P O R
T F O L I O
ARCHITECTURE 2024
JERZY ZUNIGA
JERZY ZUNIGA
I am a licensed architect in Peru with 6 years of experience, working for both public and private institutions, specializing in designing and building educational and residential structures. I hold a Master’s Degree in Construction Management and possess LEED professional accreditation. Currently, I am pursuing a Master’s in Architecture at LSU, with an expected graduation in May 2024.
CONTACT INFORMATION
jerzy_zuniga@hotmail.com
(225)-410-8859
Aug 2022-May 2024
Mar 2017-Aug 2018
Dec 2014 -Sep 2017
Jan 2010 - Dec 2014
EDUCATION EXPERIENCE
LOUISIANA STATE UNIVERSITY
Master of architecture
NATIONAL UNIVERSITY OF SAN ANTONIO ABAD OF CUSCO-PERÚ Master in construction Management.
NATIONAL UNIVERSITY OF SAN ANTONIO ABAD OF CUSCO PERÚ Licensed Architect.
NATIONAL UNIVERSITY OF SAN ANTONIO ABAD OF CUSCO-PERÚ Bachelor of architecture.
May 2023 –Aug 2023
Louisiana-US
May 2021 –Jun 2022
Cusco-Perú Jul 2020 – Dec 2020
Cusco-Perú Jan 2020 –Dec 2020
Cusco-Perú Jul 2019 –Dec 2019
Lima-Perú
HOLDEN ARCHITECTS / INTERN
I interned at the firm, contributing to the production of plans and architectural details.
PERU'S MINISTRY OF HOUSING / CONSTRUCTION MANAGER
I served as the Construction Manager leading a social project for the construction of 70 sustainable homes in the mountains of Perú, located over 4800m.a.s.l.
REGIONAL GOVERNMENT OF CUSCO / CONSTRUCTION MANAGER
I served as the Construction Manager for the development of three educational institutions specializing in architecture.
MACOZ CONSULTANT AND CONSTRUCTOR S.R.L. / PROJECT ARCHITECT
Designer and Supervisor in the development of infraestructure projects
PERU'S MINISTRY OF EDUCATION / SPECIALIST ARCHITECT IN FORMULATION OF EDUCATIONAL
I acted as the formulator and designer for educational institutions, leading the design efforts for 24 elementary and high schools in northern Peru
EXPERIENCE
Jan 2019 -Aug 2019
Cusco-Perú
Aug 2018 -Dec 2018
Cusco-Perú
Oct 2017 - Dec 2018
Cusco-Perú
Aug 2016 -Oct 2017
Cusco-Perú
SKILLS
DKM E.I.R.L. / PROJECT ARCHITECT
Architect responsible for the design and supervision of infrastructure projects
EPS. EMSAPA CALCA S.A. / CONSTRUCTION MANAGER
I led the execution of a commercial cadastre project for a population of 63,155 inhabitants
POROY DISTRICT MUNICIPALITY/ PROJECT ARCHITECT
I served as Construction Manager of the following buildings:
- Elementary school institution 'N° 1361 Tiwinza' for a student population of 70 students.
- Cultural auditorium accommodating 200 people.
POROY DISTRICT MUNICIPALITY/ INTERN
I commenced my professional journey at Poroy District Municipality, initially serving as an Intern for two years. Subsequently, I assumed the role of Project Architect, overseeing various projects
ADDITIONAL INFORMATION
Graduated as best student in high school class.
LEED Green Associate 2024.
Autodesk BIM specialization program (architecture, structures, facilities, Naviswork Manage) 112 hrs.
Graduated in the top 95.56th percentile of my class of 40 students
Modeling contractor for professional architectural models during 2015 - 2018.
Revit
Archicad
Corona Chaos
Illustrator
SketchUp
Autocad
Photoshop
InDesign
Lumion Office
LANGUAGES English Spanish
Enscape
Portuguese
CONTENT EDUCATION ELEMENTARY SCHOOLS/MINISTRY OF EDUCATION. 01 HEALTHCARE ANTONIO LORENA CONTINGENCY HOSPITAL. 02 RURAL SINGLE-FAMILY HOUSE COTTAGE IN THE SACRED VALLEY 03 URBAN SINGLE-FAMILY HOUSE SINGLE FAMILY HOUSE 04 06 12 OPHTHALMOLOGICAL CLINIC 14 16 HOUSE ON THE ROCKS 18 20 SINGLE FAMILY HOUSE 22
CONSTRUCTION MANAGMENT SUSTAINABLE HOUSING CONSTRUCTION 2021 07 SCHOOL PROJECTS STUDIO 1 06 MIX-USE BUILDIGNS MULTIFAMILY BUILDING 05 3 STARS HOTEL MARKET/SPORT CENTER STUDIO 2 CONSTRUCTION OF PUBLIC SCHOOLS CONSTRUCTION OF PUBLIC SCHOOLS 24 26 28 30 32 34 36 38
MODULES OF NATIONAL RECONSTRUC-TION- 2019
In this project, I led the reconstruction of 160 flood-affected schools nationwide, creating adaptable educational modules following Peruvian regulations. I contributed to designing architectural modules , planned and designed 24 elementary and high schools.
location: Lima-Perú
Role: Project Architect
First level structural bay Roof complete unit One level Two levels three levels One level One level < 06 >
Central
patio set
Linear
Set in L
bars
Unit A.3
Educational modules were formulated that fit both the topography of the place, student needs , population, and weather conditions of each region (coast, jungle mountains). This process allowed the reduction of the execution time of each project, thus recovering the schools lost during the flood. A.1.1
set
Central patio set Parallel
set
Complement G Complement f Unit
B
A.4 Complement
A.2 Unit A.2
C.1 Extension A Complement
Unit C.1 Extension
Complement
Complement B Unit F.1.2 Unit D.13
E.3 Complement B Complement
Unit E.2 Complement
Unit D.1.2 Complement
Unit D.3 Unit D.2 Extension
< 07 >
CURRENT STATE
Unit
A.4 Extension
Complement E Unit
F Unit
Unit A.1.1 Unit
F
A
G
Unit
D
G
D
A Complement G Complement G
PREVIOUS STATE
< 08 >
SITE PROJECT
SITE PROJECT
SITE PROJECT
COAST HIGHLAND
Rural - coast typical section
Urban - coast typical section
Rural - mountains typical section
Rural - coast typical section
Urban - mountains typical section
Urban - coast typical section
KEY
Foundation according to the type of soil and modular concrete structure
Raised floor
Masonry base and standardized elements up to 2 20 meters
Standardized high partitioning
Roofed side corridor
Concrete gable roof
Rural
Foundation according to the type of soil and modular concrete structure
Raised floor
Masonry base and standardized elements up to 2 20 meters
Standardized high partitioning
Roofed side corridor
Concrete gable roof
Rural
Foundation according to the type of soil and modular concrete structure
Raised floor
Masonry base and standardized elements up to 2 20 meters
Standardized high partitioning
Roofed side corridor
Concrete gable roof
section Urban - mountains typical section
Urban
< 10 >
VIEW
AXONOMETRIC
"ANTONIO LORENA
CONTINGENCY HOSPITAL
A contingency hospital was designed to accommodate patients from the Cusco region while the construction of the larger capacity hospital was underway, with a focus on using precast blocks despite challenges in functional relationships, and I led a team of three architects for the architectural deliverables.
location: Cusco-Perú
Role: Project Architect
< 12 >
VIEW < 13 >
AXONOMETRIC
OPHTHALMOLOGICAL CLINIC
For this project, I prepared all the architectural plans for the service of an ophthalmological clinic in the city of lima-Peru. the project has surgery rooms, public service, offices, and triage rooms. in addition, the operating license was obtained and the clinic has been operating normally
location: Lima-Perú
Role: Project Architect
FIRST LEVEL < 14 >
SECOND LEVEL
THIRD LEVEL
< 15 >
COTTAGE - SACRED VALLEY
The project is located in the sacred valley of the incas in the city of cusco. it was designed in an area of 1240 ft2 in two stories. has 7 bedrooms, 4 bathrooms and spaces for common use. the project is currently under construction
Cusco-Perú
Role: Project Architect
R O Y E C T O "VIVIENDA CAMPESTRE" PROPIETARIO (A) DEPARTAMENTO CUSCO PROVINCIA ALCA DISTRITO CALCA ESCALA: INDICADAS - SRA. CELIA LAROTA CCALLOQUISPE DNI: 23932126 FECHA: ABRIL 2022 PLANO DE ARQUITECTURA AR-05 ELEVACION OESTE ESC. 1/50 ELEVACION FRONTAL ESC. 1/50 GSPublisherVersion 0.96.100.100 2.55 0.25 0.20 1.45 0.75 0.45 2.20 7.85 TIJERALES DE MADERA MISA DE 8" X 8" TIJERALES DE MADERA MISA DE 8" X 8" COBERTURA DE TEJA ANDINA BALCON DE ESTRUCTURA DE ALUMINIO Y VIDRIO LAMINADO CORREAS MISA CORREAS DE MADERA MISA DE X 4 NPT: +3.00 NPT: +7 22 NPT: +7 85 NPT: ±0.00 COMEDOR SS.HH. 2.55 0.25 0.20 2.20 0.44 1.58 0.63 0.37 8.23 2.55 0.25 0.20 1.00 1.20 0.44 1.58 0.63 0.37 8.23 TIJERALES DE MADERA MISA DE 8" X 8" TIJERALES DE MADERA MISA DE 8" X 8" CORREAS DE MADERA MISA DE X COBERTURA DE TEJA ANDINA COBERTURA DE TEJA ANDINA CHIMENEA CON REVESTIMIENTO DE LADRILLO CARAVISTA BALCON DE ESTRUCTURA DE ALUMINIO Y VIDRIO LAMINADO NPT: +3.00 NPT: +7 22 NPT: +7 85 NPT: ±0.00 NPT: +3.00 NPT: +7 22 NPT: +7 85 NPT: ±0.00 SALA EXTERIOR SALA TERRAZA CORTE B-B ESC. 1/50 CORTE < 16 > SECTION ELEVATION
location:
NPT:
P R O Y E C T O "VIVIENDA CAMPESTRE" PROPIETARIO (A) DEPARTAMENTO CUSCO PROVINCIA CALCA DISTRITO CALCA ESCALA: INDICADAS - SRA. CELIA LAROTA CCALLOQUISPE DNI: 23932126 FECHA: ABRIL 2022 AR-0 A A B B C C D D 3 3 2 2 1 1 E E L RG R 2 ' 2 ' 0.40 4.20 0.40 4.20 0.40 2.68 0.40 1.18 2.42 0.40 0.40 17.08 4.60 4.60 3.08 4.00 1.00 0.25 2.56 0.25 0.90 0.15 3.72 0.25 9.08 2.81 2.42 2.61 0.40 1.00 2.52 0.68 0.40 4.20 0.40 2.75 0.40 3.53 0.40 16.68 4.60 4.60 3.08 4.00 0.93 0.40 2.41 0.40 4.70 0.25 9.08 2.81 2.42 2.61 NPT: ±0.00 NPT: ±0.00 NPT: ±0.00 NPT: ±0.00
±0.00 NPT: ±0.00 NPT: ±0.00
NPT:
±0.00 NPT: ±0.00 PROYECCION TECHO PROYECCION TECHO PROYECCION TECHO PROYECCION TECHO PROYECCION TECHO COMEDOR COCINA DORM. 01 DORM. 02 SS.HH. SALA EXTERIOR SALA SS.HH. 6 7 8 9 11 12 13 4 5 6 LAV. A A B B C C V-01 2.52 1.65 0.90 V-0 3 3.72 1.65 0.90 V-0 2 1.30 0.75 1.80 V-0 4 1.26 2.55 0. 0 0 V-0 5 2 68 2.55 0. 0 0 V-0 6 2. 36 2.55 0. 0 0 V-0 7 4.20 2.55 0. 0 0 V-0 2 1.30 0.75 1.80 A A B B C C D D 3 3 2 2 1 1 E E 2 ' 2 ' 0.40 2.75 0.15 1.30 0.40 4.20 0.40 2.68 0.40 0.60 0.58 3.22 16.48 4.60 4.60 3.08 4.00 1.00 0.25 2.56 0.25 2.28 2.50 0.25 9.08 2.81 2.42 2.61 0.40 0.85 0.15 3.20 0.15 0.25 4.20 0.40 2.68 0.40 4.40 16.48 4.60 4.60 3.08 4.00 1.00 0.25 2.56 0.25 2.17 0.25 2.36 0.25 9.08 2.81 2.42 2.61 NPT: +3.00 NPT: +3.00 NPT: +3.00 NPT: +3.00 NPT: +3.00 NPT: +3.00 NPT: +3.00 NPT: +3.00 PROYECCION TECHO PROYECCION TECHO PROYECCION TECHO PROYECCION TECHO PROYECCION TECHO DORM. 03 SS.HH. DORM. 04 DORM. 05 DORM. 06 DORM. 07 SS.HH. TERRAZA 01 2 0 3 0 5 7 8 9 10 11 12 4 5 6 7 SS.HH. A A B B C C V-0 8 2.42 1.65 0.90 V-0 9 1.35 1.65 0.90 V10 1.20 1.65 0.90 V-1 1 1.20 2.55 0. 0 0 V-1 2 2.36 2.55 0. 0 0 V-0 2 1.30 0.75 1.80 V-1 3 2. 50 2.55 0. 0 0 V-0 7 4.20 2.55 0. 0 0 V-0 2 1.30 0.75 1.80 V-0 2 1.30 0.75 1.80 N PLANO PRIMER NIVEL ESC. 1/50 PLANO 2DO NIVEL ESC. 1/50 < 17 > FIRST LEVEL SECOND LEVEL
HOUSE ON THE ROCKS
The project is located in the sacred valley of the incas in the city of CUsco. it was designed in an area of 1240 ft2 in two stories. has 7 bedrooms, 4 bathrooms and spaces for common use. the project is currently under construction
location: Cusco-Perú
Role: Project Architect
ELEVATION
< 18 >
SECTION
< 19 >
FIRST LEVEL
SINGLE-FAMILY HOME
Project designed for Housing for family use. It has 3 stories, spaces for private and common use. Currently the project is being executed.
location: Cusco-Perú
Role: Project Architect
< 20 > ELEVATION AXONOMETRIC VIEW
1 2 3 4 5 10 15 DOWN UP 15R 0'-6.82" 14G 0'-9.97" A A B B D D E E F F G G C C 1 1 2 2 0'-5.91" 3'-3.37" 0'-5.91" 11'-4.61" 0'-5.91" 16'-1.70" 64'-5.56" 3'-3.37" 3'-1.20" 16'-1.70" 64'-5.56" R 3'-11.24" 1'-11.62" 10 11 12 13 14 15 14G 0'-9.97" A A B B D D E E F F G G C C 1 1 2 2 11'-11.70" 15'-1.88" 7'-2.61" 6'-4.57" 5'-11.65" 8'-6.56" 9'-10.05" 1'-3.75" 10'-0.86" 9'-10.11" 10'-0.86" 3'-3.37" 2'-11.43" 2'-11.43" 5'-3.98" 3'-3.37" 3'-11.24" A A B B D D E E F F G G C C 1 1 2 2 9 11 12 14 15 DOWN UP 15R 0'-6.82" 14G 0'-9.97" A B D E F G C 2 2 3'-3.37" 0'-5.91" 11'-4.61" 0'-5.91" 16'-1.70" 3'-3.37" 3'-1.20" 16'-1.70" 64'-5.56" R 3'-11.24" 1'-11.62" 11 12 14 15 DOWN UP 15R 0'-6.82" 14G 0'-9.97" A A B B D D E E F F G G C C 1 1 2 2 11'-11.70" 15'-1.88" 7'-2.61" 6'-4.57" 5'-11.65" 8'-6.56" 9'-10.05" 1'-3.75" 10'-0.86" 9'-10.11" 10'-0.86" 3'-3.37" 2'-11.43" 2'-11.43" 5'-3.98" 3'-3.37" 3'-11.24" A A B B D D E E F F G G C C 1 1 2 2 A B D E F G C 2 2 11'-4.61" 0'-5.91" 3'-1.20" 64'-5.56" 10 11 12 14 15 DOWN 15R 0'-6.82" 14G 0'-9.97" A A B B D D E E F F G G C C 1 1 2 2 11'-11.70" 15'-1.88" 7'-2.61" 6'-4.57" 5'-11.65" 8'-6.56" 9'-10.05" 1'-3.75" 10'-0.86" 9'-10.11" 10'-0.86" 3'-3.37" 2'-11.43" 2'-11.43" 5'-3.98" 3'-3.37" 3'-11.24" A A B B D D E E F F G G C C 1 1 2 2
LEVEL
LEVEL
LEVEL < 21 >
SECOND
THIRD
FIRST
SINGLE-FAMILY HOME
Project designed for Housing for family use. It has 3 stories, spaces for private and common use. Currently the project is being executed.
location: Cusco-Perú
Role: Project Architect
NPT =+-0.00 NPT =+2.60 NPT =+5.20 NPT =+7.80 NPT =+10.40 7'-6.55" 0'-11.81" 7'-6.55" 0'-11.81" 7'-6.55" 0'-11.81" 7'-6.55" 0'-11.81" 5'-10.87" 8'-6.36" 8'-6.36" 8'-6.36" 8'-6.36" 34'-1.45"
< 22 > ELEVATION AXONOMETRIC VIEW
10'-3.17" 15'-5.04"
39'-8.41"
9'-6.32" 0'-9.73" 13'-9.36" 1'-7.68"
0'-9.84"
0'-9.84"
0'-9.84"
9'-6.32"
9'-6.32"
0'-9.73"
0'-9.73"
10'-6.06"
13'-9.36"
0'-5.83"
1'-7.68"
0'-5.83"
10'-6.06"
0'-9.73"
9'-6.32"
0'-9.84"
4 4 2 5 5
12'-3.64" 0'-9.84"
12'-3.64" 0'-9.84"
0'-11.81"1'-9.66" 1'-7.68" 3'-11.28" 9'-2.20"
9'-2.20"
3'-11.28"
0'-11.81"1'-9.66"
1'-7.68"
2
0'-9.84"
0'-9.84"
0'-9.84"
10'-4.04"
10'-4.04"
9'-6.24" 0'-9.84"
31'-6.12" 12'-9.11" 11'-5.80" 6'-5.36"
1'-7.68" 11'-1.35" 1'-7.68" 9'-0.36" 1'-7.68" 5'-7.52" 0'-9.84"
0'-9.60" 11'-11.52" 0'-9.84" 10'-11.89" 0'-5.91" 5'-7.52" 0'-9.84"
P-02 V-02 V-03
31'-6.12" 12'-9.11" 11'-5.80" 6'-5.36"
1'-7.68" 11'-1.35" 1'-7.68" 9'-0.36" 1'-7.68" 5'-7.52" 0'-9.84" 0'-9.60" 11'-11.52" 0'-9.84" 10'-11.89" 0'-5.91" 5'-7.52" 0'-9.84"
R
R
V-01 P-03 P-02
P-06
V-03 P-06
P-01 P-08 V-01 P-03
P-08
23'-9.43"
2'-9.46"
9'-11.36"
0'-9.84"
0'-9.84"
0'-9.84"
0'-9.84"
9'-11.36"
9'-11.36"
0'-9.84"
2'-9.46"
0'-9.84"
9'-11.36"
10'-10.49"
10'-10.49"
10'-4.04"
9'-6.20"
0'-9.85"
0'-9.85"
9'-6.20" 0'-9.84"
15'-5.04"
23'-9.43"
27'-8.68"
27'-8.68"
40'-2.89"
40'-2.89"
15'-5.04"
15'-5.04"
12'-8.13" 11'-5.80" 6'-5.37"
1'-7.68" 11'-1.43" 1'-7.60" 9'-0.36" 1'-7.68" 25'-0.75"
1'-11.38" 9'-6.00" 0'-5.91" 2'-9.46" 0'-5.91" 10'-11.89" 0'-9.84"
R
0'-9.76"
9'-11.36"
10'-9.20"
2'-9.46"
2'-9.46"
0'-9.84"
0'-9.84"
13'-1.48"
13'-1.48"
1'-7.69" 5'-8.90" 0'-11.81" 5'-4.96" 2'-7.50" 8'-10.30" 0'-9.84" 6'-9.80"
26'-0.99"
1 1 3
15'-8.98" 0'-5.91"
3'-11.24" 0'-5.91"
13'-9.61" 1'-7.68"
P-20
P-14 V-10 P-21
P-19 V-15 P-15
P-17 P-22
0'-5.91"
10'-9.92"
15'-5.04"
13'-1.48" 0'-4.92"
4'-7.14" 3'-3.35" 0'-9.84"
12'-3.39" 0'-9.97"
V-11 V-12 V-14
TECHO DE VIDRIO CON V-13
0'-5.91"
3'-11.24" 0'-5.91"
23'-9.43"
40'-1.56"
12'-3.64" 0'-9.84"
2'-9.46"
13'-1.48"
0'-10.10" 6'-9.58" 0'-5.91" 17'-5.51" 0'-5.91" 5'-11.96" 0'-9.84" 7'-5.57" 6'-3.79" 11'-5.80" 6'-9.80" 26'-0.99"
1'-7.69" 5'-8.90" 0'-11.81" 5'-4.96" 2'-7.50" 8'-10.30" 0'-9.84" 6'-9.80" 0'-10.10" 6'-9.58" 0'-5.91" 17'-5.51" 0'-5.91" 5'-11.96" 0'-9.84"
7'-5.57" 6'-3.79" 11'-5.80" 6'-9.80"
FIRST LEVEL
2
31'-4.15" 12'-9.03" 11'-5.80" 6'-5.36"
3 2
NPT =+-0.00 NPT =+2.60 NPT =+5.20 NPT =+7.80 NPT =+10.40 0'-11.81" 8'-6.36" 8'-6.36" 8'-6.36" 8'-6.36"
THIRD LEVEL
13'-9.36" 1'-7.68"
15'-5.04" 13'-1.48"
13'-1.48"
2'-1.60" 9'-1.81" 0'-5.91" 2'-11.43" 2'-11.43" 2'-3.56" 6'-2.80" 0'-9.84" 5'-8.81" 0'-9.84" 1'-5.71" 11'-1.43" 1'-7.60" 9'-0.36" 1'-7.68" 5'-7.52" 0'-9.84"
31'-4.15" 12'-9.03" 11'-5.80" 6'-5.36"
1'-5.71" 11'-1.43" 1'-7.60" 9'-0.36" 1'-7.68" 5'-7.52" 0'-9.84"
2'-1.60" 9'-1.81" 0'-5.91" 2'-11.43" 2'-11.43" 2'-3.56" 6'-2.80" 0'-9.84" 5'-8.81" 0'-9.84"
4 1
P-05 P-07 P-04 D D
0'-9.76"
0'-10.01"
0'-9.76"
A A
A A 3 2 1 4 1 3 2 0'-9.84" 0'-9.76" 1'-7.68" 11'-1.43" 1'-7.60" 9'-0.36" 1'-7.68" 25'-0.75" 12'-8.13" 11'-5.80" 6'-5.37" 1'-11.38" 9'-6.00" 0'-5.91" 2'-9.46" 0'-5.91" 10'-11.89" 0'-9.84" 0'-9.85" 0'-9.85" R 3 2 1 4 1´ 26'-0.99" 6'-9.80" 7'-5.71" 6'-3.65" 11'-5.80" 6'-9.80" 1 3 2 11 DOWN D D C C B B A A 3 3 2 2 1 1 4 4 1´ 4 4 1 1 3
13'-9.36" 1'-7.68" 12'-3.64" 0'-9.84"
0'-5.91" 3'-11.24" 0'-5.91" 8'-11.64" 3'-4.00" 0'-9.84"
METALICA
P-11 P-09 V-07 P-10 V-05 V-06 V-09 P-13 P-12 P-10 V-01 V-08 P-10 P-11 V-04
5'-8.81"
9'-11.36"
10'-9.74"
PERFIL DE TERENO EXISTENTE
7'-10.49"
28'-1.60"
28'-1.60"
0'-10.01" 8'-0.89" 0'-5.91"1'-11.62" 5'-10.87"
8'-0.89" 0'-5.91"1'-11.62"
2'-9.46"
10'-9.74"
7'-10.49"
1
1 1
5'-8.81" 6'-4.83"
9'-11.36" 2'-9.46"
7'-10.49"
B B
5'-10.87"
0'-5.91"
8'-10.30"
0'-5.91"
8'-10.30"
23'-9.43"
40'-1.48"
15'-5.04"
15'-5.04"
40'-1.48"
0'-5.91"
23'-9.43"
C C
12'-3.64"
13'-1.48"
5 5
METALICA P-11 P-09 V-07 P-10 V-05 V-06 V-09 P-13 P-12 P-10 V-01 V-08 P-10 P-11 V-04
7'-5.71" 6'-3.65" 11'-5.80" 6'-9.80"
3 2
6'-4.83"
0'-9.84"
12'-3.64"
2'-9.46"
13'-1.48"
5 5 BARANDA
0'-9.84"
2'-9.46"
0'-5.91" 7'-10.49" 10'-0.92" 6'-4.83"
1'-7.69" 5'-8.90" 0'-11.81" 5'-4.96" 2'-7.50" 8'-10.30" 0'-9.84" 6'-4.83" 26'-0.99" 6'-9.80" 0'-10.10" 6'-9.58"
7'-5.71" 6'-3.65" 11'-5.80" 6'-9.80"
2 2
3 3
4 4 1´
3 2
SECOND LEVEL
7'-6.55" 0'-11.81" 7'-6.55" 0'-11.81" 7'-6.55" 0'-11.81" 7'-6.55" 0'-11.81" 5'-10.87" 8'-6.36" 8'-6.36" 8'-6.36" 8'-6.36" 34'-1.45"
NPT =+-0.00 NPT =+2.60 NPT =+5.20 NPT =+7.80 NPT =+10.40
< 23 >
D D C C B B 3 2 1 4 1´ 1'-7.69" 5'-8.90" 0'-11.81" 5'-4.96" 2'-7.50" 8'-10.30" 0'-9.84" 6'-4.83" 26'-0.99" 6'-9.80" 0'-10.10" 6'-9.58" 0'-5.91" 7'-10.49" 10'-0.92" 6'-4.83" 9'-6.24" 0'-9.84" 10'-5.98" 0'-5.91" 3'-11.24" 0'-5.91" 8'-11.64" 3'-4.00" 0'-9.84" 9'-6.24" 0'-9.84" 13'-9.36" 1'-7.68" 12'-3.64" 0'-9.84" 39'-8.44" 10'-4.04" 15'-5.04" 13'-1.48" 8'-0.89" 1'-11.62"0'-5.91" 5'-10.87" 0'-5.91" 8'-10.30" 0'-5.91" 12'-3.64" 0'-9.84" 9'-11.36" 2'-9.46" 23'-9.43" 2'-9.46" 40'-1.48" 10'-9.74" 15'-5.04" 13'-1.48" 7'-5.71" 6'-3.65" 11'-5.80" 6'-9.80" 28'-1.60" 5'-8.81" 6'-4.83" 4'-11.06" 5'-8.90" 2'-11.43" 4 4 1 3 2 5 5 BARANDA METALICA BARANDA METALICA P-09 V-07 P-10 V-05 V-06 V-09 P-13 P-12 P-10 V-01 V-08 P-10 P-11 V-04 D D C C B B A A 3 3 2 2 1 1 4 4 1´ 4 4 1 1 3 3 2 2 5 5 1'-7.69" 5'-8.90" 0'-9.19" 5'-7.58" 2'-7.50" 8'-10.30" 0'-4.92" 0'-9.84" 6'-10.03" 0'-5.91" 3'-11.24" 0'-5.91" 12'-8.23" 0'-9.84" 3'-3.37" 26'-0.99" 7'-5.57" 6'-3.79" 11'-5.80" 0'-9.84" 9'-11.36" 2'-9.46" 23'-9.43" 2'-9.46" 0'-9.76" 9'-11.36" 0'-5.91" 10'-9.92" 0'-5.91" 3'-11.24" 0'-5.91" 12'-3.64" 0'-9.84" 40'-1.56" 10'-9.20" 15'-5.04" 13'-1.48" 1'-7.68" 11'-1.43" 1'-7.60" 9'-0.36" 1'-7.68" 25'-0.75" 12'-8.13" 11'-5.80" 6'-5.37" 1'-11.38" 9'-6.00" 0'-5.91" 2'-9.46" 0'-5.91" 10'-11.89" 0'-9.84" 0'-9.85" 9'-6.20" 0'-9.84" 13'-9.61" 1'-7.68" 12'-3.39" 0'-9.97" 0'-9.85" 9'-6.20" 15'-8.98" 0'-5.91" 3'-11.24" 0'-5.91" 4'-7.14" 3'-3.35"0'-9.84" 10'-4.04" 15'-5.04" 13'-1.48" 0'-4.92" TECHO DE VIDRIO CON ESTRUCTURA METCALICA BARANDA METALICA BARANDA METALICA R V-13 P-14 V-10 P-21 P-20 V-11 V-12 P-19 V-14 V-15 P-15 P-16 P-18 P-17 P-22 NPT =+-0.00 NPT =+2.60 NPT =+5.20 NPT =+7.80 NPT =+10.40 7'-6.55" 0'-11.81" 7'-6.55" 0'-11.81" 7'-6.55" 0'-11.81" 7'-6.55" 0'-11.81" 5'-10.87" 8'-6.36" 8'-6.36" 8'-6.36" 8'-6.36" 34'-1.45" NPT =+-0.00 NPT =+2.60 NPT =+5.20 NPT =+7.80 NPT =+10.40 0'-11.81" 8'-6.36" 8'-6.36" 8'-6.36" 8'-6.36" 26'-6.90" 8'-10.30" 0'-7.87" 7'-10.49" 0'-7.87" 7'-10.49" 0'-7.87" 7'-10.49" 7'-10.49" 7'-10.49" PERFIL DE TERENO EXISTENTE SECTION D D C C B B A A 3 3 2 2 1 1 4 4 1´
39'-8.41" 1
10'-3.17" 15'-5.04" 13'-1.48" 1 3 3 2
9'-6.24" 0'-9.84" 10'-5.98"
9'-6.24" 0'-9.84"
39'-8.44"
15'-5.04"
3 2 1 4 1 3 2 11 D
C
B B
4'-11.06" 5'-8.90" A
2'-11.43"
4
1 3
D
C
A
3 3
2 2
1 1
4 4 1´
V-02
P-05 P-07 P-04 10 D D C C B B A A 3 3 2 2 1 1 4 4 1´ 1'-7.69" 5'-8.90" 0'-11.81" 5'-4.96" 2'-7.50" 8'-10.30" 0'-9.84" 6'-4.83" 26'-0.99" 6'-9.80"
13'-1.48" 6'-9.58" 0'-5.91" 7'-10.49" 10'-0.92" 6'-4.83"
4 4
3 2
5 5
P-01
0'-10.10"
0'-9.84"
9'-6.24" 0'-9.84"
10'-5.98" 0'-5.91"
3'-4.00" 0'-9.84"
3'-11.24" 0'-5.91" 8'-11.64"
12'-3.64" 0'-9.84"
39'-8.44"
0'-5.91"
4'-11.06" 5'-8.90" 2 5 5
2'-11.43"
4 4
1 3
2
BARANDA
1'-7.69" 5'-8.90" 0'-9.19" 5'-7.58" 2'-7.50" 8'-10.30" 0'-4.92" 0'-9.84" 6'-10.03" 0'-5.91" 3'-11.24" 0'-5.91" 12'-8.23" 0'-9.84" 3'-3.37"
26'-0.99"
7'-5.57" 6'-3.79" 11'-5.80"
0'-9.84"
9'-11.36"
2'-9.46"
P-16 P-18
26'-6.90" 8'-10.30" 0'-7.87" 7'-10.49" 0'-7.87" 7'-10.49" 0'-7.87"
MULTIFAMILY BUILDING
design of residential apartments built in an area of 4600 ft2. it has independent departments at each level. the project was scheduled in 9 stories and is currently built.
location: Cusco-Perú
Role: Project Architect
< 24 >
10 11 12 13 14 15 F F 1´ C C D D A A E E 1 1 2 2 3 3 B B B B A 1'-11.62" 9'-6.11" 2'-7.50" 12'-0.18" 2'-7.50" 7'-5.53" 2'-7.50" 9'-10.11" 4'-5.15" 6'-7.20" 2'-7.56" 62'-3.95" 11'-7.11" 15'-5.06" 10'-11.89" 10'-7.95" 12'-10.08" 0'-9.84" 13'-3.41"
18'-7.30" 2'-7.49" 2'-7.48" 41'-2.88" 14'-1.25" 23'-7.33" 0'-9.92" 9'-10.80" 1'-9.82" 17'-11.41" 0'-9.84" 10'-2.05" 0'-9.84" 4'-11.06" 0'-11.62" 3'-11.43" 0'-9.84" 11'-5.80" 0'-9.84" 12'-3.64" 10'-7.95" 10'-11.89" 19'-8.57" 10'-9.29" 65'-3.28"
1'-11.62" 13'-9.39" 0'-9.81" 39'-2.60" 14'-6.70" 11'-10.12" 11'-9.21" NPT=±0.00 NPT=±0.00 NPT=±0.00 NPT=+1.53 NPT=+2.38 PARKING AREA HALL 01 02 03 04 05 CONTROL V-01 V-02 P-02 P-01 ELEVATOR 10 11 12 13 14 15 0'-6.95" 9'-10.11" 18 19 20 21 22 23 25 V-07 P-03 P-04 V-06 V-09 V-03 P-05 V-04 V-05 C C D D A A E E 1 1 2 2 3 3 B B B B A A 11'-5.73" 2'-7.50" 12'-0.18" 2'-8.45" 0'-5.91" 2'-7.50" 0'-5.91" 5'-8.90" 0'-7.87" 5'-8.90" 4'-1.21" 4'-5.15" 6'-7.20" 2'-7.56" 62'-3.95" 15'-4.26" 10'-11.89" 10'-7.95" 12'-10.08" 0'-9.92" 6'-7.43" 3'-3.37" 1'-9.82" 17'-11.41" 0'-9.84" 10'-2.05" 0'-9.84" 9'-10.11" 0'-9.84" 11'-5.80" 0'-9.84" 65'-3.28" 8'-2.57" 3'-1.40" 5'-8.90" 3'-3.37" 7'-2.44" 3'-3.37" 9'-2.49" 4'-11.06" 10'-6.06" 0'-9.81" 39'-2.60" 14'-7.17" 23'-7.33" 0'-9.81" 13'-8.78" 3'-11.24" 19'-0.79" 1'-7.80" 0'-5.91" 2'-7.50" 5'-5.10" 3'-11.24" NPT=+2.80 NPT=+2.80 COMERCIAL SPACE ACCESO COMERCIAL COUNTER RESTROOM M RESTROOM (F) ELEVATOR HALL 0'-6.95" 9'-10.11" 19 20 21 22 23 24 25 26 27 28 29 30 36 37 38 39 40 41 C D A E 3 3 B B A A 2'-1.39" 0'-2.48" 1'-11.62" 2'-7.50" 12'-0.18" 2'-7.50" 7'-5.53" 2'-7.50" 9'-10.11" 4'-5.15" 9'-2.77" 15'-4.26" 10'-11.89" 10'-7.95" 12'-7.92" 0'-5.91" 2'-3.56" 11'-8.14" 8'-4.39" 0'-9.84" 13'-4.20" 13'-5.29" 5'-8.90" V-13 V-06 V-03 V-04 V-05 C D A E 1 1 B B 2'-7.49" 0'-9.92" 6'-7.43" 3'-3.37" 1'-9.82" 17'-11.41" 0'-9.84" 10'-2.05" 0'-9.84" 9'-10.11" 0'-9.84" 11'-5.80" 0'-9.84" 5.99 10'-11.89" 10'-7.95" 12'-3.54" 3'-3.37" 1'-7.80" 0'-6.95" 9'-10.11" 17 18 19 20 21 22 23 26 27 28 29 30 31 32 34 35 36 37 38 39 40 R L V-16 V-15 P-07 P-07 P-07 P-11 P-11 P-11 V-14 P-10 P-06 V-19 P-09 V-18 V-18 V-11 P-08 V-17 V-12 P-07 C C D D A A E E 1 1 2 2 3 3 B B B B A A 56'-3.83" 0'-5.91" 8'-0.46" 3'-4.27" 0'-5.91" 3'-3.37" 1'-9.65" 3'-3.37" 0'-5.91" 2'-1.59" 6'-6.74" 1'-9.65" 0'-9.84" 9'-10.11" 0'-5.91" 6'-0.75" 5'-8.76" 0'-9.79" 5.99 10'-11.89" 10'-7.95" 12'-3.64" 2'-1.39" 0'-5.91" 28'-2.04" 0'-7.87" 5'-8.90" 4'-1.21" 4'-5.15" 9'-2.77" 0'-2.48" 1'-11.62" 2'-7.50" 12'-0.18" 2'-7.50" 7'-5.53" 2'-7.50" 9'-10.11" 4'-5.15" 9'-2.77" 15'-4.26" 10'-11.89" 10'-7.95" 12'-7.92" 52'-9.84" 0'-5.91" 2'-3.56" 11'-8.14" 0'-9.84" 3'-1.13" 6'-1.11" 0'-9.84" 6'-3.65" 8'-0.46" 0'-5.91" 1'-7.69" 18'-11.50" 1.20 13'-7.76" 0'-9.84" 23'-7.33" 8'-4.39" 7'-8.12" 0'-9.84" 13'-4.20" 3'-3.37" 18'-7.30" 2'-7.49" 13'-5.29" 2'-11.43" 5'-8.90" 13'-6.51" 28'-2.04" 13'-11.55" 11'-4.73" 10'-5.98" 9'-10.11" 3'-3.37" NPT=+5.80 NPT=+5.80 NPT=+5.80 NPT=+5.80 NPT=+5.80 NPT=+5.80 NPT=+5.80 NPT=+5.80 V-19 P-10 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 R V-16 V-15 P-07 P-07 P-07 P-11 P-11 P-11 V-14 P-10 P-06 V-19 V-18 V-18 V-11 P-08 V-17 V-12 P-07 C C D D A A E E 1 1 2 2 3 3 B B R B B A A 3'-3.37" 3'-11.24" 52'-9.84" 12'-10.07" 10'-7.95" 10'-11.89" 15'-5.06" 40'-11.38" 0'-7.82" 9'-6.19" 3'-11.24" 0'-5.91" 9'-10.11" 0'-5.91" 3'-11.24" 0'-5.91" 10'-10.75" 0'-5.91" 14'-1.25" 23'-7.33" 0'-5.91" 9'-10.11" 0'-9.84" 10'-5.98" 0'-5.91" 3'-11.24" 0'-5.91" 3'-11.24" 0'-5.91" 11'-4.73" 0'-5.91" 0'-9.84" 1'-9.82" 17'-11.41" 0'-9.84" 10'-2.05" 0'-9.84" 9'-10.11" 0'-9.84" 11'-5.80" 0'-9.84" 56'-4.10" NPT=+11.40 NPT=+11.40 NPT=+11.40 NPT=+11.40 NPT=+11.40 NPT=+11.40 NPT=+11.40 NPT=+11.40 COMEDOR V-13 P-06 V-19 1ST LEVEL 2ND LEVEL 3RD LEVEL 4TH TO 7TH LEVEL 8 10 11 12 13 14 15 F F 1´ C C D D A A E E 1 1 2 2 3 3 B B B B A 1'-11.62" 9'-6.11" 2'-7.50" 12'-0.18" 2'-7.50" 7'-5.53" 2'-7.50" 9'-10.11" 4'-5.15" 6'-7.20" 2'-7.56" 62'-3.95" 11'-7.11" 15'-5.06" 10'-11.89" 10'-7.95" 12'-10.08" 0'-9.84" 13'-3.41" 3'-3.37" 18'-7.30" 2'-7.49" 2'-7.48" 0'-9.92" 9'-10.80" 1'-9.82" 17'-11.41" 0'-9.84" 10'-2.05" 0'-9.84" 4'-11.06" 0'-11.62" 3'-11.43" 0'-9.84" 11'-5.80" 0'-9.84" 12'-3.64" 10'-7.95" 10'-11.89" 19'-8.57" 10'-9.29" 65'-3.28" 2'-0.58" 9'-3.79" 1'-11.62" 9'-3.79" 1'-11.62" 13'-9.39" 0'-9.81" 39'-2.60" NPT=±0.00 NPT=±0.00 NPT=±0.00 NPT=+1.53 NPT=+2.38 PARKING AREA HALL 01 02 03 04 05 CONTROL V-01 V-02 P-02 P-01 ELEVATOR 8 10 11 12 13 14 15 0'-6.95" 9'-10.11" 17 18 19 20 21 22 23 24 V-07 P-03 P-04 V-06 V-10 V-03 V-08 P-05 V-04 V-05 C C D D A A E E 1 1 2 2 3 3 B B B B A A 11'-5.73" 2'-7.50" 12'-0.18" 2'-8.45" 0'-5.91" 2'-7.50" 0'-5.91" 5'-8.90" 0'-7.87" 5'-8.90" 4'-1.21" 4'-5.15" 6'-7.20" 2'-7.56" 62'-3.95" 0'-9.84" 13'-3.41" 0'-5.91" 2'-9.46" 18'-7.30" 2'-7.49" 0'-9.92" 6'-7.43" 3'-3.37" 1'-9.82" 0'-9.84" 10'-2.05" 0'-9.84" 9'-10.11" 0'-9.84" 11'-5.80" 0'-9.84" 65'-3.28" 13'-4.20" 8'-2.57" 5'-8.90" 5.99 10'-11.89" 10'-7.95" 12'-3.54" 3'-3.37" 7'-2.44" 3'-3.37" 9'-2.49" 4'-11.06" 10'-6.06" 0'-9.81" 39'-2.60" 0'-9.81" 13'-8.78" 3'-11.24" 19'-0.79" 1'-7.80" 23'-6.34" NPT=+2.80 NPT=+2.80 COMERCIAL SPACE ACCESO COMERCIAL COUNTER RESTROOM M P-05 RESTROOM (F) ELEVATOR HALL 0'-6.95" 9'-10.11" 21 22 23 24 25 26 27 28 38 39 40 C D A E 3 3 B B A A 2'-1.39" 0'-5.91" 28'-2.04" 0'-7.87" 5'-8.90" 4'-1.21" 4'-5.15" 9'-2.77" 0'-2.48" 1'-11.62" 2'-7.50" 12'-0.18" 2'-7.50" 7'-5.53" 2'-7.50" 9'-10.11" 4'-5.15" 9'-2.77" 15'-4.26" 10'-11.89" 10'-7.95" 12'-7.92" 52'-9.84" 0'-9.84" 0'-9.84" 2'-11.43" 5'-8.90" 13'-6.51" V-13 < 25 >
3'-3.37"
2'-0.58" 9'-3.79" 1'-11.62" 9'-3.79"
3 STAR HOTEL
The project is a 3-star hotel project. it has a first level for public use and upper levels of independent rooms and reception. it was programmed in 2800 ft2 of 6 stories. the project is currently under construction
location: Cusco-Perú
Role: Project Architect
< 26 >
20'-11.97" 6'-4.87"
1'-11.62"
A A
V-04
A A
10'-9.45" 13'-1.48" 10'-7.95" 12'-6.69" 13'-2.15" 0'-9.81"
3 3
61'-2.58" 1'-11.62" 8'-0.32" 1'-11.62" 11'-3.25" 1'-11.62" 19'-9.02" 1'-11.62" 1'-11.62"
A A
B B
0'-6.89"
V-04
1 1 2 2 3 3´
20'-2.14" 20'-11.97" 6'-4.87" 10'-5.83" 13'-1.89" 10'-8.28" 12'-6.97"
0'-5.91" NPT=±0.000 NPT=±0.000
3'-3.37" 7'-3.03" 2'-3.56" 9'-6.17" 2'-3.56" 8'-4.39" 2'-3.56" 11'-6.88" 5'-7.05"
3 3
P-03 P-02 2 5 11 12 13 14 15
C C
D D
0'-6.89"
3 3
B B
NPT=±0.000
3'-3.37" 7'-3.03" 2'-3.56" 9'-6.17" 2'-3.56" 8'-4.39" 2'-3.56" 11'-6.88" 5'-7.05"
10'-9.45" 13'-1.48" 10'-7.95" 12'-6.69" 13'-2.15" 0'-9.81"
4 4
20'-2.14" 10'-5.83" 13'-1.89" 10'-8.28" 12'-6.97"
3'-3.48" 7'-5.95" 2'-3.56" 9'-6.17" 2'-3.56" 8'-4.39" 2'-3.56" 11'-6.88" 2'-3.56" 9'-9.83" 1'-11.62"
P-06 P-03 P-02 4 12 13 14 15 16
DE ILUMINACION V-03
P-06 P-01 V-02
C C
D D
E E
61'-2.58" 1'-11.62" 8'-0.32" 1'-11.62" 11'-3.25" 1'-11.62" 19'-9.02" 1'-11.62" 1'-11.62"
14'-11.65"
16'-10.15"
20'-2.79"
NPT=±0.000
F F
PROYECCION POZO
0'-9.91"
28'-3.13"
0'-9.77" 6'-3.58"
0'-9.81"
3'-5.82"
21'-2.24" 46'-11.08" 1'-0.03" 6'-0.30" 0'-6.02" 6'-7.52" 0'-10.04" 1'-11.36" 0'-9.81"
1'-7.82"
0'-9.07"
0'-5.95"
DE ILUMINACION V-03
0'-11.93" 42'-3.27" 3'-10.36" 0'-11.81" 3'-5.34" 2'-3.56" 0'-5.91" 3'-11.24" 0'-5.91" 2'-1.13" 0'-4.12" NPT=±0.000 NPT=±0.000
61'-2.58"
4 4
E E
20'-2.79"
1 1 2 2 3 3´
21'-2.24" 46'-11.08" 1'-0.03" 6'-0.30" 0'-6.02" 6'-7.52" 0'-10.04" 1'-11.36" 0'-9.81"
14'-11.65"
16'-10.15"
28'-3.13"
0'-9.77" 6'-3.58"
0'-9.91"
1'-7.82"
0'-9.07"
0'-9.81"
F F
THIRD-SIXTH LEVEL
NPT =+-0.00 NPT =+3.50 NPT =+6.30 NPT =+9.10 NPT =+14.70 NPT =+17.50 NPT =+20.30
66'-7.21" 9'-2.24" 9'-2.24" 9'-2.24"
1'-11.62" 1'-11.62" 7'-2.61" 7'-2.61" 7'-2.61" 1'-11.62" 1'-11.62" 1'-11.62"
P-10 P-10 P-09
P-10 P-10 P-09
A A
P-12
3'-3.48" 7'-5.95" 2'-3.56" 9'-6.17" 2'-3.56" 8'-4.39" 2'-3.56" 11'-6.88" 2'-3.56" 9'-9.83" 1'-11.62"
V-11 P-08
B B
3'-11.24"
P-08 V-06
V-12
10'-9.43" 13'-1.48" 10'-7.95" 12'-6.69" 13'-2.15" 1'-11.62" 8'-0.32" 1'-11.62" 11'-3.25" 1'-11.62" 19'-9.02" 1'-11.62" 46'-11.08" 1'-11.62"
3 3
15G
10'-9.92" 8'-6.36" 8'-6.36" 0'-7.87" 9'-2.24" 0'-7.87" 0'-7.87"
V-08 V-08 P-07
P-12
R P-03 P-05 P-04 P-04 5 12 13 14 15 16
V-09 P-11 V-07 V-07
V-11 P-08
B B
P-08 V-06
C C
5'-6.76"
1 1 2 2 3 3´
5'-10.87" 9'-10.11" 11'-9.23" 12'-6.09" 13'-9.35" baranda vidrio R
V-10
P-11 P-11 P-07
D D
0'-6.89"
baranda vidrio R
R P-03 P-05 P-04 P-04 V-01 5 14 15 16
4 4
61'-2.58"
C C
V-09 P-11 V-07 V-07
14'-11.65"
5'-10.87" 9'-10.11" 9'-10.11" 12'-6.09" 14'-9.11" NPT=+3.500
D D
P-10 A B C D E F 1 1
V-18 V-18 V-14
E E
14'-8.03"
V-10
0'-9.77" 28'-3.13" 6'-3.42"
5'-11.55"
0'-9.81" 16'-10.12"
F F
21'-1.73"
P-11 P-11 P-07
DOWN
3'-3.48" 7'-5.95" 2'-3.56" 9'-6.17" 2'-3.56" 8'-4.39" 2'-3.56" 11'-6.88" 2'-3.56" 9'-9.83" 1'-11.62" 1'-11.62" 8'-0.32" 1'-11.62" 11'-3.25" 1'-11.62" 19'-9.02" 1'-11.62" 46'-11.08" 1'-11.62"
0'-9.07"
P-16 P-16
61'-2.58"
4 4
E E
5'-6.76"
14'-11.65"
V-08 V-08 P-07 V-13
P-10 A B C D E F 1 1
14'-8.03"
21'-1.73"
0'-5.95"
3'-3.48" 7'-5.95" 2'-3.56" 9'-6.17" 2'-3.56" 8'-4.39" 2'-3.56" 11'-6.88" 2'-3.56" 9'-9.83" 1'-11.62" 1'-11.62" 11'-3.34" 0'-5.91" 4'-11.06" 0'-5.91" 1'-7.69" 0'-5.91" 5'-1.02" 0'-5.91" 10'-2.05" 1'-11.62" 0'-5.91" 9'-7.26" 0'-5.91" 7'-9.40" 0'-5.91" 4'-7.06" 0'-8.75"
FIRST LEVEL SECOND LEVEL
V-24 V-24
F F
5'-11.55"
1 1 2 2 3 3´
0'-9.77" 28'-3.13" 6'-3.42"
0'-9.07"
0'-9.81" 16'-10.12"
1er Nivel 2do Nivel 5to Nivel 6tonivel entretecho techo BEDROOM
RESTROOM
BEDROOM
RESTROOM KITCHEN REST AU RA N T
COUNTER
BEDROOM RESTROOM
RESTROOM
RESTROOM
BEDROOM RESTROOM
5'-6.76"
3 4 3'-3.48" 7'-5.95" 2'-3.56" 9'-6.17" 2'-3.56" 8'-4.39" 2'-3.56" 11'-6.88" 2'-3.56" 9'-9.83" 1'-11.62" 1'-11.62" 11'-3.34" 0'-5.91" 4'-11.06" 0'-5.91" 1'-7.69" 0'-5.91" 5'-1.02" 0'-5.91" 10'-2.05" 1'-11.62" 0'-5.91" 9'-7.26" 0'-5.91" 7'-9.40" 0'-5.91" 4'-7.06" 0'-8.75"
P-16 V-25 P-16 P-14
3 4 3'-11.24"
0'-9.52"
LAUNDRY RESTROOM BEDROOM
BEDROOM BEDROOM
BEDROOM BEDROOM
RESTROOM
BEDROOM RESTROOM
BEDROOM BEDROOM
RESTROOM
BEDROOM RESTROOM
BEDROOM
TERRACE
10'-9.44" 13'-1.48" 10'-7.95" 12'-6.69" 13'-1.97" 20'-11.97" 13'-10.51"
21'-1.63" V-22
10'-9.44" 13'-1.48" 10'-7.95" 12'-6.69" 13'-1.97" 5'-6.76"
1'-11.62" 1'-11.62" 7'-2.61" 7'-2.61" 7'-2.61" 1'-11.62" 1'-11.62" 8'-6.36" 66'-7.21" 1er Nivel 2do Nivel 5to Nivel 6tonivel entretecho techo
V-18 V-18 < 27 >
0'-9.77" V-24 P-16
0'-9.77" 28'-3.13"
P-06 P-01 V-02 15 A A B C C D E F 1 1 3´ 1'-11.62" 1'-11.62" 14'-11.65" 0'-9.81" 1'-11.62" 28'-3.13" 28'-2.69" 0'-9.81" 0'-9.98" 10'-8.28" 16'-10.15" 0'-9.07" 1'-7.82" 0'-5.95" 3'-5.82" 0'-9.91" 20'-2.79" 0'-9.77" 6'-3.58" 21'-2.24" 1'-0.03" 0'-6.02" 1'-11.36" NPT=±0.000 NPT=±0.000 NPT=±0.000 NPT=±0.000 3 3 4 4 PROYECCION POZO DE ILUMINACION P-04 V-01 V-05 V-04 A C D D 3´ 3 3 4 4 0'-9.84" 5'-10.83" 0'-5.91" 3'-5.37" 0'-5.91" 2'-8.99" 1'-5.72" 0'-8.35" 4'-11.06" 6'-4.88" 0'-9.82" 1'-11.62" 1'-11.62" 0'-9.81" 16'-10.12" 0'-9.07" 5'-11.55" 0'-5.95" 14'-8.03" 5'-6.76" 0'-9.77" 28'-3.13" 6'-3.42" 21'-1.73" 5'-10.87" 9'-10.11" 13'-9.35" NPT=+3.500 baranda vidrio R V-12 P-11 P-11 V-06 P-09 P-09 V-09 V-08 V-08 V-13 P-10 P-35 10 DOWN A A B B C C D D E E F F 2 2 3 3´ 3 3 4 4 3'-11.24" 15'-5.04" 20'-11.97" 6'-4.87" 28'-2.67" 10'-8.28" 0'-6.02" 3'-4.63" 8'-6.93" 1'-11.62" 17'-9.08" 16'-10.12" 0'-5.12" 1'-11.77" 0'-5.95" 3'-5.84" 0'-9.90" 13'-10.51" 0'-9.52" 5'-6.76" 0'-9.77" 28'-3.13" 6'-3.25" 21'-1.63" NPT=+6.300 baranda vidrio V-20 V-19 V-22 P-17 V-24 P-13 P-15 V-26 V-15 P-14 P-16 P-35 P-17 V-18 V-14 V-16 NPT =+3.50 NPT =+6.30 NPT =+9.10 NPT =+11.90 =+14.70 NPT =+20.30 NPT =+3.50 NPT =+6.30 NPT =+9.10 NPT =+11.90 =+14.70 NPT =+20.30 9'-6.17" 7'-2.61" 1'-11.62" 1'-11.62" 1'-11.62" 1'-11.62" 7'-2.61" 1'-11.62" 7'-2.61" 0'-7.87" 8'-6.36" 0'-7.87" 8'-6.36" 9'-2.24" 8'-6.36" 8'-6.36" 0'-7.87" 11'-5.80" 9'-2.24" 9'-2.24" 9'-2.24" 9'-2.24" 11'-5.80" 9'-2.24" 9'-2.24" 9'-2.38" 9'-2.09" 9'-6.17" 7'-2.61" 1'-11.62" 1'-11.62" 1'-11.62" 1'-11.62" 7'-2.61" 1'-11.62" 0'-7.87" 1er Nivel 2do Nivel 3er Nivel Nivel 6to- nivel entretecho techo 1er Nivel 2do Nivel 3er Nivel Nivel 6to- nivel entretecho techo BEDROOM RESTROOM BEDROOM COUNTER RESTROOM KITCHEN RESTAURA TERRACE LAUNDRY RESTROOM BEDROOM RESTROOM BEDROOM RESTROOM BEDROOM BEDROOM RESTROOM BEDROOM RESTROOM BEDROOM BEDROOM RESTROOM BEDROOM RESTROOM BEDROOM BEDROOM RESTROOM BEDROOM RESTROOM BEDROOM SECTION D E 3 4 2 10 12 13 0'-6.89" A A B B C C D D E E F F 1 1 2 2 3 3´ 3 3 4 4 7'-2.61" 15'-5.04" 3'-3.48" 7'-5.95" 2'-3.56" 9'-6.17" 2'-3.56" 8'-4.39" 2'-3.56" 11'-6.88" 2'-3.56" 9'-9.83" 1'-11.62" 61'-2.58" 10'-9.44" 13'-1.48" 10'-7.95" 12'-6.69" 13'-1.97" 0'-9.84" 5'-9.65" 0'-6.05"
1'-11.62"
5'-7.04" 0'-9.82" 1'-11.62" 8'-0.32" 1'-11.62" 11'-3.25" 1'-11.62" 19'-9.02" 1'-11.62" 46'-11.08" 10'-5.83" 13'-1.89" 10'-8.28" 12'-6.97" 0'-9.81" 2'-0.16" 0'-6.02" 3'-4.63" 0'-5.91" 8'-6.93" 1'-11.62" 17'-9.08" 16'-10.12" 0'-5.12" 1'-11.77" 0'-5.95" 3'-5.84" 0'-9.90" 13'-10.51" 0'-9.52" 5'-6.76" 0'-9.77" 28'-3.13"
21'-1.63" baranda vidrio V-20 V-19 P-13 P-16 P-16 P-17
V-24 V-17 V-17 P-14 V-23 P-13 P-15 V-24 P-16 V-26 V-25 P-16 P-13 P-14 P-16 P-17 P-17 V-18 V-14 V-16
3'-6.41" 0'-5.91" 2'-8.99" 1'-11.62" 1'-11.96"
1'-11.76"
6'-3.25"
P-17
NPT =+-0.00 NPT =+3.50 NPT =+6.30 NPT =+9.10 NPT =+14.70 NPT =+17.50 NPT =+20.30
9'-2.24" 9'-2.24" 9'-2.24"
"DUALITY OF FUNCTION”
MARKET/SPORT CENTER
The project is located at 3928 meters above sea level in a town with 2-to3 level houses. For this assignment, both weather conditions and characteristics of the immediate context were prioritized. This project was designed with a duality of functions since it functioned both as a sports complex and as an itinerant market customary for the population.
location: Cusco-Perú
Role: Project Architect
< 28 >
In a town with 1.2 m2 of green area per person, the issue of open spaces became a priority. Along with the project, green areas and meeting parks were included throughout the project, contributing to the reduction of such a sad indicator. 1RST
< 29>
FLOOR
BREAKING BARRIERS
- STUDIO PROJECT
The residential project, designed for 150 apartments, seeks to foster community integration by reconfiguring the existing parking area that currently separates the university campus and the adjacent community, aiming to create a shared and inclusive environment through the introduction of amenities and a community center.
location: Louisiana-US
Role: Master’s Student
< 30 >
< 31 >
BREAKING BARRIERS
- STUDIO PROJECT
The school aims to encapsulate the dynamic, vibrant energy, joy, and enthusiasm inherent in young students as they explore and nurture their talents. Achieved through an integrating block designed to harmonize with the town’s characteristics, it not only blends within the existing context but also creates a novel environment, providing students with a quality and welcoming atmosphere.
Role: Master’s Student
< 32 >
BASEMENT A B A B C C FIRST LEVEL A B A B C C SECOND AND THIRD LEVEL A A C C < 33 >
SUSTAINABLE HOUSING CONSTRUCTION 2021
In 2021, I led a social project focused on constructing 70 homes in the Peruvian mountains, aimed at enhancing the living conditions of impoverished individuals and elevating their overall quality of life. The design of these homes carefully considered the region’s low temperatures, incorporating passive heating systems to provide effective alleviation.
location: Cusco-Perú
Role: Construction Manager
< 34 >
< 35 >
ELEVATION SECTION
SECTION FIRST LEVEL
CONSTRUCTION OF PUBLIC SCHOOLS
I managed the construction of a school in Cusco, with a 10,000,000.00 soles budget, designed for 800 students. While the institution handled the planning, my responsibility was ensuring timely construction and compliance with anticipated standards.
location: Cusco-Perú
Role: Construction Manager
< 36 >
ELEVATION
PLANTA DISTRIBUCIÓN GENERAL PRIMER NIVEL CALLE SIN NOMBRE PASAJE SIN NOMBRE PASAJE SIN NOMBRE GALERIA DE CIRCULACION NPT 0.15 GALERIA DE CIRCULACION NPT 0.15 GALERIA DE CIRCULACION NPT 0.15 GALERIA DE CIRCULACION GALERIA DE CIRCULACION NPT 0.15 GALERIA DE CIRCULACION GALERIA DE CIRCULACION NPT 0.15 NPT 0.15 BLOQUE 7 (EXISTENTE) BLOQUE 8 PATIO DE HONOR AULA 05 AULA 04 EXPENDIO CAFETÍN ESCOLAR ACOPIO RECICLAJE SUB ESTACIÓN CANCHA DE BASQUET CANCHA DE VOLEY GALERIA DE CIRCULACION GALERIA DE CIRCULACION NPT 0.15 NPT 0.15 SS.HH. MUJERES SS.HH. VARONES NPT 0.15 HALL NPT 0.15 BLOQUE 3 BLOQUE 2 BLOQUE 1 TÓPICO HALL PROFESORAS SS.HH. P-4 SS.HH. SS.HH. BLOQUE 5 BLOQUE 6 P-4-OFICINA DE EDUCACIÓN FÍSICA DEPÓSITO DE MATERIALES DEPORTIVOS HALL P-2 BLOQUE 4 BLOQUE 9 (EXISTENTE) AULA 08 AULA 07 SS.HH. MUJERES SS.HH. VARONES GALERIA DE CIRCULACION 3371.13 m.s.n.m. GALERIA DE CIRCULACION GALERIA DE CIRCULACION VIDEO VIGILANCIA GUARDIANÍA NPT 2.23 Area = 60.00 m2 Area 60.00 m2 NPT + 0.25 Area 60.20 m2 NPT 0.25 NPT 0.62 Area 17.10 m2 TANQUE CISTERNA HUERTO ÁREA DE ESTAR 01 CUARTO DE BOMBAS ÁREA DE ESTAR 02 3371.08 m.s.n.m. 3371.18 m.s.n.m. NPT + 0.52 NPT + 0.15 NPT + 0.85 NPT 0.85 NPT + 0.15 SUM COMEDOR NPT 0.25 Area 121.40 m2 COCINA COCINA GALERIA DE CIRCULACION NPT 0.15 GALERIA DE CIRCULACION NPT 0.15 GALERIA DE CIRCULACION NPT 0.15 DEPÓSITO SUM ATENCIÓN Area 5.95 m2 DEPÓSITO DE ALIMENTOS COCINA CONTROL SS.HH. Area 6.00 m2 P-2 D C A A B A B C C NPT 3.50 NPT 3.50 NPT + 0.62 Area 10.85 m2 FECHA: JUNIO 2019 A-1 PLANO DE: MEJORAMIENTO Y AMPLIACION DE LOS SERVICIOS EDUCATIVOS DE LA I.E. N° 51017 MARISCAL GAMARRA NIVEL PRIMARIO, DISTRITO DE CUSCOPROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO" ESPECIALIDAD: ARQUITECTURA BERTHA PAZ GUILLÉN UBICACION DEPARTAMENTO: PROVINCIA: DISTRITO: LOCALIDAD: CUSCO CUSCO CUSCO URB. MARISCAL PROYECTO SUB GERENCIA DE ESTUDIOS DE INVERSION GERENCIA REGIONAL DE INFRAESTRUCTURA ING. RAUL E. ROJAS MARTINEZ ING. JOSE H. CABEZAS MANCILLA DISTRIBUCIÓN GENERAL: PRIMER NIVEL GAMARRA < 37 >
SECTION
FIRST LEVEL
CONSTRUCTION OF PUBLIC SCHOOLS
In this project, I was entrusted with the responsibility for the construction of a public school valued at 12,000,000.00 soles, which was managed by my residence as a specialist in educational architecture. The tasks were executed within the anticipated timelines, meeting the quality standards established by the Ministry.
location: Cusco-Perú
Role: Construction Manager
MURO CONTENCION MURODECONTENCION PRIMARIA SECUNDARIA INICIAL CIRCULACIO EHICULAR CIRCULACION TROCHA CARROZABLE ALINEAMIENTO DE CABLES ALTA TENSION AV. HUANACAURI 59.94 20.78 24.86 34.00 73.63 A B C D E F G H I h=1.00 E-185650 E-185650 E-185700 E-185700 E-185750 E-185750 N-8500450 N-8500400 N-8500400 CALLE LOS LIRIOS CALLELOSGIRASOLES AV. PRIMAVERA APV. PICOL 2DA ETAPA 3272.00 3271.50 3270.00 3269.50 3269.00 3268.50 3268.00 3267.50 3267.00 3266.50 3266.00 3265.50 3265.00 3264.50 3265.00 3265.50 3264.50 3266.00 3266.50 3267.00 3267.50 3268.00 3268.50 3269.00 3269.50 3270.00 3270.50 3271.00 3272.00 3272.50 3273.00 3273.50 3274.00 3274.50 3275.00 3266.00 3266.50 3267.00 3267.50 3268.00 3268.50 3270.50 3271.00 3271.50 3272.00 3272.50 3273.00 3273.50 3274.00 3274.50 3273.50 3273.00 .00 3271.50 3271.00 3271.00 3270.00 3275.00 3269.00 NPT+3.65 NPT+3.65 HALLULACION AREAVERDE JARDIN MURO PERIMETRICO LADRILLO TIPO SOGA CONSTRUC MURODECONTENCION MURODECONTENCION MURO CONTENCION MURO NCION GAVIONES MURO CONT ENCION VIO NES MURO DE CONTENCION VIONES MURO DE CONTENCION AREA JUEGOS INFALTILES ZONA DE RECEPCION LINEA REFERENC TALUD PATIO AREA 568.00 M2 PATIO AREA 630.00 M2 PATIO AREA = 630.00 M2 +0.50 ESTRUCT. MALLLA +0.10 Vereda Vereda Vereda Vereda Vereda Vereda Vereda Vereda Vereda Vereda VeredaNPT +4.70 NPT +4.50 MUROPERIMETRICODELADRILLOTIPOSOGA ROPER ETRIC DE TIPOSO MUROPERIMETRICO LADRILLO IPOSOGA MUROPERIMETRICO DRILLO IPOSOGA PERIM. CERCO PERIM. ESTRUCT. DE METAL TIPO MALLLA O. A.G. N-8500450 PISO DE CEMENTO PULIDO BRUÑADO NPT+3.70 NPT+3.68 VESTIBULOAREA: .N.M.=3265.15 AREA: NPT+0.00 M.S.N.M.=3265.00 ESC.:1/50 PLANTASPRIMERNIVELAREA +3.75AREA:NPT+3.50 M.S.N.M.=367 Zenital AREA: +3.75 ventilación 5.00 AREA: Bruñado Cemen Bruñ AREA: Evacuación NPT +3.65 3.75 AREA: AREA: Pendiente Pen nte TECHOPOLICARBONATO alimentador TANQUE CISTERNA CIRCULACION GRADERIAAPOYADASOBRETERRENO EXISTENTE NPT+0.90 C/Paso 0.40Mt. +2.90 Paso 0.75Mt. GRADERIAAPOYADASOBRETERRENOEXISTENTE NPT+0.40 0.40CM.ParacadaGrada NPT+2.40 0.75CM.PorcadaGrada INGRESO PEATONAL INGRESO PEATONALINGRESO VEHICULARINGRESO VEHICULARINGRESO PEATONAL +0.65 S.N.M.=3265.1 M.S.N.M.=3265.15 M.=3265. M.S.N.MS.N.M.=3265 +0.00 AREA: AREA M.S.N.M.=3265. +0.65 PLANTASPRIMERNIVEL Ceme .M.=3265.15 AREA ESCENARIO M.S.N.M.=3265.+0.65 AREA dilataciónPLANTAS PRIMER NIVEL Cemento M.=3265.15Bruñadodilatación Cemento-----------ASTA BANDERA ZONA DE RECEPCION < 38 >
FIRST LEVEL SECTION
CONSTRUCTION OF PUBLIC SCHOOLS
In this project, I was entrusted with the responsibility for the construction of a public school valued at 12,000,000.00 soles, which was managed by my residence as a specialist in educational architecture. The tasks were executed within the anticipated timelines, meeting the quality standards established by the Ministry.
location: Cusco-Perú
Role: Construction Manager
< 39 >
SECTION
FIRST LEVEL