2024 Summer Capital Improvements Town Hall

Page 1


Ward 6 Town Hall

Summer Capital Improvements

Councillor Dominique O’Rourke

Councillor Ken Yee Chew

Project Engineer Jackie Kay

June 17, 2024

City Hall, Guelph, ON

Welcome!

Welcome 6:30 - 6:35pm

Gordon Street Improvements 6:35 - 7:00pm

Q&A 7:00 - 7:30pm

General Updates 7:30 - 7:40pm

Mix and Mingle 7:40 - 8:00pm

Gordon Street and Arkell Road

Gordon Street Improvements

Kortright Rd
Edinburgh Rd
Lowes Rd
Clair Rd

Lowes Road Storm

Sewers

Kortright Rd
Edinburgh Rd
Lowes Rd
Clair Rd

Background

• Lowes Road drains to the north side of the road

Phase 1 - Project Details

• Install storm sewers on the north side of Road that will outlet with a temporary connection to Gordon Street.

• Temporary outlet will provide stormwater outlet and reduce need to pumping during heavy rains.

• Construction is anticipated to begin in fall 2024 and be completed by the end of the year.

Phase 1 - Next Steps

• June/July 2024 - Geotechnical investigation

• September 2024 - Tender the project

• October/November 2024 – Start construction

• December 2024 - Phase 1 construction complete

Phase 1 - Next Steps

• June/July 2024 - Geotechnical investigation

• September 2024 - Tender the project

• October/November 2024 – Start construction

• December 2024 - Phase 1 construction complete

Phase 2 – Project Details

• Lowering sewer on Gordon Street

• Providing final storm sewer connection to Gordon Street

• Work will be completed with the Gordon Street widening work

Gordon Street Connection

Gordon Street Connection

Phase 1 – Temporary Connection to Gordon Street

Phase 2 – Final connection to lowered storm sewer on Gordon Street

speed of 50 km/hour north of Hands Drive and 60 km/hour south of Hands Road. The posted speed increases to 70 km/hour south of Clair Road. Gordon carries approximately 27,000 vehicles per day north of Arkell Road and 23,000 per day south of Arkell Road (as of 2016 traffic counts) and has a right-of metres.

Gordon Street Widening

As discussed in Section 1.4.6, Gordon Street was previously widened from lanes between Harts Lane to Clair Road, completed as an urban cross-section

speed of 50 km/hour north of Hands Drive and 60 km/hour south of Hands Road. The posted speed increases to 70 km/hour south of Clair Road. Gordon carries approximately 27,000 vehicles per day north of Arkell Road and 23,000 per day south of Arkell Road (as of 2016 traffic counts) and has a right-of metres.

Background

As discussed in Section 1.4.6, Gordon Street was previously widened from lanes between Harts Lane to Clair Road, completed as an urban cross-section

• Several studies have been completed along the Gordon St. corridor include:

Municipal Class EA – 2020

Transportation Mater Plan – 2022

Protected Cycling Network Study - 2023

3.3.2 Venue, Format and Attendance

PIC #2 was held on February 20, 2020 at the same venue as PIC #1, at the Army Guelph Citadel & Nursery School.

Similar to PIC #1, PIC #2 was a drop-in open house format where members project team and City staff were available to speak with individuals and small about the study, and to address any questions and concerns. A total of 49 individuals were in attendance (of which 45 signed in), which was similar to the attendance #1.

Municipal Class EA - 2020

Display boards were setup around the room, providing details on the Study. aerial map of the study area was also laid along a table in the centre of the attendees could review the preferred solution in detail, and leave location-based comments.

• Investigated the need for safety/operational improvements and traffic management for Gordon Street and considered

• Two community engagement touch points

• Recommended a centre turning lane and multi-use paths on both sides of Gordon Street

Participants at PIC #2

The PIC #2 Survey was provided to attendees. The PIC #2 Survey included respondent profile and top concern questions from PIC #1 to serve as a comparison, well as a question about whether the proposed solution addresses the top concerns identified in the PIC #1 Survey. The PIC #2 Survey also included the solicitation comments on the study findings and overall support for the Preferred Option there were any additional considerations that should be addressed prior to detailed

TMP Update - 2022

• Defines how our transportation system will support the community as Guelph continues to grow.

• Four points of community engagement

• Identified Gordon Street as part of the cycling spine network and recommended all ages and abilities (AAA) cycling facilities along Gordon Street

Protected Cycling Network - 2023

• Looks at ways to provide safe, continuous connections for cycling and micro-mobility, such as scooters, to and from community destinations, including major transit stops

• Two community engagement touch points

• Recommended cycle tracks and sidewalk along the entire Gordon Street corridor

Next Steps

• Develop road cross sections and identify impacts along Gordon Street - 2024

• Design intersection and signal improvements – 2024/2025

• Utility relocations and/or land acquisition - 2024/2025

• Construction of road widening and Phase 2 Lowes Road – 2025/2026

Q&A

General Updates

Maltby Road Wildlife Crossing

Niska Bridge Heritage Feature

South End Community Centre

GRCA Niska Management Plan

New UGDSB High School

Maltby Road Wildlife Crossing

Niska Bridge Heritage Feature

South End Community Centre

Current Progress

Ground excavations and foundation

Niska Management Plan

Kortright Hills Area

Niska Lands

Niska Management Plan

Kortright Hills Area

• 117 acres of forest

Niska Land Holdings Description 65 hectares

• 5 acres of marsh

• 117 acres of forest

• 7.5 acres of meadow

• 5 acres of marsh

• 7.5 acres of meadow

• Hanlon Creek - cold water stream

• Hanlon Creek - cold water stream

• 31 acres of leased agricultural land

• 31 acres of leased agricultural land

Niska Lands

Niska Management Plan

Kortright Hills Area

• In 2018 the GRCA Board directs staff to develop MP.

• Draft MP released for public comment May 2023

• Public comments presented to GRCA Board with Draft MP

• Final version to be brought forward to the board June 21, 2024

Arkell Road Victoria Road

New UGDSB School Location

New UGDSB High School