Skip to main content

Jordan Barrett Portfolio 2026 ISSUU

Page 1

Part II: Merlin Grove, Beckenham, CURIO Architects, 2025

1

1

1

21007

21008

3D VIEW - FRONT PROPOSED

1 21009

I worked to model and draw the details for an extension and loft conversion on a small residential project.

2 USB

2

2

3D VIEW - REAR PROPOSED

2

0

1

0.2

0.4

0.6

1:20

S

SK002

ML

EQ EQ

2

SKY

1023

900

2

EQ

900

1145

2

900

2

1200

T TV

151

2

EQ

1200

2000

USB 2

1722

100

SD

2

1145

900

HD

EQ

EQ

18

EL

Kitchen/Dining 31 m²

2

1145

2

Kitchen/Dining

2 USB

1 m²

170

SKY

2

WC

EQ

EQ

2

EQ

Hall

EQ EQ

9 m²

60

1204

2

1 m²

2

EQ EQ

Hall Living

9 m²

Living

15 m²

15 m²

UP

1

Proposed_Level 00 Lighting Plan 1 : 50

120

WC EQ EQ

TV

EQ

2

EQ EQ

2

1145

2

31 m²

UP

2

Proposed_Level 00 Electrical Plan 1 : 50

25

13

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2.2

2.4m


Planning Notes

Part II: Glossop Road, South Croydon, CURIO Architects, 2025

2

• For planning purpose othe • All dimensio • Subject to S specification • Window mu mullion/ pati detail design • Site footprin mapping dat buildings is a

Planning Notes • For planning purposes, not for construction or any purpose other than planning application. • All dimensions are in millimetres unless otherwise noted. • Subject to Structural Engineers technical design and specification. • Window mullion/patio glazing arrangement window mullion/ patio glazing arrangement indicative subject to detail design. • Site footprint taken from combination of survey and OS mapping data. Any information relating to neigbouring buildings is approximate.

PROPOSED - 3D_FRONT

Glossop Road

Glossop Road 2 1

Planning Draft FIRST ISSUE

rev

description

revisions 2 1

Planning Draft FIRST ISSUE

rev

description

AG/NF JB/NF

14/08/25 06/08/25

This drawing is to be under The Copyright, purposes only. Figure All dimensions are to doubt, ASK.

revisions Status:

PLA

Status:

date

drawn / checked

PLANNING

This drawing is to be used for design intent only. This drawing is protected under The Copyright, Designs and Patents Act 1988. Scale for planning purposes only. Figured dimensions only are to be taken from this drawing. All dimensions are to be checked on site before any work is put in hand. If in doubt, ASK.

2

Existing_Block Plan 1 : 200

164-180 Union Street, SE1 0LH w:

www.curioarchitects.co.uk

e:

hello@curioarchitects.co.uk

Proposed_Block Plan 1 : 200

Planning Notes Client: purposes, RONNY • For planning notBRAZDIL for construction or any purpose other than planning application. • All dimensions are in millimetres unless otherwise noted. • Subject to Structural Engineers technical design and specification. Project: 36 GLOSSOP ROAD • Window mullion/patio glazing arrangement window SOUTH CROYDON mullion/ patio glazing arrangement indicative subject to detail design. • Site footprint taken from combination of survey and OS Title: 3D VIEWS mapping data. Any information relating to neigbouring EXISTING buildings is approximate.

25049-CA-ZZ-ZZ-M3-A-00000

PROPOSED - 3D_REAR

1

LI.205, The Print Rooms

a:

FRONT/ REAR

@ A1

Scale: Date:

AUG 2025

Job no:

Drawing no:

Drawn:

JB

Checked:

AG/NF

11.8 m²

Revision:

SK002 2

25049

0

Study

2m

4

6

8

10

12

14

16

18

20

22

24m

1:200

CA Model Reference:

1

I worked to model and produce plans for a loft conversion on a small residential project.

Client:

RONNY

Project:

36 GLO SOUTH

Title:

EXISTIN BLOCK

Scale:

1 : 200

Date:

AUG 20

Job no:

Drawing

25049

Bathroom 4.3 m²

WC 0.7 m²

Bathroom 5.0 m²

Eaves Storage

Boiler

11.5 m²

Bedroom 3 6.8 m²

Kitchen 11.3 m²

1

Proposed_South 1 : 50

2

Landing 12.3 m²

Proposed_East 1 : 50

Bedroom 2

Landing

11.3 m²

6.0 m²

Bedroom 6 8.6 m²

Dining Room 12.0 m²

Hallway 7.8 m²

Bedroom 5 8.9 m²

Bedroom 1 12.0 m²

1

Planning Draft

rev

description

AG/NF

14/08/25

drawn / checked

date

Reception Room

Status:

Bedroom 4

15.0 m²

revisions

4.0 m²

PLANNING

This drawing is to be used for design intent only. This drawing is protected under The Copyright, Designs and Patents Act 1988. Scale for planning purposes only. Figured dimensions only are to be taken from this drawing. All dimensions are to be checked on site before any work is put in hand. If in doubt, ASK.

a:

LI.205, The Print Rooms 164-180 Union Street, SE1 0LH

4

Proposed_West 1 : 50

Software: Revit 0

1:50

1m

2

3

4

5

6m

hello@curioarchitects.co.uk

Client:

RONNY BRAZDIL

Project:

36 GLOSSOP ROAD SOUTH CROYDON

Title:

GENERAL ARRANGEMENT ELEVATIONS PROPOSED

Scale:

1 : 50

Date:

AUG 2025

Job no:

Drawing no:

25049

@ A1

25049-CA-ZZ-ZZ-M3-A-00000

Proposed_North 1 : 50

www.curioarchitects.co.uk

e:

1

GA_Existing_Level 00 1 : 50

Software: Revit

2

GA_Existing_Level 01 1 : 50

3

GA_Existing_Level 2 1 : 50

0

Drawn:

JB

Checked:

AG/NF Revision:

05002 1

CA Model Reference:

3

w:

1:50

1m

2

3

4

5


Part Part II: LMU, Holloway, London, MCW Architects, 2023 2023 II: LMU, Holloway, Cambridge, MCW Architects, 2

1

3

4

5

6

7

8

9

10

Platform lift

UP

A1 LV Switch Room 17 m²

UP Dark Room (B&W) 37 m²

*

Dark Room (colour) 41 m²

*

C-30

1

Graphics / Illustration / Animation Studios 136 m²

C-6

7250

C-32

C-25

Ceramics Workshop 30 m²

C-2

C-23

P-12

P-12

P-12

P-06

P-05

P-04

W-5 3D-6

L-54

Letterpress workshop 41 m²

3D-26

L-55 L-56

L-14

L-57

L-59

Male WC 18 m²

P-17

P-18

Lift 5 m²

UPS 25 m²

Female WC 18 m²

Circulation 165 m² Additional Plant Space 6 m²

Comms. room 9 m²

P-11

P-09 L-61 L-22

3D-18

W-20

*

P-11

P-19

L-60

3D-17

W-11

C1

P-20

Acc. Toilet 3 m²

*

L-62

L-22

L-62

W-2

L-63 L-40

D1

P-23

W-23

L-44

3D-4

Wood / Metal Workshop 53 m²

W-9

Finishing Studio 45 m²

Cold Water Tank Room 12 m²

P-23

P-23

3

L-53

L-50

L-48

Circulation 4 m²

Cleaner's Store 2 m²

P-30 P-31

Print workshop 84 m² P-16

3D-5

W-15

7250

Photography wet room 16 m²

Circulation 165 m²

C-27

C-22

Photographic Studio 130 m²

7250

C-9

C-14 C-20

B1

2

DN

DN

P-23

P-22

Courtyard

4 7250

G BLOCK

J BLOCK

UP

2

2

1

Ceramics Workshop Equipment Schedule

3 C-2 C-6 C-9 C-14 C-20 C-22 L-50

L-48

L-53

C-23 C-25 C-27 C-30 C-32

C-30 L-54 C-6

Letterpress workshop 41 m²

L-44

HEALTH, SAFETY AND ENVIRONMENTAL INFORMATION

1. Do not scale from this drawing. 2. All dimensions are in millimetres unless otherwise stated. 3. This drawing to be read in conjunction with all relevant architectural, civil/structural, and services engineer's drawings and specifications.

1

5m

2

C-20

B1

C-22

C-23

L-59

Loose Furniture - Supplied and Installed by LMU

Notes: C-2 - It is assumed that the work is undertakenCeramics by a competent Contractor, whoC-9 is therefore aware of all generic risks associated with these works. Workshop - It is assumed that any maintenance work referred 30 m² to on this drawing is undertaken by competent, appropriately trained operatives in line with the Access & Maintenance Strategy. - These notes are to be read in conjunction with all relevant Residual Hazard Schedules and in particular Designer Residual Hazard Schedule

Date

Description

P01

31/08/2023

Stage 02 Issue

by contractor

L-62 L-22

Buildings outside the scope of works

L-22 L-62

L-40

Architecture

2

0150

0150

2

Bin store

3

4

5

6

Plant

BEUB-04

Break-out

Fine Art

IT

Product and Furniture Design

Textiles

Catering

Foundation

Library

Reception

Toilets

Circulation

Graphics and Illustration

Meeting Rooms

Seminar Rooms/Lecture Theatre

Unknown

Event/Exhibition space

Graphics, Illustration and Animation

Photography

7

8

Staff

BEUB-03

Storage

4

2

1 : 50

C-23

2

1

BELB-29

P-12

P-12

P-12

P-06

P-05

C-25 C-27 C-30 C-32

P-04 P-30

Workshop

P-04 P-05 P-06 P-07 P-09

P-31

3D-5

3D-6

BELB-30

Platform Lift

W-23

P-20

P-11

3D-4

Wood / Metal Workshop 53 m²

3D-26

W-9

P-19

P-18

P-11

W-11

C1

1050

880

960

NOTES:

Floor Mounted Floor Mounted Floor Mounted Floor Mounted

3300 920 630 1100

900 1830 900 900

1500 460 2070 630

•

Width

Drawn by

JB

3D-17

C1

P-09

Print workshop 84 m²

Dark Room (B&W) 37 m²

Photographic Studio 130 m²

W-20

P-23

BELB-18

Dark Room (colour) 41 m²

Checked by

HN

1140 640 600 780 560 495 495 710 880 420 580 600 1160 590 610 610 2800 2800 1015

*

MCW architects Oast House, Malting Cambridge CB3 Lane 9HF www.mcwarchitects.com

Purpose of issue

For Stage Approval Drawing No.

F2417-MCW-HC-00-DR-A-7210

Equipment Front Loading Kiln Top Loading Round Kiln Bench Rubber Melting Pot Pottery Wheel Plaster Whurler Twin Bowl Stainless Steel Sink Stainless Sink for Glazing Room Large Ceramics Bench Tall Cupboard 4 Door Lab Bench 2 Door Lab Bench

Bench / Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted

Width

Height

Depth

730 600 400 700 610 1500

1560 730 500 600 850 880

1060 600 400 1000 1050 600

Floor Mounted

1050

880

960

Floor Mounted Floor Mounted Floor Mounted Floor Mounted

3300 920 630 1100

900 1830 900 900

1500 460 2070 630

Equipment Drying Rack Drying Rack Drying Rack Screen Printing Table Vacuum Screen Bed Hand Table Large Plan Chest Large Plan Chest Small Plan Chest Small Plan Chest Small Plan Chest Etching Press Etching Press Etching Press Press Guillotine Small Print Table Small Print Table Small Print Table Small Print Table Large Print Table Washout Booth Washout Booth

Bench / Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted

1200 950 950 3350 1390

Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted

970 970 1020 1020 1020 1100 1370 1280 970 970 1800 1800 1800 1800 2800 670 670

Width

2290 2290 2290 800 2200

Height

1200 1200 1200 1200 1200 1290 1440 1350 1980 1240 1000 1000 1000 1000 1000 1820 1820

1700 1100 1000 1750 1960

Depth

1270 1270 690 690 690 1400 1500 1800 1830 755 900 900 900 900 900 1150 1150

P-23

P-22

D1

UP

D1

BELB-31

0150

4

3

Print Workshop Equipment Layout

NOTES:

Wood / Metal Workshop Equipment Layout 1 : 50

• •

1 : 50

•

Ceramics Workshop 30 m²

*

Photography wet room 16 m²

Circulation 165 m²

Notes

HEALTH AND SAFETY INFORMATION

1. 2.

Notes: • It is assumed that the work is undertaken by a competent Contractor, who is therefore aware of all generic risks associated with these works. • It is assumed that any maintenance work referred to on this drawing is undertaken by competent, appropriately trained operatives in line with the Access & Maintenance Strategy. • These notes are to be read in conjunction with Principal Designer and Principal Contractor information. • These notes are to be read in conjuction with MCW Designer Residual Hazard Schedule: • Listed below are 'site specific' risks relevant to this drawing:

3.

B1

Cleaner's Store 2 m²

Circulation 4 m²

Finishing Studio 45 m² Letterpress workshop 41 m²

Acc. Toilet 3 m²

Male WC 18 m²

Print workshop 84 m²

0

Lift 5 m²

UPS 25 m²

All dimensions are in millimetres unless otherwise stated. This drawing should be read in conjunction with all relevant architectural, civil/structural, and services engineer's drawings and specifications. Do not scale from this drawing.

0.5

2.5m

1

Comms. room 9 m²

DN

4°

6.45°

Additional Plant Space 6 m²

DN

WC

G BLOCK

J BLOCK

Date

Description

Drawn by

Checked by

London Metropolitan University

P01

31/08/2023

Stage 02 Issue

SR

HN

Project Title

Equipment - Supplied by LMU, installed by contractor

MCW architects Oast House, Malting Lane Cambridge CB3 9HF

AAD Relocation London

www.mcwarchitects.com

Drawing Title

Purpose of issue

Holloway - Workshop Equipment Layouts

8054

Scale @ A1

Date

1:50

31/08/2023

8274

For Stage Approval

Status

S4

Drawn by

Checked by

Drawing No.

Rev

SR

HN

F2417-MCW-HC-00-DR-A-7250

P01

Fine Art Storage

Open-plan office

Staff Office

35500

Staff Office

Meeting Room

01_FFL 32760

81A Ground Floor

EXISTING COURTYARD

Holloway Road Campus Block G

Client

Revision

RF1

28726

D1

Loose Furniture - Supplied and Installed by LMU

AHU / Heating plantroom

Wood / Metal Workshop 53 m²

Cold Water Tank Room 12 m²

Fixed Furniture and Fixtures - Supplied and Installed by Contractor

Equipment dimensions and information based on schedules received from LMU Drawings to be read in conjuntion with F2417-MCW-ZZ-ZZ-SH-A-0100 F2417-MCW-ZZ-ZZ-SH-A-0108 Proposed equipment and layouts subject to final approval from LMU Photography department equipment and layout to be confirmed with LMU at stage 3

Circulation

Female WC 18 m²

C1

Software: Revit 9.

Height

Equipment dimensions and information based on s from LMU Drawings to be read in conjuntion with F2417-MCW F2417-MCW-ZZ-ZZ-SH-A-0108 Proposed equipment and layouts subject to final ap Photography department equipment and layout to b Depth LMU at stage 3

W-2

Graphics / Illustration / Animation Studios 136 m²

ATRIUM

0151

•

P-23

1

Wood / Metal Workshop 53 m²

•

3D-18

UP

884

LV Switch Room 17 m²

1

1090 500 1150 800 1320 920 920 70 995 865 450 1150 970 710 745 745 1000 1000 675

Depth

1060 600 400 1000 1050 600

P-23

A1

P-17

Mark

P-11 P-11 P-12 P-12 P-12 P-16 P-17 P-18 P-19 P-20 P-23 P-23 P-23 P-23 P-22 P-30 P-31

W-15

UP

Height

Print Workshop Equipment Schedule

9 10

Floor Mounted

1560 730 500 600 850 880

Wood/Metal Workshop Equipment Schedule

Letterpress Workshop Equipment Layout

B1

Width

Equipment Bench / Floor Mounted Letter Press Floor Mounted 1940 Nipping Press Bench Mounted 460 Proofing Press Floor Mounted 1100 Client Plan Chest Floor Mounted 970 CheckedType by Cabinet Floor Mounted London Metropolitan University 880 Galley Rack Floor Mounted 675 HN Galley Project Rack Title Floor Mounted 675 Stone AAD Relocation Floor Mounted 1020 Furniture Rack Floor Mounted 350 London Furniture Rack Floor Mounted 260 Drawing Leading Rack Title Floor Mounted 250 Galley Holloway Press Floor Mounted - FF&E Ground Floor 870 Lifting Platform Floor Mounted 500 Chase Rack Floor Mounted 495 Scale at A1 Date Drying Rack Floor Mounted 495 Chest of Drawers@ A1 Floor Mounted 1:100 31/08/2023 495 Large Print Table Floor Mounted 900 Large Print Table Floor Mounted 900 Chest of Drawers Floor Mounted 505

Mark

5

730 600 400 700 610 1500

Mark

C-2 C-6 C-9 C-14 C-20 C-22

W-5

1

3

Interiors

L-63

D1

1 : 50

P-16

External yard

Fashion

Ceramics Workshop Equipment Layout

P-07

Cycle store

1

L-60

L-61

New partitions and walls

C-14below are 'site specific' risk relevant to this drawing: - Listed

By Department Legend

L-14 L-40 L-44 L-48 Drawn by L-50 L-53 JB L-53 L-54 L-55 L-56 L-57 L-59 L-60 L-61 L-62 L-62 L-22 L-22 L-63

L-57

Revision

C1 Equipment - Supplied by LMU, installed

C-27

0

Fixed Furniture and Fixtures - Supplied and Installed by Contractor

Bench / Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted Floor Mounted

Letterpress Workshop Equipment Schedule

L-56 L-14

C-32

Notes

Equipment Front Loading Kiln Top Loading Round Kiln Bench Rubber Melting Pot Pottery Wheel Plaster Whurler Twin Bowl Stainless Steel Sink Stainless Sink for Glazing Room Large Ceramics Bench Tall Cupboard 4 Door Lab Bench 2 Door Lab Bench

L-55

L-53 C-25

Holloway Campus on Benwell Road required serious retrofit changes. The roof height on the main building was raised accommodating a new floor that would be used for art school facilities.

Mark

Software: SectionRevit DD 10. 1 1 : 100

Letterpress workshop

Print workshop

Finishing Studio

Male WC

Female WC

Comms. room

Additional Plant Space

Circulation

G BLOCK

00_FFL 29690


Part II: II: LMU, MCW Architects, 2023 Part ARU,Accelerator, Cambridge,London, MCW Architects, 2024

CO R1 FFL

CO R1 FFL

32615

32615 EWD.Cos 403B

EWD.Cos 405D

EWD.Cos 403A

EWD.Cos 405C

EWD.Cos 406B

EWD.Cos 406A

CO 04 FFL

CO 04 FFL

29035

29035 EWD.Cos 306B

EWD.Cos 306A

EWD.Cos 305

EWD.Cos 314F

EWD.Cos 314E

EWD.Cos 314D

EWD.Cos 315C

EWD.Cos 315B

MD R1 FFL

EWD.Cos 315A

27410

CO 03 FFL

CO 03 FFL

25610

25610 EWD.Cos 205B

EWD.Cos 205A

EWD.Cos 204

EWD.Cos 101H

EWD.Cos 101G

EWD.Cos 101F

EWD.Cos 214

EWD.Cos 213

EWD.Cos 107B

EWD.Cos 107A

EWD.Cos 212

EWD.Cos 216A

EWD.Cos 217A

EWD.Cos 218

EWD.Cos 108C

EWD.Cos 108B

EWD.Cos 108A

CO 02 FFL

CO 02 FFL

22185

22170 EWD.Cos 101E

EWD.Cos 106

CO 01 FFL

CO 01 FFL

18760

18760

Cemetery Wall

Allow for proprietary framed composite panel external walling system, finishes to match adjacent; Details TBC

Allow for proprietary framed composite panel external walling system, finishes to match adjacent; Details TBC

AH

AH

CO 00 FFL 14790

Existing

Existing

Existing

AH

AH

AH

Existing

EXD.MD 097

AH

1

Cemetery Wall

Mesh storage cage as B15/130

AH

CO 00 FFL DRI

New Metal Louvre NBS L10/650C

14790

Painted Steel Column

MD

External Envelope - East Elevation

Coslett Court

Ruskin Court

1 : 100

03

01

02

1

1

CO R1 FFL

CO R1 FFL

32615

CO R1 FFL

32615

Ruskin

2170

CO R1 FFL

32615

Coslett

1

2170

2170

CO R1 FFL

32615

CO R1 FFL

32615

32615

Refer to (35) set of drawings for ceiling details

Note: Notes

HEALTH AND SAFETY INFORMATION

1. 2.

Notes: • It is assumed that the work is undertaken by a competent Contractor, who is therefore aware of all generic risks associated with these works. • It is assumed that any maintenance work referred to on this drawing is undertaken by competent, appropriately trained operatives in line with the Access & Maintenance Strategy. • These notes are to be read in conjunction with Principal Designer and Principal Contractor information. • These notes are to be read in conjuction with MCW Designer Residual 3 Hazard Schedule:

3.

All dimensions are in millimetres unless otherwise stated. This drawing should be read in conjunction with all relevant architectural, civil/structural, and services engineer's drawings and specifications. Do not scale from this drawing.

CO 04 FFL 0

1

29035

5m

2

•

CO 04 FFL

Revision

Date

Description

Drawn by

Checked by

P01 P02

08/03/2024 15/03/2024

For Information For Tender

JB JB

CB CB

CO 04 FFL

29035

MD R1 FFL

MCW Oast House, Malting architects Cambridge CB3 Lane 9HF www.mcwarchitects.com

Project Title

ARU Creative Quarter - Contractor Anglia Ruskin University, East Rd, Cambridge CB1 1PT

Please refer to (21) series plans and details for external wall build-ups. Please refer to (21) series elevations for cladding panel types. Please refer to (31) series drawings and schedules for external doors and windows.

External Wall Types: Status EXW-01

Scale

Date

Drawn by

Checked by

Drawing No.

1:100

15/03/2024

JB

CB

50CB02-MCW-21-ZZZZ-D-A-2122

MD R1 FFL

MD R1 FFL

27410

27410

27410

Fire cavity barrier around all openings. Detail to be developed at Stage 04

Purpose of issue CO 04 FFL For Tender 29035

CO 04 FFL External Envelope East Elevation - Coslett & Media Building 29035

29035

Listed below are 'site specific' risks relevant to 2170 this drawing:

Refer to M&E information for heating and cooling details

Morgan Sindall

Drawing Title

CO 04 FFL

29035

Client

Concrete wall as structural engineer's documentation with Rev rainscreen system over as section H92

P02

EXW-02 Insulated SFS to specialist design with rainscreen system over as section H92 (variant with cladding as H31/115) EXW-04 Brick wall as F10/110 EXW-05

4

Existing and/or new masonry with cladding system over as section H92

2170

CO 03 FFL

CO 03 FFL

25610

CO 03 FFL

25610

CO 03 FFL

25610

CO 03 FFL

25610

CO 03 FFL

25610

25610

Curtain Walling Types: CWS-01 H11/111 Timber system, 175mm box CWS-02 H11/110A Aluminium system, 105mm box CWS-03 H11/110

1

Aluminium system, 150mm box

2171

CO 02 FFL

CO 02 FFL

CO 02 FFL

22185

CO 02 FFL

CO 02 FFL

22185

22170

CO 02 FFL

22185

22170

CWS-04 H11/110

22170

Aluminium system, 175mm box CWS-05 H11/110 Aluminium system, 125mm box Acoustic glazing and mullion/transom inserts

350

340

CO 01 FFL

CO 01 FFL

18760

CO 01 FFL

18760

CO 01 FFL

18760

CO 01 FFL

18760

CO 01 FFL

18760

18760

Existing Masonry Wall

Anglia Ruskin University or ARU creative quarter contains a Ruskin Building, Coslett Building and a proposed a Media Building extension. These construction details, elevations and strip sections show work that I worked on to the external envelope. The Coslett building was to be retrofitted and the Media building is an extension New Build. Co-A

Continuous purpose made bent metal capping and fixing system as H92/110 to extent of parapet, allowing for intermittent concrete piers at base of steel posts

200

Co-A

1 : 10

Typical Stair Curtain Wall Section Detail

1

3

1 : 10

SW timber framed step with painted timber tread and riser

CO R1 FFL

JB

CB

Vapour control layer to be continued along underside of roof deck and terminated at inner skin to external wall

Client

Morgan Sindall Project Title

ARU Creative Quarter - Contractor Anglia Ruskin University, East Rd, Cambridge CB1 1PT

Strip Sections - Coslett 3

Min. 150

Continuous concealed purpose steel up and membrane to bemade continued box gutter as R10/112 to front of roof, stainless terminated overedge continuous to discharge into concealed downpipethreshold within steel angle waterbar picture window cheeks

Scale

Date

1:50

13/03/2024

Insulated SW timber framed upstand at

Drawing No.

Rev

CB

50CB02-MCW-21-CBZZ-D-A-2132

P01

Co-M

Panel flanges overlapped and mechanical fixed through; Setting out to be coordinated prior to installation

Panel flanges overlapped and mechanical fixed through; Setting out to be coordinated prior to installation

Sheathing board and breather membrane continued behind curtain walling zone terminating behind internal linings

Curtain walling system as H11/110

Typical panel joint detail (horizontal/vertical, triangular profile)

Panel flange cut to suit

Metal framed inner skin to specialist design

Roof Plant Room Threshold Section Detail

Checked by

Typical external corner detail (horizontal, triangular profile)

Framed inner skin to be continued into interior of building to extents shown on proposed plans, allowing for additional linings and finishes to stair side

Metal framed inner skin existing structural roof deck Assumed Glazing unit substituted for to specialist design thermally insulating composite infill panel at glazing line, allowing for external finish to match mullion Curtain walling system as H11/110A

engineer's documentation

Panel flange cut to suit

EPDM Typical external corner detail (vertical, square profile)

Black insect mesh

Rainscreen cladding system outer skin as H92/111

Typical panel joint detail (vertical, square profile)

1 : 10

Box Window Roof Section Detail

Cladding & Glazing Internal Corner Plan Detail

5

1 : 10

6

1 : 10

Co-01 Typical Profiled Cladding Plan Details

1 : 10

Continuous purpose made bent metal reveal trim as H92/112

MD R1 FFL

Concrete floor slab; Refer to structural engineer’s documentation

Rainscreen cladding system External ground build-up returned into outer skin as H92/113 reveals and terminated at door threshold

CO 00 FFL

27410

CO 00 FFL

14790

CO 00 FFL

Metal framed inner skin to specialist design

14790

Black insect mesh

Floor finishes; Refer to floor finishes drawings

Brick plinth return to door reveal as F10/385

Concrete floor slab; Refer to structural engineer’s documentation

Rainscreen cladding system outer skin as H92/112

Structural concrete walls; Refer to structural engineer's documentation

Face of rainscreen cladding system beyond as H92/112

EPDM Floor finishes; Refer to floor finishes drawings

Lift pit

Interior

Indicates shaftwall partition; Refer to internal partitions drawings

25610

Screed to provide falls to top of roof deck Concrete external walls and roof deck; Refer to structural engineer's documentation

Min. 1no. layer of linings to be continuous 25610past stair landing

Below ground insulation as E20/200 to extent of new floor slab toBlack be continued compressible movement joint around foundation and terminated below and gap filler between edge of landing and internal face of external wall ground level

250

Continuous horizontal 200x50 section aluminium fin detail as part of cladding system H92/110

4

1 : 10

4

1 : 10

Typical Door Threshold Section Detail

6

1 : 10

HEALTH AND SAFETY INFORMATION

1. 2.

Notes: • It is assumed that the work is undertaken by a competent Contractor, who is therefore aware of all generic risks associated with these works. • It is assumed that any maintenance work referred to on this drawing is undertaken by competent, appropriately trained operatives in line with the Access & Maintenance Strategy. • These notes are to be read in conjunction with Principal Designer and Principal Contractor information. • These notes are to be read in conjuction with MCW Designer Residual Hazard Schedule: • Listed below are 'site specific' risks relevant to this drawing:

3.

All dimensions are in millimetres unless otherwise stated. This drawing should be read in conjunction with all relevant architectural, civil/structural, and services engineer's drawings and specifications. Do not scale from this drawing.

0 Notes

HEALTH AND SAFETY INFORMATION

1. 2.

Notes: • It is assumed that the work is undertaken by a competent Contractor, who is therefore aware of all generic risks associated with these works. • It is assumed that any maintenance work referred to on this drawing is undertaken by competent, appropriately trained operatives in line with the Access & Maintenance Strategy. • These notes are to be read in conjunction with Principal Designer and Principal Contractor information. • These notes are to be read in conjuction with MCW Designer Residual Hazard Schedule: • Listed below are 'site specific' risks relevant to this drawing:

Legend Waterproofing / damp proofing Breather membrane Air tightness line / vapour control layer

0.1

0.2

0.5m

Revision

Date

Description

Drawn by

Checked by

P01

15/03/2024

For Tender

KH

CB

Metal framed inner skin to specialist design to be continuous behind both cladding systems

Standing seam

Continuous flexible mineral wool CO 01 FFL insulation within concealed void

18760

Cavity fire barrier as P10/432 at floor slab level Rainscreen cladding system outer skin as H92/120

Below ground waterproofing as J30 and J40 to extent of new floor slab, to be continued around foundation and terminated over Concrete floor slab; Refer concrete perimeter upstand to structural engineer’s

Metal framed inner skin to specialist design

Steel column, allow for profile to be fully insulated with flexible quilt internally on site; Refer to structural engineer’s documentation

+ + + + + +

1 : 10

Typical Brick Plinth Section Detail 1 : 10

1 : 10

Drawn by

Checked by

P01

15/03/2024

For Tender

KH

CB

Notes

3.

All dimensions are in millimetres unless otherwise stated. This drawing should be read in conjunction with all relevant architectural, civil/structural, and services engineer's drawings and specifications. Do not scale from this drawing.

Morgan Sindall

ARU Creative Quarter - Contractor Anglia Ruskin University, East Rd, Cambridge CB1 1PT HEALTH AND SAFETY INFORMATION

1:10 MCW architects 0 0.1 Oast House, Malting Lane 0.2 Cambridge CB3 9HF

Project Title

ARU Creative Quarter - Contractor Anglia Ruskin University, East Rd, Cambridge CB1 1PT Purpose of issue

External Envelope Details - Media Sheet 1 Date

Drawn by

•

www.m mcwarchitects.com

Drawing Title

Status

For Tender Checked by

Drawing No.

• •

0.5m

Rev

It is assumed that any maintenance work referred to on this drawing is undertaken by competent, appropriately trainedDrawn operatives Date by in line with the Access & Maintenance Strategy. These notes are to be read in conjunction with KH Principal Designer and 15/03/2024 Principal Contractor information. These notes are to be read in conjuction with MCW Designer Residual Hazard Schedule: Listed below are 'site specific' risks relevant to this drawing:

For Tender

Checked by

CB

Breather membrane

P01

Date

Status

15/03/2024

Drawing No.

Rev

50CB02-MCW-21-CBZZ-D-A-2173

P01

Air tightness line / vapour control layer

Box Window RWP Plan Detail 1 : 10

Co-01 Revision

Purpose of issue

Waterproofing / damp proofing

• It is assumed that the work is undertaken by a competent Contractor, External Envelope Details Sheet 4 with these works. who is therefore aware of -allCoslett generic risks associated

Scale

Morgan Sindall

Legend

Drawing Title Notes:

4

1 : 10

MCW Oast House, Malting architects Cambridge CB3 Lane 9HF www.mcwarchitects.com

Project Title

•

Box Window Cheek Plan Detail

3

Client

Concealed downpipe within picture window reveal flashings to discharge onto flat roof below; Dashed line indicates extent of continuous stainless steel box gutter above

Purpose made angled reveal flashings as H31/115 to perimeter of picture window opening

Curtain walling system as H11/111

Box Window Sill Section Detail

Description

Continuous flexible mineral wool insulation within concealed void

Continuous purpose made bent metal reveal trim as H92/120

Birch faced plywood sheet as P20/240 over SW timber battens screw fixed into underside of joists to form soffit with concealed service void behind

2 Software: Revit 12.

Date

Curtain walling system as H11/110A

EPDM

15mm floor finishes, refer to floor finishes drawing. 25mm resilient floor (T&G timber boarding over acoustic separation layer). 20mm OSB deck fixed down into floor joists. 150mm SW timber floor joists with 100mm acoustic quilt between. 25mm resilient bars fixed into underside of floor joists. 2no. layers 15mm acoustic plaster board.

Revision

1. 2.

Internal linings terminated against curtain walling frame

Sheathing board and breather membrane returned to glazing

Lift Pit Slab Abutment Section Detail

Client

Scale

Below ground waterproofing as J30 and J40 to extent of new lift pit and perimeter floor slab, to be terminated and lapped with existing adjacent floor slab

Timber floor build-up; Refer to NOTE 1

Build-up behind rainscreen cladding panels comprising breather membrane and outer insulation to be continous

Aluminium sheet, standing seam cladding system as H31/115 over metal framed inner skin substrate

Purpose made angled reveal flashings as H31/115 to perimeter of picture window opening

NOTE 1: Timber infill floor construction comprises the following build-up

Software: Revit Drawings produced in collaboration with the Senior Architecture Technologist at MCW Architects 11. Notes

Assumed existing concrete floor slab; Refer to structural engineer’s documentation

EDPM

documentation

Typical Stair External Wall Section Detail

2

Cavity behind brickwork to be fully filled with insulation leaving no voids CO 01 FFL Below ground insulation as E20/200 to 18760 extent of new floor slab to be continued around foundation and terminated below ground level, allowing to overlap with insulation to brick cavity insulation

250

Additional internal linings on SW timber battens to provide depth to suit mullion size

to floor finishes drawings

Refer to floor types and 14790 finishes drawings

Concrete foundations to perimeter of new floor slab; Refer to structural engineer’s documentation

Concrete foundations to perimeter of new floor slab; Refer to structural engineer’s documentation

Rainscreen cladding system outer skin as H92/112 to be terminated at underside of fin detail

Floor finishes continuous over

changing floor build-ups; Refer CO 00Floor FFLfinishes and screed;

back14790 to structure

Concrete lift pit; Refer to structural engineer’s documentation

Below ground waterproofing as J30 and J40 to extent of new floor slab, to be continued around foundation and terminated below external door threshold

Vertical 200x50 section aluminium fin detail as part of cladding system H92/110

Typical Parapet Section Detail

Below ground insulation as E20/200 to extent of new floor slab and lift pit

Black insect mesh Allow for continuous vertical stainless steel angle at termination of standing seam cladding

Brick plinth as F10/385 on thermally

Concrete internal perimeter slab to lift pit allowing for connection into existing adjacent; Refer to structural engineer’s documentation

Painted skirting

Thermally insulating block as03 P10/256 CO FFL

Curtain walling system as H11/110A

existing concrete upstand to existing floor structure

CO 00 FFLblock as P10/256 tied insulating

14790

Slot drain to extent of door opening

Dashed lines indicate return of external wall above (South elevation)

Rainscreen cladding system outer skin as H92/111

Cavity tray and DPC as F30/330 with perpend weep holes as F30/130 Indicates localised removal of

300

Cladding as H92/110 over external face of acoustic carrier panel

Status

Drawn by

JB

Hatch denotes rainscreen build-up behind

Air tightness line to be returned to curtain walling system and terminated at mullion

Internal linings and vapour control layer terminated against curtain walling frame

voids are fully filled with flexible mineral COwool R1insulation FFL leaving no voids Warm deck overal roofing system as J41/112 over existing roof covering; Refer to roof types drawings

MCW Oast House, Malting architects Cambridge CB3 Lane 9HF www.mcwarchitects.com

Purpose made corner piece with welded joint; Allow to be manufactured off site

Purpose made angled reveal flashings as abutment with external wall, ensuring all H31/110 to perimeter of picture window opening

EPDM

Panel flanges to be overlapped prior to mechanical fixing; Purposeout of issue Setting to be coordinated prior installation FortoTender

Drawing Title

Localised stud framing to support linings fully filled with flexible mineral wool insulation to fill void between internal linings and face of Min. 150mm waterproofing upstand to insulating panel

Joists

Door system as L20

Stainless steel support angle fixed into face of concrete

Lean mix concrete haunching

3.

Birch faced plywood sheet as P20/240 over SW timber battens screw fixed into underside of joists to form soffit with concealed service void behind

5

For Tender

Co-01

CO 03 FFL

All dimensions are in millimetres unless otherwise stated. This drawing should be read in conjunction with all relevant architectural, civil/structural, and services engineer's drawings and specifications. Do not scale from this drawing.

OSB Sheet roof deck over SW Blockwork upstand to form raised timber firrings fixedframed down into SW threshold on; Allow for metal timber joists; refer to structural inner skin to be built off top of blockwork

1

Existing and/or new stair landing

1

Insulated SW timber framed upstand at abutment with external wall, ensuring all voids are fully filled with flexible mineral wool insulation leaving no voids

1 : 10

Checked by

13/03/2024

Continuous flexible32615 mineral wool insulation within concealed void

Floor finishes and screed; Refer to 32615 floor types and finishes drawings

Lift Pit External Wall Section Detail

Drawn by

P01

be provided allowing for waterproofing

Denotes contrasting slip resistant nosing trim to steps

Concrete foundations and lift pit; Refer to structural engineer’s documentation

Description

Proprietary threshold trim with drip detail

Door system as L20 allowing for proprietary extended external threshold trim with drip detail

Floor build-up

Inverted insulated roofing system as J31/130 to be

5

1 : 10

SW timber kerb to form hard edge

Co-A

Typical Door Jamb Plan Detail

Date

Continuous stainless steel angle waterbar threshold

EPDM to depth of threshold upstand

Lift pit

1 : 50

Revision

Cavity fire barrier as P10/432

200

O/A concrete upstand 1110

Indicates gravel ballast

3

14790

Below ground insulation as E20/200 to be continued around foundation and lift pit and terminated below ground level, allowing to overlap with insulation to brick cavity insulation

Plywood sheet to outer cladding line with thin board insulation over fixed down into top of concrete and metal support angle; Allow for SW timber hard edge, to provide fixings for edge trim

External grade pre-finished cement protection board adhesively fixed over waterproofing system

Waterproofing upstand to be provided at concrete parapet upstand, allowing for insulation board and waterproofing membrane to be continued up and terminated over parapet

CO 00 FFL

Coslett North Elev. - Section 10

3

1 : 50

14790

Outer skin

Standing seam

Continuous purpose made bent metal reveal trim as H92/112

Below ground waterproofing as J30 and J40 to be continued around foundation and lift pit and terminated over concrete perimeter upstand

Typical Door Head Section Detail

Inner skin

Black insect mesh

100

Extent of concrete pier; Refer to structural engineer's documentation

25610

Coslett West Elev. - Section 09

Notes: • It is assumed that the work is undertaken by a competent Contractor, who is therefore aware of all generic risks associated with these works. • It is assumed that any maintenance work referred to on this drawing is undertaken by competent, appropriately trained operatives in line with the Access & Maintenance Strategy. • These notes are to be read in conjunction with Principal Designer and Principal Contractor information. Aluminium sheet, standing seam flat warm roofing • These notes are to be read in conjuction with MCW Designer Residual system over new timber deck as H31/110; Allow for Hazard Schedule: falls to be provided by bracketry as part of roof • Listed below are 'site specific' risks relevant to this drawing:

CO 00 FFL

14790

covering system, ensuring all voids are fully filled with flexible mineral wool insulation leaving no voids

Metal framed inner skin to specialist design

Cavity behind brickwork to be fully filled with insulation leaving no voids

Co-A

Existing and/or new stair landing

Rainscreen cladding system outer skin as H92/112

Door system as L20

CO 00 FFL

Black compressible movement joint between edge of landing and transom

O/A fin 3410

Steel base fixing on concrete pier; Refer to structural engineer's documentation

Cavity tray and DPC as F30/330 with perpend weep holes as F30/130

Curtain walling system as H11/110

O/A steel posts 1390

Intermittent steel posts on steel base fixing; Refer to structural engineer's documentation

Continuous purpose made bent metal reveal trim as H92/113

CO 03 FFL

29035

Continuous horizontal fixing rails on intermittent steel posts; Refer to structural engineer's documentation

Brick plinth as F10/385 on thermally insulating block as P10/256 tied back to structure

14790 CO 03 FFL 25610

CO 04 FFL

29035

EPDM

Door system as L20

Acoustic carrier panel fixed back into horizontal rails; Exposed to roof side

Concrete perimeter upstand to external walls; Refer to structural engineer's EPDM documentation

75

Cavity fire barrier as P10/432

Continuous purpose made bent metal reveal trim as H92/112

3. Do not scale from this drawing. metal reveal trim as H92/112

300

Cavity fire barrier as P10/432

2

CO 00 FFL

14790

HEALTH AND SAFETY INFORMATION

1. All dimensions are in millimetres unless otherwise stated. Metal framed inner skin 2. This drawing should be read in conjunction with all relevant architectural, to Continuous specialist design and services engineer's drawings and specifications. purpose madecivil/structural, bent

Black insect mesh

CO 00 FFL

1479014790

1 : 50

Notes

Rainscreen cladding system outer skin as H92/120

Secondary steel; Refer to structural engineer’s documentation

14790

Eq.

Metal framed inner skin to specialist design

EPDM

Continuous purpose made bent metal capping and fixing system as H92/110 to extent of acoustic screen and support rails

CO 04 FFL

Concrete external walls; Refer to structural engineer's documentation

CO 00CO FFL 00 FFL

Coslett West Elev. - Section 08

1

Rainscreen cladding system outer skin as H92/112

Rainscreen cladding system outer skin as H92/113

External level raised to match CO 00 FFL. Refer to Civil engineer and landscape architect for further detail

CO 00 FFL

1479014790

100

Steel post to top of fin 570

Rainscreen cladding system outer skin as H92/112

Vertical 200x50 section aluminium fin detail as part of cladding system H92/110

CO 00CO FFL 00 FFL

Cavity fire barrier as P10/432 to perimeter of window opening

Concrete external walls; Refer to structural engineer's documentation

Continuous horizontal 200x50 section aluminium fin detail as part of cladding system H92/110

Existing door

1 217x

Eq.

Co-A

Existing wall New Fire Rated Louvred Door L20/484

Description

Drawn by

Checked by

For Tender

KH

CB

Client

Morgan Sindall

MCW Oast House, Malting architects Cambridge CB3 Lane 9HF www.mcwarchitects.com

Project Title

ARU Creative Quarter - Contractor Anglia Ruskin University, East Rd, Cambridge CB1 1PT Drawing Title

Purpose of issue

External Envelope Details - Coslett Sheet 3

Status

For Tender

Scale

Date

Drawn by

Checked by

Drawing No.

Rev

1:10

15/03/2024

KH

CB

50CB02-MCW-21-CBZZ-D-A-2172

P01


1 : 100

Part Part II Internship: Shelley Court, TOCA, 2023 II Internship: Shelley Court, TOCA, 2023

2

1 : 100

it PURPOSE OF ISSUE

Project Name

CLIENT

Short Elevations

Section SW 1 : 100

Owner

Date

Project number

Drawn by

DRWAING NUMBER

Checked by

A103

Issue Date

SHEET

NW Street view

1

Elevation SW Short PROJECT

1

I designed a residential building on Revit for a family for one disabled user. This small dwelling contains a balcony and curtain glazed wall to prevent sound disruption to nearby residencies. I looked at building regulations to understand the space requirements for the disabled user and these specialised building regulations heavily influenced the floorplans and the design of the building.

Author

Checker

Project Number

1 Scale (@ A3)

1 : 100

REV

1

Elevation SW Long 1 : 200

NW Street view

2

SW Street view

3

2

3 Software: Revit 13.

2

23/02/2023 16:04:50

4

Section NE No. 1 : 100

Description

4 Date

SW Street view No.

Software: Revit 14.

Description

www.autodesk.com/revit CODE

STATUS

CODE

STATUS

SUITABILITY DESCRIPTION

4

PURPOSE OF IS

Date www.autodesk.com/revit SUITABILITY DESCRIPTION

PURPOSE OF


Diploma 5th Year: Glasgow Manufacturing City 1. Demolish heavy infrastructure

2. Pave over with greenspace and tram paths

3. Develop manufacturing neighbourhoods and increase land value

During my 5th year at the Glasgow School of Art, the Mackintosh School of Architecture I developed a thesis project designed to increase the land-value of the South-Side of Glasgow in an environmentally and socially sustainable way. I designed a Manufacturing City composed of 3D printing blocks to complete this objective.

B2: Storage

Software: Rhino + Photoshop 19.

B1: Transport

G: Retail

1: Manufacturing

Software: Rhino + Photoshop 20.

2: Manufacturing

R: Delivery


Underground Transport Road: When the section is cut less deeply we can see how there is an underground road for the transportation of 3D printing powder and parts. Cycle Road: There is a road for cycle access on the ground floor Two cores with circulation: There is are two cores containing circulation in the form of two lifts and two public staircases as well one central 3D printing lift the contents of which visible to the public thanks to the box being enclosed in glass panels and steel structure.

There are forklifts to transport 3D printing powder, machinery and parts on the Basement -2 level. There is a road for lorries to transport goods. There is a road for cyclists to cycle through and enter the building.

3D Printing Lift: There is a one large 3D printing room 17m heigh 33m wide and 40m long which 3D prints moulds for the aerospace and nautical industries in and around Glasgow. The room acts as a lift situated in the centre of the block serving a different purpose on each floor. Lifts: There are 2 large lifts 17m heigh 22m wide 18m long which are used to transport 3D printing powder, people and pieces of machinery through each floor and ultimately support the main 3D printing lift in terms of structure and transportation.

The 3D printing box travels up and down the height of the block. On the Basement level it serves to collect stored powder and parts from the storage, to serve the transportation of powder and parts the level up, to serve presentation purposes the level above, to serve manufacturing purposes the level above again and finally to serve testing purposes on the second floor. It is a multi-use room that’s primary focus is 3D printing but it also serves different functions on different floors.

Software: Rhino + Photoshop 21.

Software: Rhino + Photoshop 22.


Thesis Statement 250 words max

nics

ensity odule

“During the 21st century work is creeping into our domestic lives. I propose that should be spatially and proDiploma 4th Year: Rehabilitation Centre fortheyDrug &separated Alchohol grammatically using indoor, outdoor formal interventions inorder to increase overall human productivity.” Misuse

Rehabilitation Centre Perspective Section: Section 1:200

Public and Private Space Diagrams and Axonometric Revit Model:

Domesticity

1 Public

Domesticity

Cross-Section 1:100 Nurse Access

Cared Living Rooms

Labour

Private

c ad

Rehabilitation Centre in context axonometric model:

During 4thtoyear at the School Art, theinMackintosh of Architecture I designed a “Themy option live and workGlasgow closer together hasof increased popularity for School the sustainability of relationships and communiRehabilitation Centre for Alcohol Misuse. Located in Glasgow’s ties with the city still being the prime and placeDrug for access to opportunities and services.” Merchant City this centre would provide support for those in need. Swimming pools, balconies, greenhouses and shops were designed to “The masterplan proposes to attract vulnerable people from economically deprived areas of the inner city and provide assist.

Summer Elevation Candleriggs Rehabilitation Centre1:200 Winter Elevation:

them with services to care for them and re-skill them inorder to redistribute them around the city as more independent and stronger members of society.”

Independent 3D printing studios

M

ng

ion 1:200

Winter Elevation Candleriggs 1:200 Rehabilitation Centre Summer Elevation:

Rehabilitation Front Elevation: Front Elevation WilsonCentre Street 1:200 Winter Elevation Candleriggs 1:200

Rehabilitation Centre Long Section:

Section 1:200

“By enhancing the architectural experience of the rehabilitation centre, with nature and technology, I can make programmatic and spatial separations in a more unconventional and uninstitutional way, increasing rehabilitation performance.”

Software: Rhino + Photoshop 23.

Software: Rhino + Photoshop 24.

Summer Elevation Candleriggs 1:200


Bachelors 3rd Year: Bathing Facility, Scarborough Short Perspective Section

Long Perspective Section

During my final year at Sheffield University, the Sheffield School of Architecture, I designed a Bathing Facility that would provide a series of descending swimming pools for bathing. The bathers would descend down to the sea where they would finally complete their bathing experience.

Software: Hand Sketch 29.

Software: Hand Sketch 30.


Bachelors 3rd Year: Castle Market, Sheffield Guild Perspective Hand SketchSheffield & Guild Sectional Axonometrics

Hand Sketch 37.

In my final year at the Sheffield School of Architecture, I designed a Castle Market for digital fabrication. Composed of 4 “guilds” specialising in a different 3D printed recycled material, this market would provide jobs and retail options for those on their way to Victoria Train Station.

38.


Turn static files into dynamic content formats.

Create a flipbook
Jordan Barrett Portfolio 2026 ISSUU by jordanhbarrett - Issuu