COMPREHENSIVE PORTFOLIO ARCH 4216 Kevin Hoehne
4
SKETCHES
5
Ta b l e o f C o n t e n t s
PROJECT INTRO
SCHEMATIC DESIGN MASSING SCHEMATIC SCHEMATIC JURY
6-7 8-11 12-19
DESIGN DEVELOPMENT STRUCTURAL CALCS BUILDING SYSTEMS
20-21 22-31
CONSTRUCTION DOCUMENTS
32-41
FINAL PRESENTATION
42-49
Table of Contents - 3
P r o j e ct I n t r o
The museum of the Bible headquarters, located on the corner of Couch and N. Walker Avenue, is an 90,000 square foot multi-use facility housing gallery exhibits, museum collections, offices, and public spaces. In form, a central sloping courtyard is spanned by a bridging element, flanked by gallery and collection to the West and public spaces to the East. Inspired by the surrounding art deco context, the facade is an artistic abstraction of the stone clad buildings that line downtown OKC. The museum of the Bible’s mission is to preserve biblical artifacts and showcasing its relevance to the public. The staff itself is the backbone of the operation; their efforts are integral to bringing the ancient artifacts back in to the public perspective and revitalizing the relevance of the artifacts. Our mission is to celebrate their hard work by making them the focal point of the building and improving their work environment. The central sloping courtyard brings visitors to the sub-level lobby and atrium while the office spans the courtyard becoming a marquee for the facility. Light being vital to a happy working environment, the central office bridge is cladded in glass. A louvered shading system shades and protects the offices from the southern exposure and combines the panelized vocabulary of the stone veneer with the openness of the office bridge. In our previous research of optimal working environments, we found that the ideal working environment changes from person to person based on working habits. A fully collaborative environment can sometimes inhibit work productivity as well. To combat a claustrophobic working environment, the majority of the office floor plan is open providing space to rearrange desks for personal optimal performance, including desk separators for those who prefer a quieter workspace. As a final element to improve the satisfaction of the workspace, rooftop patios are placed atop the roof on the southern side of the building. These spaces create magnificent views of the central courtyard as well as the skyline, park, and other surrounding areas of the site. The patios also create a relaxing environment for the workers to take breaks, mingle with each other, and work on projects in an outdoor setting. By paying careful attention to the employees work environment and emphasizing their centrality to the success of the museum, we hope to have created the optimum conditions for productivity and enjoyment.
4 - Project Intro
Sketches - 5
S k e tc h e s
Massing 6 - Massing
Massing Massing - 7
Sc h e m a tic
8 - Schematic
Schematic - 9
Sc h e m a tic
Sc h e m a tic
1
1.1
2
2.2
3
4
5
5.1
6
---
7
8
8.1
9
10
11
E
Transformer Vault
Electrical Room/ Emergency Power
53
54
374 SF
277 SF
Heat Exch. UP
55 187 SF
UP
Sat. Elec.
DN
75
Switchgear Room Classroom Storage
Workshop/Exhibit Preparation 23
80
Classroom
Quarantine Room
32
22 344 SF
Conservation Area
D
Machine Room 76 76 SF
198 SF
Machine Room 57 SF
291 SF
33
1402 SF
90 SF
78
62 356 SF
801 SF
C.1
Mens RR Service Corridor 64
20
C
1421 SF
Receiving 24 476 SF
B.1
Womens RR 63 330 SF
B
Collections Storage
Cafe
26
17
4287 SF
1907 SF
Photo/Digital Scanning Studio 19 743 SF
Cafe Kitchen 38 769 SF
A
10 - Schematic
Sc h e m a tic Schematic - 11
Sc h e m a tic J u r y
12 - Schematic Jury
Schematic Jury - 13
Sc h e m a tic J u r y
Sc h e m a tic J u r y
14 - Schematic Jury
Schematic Jury - 15
Sc h e m a tic J u r y
Sc h e m a tic J u r y
16 - Schematic Jury
Schematic Jury - 17
Sc h e m a tic J u r y
Sc h e m a tic J u r y
18 - Schematic Jury
Schematic Jury - 19
Sc h e m a tic J u r y
St r u ct u r a l C a l c s
ROOF LOAD $
/HYHO
Structure........................................................ 7.0 Finish Floor..................................................... 4.0 Conc/Metal Decking.................................. 63.0 Rigid Insulation............................................. 3.0 W.P Membrane............................................ 1.0 Mech, Elec, Plumbing.................................. 4.0 Sprinklers........................................................ 3.0 Collateral...................................................... 1.0 86.0 psf Roof Live Load = 100 psf Roof Dead Load = 86.0 psf Dead + Live = 186.0 psf Wu = 1.2(86) + 1.6(100) = 263.2 psf
FLOOR LOAD Structure........................................................ 7.0 Finish Floor..................................................... 10.0 Conc/Metal Decking.................................. 63.0 Finish Ceiling................................................. 3.0 Mech, Elec, Plumbing.................................. 4.0 Sprinklers........................................................ 3.0 Collateral...................................................... 1.0
$
91.0 psf /HYHO
Floor Live Load = 100 psf Floor Dead Load = 91.0 psf Dead + Live = 191.0 psf Wu = 1.2(91) + 1.6(100) = 269.2 psf
FACADE LOAD Sheathing/Insulation.................................... Rainscreen.................................................... W.P Membrane............................................ Interior Wall Finish.........................................
8.0 3.0 1.0 1.5
13.5 psf Facade Dead Load = 13.5 psf Wu = 1.2(13.5) = 16.2
20 - Structural Calcs
ROOF DECKING 10’ - 0” CLEAR SPAN TOTAL SLAB DEPTH = 5”
St r u ct u r a l C a l c s
ROOF TERRACE FRAMING PLAN
FLOOR FRAMING PLAN
Structural Calcs - 21
Building Systems 22 - Building Systems
Building Systems Building Systems - 23
Building Systems 24 - Building Systems
Building Systems Building Systems - 25
Building Systems 26 - Building Systems
Building Systems Building Systems - 27
Building Systems 28 - Building Systems
Building Systems Building Systems - 29
Building Systems 30 - Building Systems
Building Systems Building Systems - 31
C o n s t r u cti o n D o c u m e n t s
Oklahoma City, OK
Goku Architects 101 Overpowered St. Dallas, TX 256-486-2198 goku.supersaiyan@gmail.com
Gohan Landscape Co. 101 Earth Ave Oklahoma City, OK 932-678-9653 gohan.notsosupersaiyen@gmail.com
Frieza Demolition Co. 435 Theuniverse Blvd. Planet Frieza No. 79 876-394-3240 frieza.iamevil@gmail.com
1/4" / 1'-0"
1/4" / 1'-0"
1/4" / 1'-0"
1/4" / 1'-0"
Piccolo Mechanical Engineers 321 Itsgonenow Ave. Planet Namek 956-5894-9450 e-mail
Krillen Electrical Consultants 101 Earth Ave. Oklahoma City, OK 256-321-9965 krillen.useless@yahoo.com
G100 G101
COVER PAGE GENERAL NOTES, ABBREVIATIONS
CIVIL C100 C101 C102 C103 C104
32 - Construction Documents
GENERAL NOTES SITE PLAN UTILITY PLAN PAVING PLAN GRADING PLAN
STRUCTURAL
ARCHITECTURAL
FIRE PROTECTION
MECHANICAL
FIRE ALARM AND SECURITY
S100 S101 S102 S103 S104 S105 S106 S107 S108 S109
A100 A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A200 A201 A202 A203 A300 A301 A400 A401 A402 A500 A501 A502 A600 A700 A702 A703 A704 A705 A706 A800 A801 A802 A803
FP100 FP101 FP102 FP103 FP104 FP200 FP201 FP202 FP203
M100 M101 M102 M103 M104 M105 M106
FA100 FA101 FA102
GENRAL NOTES SITE PLAN FOUNDATION FIRST LEVEL FRAMING PLAN SECOND LEVEL FRAMING PLAN THIRD LEVEL FRAMING PLAN FOURTH LEVEL FRAMING PLAN FRAMING DETAILS FRAMING DETAILS DUMPSTER ENCLOSURE DETAILS
SITE PLAN OVERALL FIRST FLOOR PLAN OVERALL SECOND FLOOR PLAN OVERALL THIRD FLOOR PLAN OVERALL FOURTH FLOOR PLAN ENLARGED FIRST FLOOR PLAN ENLARGED FIRST FLOOR PLAN ENLARGED SECOND FLOOR PLAN ENLARGED SECOND FLOOR PLAN ENLARGED THIRD FLOOR PLAN ENLARGED THIRD FLOOR PLAN ENLARGED FOURTH FLOOR PLAN ENLARGED FOURTH FLOOR PLAN EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS BUILDING SECTIONS BUILDING SECTIONS WALL SECTIONS WALL SECTIONS WALL SECTIONS SECTION DETAILS SECTION DETAILS SECTION DETAILS PLAN DETAILS REFLECTED CEILING PLAN REFLECTED CEILING PLAN REFLECTED CEILING PLAN REFLECTED CEILING PLAN GALLERY CEILING PLAN COURTYARD DETAILS WALL TYPES LOUVER CURTAIN WALL DETAILS DOOR DETAILS SCHEDULES
GENERAL NOTES AND LEGEND FIRE PROTECTION FIRST LEVEL FIRE PROTECTION SECOND LEVEL FIRE PROTECTION THIRD LEVEL FIRE PROTECTION FOURTH LEVEL FIRE PUMP DETAILS FIRE PROTECTION SOUTH STANDPIPE FIRE PROTECTION EAST STANDPIPE FIRE PROTECTION DETAILS
GENERAL NOTES AND LEGEND MECHANICAL PLAN FIRST LEVEL MECHANICAL PLAN SECOND LEVEL MECHANICAL PLAN THIRD LEVEL MECHANICAL PLAN FOURTH LEVEL MECHANICAL DETAILS MECHANICAL SCHEDULES
GENERAL NOTES AND LEGEND FIRE ALARM PLAN SECURITY PLAN
PLUMBING
ELECTRICAL
LANDSCAPE
P100 P101 P102 P103 P104 P105 P106 P107 P108 P109 P110
E100 E101 E102 E103 E104 E105 E106 E107
LA 100
GENERAL NOTES AND LEGEND PLUMBING SCHEDULES PLUMBING PLAN FIRST LEVEL PLUMBING PLAN SECOND LEVEL PLUMBING PLAN THIRD LEVEL PLUMBING PLAN FOURTH LEVEL PLUMBING PLAN ROOF ENLARGED FRESH DISTRIBUTION PLAN ENLARGED RESTROOM PLANS PLUMBING RISER - WASTE AND VENT PLUMBING DETAILS
GENERAL NOTES AND ABBREVIATIONS ELECTRICAL SITE LIGHTING/UTILITY PLAN ELECTRICAL LIGHTING PLAN ELECTRICAL POWER PLAN ENLARGED FRESH DISTRIBUTION PLAN ELECTRICAL ROOF POWER PLAN ELECTRICAL DETAILS AND SCHEDULES ELECTRICAL PANELBOARD SCHEDULES
COURTYARD PLAN
Owner museum of the Bible COVER PAGE Project number Date Drawn by Checked by
001 4/20/2019 Kevin Hoehne The Professors
G100
4/30/2019 7:26:56 PM
General
C o n s t r u cti o n D o c u m e n t s
Terracotta Louver System Stone Veneer
1
2
3
4
-
6
7
8
8.1
9 9.1
10
11
-
-
-
-
1
---
---
---
---
A300
3' - 0" 10' - 8"
7' - 4"
---
4.1 5
Roof 72' - 0"
Level 4 54' - 0"
Level 3 36' - 0"
Level 2 18' - 0"
Level 1 0' - 0"
Goku Architects 101 Overpowered St. Dallas, TX 256-486-2198 goku.supersaiyan@gmail.com
Gohan Landscape Co. 101 Earth Ave Oklahoma City, OK 932-678-9653 gohan.notsosupersaiyen@gmail.com
Piccolo Mechanical Engineers 321 Itsgonenow Ave. Planet Namek 956-5894-9450 e-mail
Frieza Demolition Co. 435 Theuniverse Blvd. Planet Frieza No. 79 876-394-3240 frieza.iamevil@gmail.com
Krillen Electrical Consultants 101 Earth Ave. Oklahoma City, OK 256-321-9965 krillen.useless@yahoo.com
1
South 1/16" = 1'-0"
Stone Veneer Glass Curtain Wall Fiber Cement Rainscreen
10 1
8.1
8
7
6
5 4.1
4
3
-
-
-
-
---
---
---
---
2
1 ---
3' - 0" 10' - 8"
3' - 0"
A300
9.1 9
Roof 72' - 0"
Level 4 54' - 0"
Level 3 36' - 0"
Level 2 18' - 0"
Level 1 0' - 0" Stone Veneer
2
North 1/16" = 1'-0"
Glass Storefront
Owner museum of the Bible ELEVATIONS Project number Date Drawn by Checked by
A200
001 4/20/2019 Author Checker
4/30/2019 7:19:34 PM
11
Construction Documents - 33
2
-
3
4
-
---
4.1
5
6
-
---
7
-
---
---
198' - 6" 36' - 6"
30' - 0"
0' - 0"
30' - 0"
22' - 0"
8' - 0"
36' - 0"
1 / A105
1 / A106
36' - 0"
-
8' - 0"
---
TRANSFORMER
-
E
9' - 10"
20' - 0 1/2"
Fan #1
18' - 0"
D.2
10 B
D.1 Cafe
10B
14A
13
14 662 SF
276 SF
Womens RR
15
16
253 SF
13' - 1 3/4"
15A
16A
7
8 99 SF
C.1
8B
1390 SF
6A
Corridor 6
Recieving
1072 SF
19 1189 SF
4 A601
A
7' - 6 1/2"
Photo/Digital Scanning Studio
1A
-
10' - 8"
5 37' - 2"
15' - 0"
1B
3A
15' - 0"
470 SF
21' - 0"
25' - 0"
5B
4A
4B
-
-
1233 SF 29' - 2"
2
3
664 SF 23' - 0"
SEE LA100 FOR COURTYARD DETAILS
4
1617 SF -
0' - 0"
Qumran Research Room
-
-
723 SF
-
-1' - 0"
1 A301
A
A.1 6B
10' - 0"
-
30' - 4 1/4"
1
Conservation Area
20' - 0"
50' - 0"
---
2A
Quarantine Room
B.1
B
-
Workshop Exhibit Prep
C
6' - 0"
5A
---
Owner A
---
Krillen Electrical Consultants 101 Earth Ave. Oklahoma City, OK 256-321-9965 krillen.useless@yahoo.com
20' - 0"
19A
Frieza Demolition Co. 435 Theuniverse Blvd. Planet Frieza No. 79 876-394-3240 frieza.iamevil@gmail.com
210 SF
19B
---
7B
223 Vestibule
120' - 0"
18
Mens RR
Lobby
Piccolo Mechanical Engineers 321 Itsgonenow Ave. Planet Namek 956-5894-9450 e-mail
12' - 6"
17A
8A
Gohan Landscape Co. 101 Earth Ave Oklahoma City, OK 932-678-9653 gohan.notsosupersaiyen@gmail.com
7' - 6"
9A
9' - 4 1/4"
Elev 1
LOADING DOCK
7A
29' - 0"
13B
17
-
A
C.2
Machine RM
TRENCH DRAIN -4' - 0"
---
14B
20' - 0"
13A
D
Storage Room 10' - 0"
Stair 1
---
1369 SF
10' - 0"
---
13' - 1 3/4"
-
-
9
10A
Goku Architects 101 Overpowered St. Dallas, TX 256-486-2198 goku.supersaiyan@gmail.com
10' - 0"
SLOPE 1 3/8"DOWN / 1'-0"
11A
10' - 0"
12A
655 SF
10' - 0"
11 1457 SF
---
14' - 0"
Cafe Kitchen
Fan Room
12 199 SF
36' - 0"
Fan #2
C
Electrical Room
7' - 0"
14' - 5 1/2"
BACKUP GENERATOR
2' - 4"
6' - 0"
16' - 5 1/2"
24' - 0"
7' - 0 1/4"
6' - 5"
--9' - 9"
museum of the Bible ENLARGED FIRST FLOOR PLAN Project number Date Drawn by
1
34 - Construction Documents
Level 1 - Enlarged Floor Plan West 1/8" = 1'-0"
Checked by
A105
001 4/20/2019 Author Checker
4/30/2019 7:17:43 PM
C o n s t r u cti o n D o c u m e n t s
1
1 / A105
1 / A106
8
8.1
---
9
9.1
10
11 1 A300
144' - 0" 36' - 0"
C o n s t r u cti o n D o c u m e n t s
7
35' - 0"
1' - 0"
8' - 0"
28' - 0"
36' - 0"
---
-
---
---
6' - 0"
FAN #3
Retail Storage
-
8' - 0 1/4"
Mens RR
Womens RR
37
36
337 SF
294 SF
MOTB Retail
37A
23 1102 SF
8' - 0"
10' - 8"
34A
33A
Sat. Elec. 32A
32 8' - 4"
A
---
33
31
D Stair 3 30
--17' - 5"
--37' - 0"
Frieza Demolition Co. 435 Theuniverse Blvd. Planet Frieza No. 79 876-394-3240 frieza.iamevil@gmail.com
Krillen Electrical Consultants 101 Earth Ave. Oklahoma City, OK 256-321-9965 krillen.useless@yahoo.com
A
21
20 450 SF
30B
120' - 0"
Stair 2
Elev 2
30A
C.1
Machine RM Elev 3
25
22
78 SF
26A
29A
Vestibule 17' - 0"
11'29 - 0"
16' - 1"
20A
B
Piccolo Mechanical Engineers 321 Itsgonenow Ave. Planet Namek 956-5894-9450 e-mail
12' - 6"
24 1946 SF
C.2 7' - 6"
30' - 4 1/4"
Lobby
---
Gohan Landscape Co. 101 Earth Ave Oklahoma City, OK 932-678-9653 gohan.notsosupersaiyen@gmail.com
25A
C
10' - 0"
24B
277 SF
12' - 7"
39B
39
14' - 9 1/2"
Vestibule 7' - 0"
A
7' - 3 1/2"
24A
7' - 6"
23A
39A
D.1
55 SF Elev 4
7' - 11"
Goku Architects 101 Overpowered St. Dallas, TX 256-486-2198 goku.supersaiyan@gmail.com
10' - 0"
Machine RM
36A
A
-
205 SF
600 SF
35A
5' - 8 1/4"
34' - 0"
38A
83 SF
34
35
38
-
D.2
H.E Room
Fan Room
14' - 0"
6' - 11"
10' - 0"
29' - 1"
10' - 0"
6' - 0"
E
B.1
28A
26 1002 SF
7' - 4"
Lecture Auditorium
5' - 1 1/2"
28
28B
---
2917 SF
3' - 0" 3' - 7"
Classroom
20' - 0"
---
B A
-
20' - 0"
---
8' - 0"
22' - 0"
6' - 0"
36' - 8"
1 A301
A.1
Owner A
---
museum of the Bible ENLARGED FIRST FLOOR PLAN Project number Date Drawn by
1
Level 1 - Enlarged Floor Plan East 1/8" = 1'-0"
Checked by
A106
001 4/20/2019 Author Checker
4/30/2019 7:18:35 PM
27A
10' - 0"
7' - 8"
27 152 SF
7' - 6"
C
Classroom Storage
Construction Documents - 35
C o n s t r u cti o n D o c u m e n t s
Goku Architects 101 Overpowered St. Dallas, TX 256-486-2198 goku.supersaiyan@gmail.com
Gohan Landscape Co. 101 Earth Ave Oklahoma City, OK 932-678-9653 gohan.notsosupersaiyen@gmail.com
E
D.2
D.1
D
C.2
C.1
C
---
B.1
B
A.1
Piccolo Mechanical Engineers 321 Itsgonenow Ave. Planet Namek 956-5894-9450 e-mail
A
Frieza Demolition Co. 435 Theuniverse Blvd. Planet Frieza No. 79 876-394-3240 frieza.iamevil@gmail.com
---
Roof 72' - 0"
Pergola See A502 for details
Hospitality Kitchen 63
Hospitality
Public Terrace
55
69
Krillen Electrical Consultants 101 Earth Ave. Oklahoma City, OK 256-321-9965 krillen.useless@yahoo.com
1 A400
Level 4 54' - 0"
Fan Room
Temporary Gallery
Temporary Gallery
76
36
36 Level 3 36' - 0"
Gallery Storage 26
Permanent Gallery
Permanent Gallery
19
19 Level 2 18' - 0"
35
Lobby 24
Lecture Auditorium
Owner
28 Level 1 0' - 0"
1
Building Section 1/8" = 1'-0"
museum of the Bible BUILDING SECTIONS Project number Date Drawn by Checked by
A300
36 - Construction Documents
001 4/20/2019 Author Checker
4/30/2019 7:19:57 PM
Fan Room
C o n s t r u cti o n D o c u m e n t s
Goku Architects 101 Overpowered St. Dallas, TX 256-486-2198 goku.supersaiyan@gmail.com
Gohan Landscape Co. 101 Earth Ave Oklahoma City, OK 932-678-9653 gohan.notsosupersaiyen@gmail.com
6
7
8
8.1
9
9.1
10
Piccolo Mechanical Engineers 321 Itsgonenow Ave. Planet Namek 956-5894-9450 e-mail
11
Frieza Demolition Co. 435 Theuniverse Blvd. Planet Frieza No. 79 876-394-3240 frieza.iamevil@gmail.com
Roof 72' - 0"
Krillen Electrical Consultants 101 Earth Ave. Oklahoma City, OK 256-321-9965 krillen.useless@yahoo.com
Public Terrace 69 Level 4 54' - 0"
Temporary Gallery 36 Level 3 36' - 0"
Permanent Gallery 19 Level 2 18' - 0"
Classroom 26
Lecture Auditorium
Owner
28 Level 1 0' - 0"
museum of the Bible BUILDING SECTIONS Project number Date Drawn by
1
Courtyard Section 1/8" = 1'-0"
Checked by
A301
001 4/20/2019 Author Checker
4/30/2019 7:20:35 PM
1 A601
Construction Documents - 37
C o n s t r u cti o n D o c u m e n t s
A A
Alluminum Flashing Wood Block Fiber Cement Panel
0' - 8"
1" Air Space
4 A400
W.P Membrane 2" Rigid Insulation
3' - 0"
W.P Membrane
Level 4 54' - 0"
1/2" Gyp. Sheathing Wood Cant
Laminated Wood Decking
6" MTL Stud Framing w/ R19 Insulation
6' - 0"
Roof Insulation
Level 4 54' - 0"
5" Concrete Slab
1/2" Gyp. Wall Board Metal Decking
4
Gohan Landscape Co. 101 Earth Ave Oklahoma City, OK 932-678-9653 gohan.notsosupersaiyen@gmail.com
Piccolo Mechanical Engineers 321 Itsgonenow Ave. Planet Namek 956-5894-9450 e-mail
Gallery Wall Detail 3 3/4" = 1'-0"
A
12' - 0"
Goku Architects 101 Overpowered St. Dallas, TX 256-486-2198 goku.supersaiyan@gmail.com
3 A400 Fiber Cement Panel
Frieza Demolition Co. 435 Theuniverse Blvd. Planet Frieza No. 79 876-394-3240 frieza.iamevil@gmail.com
1" Air Space
Level 3 36' - 0"
Alluminum Horizontal Bracket
6' - 0"
Wood Baffles
Vapor Barrier
Track Lighting
Terrazzo Tile
2" Rigid Insulation
Krillen Electrical Consultants 101 Earth Ave. Oklahoma City, OK 256-321-9965 krillen.useless@yahoo.com
5" Concrete Slab
Linear Slot Diffuser
Level 3 36' - 0"
1' - 6"
Metal Decking 1/2" Gyp. Fire Rated B.D.
Gypsum Wall Board
1/2" Gyp. Sheathing
10' - 6"
6" MTL Stud Framing w/ R19 Insulation
3
Gallery Wall Detail 2 3/4" = 1'-0"
6' - 0"
Level 2 18' - 0"
A
Wood Finish Ceiling 6" MTL Stud Framing w/ R19 Insulation
Fiber Cement Panel 1" Air Space W.P Membrane
Vinyl Wrap 1/2" Gyp. Wall Board
2" Rigid Insulation 1/2" Gyp. Sheathing Alluminum Plate
12' - 0"
6" Concrete Slab Vapor Barrier 4" Gravel
Fiber Cement Rainscreen
Concrete Grade Beam
2 A400
Compacted Soil
Level 1 0' - 0"
Gallery Wall Section 1/4" = 1'-0"
Sidewalk Paving Metal Flashing Silicone W.P
Owner
3" Rigid Insulation
museum of the Bible WALL SECTIONS 2
Gallery Wall Detail 1 3/4" = 1'-0"
Project number Date Drawn by Checked by
A400
38 - Construction Documents
001 4/20/2019 Author Checker
4/30/2019 7:21:09 PM
1
Level 1 0' - 0"
C o n s t r u cti o n D o c u m e n t s
7
7' - 10 1/2"
5' - 7 1/2"
6' - 10 1/4"
C
10' - 0"
0' - 11 1/2"
Goku Architects 101 Overpowered St. Dallas, TX 256-486-2198 goku.supersaiyan@gmail.com
8' - 6"
2x2 Steel Angle Masonry Screw
Level 1 0' - 0"
0' - 11 1/2"
B.1
Krillen Electrical Consultants 101 Earth Ave. Oklahoma City, OK 256-321-9965 krillen.useless@yahoo.com
20' - 0"
90.0 0°
0' - 11 1/2"
8' - 6"
Water Table
2
65' - 7 1/2"
/2" 11 1 8' -
8' - 6"
Piccolo Mechanical Engineers 321 Itsgonenow Ave. Planet Namek 956-5894-9450 e-mail
Frieza Demolition Co. 435 Theuniverse Blvd. Planet Frieza No. 79 876-394-3240 frieza.iamevil@gmail.com
3
Courtyard Section - Metal Grate Detail 3" = 1'-0"
7 B
0" 3' -
20' - 0"
0' - 11 3/4"
8' - 6"
0' - 11 1/2"
Gohan Landscape Co. 101 Earth Ave Oklahoma City, OK 932-678-9653 gohan.notsosupersaiyen@gmail.com
Fountain attachment
3 5/8" MTL Stud @ 16" O.C Granite Cap 8" CMU Wall
8' - 6"
0' - 1"
Granite Veneer
1 12' - 0 1/2"
2' - 0"
0' - 11"
6' - 5"
10' - 0"
8' - 6"
Sand
Level 1 0' - 0" Pressure pipe 2 A601
1' - 0"
0' - 3"
3" Concrete Slab
Owner
Return flow fitting
1' - 11 3/4"
W.P Membrane 0' - 11 3/4"
Pavers
Metal Grate
A.1
Water Resevoir
A
Overflow/drain line to channel
Return flow pipe
museum of the Bible COURTYARD DETAILS Project number
Submersable motor-driven pump Dirt collection screen
4
Level 1 - Enlarged Courtyard Plan Detail 1/4" = 1'-0"
1
Courtyard Section - Water Table 3/4" = 1'-0"
Date Drawn by Checked by
A601
001 4/20/2019 Author Checker
4/30/2019 7:21:42 PM
A301
Construction Documents - 39
C o n s t r u cti o n D o c u m e n t s
9
9.1
10
11
Return Grill
C Track Lighting Slot Diffuser
Goku Architects 101 Overpowered St. Dallas, TX 256-486-2198 goku.supersaiyan@gmail.com
Gohan Landscape Co. 101 Earth Ave Oklahoma City, OK 932-678-9653 gohan.notsosupersaiyen@gmail.com
B.1
Piccolo Mechanical Engineers 321 Itsgonenow Ave. Planet Namek 956-5894-9450 e-mail
Frieza Demolition Co. 435 Theuniverse Blvd. Planet Frieza No. 79 876-394-3240 frieza.iamevil@gmail.com
Sprinkler Krillen Electrical Consultants 101 Earth Ave. Oklahoma City, OK 256-321-9965 krillen.useless@yahoo.com
Wood Ceiling Baffle
Permanent Gallery 19
B
28' - 6"
30' - 0" 29' - 6 3/4"
A.1
Owner
Project number Date Drawn by Checked by
Enlarged Ceiling Plan - Gallery 1 1/4" = 1'-0"
40 - Construction Documents
A705
001 4/20/2019 Author Checker
4/30/2019 7:22:03 PM
A
museum of the Bible GALLERY CEILING PLAN
Construction Documents - 41
C o n s t r u cti o n D o c u m e n t s
Fi n a l P r e s e n t a ti o n
42 - Final Presentation
Final Presentation - 43
Fi n a l P r e s e n t a ti o n
Fi n a l P r e s e n t a ti o n
44 - Final Presentation
Fi n a l P r e s e n t a ti o n
Gallery Wall Section
Final Presentation - 45
Fi n a l P r e s e n t a ti o n
Ground Floor Plan
46 - Final Presentation
Fi n a l P r e s e n t a ti o n
Second Floor Plan
Final Presentation - 47
Fi n a l P r e s e n t a ti o n
Third Floor Plan
48 - Final Presentation
Fi n a l P r e s e n t a ti o n
Fourth Floor Plan
Final Presentation - 49