Kamilah Acebal-Acevedo Architecture Portfolio - 2023

Page 1

Issue

Selected works from Professional Work Experience 2017-2022 & B. Arch. 5-year program at the University of Miami School of Architecture 2011-2016

KAamilah cebal Architecture Portfolio 01.23

KAamilah cebal

Selected works from Professional Work Experience 2017-2023 & B. Arch. 5-year program at the University of Miami School of Architecture 2011-2016

Architecture Portfolio 01.23

//TABLE OF CONTENTS

Professional Work (Hart Howerton) Professional Work (FONS D&A) Student Work Fabrication Drawing Stadium Park Competition 19-20 HAMAC The New Miami Metro Station 23-28 SUKKAH Design Build Competition 35-36 Models and Furniture 31-34 Hand Drawings and Sketches 39-42 Hand and Digital Drafted Drawings 43-44 Gulfstream Tower 17-18 Resumé 3-4 Summerlin Office Building 7-12 Private Ski Resort Village Core 13-16

KAamilah cebal

CURRICULUM VITAE

3

CONTACT

Kamilah Z. Acebal-Acevedo 258 4th Avenue, San Francisco, CA 94118 c: +1.305.761.4394 email: kamiacebal@gmail.com linkedin.com/in/kamilah-acebal-acevedo

KEY SKILLS

• Advanced: Revit, AutoCAD, SketchUp, Rhino, Adobe Photoshop, Adobe InDesign, Microsoft Office Suite

• Intermediate: 3D Studio Max, Rendering with V-ray, Adobe Illustrator, ArcGIS

• Proficient in hand-drafting, hand sketching, painting, furniture building and modelmaking

• Languages: English (native), Spanish (native), Portuguese (advanced), Italian (intermediate), and Japanese (currently learning).

EDUCATION

Bachelor of Architecture (NAAB Accredited) with Minor in Architectural Engineering

University of Miami School of Architecture, Coral Gables, FL (2011 - 2016)

• Cumulative GPA: 3.5

• Architecture courses GPA: 3.68

INTERNSHIP EXPERIENCE

• Urban Land Institute (ULI) Accessory Services Panel for Toa Baja, Puerto Rico“Intern” to the panelists (Dec 2018)

• Friends of the Underline / James Corner Field Operations (JFCO) , Miami FL - Intern (June-July 2015)

• Rafael Vinoly Architects PC, New York, NY - Intern (June - Aug 2014)

STUDY ABROAD EXPERIENCE

• Rome (Fall Semester 2015)

• Japan, China, S. Korea (Summer 2015)

AWARDS IN COMPETITIONS

• Archstorming Residential Stadium

Adaptive Reuse Competition - Finalist (November 2018)

• ACSA and ASCE Steel Bridge Design

National Student CompetitionCategory I: ‘Bridge to Building’Honorable Mention (Spring 2013)

PROFESSIONAL PROFILE

Highly motivated architectural designer with five years of experience in all phases of project development from concept to construction documents. Effective team player with excellent technical and communication skills. Searching for an opportunity to contribute to a workplace that values excellence and open collaboration with a culture that nurtures my determination to grow in leadership, technical and design skills.

WORK EXPERIENCE

Hart Howerton, San Francisco, CA - Architectural Designer (Nov 2019-Oct 2022)

• Developed a fluency in Revit (3 years of practical experience) while working on various large-scale projects across the United States and abroad, including mixed-use, multi-family, corporate offices, and hospitality.

• Worked closely with Project Managers and Principals during the design development stage using Sketchup and Rhino to create massing studies and 3D renderings used for client proposals and progress presentations.

• Assisted with consultant coordination and maintained detailed minutes of meetings to ensure efficient follow up and timely response to outstanding items and client requests.

• Communicated regularly and effectively with team members and assisted in the development of architectural solutions to meet project goals and specifications.

• Gained valuable computer aided interior design experience including space planning, fixtures, furnishing and lighting solutions in addition to working closely with LEED experts.

• Responsible for developing construction documentation sets which included important tasks such as: cartooning the set, dimensioning plans, adding notes and referencing materials and products, refine plans and wall sections, assembling and refining project details, and applying pertinent code and accessibility requirements.

FONS Design & Architecture, Miami, FL - Junior Architect (Nov 2017 - Oct 2019)

• Team production architect for a small architecture firm specialized in construction documents and Architect of Record services for large mixed-use and residential projects.

• Produced construction document sets for permitting using AutoCAD.

• Gained valuable hands-on experience in multiple essential functions from researching building and access codes, coordinating with engineering disciplines, running plans through the permitting process, assisting in the drafting of LOIs for new projects, to interfacing with clients to maintain strong relationships and open communication.

Florida East Coast Realty, Miami, FL - Junior Architect (Feb 2017 - Nov 2017)

• In-house staff architect for Miami-based development company.

• Worked closely with the owners to come up with the initial schematic design and concept packages for prospective projects - using AutoCAD, Sketchup, and Adobe Creative Suite software

• Project highlight: Panorama Tower with 85-stories is the tallest building south of New York, which includes 820 luxury residential units as well as a 208-key hotel.

4
1 About Me Architecture De - Urban Design 5

//PROFESSIONAL PROJECTS

2
6
01 7
//View from Oval Park Drive //View from the Paseo

Summerlin

[PROJECT SCOPE] Involved in all phases: concept, SD, DD and CD’s.

[LOCATION] Summerlin, Las Vegas, Nevada

[SOFTWARE] REVIT, Rhino, Sketchup, Photoshop, Indesign

[TIMELINE] 2021-2022 [ROLE] Architect Designer III, HH team consisted of: 5

High-End Office Building
9-Story
Plan 8 //Ground Floor Plan //Ground Floor RCP
//Site

//Enlarged Ground Floor Plan - Lobby Area

9
//Window GFRC Panel Layouts - West Elevation
10
//Enlarged Ground Floor RCP - Lobby Area
//Window GFRC Panel Types (North Corners)
11 //East Storefron Sections
//Slab Edge Details

//Stair Sections, Plans, Axon

12
//Site Visit Photo - View from Paseo
LEVEL 03 7,227' - 0" LEVEL 02 7,214' - 0" LEVEL 01LR 7,196' - 6" LEVEL 04 7,240' - 0" 17' 6" 13' 0" 13' 0" CB CE CG CK CM CQ CS CU- -06 40 13.S2 07 72 53.A1 07 62 00.C1 07 72 53.A1 26 81 13.A3 26 81 13.A1 -006 06 40 13.S2 CH-01 04 43 00.E1 CAA 06 40 13.LA LEVEL 03 7,227' - 0" LEVEL 02 7,214' - 0" LEVEL 01 7,201' - 0" LEVEL 01LR 7,196' - 6" C16 C13 C11 C10 C8 C6 C5 C4 GC7 GC9 GC208 32 13.A1 06 40 13.N1 07 72 53.A104 43 00.B5 -006 04 43 00.E1 RFRL-B5-01 07 72 53.A1 RF-01 06 40 13.S2 07 62 00.C1 10 31 30.A1 S-006 06 40 13.LD S-015 13' 0" 13' 6" 06 40 13.LA S-023 WOOD HEADER AT OPENING 06 40 13.M2 LEVEL 03 7,227' - 0" LEVEL 02 7,214' - 0" LEVEL 01 7,201' - 0" LEVEL 04 7,240' - 0" 13' 0" 13' 0" 13' 0" B6 B4 B3B1 CH-01 LEVEL 03 7,227' - 0" LEVEL 02 7,214' - 0" LEVEL 01 7,201' - 0" LEVEL 04 7,240' - 0" 13' 0" 13' 13' 0" - -CH06 40 13.LF S-023 ELEVATION NOTES 1. SEE PLANS FOR EXTERIOR WALL TYPE TAGS FOR EXTERIOR WALL CONSTRUCTION AND FINISH 2. SEE SHEET A5.6.6.1 FOR BRACKET TYPES 3. SEE SHEET A5.6.7.1 FOR CHIMNEY TYPES 0 10 East 40th Street, New York, NY 10016 Tel 212 683 5631 Fax 212 481 3768 Email NY@harthowerton.com NEW YORK SAN FRANCISCO ©2021 Hart Howerton The designs and concepts shown are the sole property of Hart Howerton and may not be used without the prior written consent Hart DIMENSIONS ONLY, OR SEEK CLARIFICATION DRAWING NO: CHECKED BY: PROJECT #: DRAWN BY: DRAWING TITLE: MILESTONES DATEISSUE 6/30/2022 8:38:05 AM As indicated NOT FOR CONSTRUCTION A5.3.1.0 Author Checker BUILDING ELEVATIONS BUILDING 5 VP2 -YELLOWSTONE CLUB VILLAGE PHASE 2 BIG SKY, MT 06/30/2021 SD 10/15/202150% DD 12/03/2021DD PRICING 05/06/2022CD PROGRESS 6/30/2022CD BID SET 1/8" = 1'-0" 1 ELEVATION 01 1/8" = 1'-0" 2 ELEVATION 02 01 02 1/8" = 1'-0" 3 ELEVATION 03 1/8" = 1'-0" 4 ELEVATION 04 04 03 KEYNOTE LEGEND 04 43 00.B55" MIN. STONE VENEER, CANTED AS SHOWN 04 43 00.E14" THICK STONE CAP, SLOPE TOP 06 40 13.D12X SHAPED FINISH WOOD 06 40 13.LAWOOD BRACKET TYPE '5A', COLOR 'A' 06 40 13.LBWOOD BRACKET TYPE '5B', COLOR 'A' 06 40 13.LDWOOD BRACKET TYPE '5D', COLOR 'A' 06 40 13.LEWOOD BRACKET TYPE '5E', COLOR 'A' 06 40 13.LFWOOD BRACKET TYPE '5F', COLOR 'A' BEAM/COLUMN 06 40 13.M2SHAPED END CAP WITH NO VISIBLE JOINTS, TYP AT ALL BOXED BEAMS, REFER TO DETAILS 06 40 13.N15/4 HORIZONTAL WOOD SIDING 06 40 13.S1WOOD FASCIA, SEE DETAILS 06 40 13.S2WOOD RAKE, SEE DETAILS 07 62 00.C1HALF-ROUND GUTTER, S.P.D. 07 62 00.D1DOWNSPOUT, S.P.D. 08 32 13.A1SLIDING ALUMINUM-FRAMED GLASS DOORS PER PLAN, TYP STOREFRONTS PER PLAN, TYP 23 51 10.B1KITCHEN RANGE/LAUNDRY DRYER EXHAUST TERMINATION CAP, S.M.D. 26 81 13.A3ROOF SURFACE MOUNTED SNOW MELT TRACK STONE CHIMNEY TYPE 01, SEE DETAIL 01/AD.6.6.5 STONE CHIMNEY TYPE 02, SEE DETAIL 06/AD.6.6.5 RF-01 SLOPED ROOF ASSEMBLY PER DETAIL 03/AD.6.2.0 RL-B5-01RAILING TYPE RL-B5-01 (TYP AT B5, U.O.N.) SEE TYPES ON SHEET AD6.6.3 S-006 WINDOW/DOOR PER PLAN, TYP. S-015 COPPER CAPS AT EXPOSED TIMBERS, TYP. S-023 DECORATIVE RECESSED WOOD HEADER, SEE WINDOW DETAILS KEY PLAN AREA 1 AREA 2 REVISIONS NO.DATEISSUE PROJECT NAME & INFORMATION WITHHELD PER OWNER CONFIDENTIALITY AGREEMENT 02 13

Private Ski Club

Ski Village Phase: 4 High-End Residential Buildings and Private Ski Club Amenities

[PROJECT SCOPE] Developed DD and CD architectural set for the new 475,000 sf Village Core project expands and redefines the heart of “Private Ski Resort” Club.

[LOCATION] American West (Exact location witheld due to owner request)

[SOFTWARE] REVIT, Photoshop, Indesign [TIMELINE] 2021-2022

[ROLE] Architect Designer III, HH team consisted of: 7 architects, 4 interior designers, and 2 landscape architects

UP UP UP A5.4.0.0 4 BUILDING ABOVE 3 A5.4.0.1 1 A5.4.0.0 A5.4.0.2 6 A5.4.0.2 GARAGE LOBBY NORTH PROPERTY STORAGE 5D STORAGE 5B STORAGE 5F STORAGE 5G SOFTENER LOBBY SOUTH E.C.R. AD AA A8 AE AN AP B3 B4 B6 BA BF BG CA C5 C10 C16 CM A1 C12 C4 GAC GA2 GA4 GAD GA6 A12 A9 CD AH CQ CN GC9 GC7 GC8 GC6 GC3 GC2 GC1 GC4 C7 GBD GBB GCB GCC GBA GAA GC5 GCD GA3 GA5 B1 RECYCLING TRASH ROOM SOUTH PRIVATE GARAGE 1 2 3 4 5 S1 S2 S3 6 7 8 9 ADA G1 ADA 15 14 13 12 G3 G2 S4 10 ADA 11 STORAGE 5A STORAGE 5K STORAGE 5J STORAGE 5I STORAGE 5H STORAGE 5C STORAGE 5E MECH TRASH & RECYCLING PRIVATE AIR GAP AIR GAP HALL SOUTH E.C.R. SERVICE HALL NORTH MECH. SERVICE ZONE ELEV ELEV 5P1 STAIR 5D ELEV 5S2 STAIR 5B ELEV 5P3 A5.4.0.0 A5.4.0.1 COCHERE RAMP 3 A5.4.0.1 A5.4.0.0 5 6 PUBLIC CORRIDOR TERRACE TERRACE EMERGENCY I.D.F. ROOM MECH (DOAS) MAIN ELECTRICAL MECH ELEC ROOM MECH CONDO 5-202(L) SEE I5.5.02.XX -203(L) SEE I5.5.03.XX AP B3 BF BG CU CM A2 GAB GAC GA4 GAD GA6 GA1 CD AH CQ CN CT GBD GBC GBB GCA GBA GA3 GA5 GA7 RETAINING WALL BETWEEN LOWER AIR GAP AND UPPER AIR GAP SHAFT SHAFT ELEV GARAGE DOOR ROLL DOWN FIRE SHUTTER ROLL DOWN STAFF CHANGING CHANGING CHANGING ROOMSERVICE ELEV. UPPER PUBLIC ELEV. VESTIBLE LOUNGE ELEV 5S1 STAIR 5A ELEV 5P1 STAIR 5C ELEV ELEV STAIR 5E SKIER SERVICES -131 VEST FLOOR PLAN NOTES FOR ABBREVIATIONS, SYMBOLS. 3. REFER TO ENLARGED CONDO PLANS (I5.5.XX.XX -SERIES) FOR WITHIN CONDOS. 5. REFER TO SHEETS A5.7.0.X -SERIES FOR DOOR SCHEDULES AND 6. REFER TO SHEETS A7.7.1.X -SERIES FOR WINDOW AND LOUVER 7. REFER TO SHEET A5.1.0.0 FOR CONDO MATRIX. 8. PARTITION RATINGS (U.O.N.) -CORRIDOR & CONDO DEMISING 1-HOUR -HVAC SHAFT 2-HOUR & -HORIZONTAL EXIT 2-HOUR 0 8 16 32 10 East 40th Street, New York, NY 10016 Tel 212 683 5631 Fax 212 481 3768 Email NY@harthowerton.com NEW YORK SAN FRANCISCO The designs and concepts shown are the sole property Hart Howerton and may not be SCALE: CHECKED BY: PROJECT #: DRAWING TITLE: 12/3/2021 9:06:34 PM As indicated NOT FOR CONSTRUCTION A5.1.1.0 Author OVERALL GARAGE AND FIRST FLOOR PLAN BUILDING 5 YELLOWSTONE CLUB PHASE II BIG SKY, MT 06/30/2021SD 10/15/202150% DD 12/03/2021DD PRICING 19-047 1/16" = 1'-0" 1 OVERALL GARAGE FLOOR PLAN KEYNOTE LEGEND KEYNOTE KEYNOTE DESCRIPTION 1/16" = 1'-0" 2 OVERALL FIRST FLOOR PLAN REVISIONS NO.DATEISSUE PROJECT NAME AND INFORMATION WITHHELD PER OWNER CONFIDENTIALITY AGREEMENT 14
LEVEL 03 7,227' - 0" LEVEL 02 7,214' - 0" LEVEL 01 7,201' - 0" LEVEL 00 7,188' - 0" CQ CS 13' 0" 13' 0" 13' 0"5-001 OWNER'S R02-320 BEDROOMGCE 18 AD.6.2.0 17 AD.6.4.2 08 01 AD.6.4.2 16 14 AD.6.4.2 02 AD.6.1.1 08 FL-01A CL-DOUBLE QUEEN BDRM R05-111 SOG-02BLDG 5 LVL 00 F.F. 7,188' - 0 1/2" LEVEL 03 7,227' - 0" LEVEL 02 7,214' - 0" LEVEL 01 7,201' - 0" LEVEL 00 7,188' - 0" LEVEL 04 7,240' - 0" 13' 0" 13' 0" 13' 0" 13' 0" SOG-02 06 40 13.G1 S-006 FL-01 06 40 13.M1 -02 15 GBE AD.6.7.1 01 AD.6.4.3 03 0" PER WINDOW SCHEDULE AD.6.4.3 07 AD.6.4.2 02 FL-01A SIM WALL, S.L.D. GBF 7' 5" 07 21 19.H1 FAMILY ROOMGARAGE 5-001 R02-104 GREAT ROOM R05-103RF- RFS-028 0 2 4 10 East 40th Street, New York, NY 10016 Tel 212 683 5631 Fax 212 481 3768 Email NY@harthowerton.com NEW YORK SAN FRANCISCO ©2021 Hart Howerton The designs and concepts shown are the sole property Hart Howerton and may not be used without the prior written consent of Hart DIMENSIONS ONLY, OR SEEK CLARIFICATION SCALE: DRAWING NO: PROJECT #: DRAWN BY: DRAWING TITLE: 6/30/2022 12:39:28 PM As indicated NOT FOR CONSTRUCTION A5.4.1.3 Checker DETAIL WALL SECTION BUILDING 5 VP2 -YELLOWSTONE CLUB VILLAGE PHASE 2 BIG SKY, MT 10/15/2021 50% DD 12/03/2021 DD PRICING 05/06/2022 6/30/2022CD BID SET 19-047 1/4" = 1'-0" 1 WS 5-07 KEY PLAN 01 1/4" = 1'-0" 2 WS 5-08 02 KEYNOTE LEGEND 03 30 00.C1CONCRETE RETAINING WALL, S.S.D 05 52 13.A1PREFINISHED ALUMINUM RAILING, SEE PLANS FOR TYPE 06 40 13.G1SOLID WOOD RAFTERS, SEE RCP FOR 06 40 13.M1BUILT UP WOOD SHAPE AROUND STEEL 07 21 19.H1SPRAYED INSULATION, 3" U.O.N CL-01 INSULATION AT EXPOSED STRUCTURE, SEE 1/AD.6.1.0 FL-01 BALCONY/TERRACE FLOOR ASSEMBLY PER DETAIL 8/AD.6.1.0 2/AD.6.1.1 N-002 PAVING, S.L.D. 03/AD.6.2.0 RF-02 PORCH ROOF ASSEMBLY PER DETAIL 07/AD.6.2.0 S-006 WINDOW/DOOR PER PLAN, TYP. S-028 DECORATIVE WOOD BRACKET, SEE ELEVATIONS FOR TYPE SF-11 FIBER CEMENT SOFFIT, SEE DETAIL 15/AD6.6.1 SOG-02 SLAB ON GRADE ASSEMBLY PER DETAIL 9/AD.6.1.1 REVISIONS PROJECT NAME & INFORMATION WITHHELD PER OWNER CONFIDENTIALITY AGREEMENT 5-201 5-202 (U) 5-203 (U) 5-204 YELLOWSTONE CLUB Big Sky, Montana October 25, 2021 LIMITED COMMON ELEMENT NOTE: GROSS INTERIOR SQUARE FOOTAGE IS MEASURED TO THE OUTSIDE FACE OF EXTERIOR WALL STRUCTURE SUCH AS SHEATHING OR CONCRETE, TOTHE OUTSIDE FACE OF FULL-HEIGHT GLAZING, AND TO THE CENTER LINE OF INTERIOR DEMISING WALL ASSEMBLIES INCLUDING EMBEDDED STRUCTURAL ELEMENTS. GROSS EXTERIOR SQUARE FOOTAGE IS MEASURED TO THE CENTER LINE OF GUARDRAIL ELEMENTS, AND TO THE EXTERIOR FACE OF ALL OTHER ELEMENTS INCLUDING WALLS, COLUMNS, AND FULL-HEIGHT GLAZING. BUILDING 5 - LEVEL 2 FLOOR PLAN GENERAL COMMON ELEMENT2,012 SF 8,679 SF Project Name and Information withheld per Owner Confidentiality Agreement 5-202 (L) 5-203 (L) YELLOWSTONE CLUB Big Sky, Montana October 25, 2021 LIMITED COMMON ELEMENT NOTE: GROSS INTERIOR SQUARE FOOTAGE IS MEASURED TO THE OUTSIDE FACE OF EXTERIOR WALL STRUCTURE SUCH AS SHEATHING OR CONCRETE, TOTHE OUTSIDE FACE OF FULL-HEIGHT GLAZING, AND TO THE CENTER LINE OF INTERIOR DEMISING WALL ASSEMBLIES INCLUDING EMBEDDED STRUCTURAL ELEMENTS. GROSS EXTERIOR SQUARE FOOTAGE IS MEASURED TO THE CENTER LINE OF GUARDRAIL ELEMENTS, AND TO THE EXTERIOR FACE OF ALL OTHER ELEMENTS INCLUDING WALLS, COLUMNS, AND FULL-HEIGHT GLAZING. BUILDING 5 - LEVEL 1 FLOOR PLAN GENERAL COMMON ELEMENT29,027 SF 3,125 SF Project Name and Information withheld per Owner Confidentiality Agreement 15
5/4 HORIZONTAL WOOD SIDING SLOPE OF BOARD 4X SHAPED FINISH WOOD WALL PER PLAN, TYP 6" 6 DASHED LINE INDICATES NOMINAL 3/4" 3/4" MITER BOARDS AT CORNER, TYP. 07 27 26.A1WALL MEMBRANE WALL ASSEMBLY, SEE 2 AD.6.0.0A 5/4 HORIZONTAL WOOD SIDING SLOPE OF BOARD WALL PER PLAN, TYP 04 43 00.B15" STONE VENEER "Y" 3/4" PLACE FULL WIDTH (9 1/4") WHERE OPPOSITE ENDS OF TERMINATE AT INSIDE CORNERS TERMINATES TO AN INSIDE CORNER, AND THE OTHER FACE TO AN OUTSIDE CORNER, CENTER BOARDS ON FACE WITH TWO OUTSIDE CORNERS, AND MATCH WIDTH OF BOARDS AT CORNER. (X=Y) WHERE BOTH FACES TERMINATE TO AN OUTSIDE CORNER, CENTER BOARDS ON AT CORNER (X DOES NOT EQUAL Y) AT ALL CORNERS, NO CORNER BOARD SHALL BE VERTICAL FIBER CEMENT SIDING WALL ASSEMBLY, SEE 17 AD.6.0.0A RETURN LENGTHS AS INDICATED. OFFSET VERTICAL JOINTS AT EACH COURSE AD.6.0.0B STONE WALL ASSEMBLY, SEE 6"-10" SLOPE OF BOARD WALL ASSEMBLY, SEE 2 AD.6.0.0A GRID GRID 11" 11" 11" 11" 1/2" 1/2" ON 1/2" FRT PLYWOOD OVER STEEL BEAM 06 40 13.E73X12 FINISH WOOD MITER BOARDS AT CORNER, TYP. 05 12 00.A1 STEEL WF COLUMN, S.S.D. 07 27 26.B1 DETAIL/TRANSITION MEMBRANE GRID GRID 2X WOOD CLADDING ON 1/2" FRT PLYWOOD OVER 07 27 26.B1 DETAIL/TRANSITION 8" 8" 05 12 00.C1STEEL HSS, S.S.D. 06 40 13.E73X12 FINISH WOOD BASE, WHERE OCCURS MITER BOARDS AT CORNER, TYP. 06 40 13.D9 ON 1/2" FRT PLYWOOD OVER STEEL BEAM DETAIL/TRANSITION MEMBRANE STEEL WF COLUMN, S.S.D. HORIZONTAL SIDING WALL ASSEMBLY, SEE AD.6.0.0A MITER BOARDS AT CORNER, TYP. EQ EQ MITER BOARDS AT VERTICAL REVERSE BOARD & BATTEN ASSEMBLY, SEE 9 AD.6.0.0A VERTICAL REVERSE WALL ASSEMBLY, SEE AD.6.0.0A 06 40 13.F24X4 FINISH WOOD HORIZONTAL SIDING WALL ASSEMBLY, SEE 2 AD.6.0.0A VERTICAL REVERSE BOARD & BATTEN SIDING WALL ASSEMBLY, SEE WALL PER PLAN, TYP 04 43 00.B15" STONE VENEER 06 40 13.F1 4X SHAPED FINISH WOOD WALL ASSEMBLY, SEE VERTICAL REVERSE BOARD & BATTEN SIDING WALL ASSEMBLY, SEE AD.6.0.0A GRID GRID 1/2" FRT [06 05 73] PLYWOOD, PROVIDE METAL STUDS/CLIPS TO STEEL BEAM AS REQUIRED FOR 06 40 13.E1 3X SHAPED FINISH 05 12 00.A1 STEEL WF COLUMN, S.S.D. 07 27 26.A1WALL MEMBRANE 4" 1' 2" 6" 6" GRID GRID ON 1/2" FRT PLYWOOD OVER 07 27 26.B1 DETAIL/TRANSITION EQ EQ 05 12 00.A1 STEEL WF COLUMN, S.S.D. MITER BOARDS AT CORNER, TYP. 10 East 40th Street, New York, NY 10016 Tel 212 683 5631 Fax 212 481 3768 Email NY@harthowerton.com NEW YORK SAN FRANCISCO SCALE: DRAWING NO: CHECKED BY: PROJECT #: DRAWING TITLE: MILESTONES DATEISSUE 6/30/2022 7:46:56 AM 3" = 1'-0" NOT FOR CONSTRUCTION AD.6.0.1 Author Checker CORNER AND WALL TRANSITION DETAILS GENERAL VP2 -YELLOWSTONE CLUB VILLAGE PHASE 2 BIG SKY, MT 4/29/2022CUP SET 05/06/2022CD PROGRESS 6/30/2022CD BID SET 3" = 1'-0" 10 WALL PLAN TRANSITION -HORIZONTAL WOOD SIDING 45 DEGREE INSIDE CORNER DTL-A8-018 3" = 1'-0" 02 WALL PLAN TRANSITION -HORIZONTAL WOOD SIDING OUTSIDE CORNER DTL-A8-011 3" = 1'-0" 05 WALL PLAN TRANSITION -HORIZONTAL WOOD SIDING/ STONE INSIDE CORNER DTL-A8-008 3" = 1'-0" 04 WALL PLAN TRANSITION -VERTICAL FIBER CEMENT SIDING OUTSIDE CORNER DTL-A8-011 3" = 1'-0" 01 WALL PLAN TRANSITION -STONE EXTERIOR CORNER DTL-A8-008 3" = 1'-0" 06 WALL PLAN TRANSITION -HORIZONTAL WOOD SIDING 90 DEGREE INSIDE CORNER DTL-A8-011 3" = 1'-0" 14 CHAMFERED CORNER TIMBER WRAP STEEL COLUMN PLAN DETAIL 3" = 1'-0" 15 TIMBER WRAP STEEL COLUMN PLAN DETAIL 3" = 1'-0" 16 WOOD PILASTER AT WALL CORNER PLAN DETAIL 3" = 1'-0" 03 WALL PLAN TRANSITION -VERTICAL REVERSE BOARD AND BATTEN SIDING OUTSIDE CORNER DTL-A8-011 3" = 1'-0" 07 WALL PLAN TRANSITION -VERTICAL REVERSE BOARD AND BATTEN SIDING INSIDE CORNER DTL-A8-011 3" = 1'-0" 11 WALL PLAN TRANSITION -HORIZONTAL TO VERTICAL WOOD SIDING AT CORNER DTL-A8-011 3" = 1'-0" 09 WALL PLAN TRANSITION -VERTICAL WOOD SIDING/ STONE INSIDE CORNER DTL-A8-008 3" = 1'-0" 12 WALL PLAN TRANSITION -HORIZONTAL TO VERTICAL SIDING ACUTE ANGLE INSIDE CORNER DTL-A8-018 3" = 1'-0" 17 QUAD WOOD POST CORNER DETAIL 3" = 1'-0" 19 TIMBER WRAP STEEL COLUMN TYPE 2 REVISIONS NO.DATEISSUE PROJECT NAME & INFORMATION WITHHELD PER OWNER CONFIDENTIALITY AGREEMENT 338" RECREATION BEDROOM SUITE BUNK BEDROOM WELLNESS FLEX TERRACE TERRACE BATH BATH BATH SUITE PWDR BATH SUITE BATH 53' - 8" 453 YELLOWSTONE CLUB Big Sky, Montana October 25, 2021 LIMITED COMMON ELEMENT NOTE: GROSS INTERIOR SQUARE FOOTAGE IS MEASURED TO THE OUTSIDE FACE OF EXTERIOR WALL STRUCTURE SUCH AS SHEATHING OR CONCRETE, OTHE OUTSIDE FACE OF FULL-HEIGHT GLAZING, AND TO THE CENTER LINE OF INTERIOR DEMISING WALL ASSEMBLIES INCLUDING EMBEDDED STRUCTURAL ELEMENTS. GROSS EXTERIOR SQUARE FOOTAGE IS MEASURED TO THE CENTER LINE OF GUARDRAIL ELEMENTS, AND TO THE EXTERIOR FACE OF ALL OTHER ELEMENTS INCLUDING WALLS, COLUMNS, AND FULL-HEIGHT GLAZING. CONDO 5-202 (L) 3 BEDROOMS 5 BATHROOMS + 1 POWDER ROOM INT: 3,792 SF EXT: 1,460 SF RESIDENCE AREA Project Name and Information withheld per Owner Confidentiality Agreement 395" 377" GRAND GREAT ROOM ROOM KITCHEN OWNER'S BEDROOM BEDROOM FLEX OWNER'S BATH BATH BATH TERRACE 27' - 10" BUTLER'S BATH POWDER 27'- 10" 51' - 10" 22 - 4 YELLOWSTONE CLUB Big Sky, Montana October 25, 2021 LIMITED COMMON ELEMENT NOTE: GROSS INTERIOR SQUARE FOOTAGE IS MEASURED TO THE OUTSIDE FACE OF EXTERIOR WALL STRUCTURE SUCH AS SHEATHING OR CONCRETE, TOTHE OUTSIDE FACE OF FULL-HEIGHT GLAZING, AND TO THE CENTER LINE OF INTERIOR DEMISING WALL ASSEMBLIES INCLUDING EMBEDDED STRUCTURAL ELEMENTS. GROSS EXTERIOR SQUARE FOOTAGE IS MEASURED TO THE CENTER LINE OF GUARDRAIL ELEMENTS, AND TO THE EXTERIOR FACE OF ALL OTHER ELEMENTS INCLUDING WALLS, COLUMNS, AND FULL-HEIGHT GLAZING. CONDO 5-202 (U) 4 BEDROOMS 5 BATHROOMS + 2 POWDER ROOM INT: 5,349 SF EXT: 1,285 SF
Project Name and Information withheld per Owner
Agreement 16
RESIDENCE AREA
Confidentiality
03 17

24-story Residential Building

[PROJECT SCOPE] Developed CD set for new 24-story building with 297 apartment units, restaurant space, pool deck and amenities level, and 7 parking levels with 524 parking spaces.

[LOCATION] City of Hallandale, Florida [SOFTWARE] AutoCAD [TIMELINE] Spring 2015 [ROLE] Junior Architect

Gulfstream
LEVEL 25 POOL DECK LEVEL 24 APARTMENT 15 LEVEL 23 APARTMENT 14 LEVEL 22 APARTMENT 13 LEVEL 21 APARTMENT 12 6 A8.01 6 A8.01 6 A8.01 6 A8.01 10 A8.02 WALL SECTION 1 1A 18 LEVEL 25 POOL DECK LEVEL 24 APARTMENT 15 LEVEL 23 APARTMENT 14 LEVEL 26 MECHANICAL LEVEL 27 TOP OF ROOF SECTION 100 South Biscayne Blvd, Suite 1020 Miami, Florida 33131 Moshe Cosicher Architect, AIA AR# 0006849 COSICHER Florida East Coast Realty, Inc. Description Date No. STEVEN FELLER P.E., PL MIAMI, FLORIDA 33131 25 SE 2nd AVENUE, SUITE 428 T. 305.377.8850 100 SOUTH BISCAYNE BLVD., SUITE 900 MIAMI, FLORIDA 33131 T. 305.358.7710 SAMUEL N. NIFAH, P.E. 8785 SW 165th AVE, SUITE #108 TEL. (305) 386-1002 FAX. (305) 386-3907 918 SOUTH FEDERAL HIGHWAY CITY OF HALLANDALE BEACH, FLORIDA 33009 PERMIT SET | 12.07.15 1
04 19

Stadium Park

Residential Stadium Adaptive Reuse Competition

[PROJECT SCOPE] Competition for an adaptive World Cup stadium that could be used (or transformed over time) as a residential building.

[LOCATION] Brooklyn, New York, NY [TIMELINE] November 2018 [SOFTWARE] AutoCAD, Rhino, 3DS Max, Vray [ROLE] Contestant with my co-worker Juan Lozano at FONS D&A LLC Conceptualized, designed, and developed drawings for the competition board.

Finalist 20
Archstorming Design Competition
21

//STUDENT WORK

2 22
23 05

[PROJECT SCOPE] Redesign of Brickell Metro Station in Miami and Masterplan of space around/under station as part of the Underline.

[LOCATION] Miami, Florida [ACADEMIC] 4th Year UM SoA // Prof. Jacob Brillhart [YEAR] Spring 2015 [GROUP PROJECT] With teammates Sophie Juneau and Sofia Menezes

24
Metro Station Offices & Retail Expansion + Underline Linear Park Section
HAMAC
25
26
27
28
29

//FABRICATION

30

Models and Furniture

33
34

SUKAH

Design and Build competition

Competition Commemorating Jewish Sukkot Holliday

01 37
35 07

University of Miami Design and Build Sukkah Competition 1st Place Winner

38
36
37

//ILLUSTRATIONS

38

Drawings

Architectural drawings and sketches from University courses and travel abroad experiences

01
43 39 08
44 40
45 SKETCHES FROM JAPAN 41
46 SKETCHES FROM ROME,
42
ITALY

Drawings

Architecturalhand-draftedandcomputer-drafted drawings

47 02
Drafted
43 09
48 44

Paintings and Illustrations

Non-architectural

43 10
44

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Kamilah Acebal-Acevedo Architecture Portfolio - 2023 by Kamilah Acebal - Issuu