Pilot Plant Quotation

Page 6

The 2 TPD Waste to Energy system consists of 5 subsystems. These subsystems are 1) Feed Subsystem; 2) Gasifier Subsystem; 3) Gas Cleanup Subsystem; 4) Steam Generation Subsystem and 5) Auxiliary Subsystem. The feed preparation and delivery equipment will be supplied by others. Further technical details including – 1) Process Flow Diagram 2) Process Description for the plant 3) Heat and Mass Balances and Potential Energy Output 4) Utility Requirements 5) Equipment list and specifications areprovided in the Appendix 1 of Scope of Supply. The appendix also includes the necessary design drawings of the pilot plant. It is the responsibility of the bidder to review, understand the technical requirements of the bid. Any deviation from the technical details may result in the bid being disqualified.Hence the bidder is advised to review the detailed scope of supply provided in the Appendix 1thoroughly. 5. SCHEDULE OF BIDDING PROCESS Date of RFQ Last date for receiving queries Reponses to the queries by KITS

23.08.2021 31.08.2021

Bid Due Date

15.09.2021

Opening of Bids

17.09.2021

Letter of Award(LOA)

05.10.2021

Validity of Bids

60 Days of Bid Due Date

Signing of Acceptance letter

Within 7 days of award of LOA

2TPD 190821

Page 6 of 11


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.