C-CHANNEL BRACKET TO RHS STEEL TRUSS 10mm THK PLYWOOD 50mm THK MINERAL FIBERWOOD INSULATION 3mm THK CORRUGATED METAL ROOF NAILED TO STEEL PURLIN TO MANUF'S DETAILS 120mm x 120mm RHS STEEL TRUSS SUPPORT WITH STEEL BRACKET TO ENG'S DETAIL 5mm THK MS BRACKET BOLTED TO STEEL TRUSS FRAMING RECYCLE PLASTIC BOTTLE AIR COOLER WITH CEMENT CONCRETE 25mm THK MILD STEEL TIMBER COLUMN CAPS TO BE SCREWED ON TOP OF TIMBER COLUMN TO ENGR'S DETAIL RECYCLED TIMBER SHINGLE FACADE TO BE NAILED 150mm x 150mm MANGROVE TIMBER COLUMN TREATED WITH INSECT INFESTATION PROTECTION TO ENGR'S DETAIL 50mm x 50mm STEEL TRUSS FRAMING TO ENGR'S DETAIL RECYCLE PLASTIC BOTTLE AIR COOLER WITH CEMENT CONCRETE 25mm THK MILD STEEL BASE PLATE FOR TIMBER COLUMN SUPPORT TO BE BOLTED TO ENGR'S DETAIL 30mm THK TIMBER FLOORING PLANK WITH TOUGUE AND GROOVE JOINT TO BE NAILED TO THE TIMBER STUD 50mm THK FIBER MINERAL WOOD INSULATION WATER PROOFING LAYER TO MANUF'S DETAIL 200mm THK RC SLAB TO ENGR'S DETAIL 200mm x 500mm THK RC BEAM COVERED WITH 20mm CEMENT PLASTED TO ENGR'S DETAIL 110mm THK BRICKWALL WITH 20mm CEMENT PLASTER ON BOTH SIDE 150mm THK TIMBER STUD BOLTED SCREWED TO BRICK WALL TO ENGR'S DETAIL PLASTERBOARD CW 50mm THK SOUND INSULATION DIRECT MOUNTED TO WALL ALUMINIUM TRANSFER DUCT 30mm THK TIMBER FLOORING PLANK WITH TOUGUE AND GROOVE JOINT TO BE NAILED TO THE TIMBER STUD 50mm THK FIBER MINERAL WOOD INSULATION WATER PROOFING LAYER TO MANUF'S DETAIL 200mm THK RC SLAB TO ENGR'S DETAIL RECYCLING MATERIAL DUMPSTER REFER TO DETAIL 01 13 2022 | Year 02 | Pulau Ketam, Malaysia
OVERALL SECTION SCALE 1:20
PLASTIC BOTTLE ROOF WATER DRUM GUTTER WATER DRUM WATER CONTAINER PVC PIPE STEEL RIDGE CAP AND SHEET METAL FASTERNER TO MANUF'S DETAIL 75mm x 30mm STEEL C-CHANNEL BRACKET TO RHS STEEL TRUSS 3mm THK CORRUGATED METAL ROOF NAILED TO STEEL PURLIN TO MANUF'S DETAILS 50mm THK MINERAL FIBERWOOD INSULATION 5mm THK MS BRACKET BOLTED TO STEEL TRUSS FRAMING 30mm THK TIMBER FLOORING PLANK WITH TOUGUE AND GROOVE JOINT TO BE NAILED TO THE TIMBER STUD 50mm THK FIBER MINERAL WOOD INSULATION WATER PROOFING LAYER TO MANUF'S DETAIL 200mm THK RC SLAB TO ENGR'S DETAIL RIGID INSULATION WITH SARKING MEMBRANE OVER TO MANUF'S DETAIL VERTICAL TIMBER CLADDING FIXED TO HORZONTAL BATTENS ON VERTICAL COUNTER BATTENS NAGGING BETWEEN VERTICAL BATTENS TO CLOSE CAVITY POLYPROPYLENE CARGO SET SLING TO MANUF'S DETAIL 100mm x 100mm MANGROVE TIMBER COLUMN TREATED WITH INSECT INFESTATION PROTECTION TO ENGR'S DETAIL SUN SHADE NETTING WITH UV PROTECTION TO MANUF'S DETAIL RECYCLING CENTRE, LIVING COMMUNITY PATH, WORKSHOP
REFER TO DETAIL 02 REFER TO DETAIL 03 2022 | Year 02 | Pulau Ketam, Malaysia 14
REFER TO DETAIL 01 REFER TO DETAIL 02 AXONOMETRIC DETAIL 01 AXONOMETRIC DETAIL 01 STEEL RIDGE CAP AND SHEET METAL FASTERNER TO MANUF'S DETAIL 3mm THK CORRUGATED METAL ROOF NAILED TO STEEL PURLIN TO MANUF'S DETAILS 75mm x 30mm STEEL C-CHANNEL BRACKET TO RHS STEEL TRUSS 50mm x 50mm STEEL TRUSS FRAMING TO ENGR'S DETAIL 30mm THK TIMBER FLOORING PLANK WITH TOUGUE AND GROOVE JOINT TO BE NAILED TO THE TIMBER STUD 50mm THK TIMBER STUD NAILED TO STEEL TRUSS TO ENGR'S DETAIL 200mm THK RC SLAB TO ENGR'S DETAIL 25mm THK MILD STEEL TIMBER COLUMN CAPS TO BE SCREWED ON TOP OF TIMBER COLUMN TO ENGR'S DETAIL 150mm x 150mm MANGROVE TIMBER COLUMN TREATED WITH INSECT INFESTATION PROTECTION TO ENGR'S DETAIL 60mm DEPTH x 50mm THK TIMBER SUPPORT SCREWED AND BOLTED BETWEEN TIMBER COLUMN TO ENGR'S DETAIL 5mm RADIUM TIMBER DOWEL JOINT 5mm THK MILD STEEL TIMBER FRAME FOOTING PLATE TO ENGR'S DETAIL 100mm 100mm MANGROVE TIMBER FRAME TREATED WITH INSECT INFESTATION PROTECTION TO ENGR'S DETAIL 100mm x 100mm MANGROVE TIMBER FRAME TREATED WITH INSECT INFESTATION PROTECTION TO ENGR'S DETAIL METAL ROOF DETAIL, TIMBER COLUMN DETAIL & TIMBER FLOORING DETAIL BLOW UP DETAIL 1: AXONOMETRIC 15 2022 | Year 02 | Pulau Ketam, Malaysia
2022 | Year 02 | Pulau Ketam, Malaysia 16
PULAU KETAM_ MANGROVE REHABILITATION _
LANDSCAPE DESIGN PROPOSAL
INFO Place: Pulau Ketam, Selangor, Malaysia
Year: 2022
Type: Mangrove Rehabilitation
Lecturer: Ar.Quake Huey Tin, Ar Ch’ng Sao Inn
The goal of the landscape design is aim to restore the polluted environment at Pulau Ketam, and maintaining landscapes by considers the ecology of a site and creates landscape that enhance the surrounding environment for the benefit of the community and all other life in the ecosystem of Pulau Ketam.
Mangroves play a vital role in filtering and purifying water. Their extensive root systems and dense vegetation can effectively trap sediment, organic matter, and pollutants, preventing them from reaching the surrounding waters. By strategically locating mangrove plantations in areas where water pollution is a concern, the design can help mitigate the negative impacts and contribute to the overall improvement of water quality.
17 2022 | Year 02 | Pulau Ketam, Malaysia
02.
2022 | Year 02 | Pulau Ketam, Malaysia 18
19 2022 | Year 02 | Pulau Ketam, Malaysia
2022 | Year 02 | Pulau Ketam, Malaysia 20
21 2022 | Year 02 | Pulau Ketam, Malaysia
2022 | Year 02 | Pulau Ketam, Malaysia 22
PUDU_CO-HOUSING APARTMENT
PUDU CO-LIVING HOUSING DEVELOPMENT
INFO Place: Pudu, Kuala Lumpur, Malaysia
Year: 2020
Type: Housing Development
Lecturer: Ar. Heng Jee Seng, Ar.John Ashraf Lucas, Ar. Cheong Gin Yong
23 2020 | Year 01 | Pudu, Malaysia
The aim of this project is to design housing for transient Millenial to facilitate their changing lifestyles and bring in young community into the Pudu Urban Revitalization process.
Shared living space (Co-living) are on the rise as Millennnials today seek more of a sociable and active lifestyle where young people have less money to spend and have different priorities to suit their lifestyle. Inspire from the traditional Iban House layout where the residents share their common spaces in a same building, the idea is then developed, transform into interconnected loop of sharing community space.
2020 | Year 01 | Pudu, Malaysia 24 03.
25 2020 | Year 01 | Pudu, Malaysia
2020 | Year 01 | Pudu, Malaysia 26
27 2020 | Year 01 | Pudu, Malaysia
2020 | Year 01 | Pudu, Malaysia 28
29 2020 | Year 01 | Pudu, Malaysia
2020 | Year 01 | Pudu, Malaysia 30
PUDU_CO-CINEMA
PUDU MIXED DEVELOPMENT PROPOSAL
INFO Place: Pudu, Kuala Lumpur, Malaysia
Year: 2019
Type: Mixed Development
Lecturer: Ar. Heng Jee Seng, Ar.John Ashraf Lucas, Ar. Cheong Gin Yong
Pudu are facing the serious issue of Lack of Community Sense which leading to a higher crime rate within the area. Secondly, being the spatial extension of society and city itself, most of the space in the urban area are fill with commercial and residential building which causes the Lack of Public Realm within Pudu area.
The main aim of the Co-cinema is to create a new conception space at Pudu, that need to become a Symbol of everyone and at the same time A Place for everyone. The project emphasizes on the seperation edges at Jalan Davis between the old District and New District in Pudu, and creates a connection by celebrating the axis between the Indian Temple and TRX tower. The project consist of two different district, first if the old district design to blend in with the surrounding context, while the new district design to contrast with the surrounding context.
31 2019 | Year 01 | Pudu, Malaysia
04.
2019 | Year 01 | Pudu, Malaysia 32
33 2019 | Year 01 | Pudu, Malaysia
2019 | Year 01 | Pudu, Malaysia 34
35 2019 | Year 01 | Pudu, Malaysia
2019 | Year 01 | Pudu, Malaysia 36
Klang, Selangor, Malaysia
Email: kianyang95@gmail.com
Tel: +60 163262629