Clarendon Road forms the western boundary of the Ladbroke Conservation Area and is one of the area’s longest streets. It runs from Holland Park Avenue in the south to Dulford Street in the north (originally, it extended as far as Lancaster Road). Two sections are excluded from the conservation area: Nos. 1–11 at the south-west end (where the original mid-19th-century houses were replaced by modern dwellings built in the 1960s), and the northern end of the street, north of No. 99 on the western side and north of Blenheim Crescent on the eastern side (in both cases, the original 19th-century buildings have largely been replaced).
The area was largely open countryside when Clarendon Road was created during the second great wave of development on the Ladbroke estate in the 1840s. The estate was still owned at that time by the Ladbroke family, in the person of James Weller Ladbroke. This was a period when the population of London was growing rapidly, and developers saw rich profits to be made by providing housing for the expanding population.
James Weller Ladbroke had detailed plans drawn up for the western part of the Ladbroke estate, including Clarendon Road, in 1843 and 1846. However, he did not undertake the development himself. Instead, he signed agreements or building leases with builders or speculators, under which they undertook to build a certain number of houses on the plot of land covered by the agreement. Once the houses were built, Ladbroke would then grant either the builder or a person nominated by him (usually the individual who had financed the construction) 99-year leases for the houses. Ladbroke derived his profit from the ground rents, which were typically about £10 per annum, while the developers gained their profit by letting the houses, which commanded annual rents of £50–60.
John Rocques’s London 10 Miles Round Map, 1746
The Ladbroke estate: The 1840s
Many of those involved in developing Clarendon Road came to financial grief. In the years following the construction of these now desirable villas, the long leaseholds (and sometimes also the freeholds) of individual houses were often bought, sold, and mortgaged to secure loans. As a result, the leaseholds quite often ended up in the hands of wealthy spinsters and others living far from the area, for whom they represented reliable investment assets paying a regular return in the form of rental income. Presumably, the tenants who actually occupied the properties remained relatively unaffected by all these changes, as long as they continued to pay their rents.
Development started from the south, and almost all the houses on the street between Holland Park Avenue and Clarendon Cross were completed during a period of frenzied activity between 1840 and 1846, under the direct auspices of James Weller Ladbroke. The houses were good-quality villas, often detached or semi-detached with generous space between them – although most of the gaps between the houses have now been filled by extensions built in the last 50 years. These properties along the southern end of the street are now some of the most desirable houses in the area.
Most of the houses were put up as speculative ventures, often with finance borrowed from wealthy property speculators.
Sometimes Weller Ladbroke himself lent the builders the money to finance the construction. There was a bewildering number of speculators, financiers, architects, and builders involved, including many of the Ladbroke area’s best-known players. The Survey of London has made a brave attempt to clarify the relationships between these various parties, but for many of the houses, the details of which parties were responsible for the finance, design, and construction remain obscure. Generally, however, in the case of Roy and Reynolds, who were partners on many of the Clarendon Road houses, it was Reynolds who organised the building of the roads, sewers, and houses, while Roy raised the necessary capital.
The road seems, in the 19th century, to have been rather more of a through route than it is today. In 1892, Cardinal Manning’s funeral cortège processed along Clarendon Road on its way to Kensal Green Cemetery (The Times). As well as the Castle on the corner of Holland Park Avenue, there were three other pubs or inns to take advantage of passing traffic: the Clarendon Hotel at No. 85, the Britannia at No. 123a, and the Talbot Arms on the other side of the road beyond Cornwall Crescent.
As the road formed the western boundary of the Ladbroke family’s estate, it has few connecting links with the parallel Portland Road to the west, on the Norland estate. Several roads run from the east into Clarendon Road from other parts of the Ladbroke estate, most deliberately designed to form vistas, clearly demonstrating the road’s relationship with the rest of the Ladbroke estate. However, the houses on the western side form almost a wall separating the estate from the Norland area, and there are no carefully designed vistas through to the west, creating, in the words of the Borough’s Conservation Area Proposal Statement for the Ladbroke estate, an effect ‘of subtle enclosure; the eye is unaware of adjacent contrasting areas “outside”.
Horse-drawn buses used to run up Clarendon Road, and the following is an extract from a report in The Times of 1886 about an altercation between two bus drivers, James Creswick and Robert Kershaw, driving buses for rival bus companies. In the 20th century, like much of the rest of the area, Clarendon Road went downhill, and many of the houses were turned into flats and lodgings, only to become smart again in the last third of the century. The street was also badly affected during the Blitz. Several houses were damaged by bombs and were later demolished and replaced, or else repaired on the cheap, with few or none of the original decorative features being restored.
London Ordnance map, 1893-1896
30 Clarendon Road, London W11 3AD, is a semi-detached house located on Clarendon Road in the Royal Borough of Kensington and Chelsea.
Listed Status
While several properties on Clarendon Road are designated as Grade II listed buildings, such as numbers 17, 19, 21, and 23-29, number 30 does not ahave the National Heritage List for England.
Conservation Area
Clarendon Road is situated within the Ladbroke Estate Conservation Area. The Ladbroke Conservation Area was designated in 1969, one of the Royal Borough’s earliest designations. It was developed speculatively from south to north by a number of different architects, developers and builders between the 1820s and the mid 1870s. Early plans were drawn up by Thomas Allason; his ideas for a circus and communal gardens were progressed by other architects who added the crescents and placed the gardens behind the houses. Architects who worked on the estate included James Thomson, Thomas Allom, William Reynolds and Thomas Pocock. In the Ladbroke area many terraces were designed to follow the contours of the hill so that the parapets (at roof level) remained continuous and unbroken. The terraces are either half or fully stuccoed with elaborate detailing; and pairs or trios of villas are of key special interest to the area. The setting of these houses is created by the gardens around them and the space in between them. A very special feature of the Ladbroke estate is the terrace ends, which were often designed to have the appearance of a symmetrical detached house. A large part of the Ladbroke Conservation Area is covered by an archaeological priority area. This is due to evidence of a Roman cemetery (including sarcophagi and burials) being discovered around Lansdowne Crescent and Ladbroke Grove when the area was developed in the nineteenth century.
PLANNING
30 Clarendon Road
ARB/24/03259
Prune 1 x Hornbeam Hedging and 4 x Camellias (front RNO (Raise No Objection) 14 Jun 2024
Given that the property and No. 32 form a pair, it is recommended to retain some level of symmetry where possible. However, acknowledging the existing differences, the following options are suggested for the rear extension:
Match No. 32
Propose a half-width lower ground floor extension to the same depth as No. 32, with a terrace or garden link above. Modify the rear elevation to include bi-fold doors similar to No. 32.
Infill Below Existing Balcony
Use the existing rear balcony as justification to infill below, while maintaining the balcony above.This would allow for a full-width extension but with less depth. Fenestration may need to be broken up rather than spanning the full elevation
Basement Potential
A basement may be a viable option, subject to standard parameters and constraints. Many properties have leveraged level differences to create basements under the garden, with glazing facing the house and a patio acting as a lightwell.
Outbuilding Opportunity
An outbuilding could potentially be achieved under Permitted Development (PD) rights, though covenants associated with the communal garden square may apply. The Article 4 Directions do not restrict outbuildings under Class E but focus on extensions under Class A. Precedents, such as No. 68 Clarendon Road, suggest this is achievable from a planning perspective.
byADLPlanning
32 Clarendon Road
PP/13/04258
Construction of a subterranean extension beneath front garden, provision of portico to front entrance, alterations to fenestration and associated alterations.
Status: Permitted
Existing
Proposed Rear Elevation not to scale
Proposed Section B-B not to scale
Proposed
Existing Lower Ground Floor - not to scale
Existing Lower Ground Floor - not to scale
36 Clarendon Road
PP/12/00583
Lower ground, ground and first floor side extension and lower ground level rear extension with lightwells, formation of new basement flat.
Status: Permitted
Proposed Elevations not to scale
PP/15/04888
Form subterranean extension to create single-storey basement level directly below house together with external alterations to building
Status: Permitted
Proposed
PROPOSAL
• Lower ground floor slab to be dropped to increase head height. Assume to foundation level to avoid underpinning.
• Waterproofing and resilience to flooding to LGF required.
• Access into rear garden to be provided from the rear elevation of the lower ground floor. Potential for a new
• sunken terrace to be agreed with the client in stage 2.
• Potential LGF kitchen/dining room extension to be agreed with client during stage 2.
• Movement of staircase from LGF to GF to be considered during stage 2.
• New small power layout throughout
• New lighting layout throughout including new ceiling and wall lights. Light switching to be daisy chain and
• not scene setting.
• New data provision throughout.
• Audio Visual requirement to be determined.
• No automated blinds required.
• New security installation required with 3rd party monitoring option. Insurance company to be contacted in
• due course.
• New fire alarm.
and
• All bathrooms and WC’s to be stripped and refurbished including new tiles and sanitaryware (sanitaryware to be good quality but not branded). Locations to be agreed with client during stage 2. Assume new WC and shower to the lower ground floor.
• New energy efficient plant equipment.
• Anti-leak solenoid to be fitted to incoming mains.
• New waste pipe installation.
• New heating strategy – radiators or underfloor heating to be agreed with client.
• Comfort cooling required.
• Below ground drainage to be reviewed in light of lowered LGF.
• Cloakroom / Boot room (could be located on the GF)
PROPOSED
• Extension under the existing GF balcony
• Staircase relocated to allow for better layout programming
• Guest bedroom with storage and ensuite bathroom
• Guest WC
• Coats wardrobe
• Boot room/storage and plant with secondary access
• Utility room
• Kitchen/dining in the new extension to the rear overlooking the garden
PROPOSED LOWER GROUND FLOOR OPTION 2
• Extension under the existing GF balcony
• Staircase relocated to allow for better layout programming
• Guest bedroom with storage and ensuite bathroom
• Guest WC
• Coats wardrobe
• Boot room/storage, plant, and utility grouped together with secondary access
• Kitchen/dining in the new extension to the rear overlooking the garden
• Potential for the under-garden basement with studio
PROPOSED LOWER GROUND FLOOR OPTION 3 SCALE 1:100
• Extension under the existing GF balcony
• Staircase as existing
• Guest bedroom with storage and ensuite bathroom
• Guest WC
• Coats wardrobe
• Boot room/storage, plant, and utility grouped together with secondary access
• Kitchen/dining overlooking the garden
PROPOSED LOWER GROUND FLOOR OPTION 4
• Extension to match the neighbour
• Staircaseas existing
• Guest bedroom with storage and ensuite bathroom- with both shower and a bath
• Guest WC
• Coats wardrobe
• Boot room/storage, plant, and utility grouped together with secondary access
• Kitchen/dining in the new extension to the rear overlooking the garden
• Additional Pantry
PROCESS
OUR APPROACH
OUR ROLE
DESIGN DETAIL DELIVER
The work of Johanna Molineus Architects reflects a passion for craftsmanship and timeless elegance; focusing on design with atmosphere, clean lines and exceptional detailing. From concept to construction we work with finely tuned care and attention.
Johanna Molineus Architects is renowned for successfully navigating the many competing demands of renovating and conserving heritage and listed buildings in the UK.
From the traditional to the trend-setting, our designers create interiors that complement the architectural environment while fulfilling the practical needs of the space.
Johanna Molineus Architects Ltd (JMA) will be the design lead for the Client on all architecture aspects and together with Webster Hart will coordinate the consultants throughout the Pre-Construction phase of the project. All consultants are employed directly by the client and work closely with JMA/WH throughout.
In addition to our services, we envisage that the consultant team will include but not be limited to the following:
•Project Manager
•Contract Administrator
•Cost Consultant/Quantity Surveyor
•Landscape Architect
•Structural Engineer
•Mechanical & Electrical Engineer
•Approved Building Inspector
•Party Wall Surveyor
•Planning Consultant
• VAT Consultant
•Acoustic Test (Comfort Cooling / ASHP)
•Arboriculturist
•Audio Visual
•Lighting Designer
JMA will be responsible for coordinating the design team together with Webster Hart and advising the client on the appointment of the consultants, for which we will put forward a number of options for each role for discussion with the client.
Together with WH, JMA will lead the process from the initial survey, throughout the design, tender, and construction phase through to completion and ultimately occupation of the house working in close collaboration with you and the rest of the team.
JMA’s team will be overseen by a Project Director, in addition to the input of Johanna Molineus, Creative Director of JMA. Our duties include monitoring the contractor throughout the construction process for quality, progress and ensuring the efficient management of the design implementation. We are on site at regular intervals for this and are in constant contact with all parties.
Throughout the design and construction phases of the project we will provide monthly progress updates to you (the Client), setting out our regular design work and tasks, highlighting our progress, together with raising any issues and Client decisions that need to be made or explored.
Once the works are complete, we will return to site after the defects period (together with the Contract Administrator), which occurs 12 months after the date of Practical Completion to ensure that any defects, which appear may have appeared, are rectified.
JMA’s scope of work will include, but not be limited to:
General Scope of Work
Assisting the client/project manager on the appointment of the specialist consultants required
Assisting the client/project manager and QS with the programme, budget and procurement strategy
Developing the exterior architectural proposals to re-model the rear facade together with re-working the internal layout configuration of both the main house to suit your requirements.
•Co-ordinating the Architectural Design proposals with structural elements, services and overall consultant team for the purposes of tender and construction.
•Preparing the technical design drawings, specifications and construction information for the Interior Fit Out works.
•Managing and coordinating all consultants together with the project manager.
Attending design team meetings and fortnightly formal meetings during the construction phase.
Assisting with the tender, procurement and selection process including assisting on the Value Engineering process.
PROJECT ROLE CONTINUED ARCHITECTURAL SCOPE OF WORK
PROJECT ROLE
• Appointment of JMA, confirming our role and extent of service.
• Develop the project brief and scope of work in conjunction with the client and project manager.
DESIGN STAGES
CONCEPT DESIGN / COST REVIEW STUDY
• We will work closely with you to develop the Concept Design Proposals. The design work will focus on developing options to re-configure the internal layouts to maximise space and to suit your brief.
• In conjunction with this, we will develop proposals to ensure an improved internal layout and increasing natural light to the lower ground floor.
• During this phase of work we will also consider various options reworking the main staircase throughout the house and reviewing the lower ground floor footprint (extension/potential small garden basement)
• During this stage we will also assemble the Project Team together with the project manager including the key consultants.
• Submit a request for pre-planning application advice to RBKC. It is assumed this is a level 3 request for advice which includes a meeting
• Once we have firmed up the internal layouts we will work closely with the Project Manager and Quantity Surveyor to develop the Cost Plan based on the agreed proposals to test the budget.
• At this stage we can also review options to enhance or reduce particular areas of the design depending on the budget and cost advice from the QS. This will allow you to focus on which areas of the build should be constructed to a higher specification or not.
Using the designs agreed with you during Stage 2 Concept Design / Cost Review and following the receipt of pre-planning advice, we will refine and develop the designs in further detail. We will coordinate and integrate the initial structural scheme and mechanical and electrical services strategy into the designs in preparation for submitting a planning application to RBKC.
The planning process involves a step by step approach, carefully considering the aspects which are most important to you. We will advise you during the design phase on elements which may carry a planning risk and a planning consultant will be engaged to provide planning advice and oversee the submission of the planning application. Otherwise, we will lead the planning process. We recommend ADL planning to act as planning consultants whom we haved worked successfully with on a number of projects in RBKC. Once submitted, there is an 8 week determination period for the application by the council.
Should there be any aspects of the design which are unacceptable at Pre-Planning Application stage, we may seek to remove these from the full planning application. Some of these items may simply never be possible with RBKC, or some of them may be able to be dealt with separately at appeal or with further applications and discussions. Depending on the time and complexity of these items, we will need to agree a strategy and seek the assistance of a planning consultant or planning lawyer.
Neighbour consultation should take place prior to the submission of the planning application, which will be led by JMA. We will also consult the Ladbroke Association, the local residents association who we have dealt with in the past on other projects.
Discharge of Conditions
Once Planning Approval for the Scheme has been received, this is accompanied by a set of conditions which must be complied with. Some of these conditions are required to be discharged prior to the commencement of the works, whilst some are to be discharged during the course of the works or prior to occupation, with the remainder of the conditions ongoing compliance requirements.
Whilst most of these conditions are anticipated within our full planning submission, the council still impose a set of pre-commencement conditions which can only be discharge following planning approval. The approval period takes 8 weeks, in addition to the time required to prepare the information requested.
DESIGN STAGES
Following a successful determination of the planning application we will progress the Technical Design work, working closely alongside yourself and the project team consultants.
During this stage we will produce a detailed package of information sufficient to submit for tender and pricing by a selected list of ‘preferred’ contractors. This can either be undertaken as part of a traditional ‘single stage’ tender process or a ‘two stage’ tender which involves tendering the shell and core and structural work separately from the interior fit out. We have discussed these options in the procurement strategy. The Technical Design will include the production of the following details drawings and specifications for the purposes of tender and construction:
(DESIGN SCOPE)
General Arrangement Plans
• Existing Plans at 1:50
• Demolition Plans at 1:50
• Proposed Plans at 1:50
• Setting Out Plans at 1:50
• Floor Finishes Plans at 1:50
• Electrical Layout at 1:50
• Reflected Ceiling Plans at 1:50
External Envelope Details
• GA Sections and Elevations at 1:50
• Construction Details at 1:20/1:10/1:5
• External windows and Door details at 1:20/1:10/1:5
• External Facade Details / Roof Details
• Balcony Details
Interior Architectural Details
• Typical Interior Details at 1:2/1:5/1:10
• Internal Door Details / Schedules
• Skirting, Architrave and Cornice Details
• Ceiling and Floor Build Up Details
• Internal Elevations at 1:25
• Built-in Joinery Details
• Internal Wall, Floor and Ceiling Types Build Ups
• Staircase - Plans, Sections and Details
• Plan Setting Out, Sections and Details
• Lower Ground Floor Waterproofing Details
During the construction phase we will undertake Construction Monitoring through to the completion of the works in conjunction with working with a contract administrator.
This includes but is not limited to:
• Bi-weekly site visits to inspect the works and dealing with queries from site.
• Running design team site meetings to address relevant issues with the consultant team.
• Undertaking regular photo records of site progress and key milestones.
• Reviewing selection of subcontractors and contractor submittals / technical specs.
• Checking that the works are being built in accordance with the designs
• Providing monthly client updates which highlight progress, variations, any issues and client required decisions
DESIGN STAGES
The construction stage can be carried out in one or two phases, depending on your requirements and timescales. We will discuss the advantages and disadvantages of each procurement strategy in more detail with you, however each are briefly described below:
A. Construction over Single Phase:
Selecting one Contractor to carry out all work (shell and core and fit out)
The entire design and all information are to be produced by all parties prior to the contractor’s start on site. This can be done in two ways: by tendering it which a minimum of three contractors will take part or a single contractor can be chosen directly. This process allows additional time to develop the design in full detail, but generally realises a later start onsite and extended project timeline.
It does give increased cost certainty prior to commencing any works onsite.
B. Construction over Two Phases:
Selecting a contractor to carry out the shell and core and structural work followed by a separate contractor to carry out the fit out stage.
This option allows an earlier start onsite for the basement and structural stage, whilst drawings and documentation for the fit out are produced. This option requires greater attention, quick decision making and most importantly a layout/design agreed at an early stage. Otherwise design changes could easily and directly affect the programme.
As for the single phase procurement strategy, a contractor can be appointed by tender or directly.
On completion of the refurbishment works we will carry out detailed inspections of the works to check quality and that the building is fit for occupation and handover to you. During this period we will:
• Snag the house or defects
• Ensure that the contractor has tested all the new systems and completed the handover pack together with a set o as-built drawings
• Liaise with the Interior Designer to ensure their installation is co-ordinated with the final stages of the build.
PRINCIPAL DESIGNER (BUILDING REGULATIONS AND CDM)
When appointed as a principal designer on a project, Johanna Molineus Architects ensures the project team have the skills, knowledge and experience to fulfil their duties under the CDM and Dutyholder Regulations.
All Johanna Molineus Architects, all architects are registered and regulated by the Architects Registration Board (ARB). The project architect will have many years of post-qualification experience, a significant amount of which will involve work on similar projects involving the refurbishment, adaption and extension of existing residential buildings. Completed reference projects are included in the Selected Projects section of the presentation and include
• 22 St James Gardens
• 9-11 Roland Gardens
• 42 St Petersburg Place
• 10 North Hill
• 89 Portland Road
The practice is also currently on-site with large residential refurbishment schemes on Upper Phillimore Gardens and St James Gardens
The project architect will also be a member of the Royal Institute of British Architects (RIBA). The ARB and RIBA require architects to undertake Continuing Professional Development (CPD) and maintain records with regards to this. Both the ARB and RIBA CPD requirements include Building Safety and Building Regulations as mandatory areas for annual CPD. All practice architects have undertaken multiple CPDs relating to the updated building regulations and Fire Safety Act 2021 as well as fulfilling their obligations with relevant CPDs relating to the wider design considerations of buildings of this type.
PRINCIPAL DESIGNER
PRINCIPAL DESIGNER CONTINUED
On larger, more complicated projects, we also engage a principal designer advisor to assist in ensuring our role as principal designer is met. Often, this appointment can be widened to include advice for the client.
One of the client duties under the regulations is to take all reasonable steps to ensure any designers or contractors appointed are competent to carry out the work for which they are appointed. Key staff members can provide competency statements demonstrating their skills, training, experience as well as setting out the Practice processes and procedures to ensure this.
MOODBOARDS
BRONZE PATIO DOORS
WOODEN GLAZED DOORS METAL GLAZED DOORS
CABINETS/ BOOKSHELVES
PROJECT COSTS
ARCHITECTURAL FEE NOTES
Our aim is to define and explore your aspirations and objectives for the project based upon an understanding of what is feasible and the associated costs, time-scales and risks. Once we have completed RIBA Stages 1, 2 & 3, we will have a clearer understanding of the project’s complexity and services you require from us. The fee can then be adjusted either as lump sum or as a percentage of the build cost. Considering the nature of the project we would expect our total fee to be in the region of 11% of the construction cost. The fee calculation for Stages 1, 2 & 3 are based on an approximate project budget of £2,500,000. Following confirmation of the indicative construction cost after Stage 3, Stages 4 and 5 will reflect the outstanding fee. Stage 5 would be split over the 15 month construction programme (programme TBC).
DELIVERABLES
Stage 1: Preparation & Brief (Feasibility Study)
£ 8,275.00
Stage 2: Concept Design £ 38,620.00
Stage 3: Design Development & statutory consultation £ 34,365.00
Stage 4: Technical Design/ £ 81,260.00 TBC
Pre-plan Building Regulations Procurement / Tender
Stage 5: Construction Documents £ 97,560.00 TBC
Construction Monitoring
Stage 6: Handover and Close Out Incl.
Total £ 275,000.00
*All fees are payable in GBP excluding VAT, or other applicable tax plus expenses.
Hourly Rates: The following hourly rates shall be used when a portion of the Architect’s fee is to be charged on an hourly basis or if the Architect is requested to perform additional work. Hourly rates are subject to annual increase of 1% per annum. For fees based on an hourly rate the Architect will provide, when requested, time sheets to substantiate hours claimed.
Position Standard Hourly Rate (GBP)
Director £175
Associate £125
Architect £95
Assistant (Part II)
£65
Programme: for the purposes of the above fee budget we have assumed a Stage 5 (construction) duration of approximately 15 months where the fee is split into 15 monthly payments. Should our input extend beyond this time period, we propose the continuation of the stage 5 monthly payments until completion.A two stage procurement strategy may also influence our final fee. Please refer to the attached programme for a more detailed oversight.
Construction Budget: Should the construction budget increase or reduce beyond the outlined scope we would propose to renegotiate and adjust our fees accordingly to reflect the revised scope.
Design Changes: Should Client design changes be made after sign off of:
a)the approved Concept Design Schemes; OR
b)the completion of the Technical Design / Construction Information Packages; OR
d)additional planning applications required over and above he items described in Stage 3 above;
e)due to a change of requirements proposed by the Client.
EXPENSES
Included
We have allowed for the following within the overall fee:
•Meetings within Johanna Molineus Architects’ office, clients office or site as necessary to refine brief and develop design
•8 meetings pre-construction
Reimbursable
Expense costs to be reimbursed by the Client may include, but are not limited to the following: Digital measured surveys, planning fees, presentation material, product samples, photography, travel, accommodation, additional printing, postage and packaging.
Additional Expenses
Should the Client wish to purchase additional marketing materials, the following prices are applicable:
3D Visualisations
Physical models
Quotes provided upon request
Quotes provided upon request
INSURANCE & LIABILITY
confirm we maintain professional indemnity
insurance of no less than £5,000,000 cover which will be the maximum limit of our liability to you arising out of this agreement. Any such liability will expire after 6 years from practical completion of the construction of the project or, if earlier, the conclusion of our appointment. Our liability for loss or damage will be limited to the amount that it is reasonable for us to pay in relation to the contractual responsibilities of the other consultants, contractors, and specialists appointed.
ARCHITECTURAL FEE NOTES
FORM OF APPOINTMENT
The agreement between us will comprise of this Project Proposal together with the RIBA Domestic Professional Services Contract 2020 (2024 amendment) Architectural Services.
A completed contract with full project details will be provided upon appointment.
TERMS OF PAYMENT
Our fees calculated as a percentage of each complete work stage Invoices will be issued no less than monthly as a percentage of the work completed. Payments are to be received within 14 days of date of invoice.
Interest on late payments will be charged at 8%. If payments are not received on the due dates Johanna Molineus Architects cannot guarantee to continue to provide the service.
PROGRAMME
30 CLARENDON ROAD PROJECT PROGRAMME
STAGE 1. BRIEF & INITIAL CONCEPT BRIEF Define and confirm project brief C e n s gn-o
STAGE 2. CONCEPT DESIGN
APPOINTMENTS Professional Team appointments
CONCEPT DESIGN Concept design options Cost plan C e n P e -p a ng s g -o
JOHANNA MOLINEUS ARCHITECTS ARCHITECT & LEAD CONSULTANT
Johanna Molineus Architects is a London based practice, founded by Johanna back in 2000, with a profound commitment to the city in which we work. From offices & estates to art institutions, galleries, retail and residential, we tailor our expertise to fit the specific needs of our clients.
We work to ensure that every project we undertake is finished to the highest quality, whilst ensuring minimum disruption not only to our clients but also to the communities in which they live and work.
Our projects seamlessly blend flawless design with cutting-edge technical acumen to create buildings that respect and understand their heritage whilst honouring their ambition.
Practicing in London for over a decade, we have a clear understanding of how to work with those that preserve London’s heart, aesthetically, culturally and physically. We celebrate the enormous diversity that sits within the heart of London with a flexible, international, outward-looking team, because no-one appreciates the values of London’s architectural lineage more than those who choose to embrace it.
Johanna Molineus Architects is a business founded upon the attention to detail, organisational skills and professional flair that guarantees projects finished beautifully, on time, to budget.
SELECTED PROJECTS 2020-2024
II Listed
Collaboration with Luciano Giubbilei, Vicenzo
DeCotiis, David Adjaye, Rick Owens & Michele Lamy, Nicolas Schuybroek and Ingrid Donat Invisible Collection, Flagship
THE INVISIBLE COLLECTION GALLERY
PROPERTY Commercial Gallery
SIZE 5,700 sq/feet
SERVICE RIBA Stages 1-6
LOCATION London, UK
DATE 2022
The Invisible Collection approached Johanna Molineus Architects to design and oversee the build of their first gallery in London. The gallery will not only showcase their designs but act as an event space. The key elements to the brief was not only a quick turnaround within a designated budget, but also a sensitivity to the design ethos of their company.
ST JAMES’S GARDENS
PROPERTY Residential, Listed
SIZE 4,685 sq/feet
SERVICE RIBA Stages 1-6
LOCATION London, UK
DATE 2022 2023
This property had a unique and complicated planning history and required a full internal remodel and spacial design. The clients brief was to design a family home which integrated their multicultural background. The project was very design driven and our team worked very closely with the clients. JMA delivered a full FF&E package alongside all architectural services.
BERLIN PENTHOUSE PRIVATE RESIDENCE
PROPERTY Residential
SIZE 4,750 sq/feet
SERVICE RIBA Stages 1-6
LOCATION Berlin, Germany
DATE 2021 - 2022
JMA were asked to transform two apartments into a two bedroom penthouse in the heart of Charlottenburg. The clients brief was to use warm and natural tones and create a timeless and elegant property. JMA was also asked to assist with the sourcing and positioning of the art.
LADBROKE HALL GALLERY
PROPERTY Grade II Listed Factory
SIZE 28,000 sq/feet
SERVICE RIBA Stages 1-6
LOCATION London, UK
DATE 2020 Under Construction
Johanna Molineus Architects were asked to head up a team of talented artists, artisans and architects to design and oversee the works including the 400 sq/m new basement within a Grade II Listed factory. The end use is for an art foundation and gallery space with capacity for hosting live events and a resident michelin star restaurant. Collaboration include Vincenzo
DeCotiis, Rick Owens & Michele Lamy, Nicolas Schuybroek and Ingrid Donat.
ST PETERSBURGH PLACE
PRIVATE RESIDENCE
NORTH HILL PRIVATE RESIDENCE
PROPERTY Private Residence
SIZE 320 sq/m
SERVICE RIBA Stages 3-6
LOCATION London, UK
DATE 2020-2022
This project involved an ambitious extension to a historic Walter Segal property in Highgate, London. In the spirit of Segal and the self-build ethos, the project utilises a prefabricated CLT (cross laminated timber) structure. The form takes queues from the sloped nature of the site, stepping down and opening up to the garden.
PORTLAND ROAD PRIVATE RESIDENCE
PROPERTY Residential
SIZE 3,350 sq/feet
SERVICE RIBA Stages 1-6
LOCATION London, UK
DATE 2020 2021
Johanna Molineus Architects have successfully completed three properties on Portland Road, two of which were facade retentions and included full basements. Each project was treated as individually as each client had different aspirations.
OLIPHANT STREET
PROPERTY Private Residence
SIZE 150 sq/m
SERVICE RIBA Stages 0-6
LOCATION London DATE 2021-2023
WATERLOO PLACE GALLERY
PROPERTY Commercial Gallery
SIZE 7,950 sq/feet
SERVICE RIBA Stages 1-6
LOCATION London, UK
DATE 2022 2023
Johanna Molineus and her team successfully won a competition to refit a former bank into a commercial gallery. The clients brief was to create a usable gallery space without loosing the heritage. JMA worked very closely with artisans to restore the original materials and bring the space back to life.
Immerse is transforming architectural visualisation by utilising advanced gaming technology to create bespoke, interactive 3D building models accessible across all platforms. These high-quality models provide an innovative marketing solution, enabling clients to explore and experience spaces well before construction is completed. Projects can be shared globally with just a single click, making collaboration seamless and straightforward. What sets Immerse apart is its emphasis on user empowerment and interactivity. The platform gives both users and their clients direct control, with intuitive tools that allow for independent exploration, interaction, and real-time customisation of spaces. This unmatched level of engagement makes Immerse unlike any other tool on the market.