Kelli Berg McIlroy Holistic Portfolio 2025-

Page 1


Architecture Portfolio 2025

MUSEUM OF FUTURE BUILDINGS

Design Competition Helsinki, Finland

Rhino / Hand drawing / AutoCad / Photoshop

Design & Concept contributor / Material responsible.

F101 Architekten 2024

Table of Contents

F101 Architekten Berlin 2024 - 2025

2. - 7. Museum of Future Buildings -/ Design Competition Helsinki

8. - 11. Restauration -/ Nomad Bar & Restaurant

dgk Architekten Berlin 2023 - 2024

12. - 15. Bürogebäude Roth Alt-Biersdorf -/ Visualisations & Concept

16. - 21. Dunant Primary School -/ Attic Floor Rennovation

Volyme Zero Competition Entry 2020

22. - 25. Tiny House Competition -/ Spatial statement & Design

Studio Tomás Saraceno 2023

26. - 27. The Serpentine Gallery -/ In the Shadow - West Gallery

28. - 29. The Serpentine Gallery -/Archno-arcano-anarco - East Gallery

30. The Serpentine Gallery -/ The Minidoors - Interspecies

*Leistungsphasen (LP) here translated as Perfromace Phase are the phases of a construction project defined by the German law HOAI, (Honorarordnung für Architekten und Ingenieurs).

They run from LP 1-9. The author has worked from LP 1-6 and they are as follows:

LP 1 - Strategic project definition

LP 2 - Preparation & Briefing

LP 3 - Concept Design

LP 4 - Planning Permit

LP 5 - Technical Design

LP 6 - Technical Design in preparation for project tender

*All documents performed by author. If design made by external soruces others than author this is clarified in project description.

Ground Level View from the direction of Market sqaure
View from Sea

A Museum in the exposed city quay aims to honor the Helsinki harbor history, juxtaposing and responding through rough and slender characteristics. It´s a story of fragility and strength. Cruise ship activities and the historic use of the harbor are bound to disappear. The whole coastline will receive a cultural remake; already old market, sauna and Ferris wheel.

Helsinki inhabitants, society from outside and tourists would end up in the city center with its oldest harbor. The Museum will act as a remembrance of ancient harbor atmosphere in scale and materialization.

Shipyards, oil, steel, wooden sheds as well as large-scale storage buildings reflects concept in the similar manner a cruise ship reflects in the water. In main skin, corroded steel, and outdoor flooring in Kebony-wood.

An Urban Terassille: A wider ramp invites to the large rooftop terrace with 270° views over harbor and city. Looking into an Inner marketplace via a designed route. The route connects, bridging the Laivasillankatu, the park and hillside at the Bernardinkatu.

Attracting visitors from seaside, city center and surrounding living areas.

Competition site

Shape & Site response

& Form

Ship on Helsinky quay
Historical essence
Markethall
Urban Ribbon
Initial Interior Ideation
Ground Exposure / Meetings & Separation
Reflections / Walls & the Sea

NOMAD BAR & RESTAURANT

Restauration Berlin, Mitte

Performance phase 1-6

Nisches (Nischen)

Mirror wall (Spiegelwand)

Mirror wall bench (Spiegelwand sitzbank)

Room 1 (Raum 1)

Wine cabinet (Weinschrank)

Bench 01 x 2 (Sitzbank 01 x2)

Service point (Servicestelle)

Ceiling panelling 1 (Decken-Paneele 1)

Room 2 (Raum 2)

Rhino / AutoCad / Photoshop

Project Leader & Narrator F101 Architekten 2024.

Bar Extension (Bar-Erweiterung )

Ceiling panelling 2 (Decken-Paneele 2)

Room 3 (Raum 3)

Room 4 (Raum 4)

In the role of designer and concept manager I encouraged the clients to take part in the design process. I witnessed ideas sometimes seemingly contradictory combined and realised. To have been involved in shaping the idea into execution has been incredibly fulfilling. This latest project involvment included detailed drawings and discussion with craftsmen conserning the Nomad restoration. I wanted to achieve a hybrid, holistic design that contributed in narrative as well as in detail with sustainable material choices.

Pendant lights (Hängeleuchten)

Shelf bar Back Panels (Regal Bar Rückwand)

Bar front Panelling (Bar Front Verkleidung)

New floor tiles (Neues Bodenfliesen)

Mirror wall with bench (Spiegelwand mit Sitzbank)

Wine cabinet (Weinschrank)

Alle Maße sind vor Ort vom Auftragnehmer eigenverantwortlich zu prüfen. Abweichungen sind unverzüglich mit dem Planverfasser zu klären.

PROJEKT ADRESSE

NOMAD 12345 Berlin Borsigstraße 28 10587 Berlin Röntgenstr. 14a

Eventworks GmbH

Wine cabinet in context (Weinschrank im kontext)

Architekten

Bar

(Bar Verlängerung)

Shelf bar back panel (Regal Bar Ruckwand)

Barfront

Bar Front paneling (Bar Front Verkleidung)

There was an intention to create a cooler atmosphere to the Bar & Restaurant. The nisches played an imporant part in secluding the second room. The ceiling paneling together with more greens, ambient lights and bench upholstary provided not only acoustic benefits but was also an atmospheric gamechanger.

Nisches (Nischen) S.S.

Nisches + Bench 01. x 2 (Nischen + Sitzbank 01. x 2)

BÜROGEBÄUDE ROTH

Berlin, Alt- Biesdorf

Performance phase 5

ArchiCad / Illustrator / Photoshop

Project pitch resposible / Concept communicator. dgk Architekten 2023

Roof terrace with PVC- Shutters & Intensive Greenroof (Dachterrasse mit PVC-Rollläden & Intensivbegrünung)

Entrance / Threshold

North to South

Ventilation system + heat recovery (Lüftungsanlage + WRG)

Roadside Acoustic mission (Strassenseitig Schallermission)

Nord - Strasse (North - Street)

Ventilation (Be Entlüftung)

Individual office / meeting (Einzelbüro / Besprechung)

Adjoining rooms (Nebenräume)

E-mobility (E-Mobilität)

Energy sufficiency concept (Energie Konzept)

Heating (Heizen)

Cooliug (Kühlen)

Large area = (Grossraum =)

Avoidance of Overheating (Vermeidung Uberhitzung)

Extensive green roofs = Reduction rainwater volume (Extensive Dachbegrünung = Reduktion Regenwassermenge)

PV + external sun protection (PV + aussenliegender Sonnenschutz) 22 Dec / 12:00

März / 12:00

South - residential development (Süd - Wohnseidlung)

21 Juni / 12:00

Window = Natural ventilation (Fenster = Natürliche Belüftung)

Heat pumps (Wärmepumpen)

Sunstudies Summer - 21 June 10.00 am (Sonnenstudie Sommer - 21 Juni 10.00 uhr)

Alt Biesdorf is a project consisting of two split co-working spaces. With an adjecent garden the building is working with maximising sunlight with new PV Sunshading (PV Sonnenschutz) designed to maximise the sun in winter and minimise in the summer. Design by dgk Architekten.

The task was to communicate the building usage and its light utility though commiting sunstudies and understanding the utilities of light in architecture. This was comitted by renderings, simultaniously working with drawings, understanding 3D and its impact on 2D regulations. A deep dive into project energy production and consumtion helped strengthening a sustainable approach to the project. The client was succesfully approving the project pitch with presented documents.

Sunstudies Winter - 22 December 10.00 am (Sonnenstudie Winter - 22 Dezember 10.00 uhr)

DUNANT GRUNDSCHULE

Rennovation Berlin, Steglitz

ArchiCad / AutoCad / Photoshop

Project Leader / Project presentation responsible. dgk Architekten

Dunant Music Room (Dunant Musik Zimmer)

Section Demolition, 2024 (Schnitt Abbruch 2024)

Section New building, 2024 (Schnitt Neubau 2024)

Attic floor plan Demolition, 2024 (Dachgeschoss Grundriss Abbruch 2024)

Attic floor plan New building, 2024 (Dachgeschoss Grundriss Neubau 2024)

Dunant Primary School, Berlin Steglitz, 2023 (Dunant Grundschule, Berlin Steglitz, 2023)

Section Current status, 2023-2024 (Schnitt Aktueller Stand 2023 - 2024)

Other room 1 Sonstiger raum 1.

Primary School, 2023 (Dunant

Attic Floor 2023)

room

Drawing (Zeichensaal)room

Other room 2. (Sonstiger raum 2.)

room 1.

Group room 2. (Gruppenraum 2.)

Group room 3. (Gruppenraum 3.)

Group room 4. (Gruppenraum 4.)

Group room 5. (Gruppenraum 5.)

Dunant Grundschule is a rennovation project in Steglitz. The attic floor consists of a Music Room, a room for art lessons and smaller adjecent rooms. My job was to draw drawings from old handdrawings on which renovation changes were to be applied. Meanwhilst I was assessed to give a sense of atmosphere and familiariy through 3D work and pitch a project presentation to reach our clients.

Music
(Musik Zimmer)
Group
(Gruppenraum 1.)
Exit 1.
Exit 2.
Storage (Lager)
Dunant
Grundschule

THE URBAN CANVAS

Volyme Zero Competitions

ArichCad / AutoCad / Photoshop

A team effort with Sophie Ersson

Dimensions of intervention is designed to fit within a truck car for potential dismanteling and site adaptation.

Slab: CLT GL30C 90 x 180
Beam: Laminated veneer (Kerto-S 63 x 240
Column: Glulaminated timber 140 x 140
Walls: CLT panels
50 cm
Staircase Scenario 1.
Staircase Scenario 2.
50 cm

The project site in Minamichó, Shimogyo Ward, Kyoto, Japan is faced with problems of street criminality. The project explores how the space within a city block can encourage dynamics and creative spirits.

The Urban Canvas works ultimately like a pocket space for artists and creatives with activities delegated to the open public. This derives from an enclosxed private housing space. This tiny house is designed for Labour and Domesticity, attempting to include, seclude and to combine works of art.

Constiction is based on a grid system made out of Cross Laminated Timber. This particulair grid is adapted on site.

GROUND FLOOR:

Kitchen and social area, characterises the urban footprint, the room can be transformed due to dismantable stairs and tables. (see details) At building back is a shelf system for open trade and second hand objects.

FLOOR 2:

Terasse access with project presentation space, the surroundings makes the space semi-public. The area has the potential for exhibitiong work. Can be accessed directly from street level via external stairs.

1. 5:

The bedroom with work areas and adjacent storage space beneath loft bed.

FLOOR

THE SERPENTINE GALLERY

Artwork in the Shadow

Rhino / Illustrator / 2d Print

Project Leader

Studio Tomás Saraceno 2023

Animal sculptures, 2023

Artist: Tomás Saraceno

Scale: See dimension spec.

Material: Metal sheet, 3.5 mm

Coating: Blackspray coating

Connection: Welded

Location: West Wing Gallery, Interspecies

Project Leader: Thomas Charil

Architect: Kelli Berg McIlroyProduction Team: Jazmin Schenone & Filippo Corato

With the task to create an entertaining version of mirrowing animal sculptures, the idea of animals in duality was discussed with my collegue, Thomas. The idea was to create a dialogue between the creatures and a topic for discussion for the gallery visitors.

Photo Courtesy: Studio Tomás Saraceno
West Gallery installation on site
Metal sheet a. Weld
Metal sheet b.

THE SERPENTINE GALLERY

The Confessional Stained Glass Windows

Rhino / Illustrator

Project Leader

Studio Tomás Saraceno 2023

The Confessional, 2023

Light and dark in togetherness and in contrast. The confessional, originated from Poland was designed before the industrialism and is a very original piece concerning dimensions, quirky corners and irregular meassurements.

With the task to give an accurate idea of how the stained glasses of the confessional would appear with its welded glassform. I was together with my collegue Thomas to perfrom a discussion with an external glass manufacturer and to translate drawing into reality. Its entire design idea was a contemporary interpretation of the confession action. Where its visitor is to confess to the spider, rather than the priest. I was assigned to work with proportions and lineweights, balance of colors and contrasts in response to its concept.

593 mm
Group A.
Group B.
Group C.
East Installation on site in Daylight
Photo Courtesy: Studio Tomás Saraceno
East Installation on site in Darkness

Confessional ArachnoArcano-Anarco

East Gallery installation on site

Arachno-Arcano-Anarco, 2023

Artist: Tomás Saraceno

Scale: Not to scale

Material: Stained glass & welded frames

Stained glass thickness: 3.5 mm

Welded metal thickness: 4 mm

Location: Serpentine Gallery South, Spider room

Project Leader: Thomas Charil

Architect: Kelli Berg McIlroy & Erik Mladenov

Production Team: Manuela Mazure Azcona & Philipp Weber

Group A.
Group B.
Group C.
Photo Courtesy: Studio Tomás Saraceno

THE SERPENTINE GALLERY

The Birds will keep Calling you The Minidoors

Rhino / Hand drawing

Project assistant

Studio Tomás Saraceno 2023

Drafting design ideas of doors dedicated to the cat, the dog and the smallest kid. Maintaining the human proportions and commonly known ”rules” of a victorian door champher and its ornaments. The challenge was to maintain a good level of detail, whilst being able to consider its manufacturing.

Artist:

Scale: See dimension spec. Material: Oakwood, 5 mm Connection: Fixed Coating: Hartöl + Antique stain

Location: Serpentine Gallery Entrance

Project Leader: Thomas Charil

Architect Team: Niki Sidirougou & Kelli Berg McIlroy

Photo Courtesy: Studio Tomás Saraceno
Photo Courtesy: Studio Tomás Saraceno
3. The Mini Doors
3. The Mini Doors
Mini Doors
Tomás Saraceno

”The spectacle is not a collection of images, but a social relation among people, mediated by images.”

-Debord, Guy

(From The Society of the Spactacle, 1974)

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.