JULIAN SNIDER
four work samples
four work samples
2014-2020
Interior Renovation (with Makeshift Collective)
julianchusnider.com/portfolio/makeshiftstudio
wemakeshift.com
@makeshiftcollective
How does one build a community?
This narrative cross section describes a community that calls itself Makeshift --a collective in the truest sense: a self-organized cross-pollination of disciplines that shares resources, space, and knowledge in order to enable each other’s creative pursuits. Wherever and whenever possible, we collaborate on projects, using our shared studio as a laboratory for creative experiments.
In 2016 my partners Alex, Nam, and I acquired a permanent studio space for Makeshift, renovating, re-branding, and incorporating as Makeshift Studio Inc. Each of us took ownership over one domain of the community, laying the foundations for it to grow as others joined the effort. I led the renovation of the studio space, with special attention focused on building an addition to house our woodshop and assembly room, which included engineering and fabricating a custom glulam beam made from salvaged old-growth studs found in a demolished interior wall.
With the spaces built out and the resources in place, the rest of the studio took shape as people received training and confidence in their ability to occupy and outfit their own individual corners of the studio.
In 2020, Makeshift had to say goodbye to its beloved studio space. Its community, however, remains strong in the Toronto arts scene, with many members going on to form their own artist collectives and shared studio spaces. ...
2020 - Ongoing BDP Quadrangle julianchusnider.com/portfolio/balliol
235 Balliol is a 27-storey purpose-built rental building in midtown Toronto. The existing site contains two storeys of underground parking with a 26-storey 1960’s era apartment building on the eastern half of the site. The proposed intervention retains the existing building, while demolishing half of the underground parking structure and infilling with the new tower.
Balliol Steet is situated in a rapidly densifying residential neighbourhood with mature trees, walkable streets, and transit connectivity. The proposed development underwent rigorous community consultation, resulting in unique programmatic components such as a daycare, increased amenity spaces, and an accessible mid-block pedestrian connection designed to accommodate large plantings and public art.
235 Balliol is currently under construction with expected completion in 2024.
SEALANT AND BACKER ROD. PROVIDE WEEP HOLES FOR DRAINAGE, TYP.
LAP AB MEMBRANE OVER PREFINISHED METAL FLASHING, TYP.
* RUN ELECTRICAL CABLES THROUGH HOLLOW HSS, SEAL OPENINGS AS REQ'D
LAMINATED TEMPERED STRUCTURAL GLAZING, TYP SEALANT, TYP
STAINLESS STEEL POINT CONNECTION PART W/ NEOPRENE WASHER, TYP
203x201 HSS OUTRIGGER, TYP (REF STRUCTURE)
SEAL AROUND ALL EVELOPE PENETRATIONS, TYP
CAPPED AND SEALED, TYP
5 A632 SCALE: 1 : 10
STRUCTURAL FRAMING TO SUPPORT PRECAST PANELS BELOW (REF STRUCTURE)
305x203 HSS w/ SPRAYED INSULATION (REF STRUCTURE)
SPRAY
FOAM INSULATION,
F5b WINDOW SILL AND WALL BASEBOARD AS SPECIFIED, TYP. SEALANT AND BACKER ROD, TYP. SPRAY FOAM INSULATION, TYP.
SLIDE-IN ALUMINUM BRACKET FOR CURTAIN WALL MULLION ATTACHMENT TO STEEL FRAME. ISOLATE DISSIMILAR METALS, TYP. 25 16mm GYPSUM BOARD TYPE "X" ON 92mm STEEL STUD FRAMING. FILL CAVITY W/ SPRAY FOAM INSULATION AROUND HSS GIRT INSULATED RWL PIPE INTO BRAKE FORM ALUMINUM ENCLOSURE BEYOND
WINDOW WALL SYSTEM METAL SPANDREL W/ INSULATED GALV. METAL BACK PAN (VB)
LAP AB/VB TRANSITION MEMBRANE OVER SLAB AND PRECAST PANEL AND SEAL, TYP.
CONT. POLISHED MARINE GRADE STAINLESS STEEL TROUGH W/ DOUBLE BOTTOM SLOPED AS REQUIRED AND DRAINED AT SCUPPER DRAINS. SECURE TROUGH TO GALV. Z-GIRTS AND ISOLATE DISSIMILAR METALS. C/W HEAT TRACING CABLE. LINE INSIDE OF TROUGH WITH WATERPROOFING MEMBRANE, TYP.
PRECAST CONNECTORS BY PRECAST SUPPLIER,
CONTINUOUS DRIP EDGE
INSULATED RWL PIPE. WRAP PIPE WITH TYPICAL PIPE INSULATION SLEEVE. C/W INTEGRATED VAPOUR BARRIER, TYP.
SEALANT AND BACKER ROD W/ WEEP HOLES FOR DRAINAGE, TYP.
PREFINISHED METAL FLASHING W/ DRIP EDGE, TYP.
R5
SLOPE
THIN BRICK EMBEDDED PRECAST PANEL W/ RIGID INSULATION (WEIGHT RELIEF)
AB/VB
MEMBRANE OVER VB MEMBRANE, TYP.
SEALANT AND BACKER ROD, TYP.
CONTINUOUS DRIP EDGE,
TYP.
STAIN U/S OF PRECAST PANEL TO MATCH THIN BRICK COLOR
PREFINISHED METAL FLASHING W/ DRIP EDGE, TYP.
2 8%
SEALANT
25 CP 25mm STEEL SUPPORT POST WELDED TO STEEL ANGLE 127mm x 127mm x 9mm STEEL ANGLE CASTED IN CONCRETE PARKING 100 100 PARKING LEVEL P2 MPH MEZZANINE 238.42 ELEVATOR OVERRUN CS B4 4A EXTERIOR 120 A632 SCALE: 1 : 10
SEALANT, TYP. 25
PROTECTION BOARD OVER WATERPROOFING MEMBRANE, TYP.
50mm RIGID INSULATION
INFILL
FOAM
INSULATION 50 474 127 375
SEALANT AND BACKER ROD, TYP.
CONTINUOUS DRIP EDGE
ASPHALT IMPREGNATED PRECOMPRESSED FOAM JOINT SEAL SLOPE
CONT. POLISHED MARINE GRADE STAINLESS STEEL TROUGH W/ DOUBLE BOTTOM SLOPED AS REQUIRED AND DRAINED AT SCUPPER DRAINS. SECURE TROUGH TO GALV. Z-GIRTS AND ISOLATE DISSIMILAR METALS. C/W HEAT TRACING CABLE. LINE INSIDE OF TROUGH WITH WATERPROOFING MEMBRANE, TYP.
ROOT PROTECTION BARRIER AS REQUIRED, TYP.
203x102mm HSS OUTRIGGER PAINTED TO MATCH MT-1. FILL HSS WITH SPRAY FOAM INSULATION AND CAP OPENING OF HSS OUTRIGGERS. ROUTE WIRING FOR ELECTRICAL COMPONENTS THROUGH HSS CAVITY BEFORE SPRAY FOAM APPLICATION, TYP.
50mm RIGID INSULATION OVER WATERPROOFING MEMBRANE, TYP. SLOPE
STAINLESS STEEL POINT CONNECTION PART WITH NEOPRENE WASHER, TYP.
LAMINATED TEMPERED STRUCTURAL GLAZING, TYP.
SEALANT AND BACKER ROD. PROVIDE WEEP HOLES FOR DRAINAGE, TYP.
CONCRETE WALL DOWLS FOR SECONDARY PLANTER WALL POUR. WATERPROOFING MEMBRANE TO WRAP AND SEAL AROUND REINFORCING, TYP.
LAP AB MEMBRANE OVER PREFINISHED METAL FLASHING, TYP.
6 CL6 GROUND FLOOR 150.15 ESTABLISHED GRADE 149.67 PB 6D MEETING ROOM PEDESTRIAN RAMP SEALANT AND BACKER ROD, TYP. CONTINUOUS DRIP EDGE CURTAIN WALL SYSTEM -VISION GLASS VERTICAL PRECAST FIN BEYOND C 15050 350 125 100 100 125200 75 PLANTER CONCRETE COLUMN BEYOND PARKING LEVEL 1 375 25 130 250 34 CONCRETE COLUMN BEYOND WEEP HOLES FOR DRAINAGE
A632 SCALE: 1 : 10 Ground Floor Precast Top at Glass Canopy 4
2014 - 2019
Interior Renovation julianchusnider.com/home/microloft
This series of projects explores the use of the bed as an architectural space-maker. Each project solves similar urban constraints: small existing bedroom or apartment, no closet, inconvenient entry door location, and unidirectional natural light. Each project employs differing variations of three main themes: lofted sleeping space, climbable closet, and framing the main entrance.
Using these spatial techniques turned small awkward rooms into dynamic spaces that take full advantage of ceiling height and creative use of light. In what used to be a room barely large enough for a twin bed, users found they were suddenly able to fit double or queen mattresses with ample space left for furniture, work space, closet space, and deep storage.
December 2018
Graduate Architectural Design Studio 5: Urban Loculi - Logistics of the Dead julianchusnider.com/portfolio/commongrave
Urban Loculi - Logistics of the Dead asked its students to critically examine the North American funeral and burial industry, its spatial, energy-consumptive, and socio-economic implications, and to propose an intervention that encourages a practical and cultural shift in the way we perceive, process, and reconcile death as a society.
Common Grave is a 100-storey work of public art, a century-long sociological experiment, and a cultural beacon in response to the prompt described above. Each large sculptural pavilion contains the bodily remains of one month’s deaths as powder-form aggregate. Each floor of the tower contains the sculptural forms of one year’s deceased: 12 pavilions arranged in differing patterns. Visitors will identify the sculpture in which their deceased is entombed by month and year, further locating their name inscribed in the bronze node at the center of the pavilion.
view full portfolio at julianchusnider.com