West Haven Waterfront Vision Plan

Page 1

City of Menlo Park West Haven Waterfront Plan

INTRODUCTION


(writing this for Wednesday)

Page | 1


TABLE OF CONTENTS Introduction ........................................................................................................................................................................ 0 Chapter 1: Existing conditions ........................................................................................................................................ 4 Introduction ........................................................................................................................................................................ 1 Overview ......................................................................................................................................................................... 1 1.2.

Physical Context ................................................................................................................................................. 1

Overview ......................................................................................................................................................................... 1 Biology ............................................................................................................................................................................. 1 Hazardous Materials ..................................................................................................................................................... 1 Air Quality ...................................................................................................................................................................... 1 Wind................................................................................................................................................................................. 2 Aesthetics........................................................................................................................................................................ 2 Opportunities/Constraints.......................................................................................................................................... 2 Opportunities ............................................................................................................................................................ 2 Constraints................................................................................................................................................................. 2 1.3.

Population and Employment ............................................................................................................................ 3

Overview ......................................................................................................................................................................... 3 Population and Demographics ................................................................................................................................... 3 Income Characteristics ................................................................................................................................................ 3 Employment and Economic Characteristics ........................................................................................................... 3 Economic Industry Data .............................................................................................................................................. 4 Top Area Employers .................................................................................................................................................... 4 Opportunities ............................................................................................................................................................ 5 Constraints................................................................................................................................................................. 5 1.4.

Land Use ............................................................................................................................................................... 5

Overview ......................................................................................................................................................................... 5 Zoning .............................................................................................................................................................................. 5 Nonresidential Land Uses ........................................................................................................................................... 7 Planned rezoning to New High Density Residential (R-4-S)............................................................................... 7 Housing ............................................................................................................................................................................ 7 Opportunities and Constraints .................................................................................................................................. 8 Opportunities ............................................................................................................................................................ 8

Page | 2


Constraints................................................................................................................................................................. 8 1.5.

Transportation and Connectivity .................................................................................................................... 9

Overview ......................................................................................................................................................................... 9 Existing Conditions ....................................................................................................................................................... 9 Vehicular Access ....................................................................................................................................................... 9 Public Transit ............................................................................................................................................................. 9 Bike and Pedestrian Infrastructure ..................................................................................................................... 11 Opportunities and Constraints ................................................................................................................................ 11 Opportunities .......................................................................................................................................................... 11 Constraints............................................................................................................................................................... 11 1.6.

Services and Utilities ........................................................................................................................................ 11

Overview ....................................................................................................................................................................... 11 Utilities ........................................................................................................................................................................... 11 Services .......................................................................................................................................................................... 12 Facilities and Amenities.............................................................................................................................................. 13 Opportunities and Constraints ................................................................................................................................ 14 Opportunities .......................................................................................................................................................... 14 Constraints............................................................................................................................................................... 14 Chapter 2: Community Perceptions ........................................................................................................................... 15 Chapter 3: Conceptual diagram ................................................................................................................................... 20 Chapter 4: Goals, Concepts, and Principles .............................................................................................................. 22

Page | 3


City of Menlo Park West Haven Waterfront Plan

CHAPTER 1: EXISTING CONDITIONS

Page | 4


INTRODUCTION Overview This chapter characterizes and contextualizes the West Haven Waterfront Plan (WHWP) Area. Information was gathered from existing Menlo Park plans, codes, and documents, as well as observations from site visits. The existing conditions and opportunities and constraints analyses provide an understanding of the area, from which further analysis and ideas for the future of the area may emerge.

1.2. PHYSICAL CONTEXT Overview This section describes the existing physical conditions within the plan area. The plan area is located right next to the Bayfront Park and along San Francisco Bay. Being a part of the Bay Area, this plan area has a nice and cool climate that adds to the natural habitat surrounding it. This includes the wetlands in Bayfront Park, which is home to numerous bird species. The following information was gathered from existing City documents, the Menlo Park General Plan, the El Camino Real/ Downtown Specific Plan-Environmental Impact Report (EIR), and a site and surrounding area visit. Biology The plan area is located in the City of Menlo Park on the east side of the San Francisco Peninsula, approximately two miles west of San Francisco Bay. Much of the natural habitat on the San Francisco Peninsula, including Menlo Park, has been converted or fragmented due to urban development. This area is fully developed and occurs in a highly urbanized/landscaped context. The plan area is bounded on the northwest by Atherton Channel and the southeast by San Francisquito Creek. Hazardous Materials The plan area currently includes a variety of land uses: commercial and light industrial developments; residential developments, open spaces; and railroad tracks. Due to the site location, there are potential exposures to asbestos from the age of some of the buildings, past contaminated soils from previous uses, and the presence of PCB-containing materials in existing structures. A list of these contaminated sites surround our plan area are listed in Figure 1.2.1(refer to Appendix). Air Quality The plan area is located in the southeastern portion of the Peninsula sub region. This region falls within the boundaries of the San Francisco Bay Area Air Basin. The nine-county Bay Area Page | 1


Basin is currently classified as non-attainment for the one-hour State ozone standard as well as non-attainment for the federal and State eight-hour standards as shown in Figure 1.2.2(refer to Appendix). BAAQMD’s Community Air Risk Evaluation (CARE) program evaluates and reduces health risks associated with exposure to outdoor Toxic Air Contaminants (TACs) in the Bay Area. BAAQMD has identified six impacted communities in the Bay Area: Redwood City/ East Palo Alto, Alameda County, eastern San Francisco, Richmond/ San Pablo, Concord, and San Jose. Major contributors to these health effects come from road mobile sources and aircraft near freeways. Our plan area has Highway 101 running through it and Redwood City is adjacent. Wind The Bay Area is known for its cool, windy climate, and frequent stratus clouds. Average wind speeds are greatest in the summer and least in the fall. Winds exhibit a diurnal variation with the strongest winds occurring in the afternoon and lightest winds occurring in the early morning. Aesthetics The central purpose of Menlo Park’s General Plan is “to maintain Menlo Park’s special character as a residential community that includes a broad range of residential, business, and employment opportunities and to provide for the change necessary to maintain a vital community.” Several of the goals and policies of the General Plan apply broadly to aesthetics across the City, including the project area. Maintenance and preservation of heritage trees should be conserved to maintain historical significance with the rest of Menlo Park. Appropriately scaled signage should be encouraged in the plan area as it is in the General Plan to help maintain the positive image of the City. Opportunities/Constraints Opportunities Incorporate sustainable construction policies and features where feasible to meet LEED program over long-term Restore wetland and salt marshes in Bayfront Park to maintain natural habitat

Strengthen downtown as a vital and competitive shopping area, while encouraging preservation and enhancement of historic features to conserve Menlo Park’s character Page | 2

Constraints Increased long-term emissions of criteria pollutants associated with construction activities that could contribute to an air quality violation Increase levels of project generated toxic air contaminants (TACs) which may lead to adverse health effects according to BAAQMD’s Community Air Risk Evaluation (CARE) program Sparsely developed/ underdeveloped industrial parks in the plan area could impede Menlo Park’s positive character


throughout the plan area Projects on infill sites in the plan area may disturb surrounding urban area uses

1.3. POPULATION AND EMPLOYMENT Overview This section presents a brief description of existing conditions in Menlo Park in terms of population, employment, and basic economic characteristics within the planning area. The following information was collected from U.S Census data for 2000 and 2010, “On The Map” US Census data generator, as well as related city documents. Population and Demographics The population of Menlo Park from 2000 to 2010 grew by approximately 4 percent to 32,026 residents. From 2000 to 2010, roughly 1,875 people in their 20s and 30s moved to Menlo Park, while roughly 1,740 people in their 40’s, and 50’s moved away from the city. (Appendixes 1.3.1 and 1.3.2). The addition of a younger demographic to the city represents a need for more diverse housing options as well as amenities. Income Characteristics In 2010, the median annual household income for Menlo Park residence was $107,860. In Menlo Park, median home values are roughly double that of the county as a whole. Median rents in Menlo Park are shown to be approximately 45 percent higher compared to the county as a whole. Forty-two percent of Menlo Park residents residing in owner-occupied units reported paying 30 percent or more of their household income towards ownership related housing costs, while 41 percent of renters reported paying 30 percent or more of their household income towards rent. Providing affordable options within the plan area will be an important aspect to accommodate the young professional demographic that has been recently attracted to Menlo Park. Employment and Economic Characteristics Currently the job-to-residents balance is a positive influx. Roughly 22,000 people enter the city daily for work, while around 12,000 leave to work in the surrounding areas (Figure 1.3.3). Of these workers entering the city, 790 work within the plan area shown in top left (Figure 1.3.3). The greatest numbers of workers in the plan area commute 10-24 miles into the city (appendix 1.3.4). Housing opportunities in the plan area will help to improve the jobs housing balance in the city, and provide an opportunity to reduce travel times to work by providing more housing options for those employed in the area.

Page | 3


Figure-4 Haven Ave Inflow/Outflow

Figure 1.3.3 Menlo Park Inflow/Outflow:

Economic Industry Data High concentrations of industry sector employment in the plan area area are observed in “Finance and insurance, and real estate and rental leasing” and “Professional, scientific, management, administrative and technical services” sectors, at 25.6 percent, and 20.3 percent, prospectively (see appendix 1.3.7). Despite its small size, the plan area is an important industrial hub, containing 61.9 percent of all of Menlo Park’s “Transportation, warehousing and utilities” sector jobs. It also contains 13.2 percent of all area jobs in the “Finance and insurance, and real estate and rental leasing”, sector and (appendix 1.3.7.). Top Area Employers Since the addition of the Facebook campus in 2011, Facebook represents Menlo Park’s largest employer with 13 percent of all jobs in the city (appendix 1.3.8).

Page | 4


Opportunities and Constraints Opportunities Site location accessible to freeway provides convenient access for residents, and shoppers. Improve pedestrian amenities and overall street character to encourage a mix of residential and business possibilities. Improve linkages between businesses, and residential uses to create a mixed-use area. Create a mixed-use space to add a sense of place to area. Improve underutilized and vacant lands.

Constraints Highway 101 limits north south connectivity and opportunities for residential uses on south side of project area. Area buildings are for industrial uses and it will be difficult to create attractive and/or pedestrian friendly environments. Marsh road and intersection congestion. Possible land use conflicts between industrial uses and residential. Multiple jurisdictional influences.

1.4. LAND USE Overview This section describes the land use and housing characteristics of the West Haven Water Front Plan Area. The Project Area covers approximately 64 acres. Zoning The plan area that is within the Menlo Park City limits is zoned M2 and the general plan land use designation is limited industry. The plan area that is within the Redwood City limits is zoned IR, which is industrial restricted. Examples of some of the uses included in these zoning designations are: warehouses, machine shops, cabinet shops, automobile and heavy equipment establishments, and public utility buildings. In recent history, the plan area has only had industrial zoning designations. Therefore, industrial businesses and their employees have been the primary users of the plan area. In our visit to the plan area on 4/5/13, the following existing uses were observed: light manufacturing, storage, vacant, and limited single family residential. See pictures 1, 2, 3, and 4. Directly south of the plan area is the 101 Freeway and an area of Redwood City zoned as R-2, which is Residential Duplex. The close location of the 101 allows increased access to the plan area. The close location of the area zoned R-2 within the Redwood City limits indicates that if the plan area were to have increased commercial uses allowed, then there are residents in close proximity that could frequent those businesses.

Page | 5


Figure 1.4.1: Existing land uses in Plan Area

Figure 1.4.2 Existing Land Uses in plan area

Figure 1.4.3 Example of existing residential land use

Page | 6


Figure 1.4.4 Example of existing residential land use

Nonresidential Land Uses Existing industrial uses are the predominant use in the Haven Avenue Plan Area. Not including the public streets and sidewalks, there is very little public open space located in the plan area. This indicates that in the plan area there is a need for increased public open space. Planned rezoning to New High Density Residential (R-4-S) As part of the settlement of a lawsuit against the City of Menlo Park regarding their housing element, the City agreed to rezone several sites throughout the City to a new High Density Residential designation (R-4-S). One of these sites is located in the plan area and is 5 acres total in size. The site will be rezoned to 35 units to the acre, which will yield approximately 540 units total. The development of high-density residential apartments/and or for sale units on this site could serve as a catalyst for future zone designation changes in the rest of the plan area. In addition, with the introduction of a high number of residents to the plan area, there will be an increased need of services in the area to meet the needs of the residents. As part of the City’s recent housing element adoption, an ordinance was created to establish the design guidelines for sites designated R-4-2. One of the conditional uses allowed in the R-42 zone is the following: Ancillary neighborhood serving commercial uses up to five (5) percent of the site area of 10,000 square feet, whichever is less, that is part of mixed-use development and the number of dwelling units for the site is in accordance with the anticipated number of units identified in the Housing Element. This indicates that mixed-use is allowed on this site within the plan area. However, it is limited. This change will introduce commercial uses to the plan area. Housing

Page | 7


As of 2012, in San Mateo County the hourly wage necessary to afford a 2 bedroom fair market rent apartment was $36.63 per hour. A 2-bedroom fair market apartment rented for $1,905 per month in the county. The income needed to afford this rent was $76,200 per year. It would be necessary to have a family working 4.6 full time jobs at minimum wage to afford this rent. (National Low Income Housing Coalition, 2012 Out of Reach Report) This data indicates that there is a need for affordable housing in San Mateo County. It is recommended that any current or future rezoning of sites to residential uses within the plan area include affordable housing units. Opportunities and Constraints The following are key features of the land use conditions that present an opportunity for development/redevelopment or a constraint to such development/redevelopment. Key features may also be categorized as both an opportunity and a constraint. Opportunities Opportunity to rezone 15 acres within the Plan Area to New High Density Residential

Location next to the salt ponds

Location next to Freeway 101 access ramp

Location next to Bayfront Park. Near the Facebook Campus #1 and the proposed Facebook Campus #2. Location of residential uses in the adjacent areas Proposed Bay Trail expansion into planning area Near Menlo Gateway, where hotel uses are proposed

Page | 8

Constraints 15 acre proposed housing site has known exposure to hazardous materials in the past and at the time that the Environmental Assessment was written for the City of Menlo Park’s 2012 Draft Housing Element, has restrictions related to hazardous waste remediation under the authority of San Mateo County Blighted appearance of several of the existing buildings and vacant/underutilized land. Limited amount of neighborhood serving commercial uses Currently proposed residential development may drive up rents in the surrounding areas. Located adjacent to a flood plain designated area Lack of a pedestrian friendly path from the downtown Menlo area to the Haven Avenue Plan Area Lack of a designated bike path along Haven Avenue that connects to the Facebook Campus #1 site


1.5. TRANSPORTATION AND CONNECTIVITY Overview This section describes the existing transportation and connectivity conditions for the Haven Avenue study area. The project area is bound by the salt ponds to the north, US Highway 101 to the South, Marsh Road to the East, and the Menlo Park city limits to the west. The project area is separated from most of the city by US 101 and the Marsh Road corridor, but has many opportunities for greater connectivity with downtown Menlo Park, services, and the region. The following information was gathered from existing city documents, the Menlo Park General Plan, and a site and surrounding area visit. The circulation map (Figure 1.5.1) shows existing traffic flow for the study area, including bus routes, traffic lights, stop signs, medians, railroads, crosswalks, and bike lanes. Existing Conditions Vehicular Access Vehicular access to the project area is provided by Marsh Road and US 101 (via the Marsh Road interchange). Properties within the project site are served by Haven Avenue, which extends beyond the Menlo Park City boundaries into Redwood City. Public Transit San Mateo County Transit District (SamTrans) provides bus service to the city, and Caltrain provides commuter rail service. The Menlo Park Caltrain station is located approximately 3.3 miles from the study area. Transit and bike access is available adjacent to the station platform. Local shuttles are provided during commute hours by Caltrain, and reach the Marsh Road corridor, providing potential connectivity to future uses in the Haven study area. The city also provides a free midday shuttle which connects to several local destinations, and currently terminates two miles east of the project area.

Page | 9


Figure 1.5.1

Page | 10


Bike and Pedestrian Infrastructure The City of Menlo Park Bike Plan provides vision, strategies, and actions for improving bicycling in Menlo Park. Long-term projects include a separated bike path near the Bayfront Expressway, extending into the project area and connecting two existing portions of the Bay Trail, bike lanes along Marsh Road, and a Bayfront Expressway bicycle and pedestrian undercrossing. Sidewalks within the project area are deteriorating and some areas are missing walkways altogether. The 2009 Menlo Park Sidewalk Plan does not include the streets in the study area as priority streets. Opportunities and Constraints Opportunities Proximity to Marsh Road US 101 interchange provides ample vehicular access to the region. The SamTrans station is a short distance from the project area, providing opportunities for regional connectivity. Complete street initiatives have been instituted at the state, regional, and local level Designated bike path extension through project area creates an opportunity for a bikefriendly neighborhood. Existing transit service adequate for now, can be modified to accommodate future uses

Constraints The placement of the highway separates the project area and rest of City. SamTrans stop is out of walking distance from the site, and bike and transit access is limited. Inadequate sidewalks in many areas create local pedestrian access issues. No bike facilities in the area may create a phasing problem as residential development is constructed. Midday shuttle does not serve project area

1.6. SERVICES AND UTILITIES Overview This section describes the existing utilities, services, facilities, and amenities at the proposed project site. While each utility comes from a single provider, many services are available from both the cities of Menlo Park and Redwood City. The facilities and amenities are scattered throughout both cities as well, providing access to a variety of different options for potential residents, but also raising issues of safe and efficient transportation to and from those areas. This will be covered in more detail under Opportunities and Constraints at the end of the section. Utilities Utilities at the project site each come from a single provider. Gas and electric are provided by the Pacific Gas and Electric Company (PG&E), water is provided by the Menlo Park Municipal Page | 11


Water District (MPMWD), wastewater is disposed of by the West Bay Sanitary District, and the city is under contract with Recology for solid waste management services.

Retrieved from: http://www.menlopark.org/departments/pwk/mpmwd_map.pdf Services Responsibility for police services for the project site is divided between the Menlo Park Police Department and the Redwood City Police Department, with an average response time of ten minutes. Responsibility for fire protection services for the project site is divided between the Menlo Park Fire Protection District and the Redwood City Fire Department, with a response time of seven minutes. The project site is in the Redwood City School District and the Sequoia Union High School District. Medical services are available at three hospitals within six miles of the project site, and there are two post office locations within five miles of the project site. The city of Menlo Park and the city of Redwood City also provide many community services that will be accessible to residents of the proposed project site, comprised of child care, teen, and senior services that include health, recreational, and educational programs, cultural events, and social services.

Page | 12


Retrieved from: http://www.google.com/imgres?imgurl=http://www.redwoodcity.org/fire/about/images/CH3Skin ner.JPG&imgrefurl=http://www.redwoodcity.org/fire/about/commandstaff.html&h=334&w=447& sz=24&tbnid=5xXS5rqgDKBsM:&tbnh=90&tbnw=120&zoom=1&usg=__wCVhFKu4y9XCGbsFYboW4UsMVTU=&docid =TwhoeC1hFTEeIM&sa=X&ei=_yqpUYrlI9GIigKU8IG4BQ&ved=0CEwQ9QEwAw&dur=623 Facilities and Amenities There are many parks that will be accessible to residents of the proposed project site, including Bedwell Bayfront Park, which is less than a half mile away, and at least five others within five miles of the site. Most of the sports facilities available to future residents of the project site are located at or around these parks. There are no grocery stores within walking distance of the project site, but there are several large chain grocery stores and smaller independent stores located within five miles. There are several coffee shops, restaurants, and laundry businesses located within three miles of the project site, but none are safely accessible on foot or by bike from the project site. There are also several gas stations within three miles of the project site.

Page | 13


Opportunities and Constraints Opportunities Opportunity to provide amenities to serve future residents and current employees in the area Opportunity to give Haven Avenue a village feel Opportunity to connect the Haven Avenue area to the surrounding areas of Menlo Park and Redwood City Services available from two different municipalities Employment in the public sector jobs possibly available with two municipalities

Page | 14

Constraints Lack of current facilities and amenities might isolate new development from the rest of Menlo Park and Redwood City Lack of existing* facilities and amenities will hinder the new development from integrating into the surrounding community Most services available are not within safe walking or biking distance with current layout


City of Menlo Park West Haven Waterfront Plan

CHAPTER 2: COMMUNITY PERCEPTIONS

Page | 15


During the weekends of April 19, 2013 to April 20, 2013 and May 3, 2013 to May 4, 2013, graduate students from the California Polytechnic State University, San Luis Obispo City and Regional Planning Program conducted outreach in both the City of Menlo Park and Redwood City. Outreach was conducted at the Facebook Campus, Burgess Park, Downtown Menlo Park, the Onetta Harris Community Center and Belle Haven Senior Center Cinco de Mayo Celebration, and at Kite Day held at Bayfront Park. The objective of the outreach was to gather input from both Menlo Park and Redwood City residents and visitors regarding envisioning future uses of the West Haven Waterfront Plan area. Surveys were conducted to gather resident and visitor input and general comments regarding the plan area were gathered as well. (????) Number of surveys were collected. The results of these surveys and an analysis of the findings can be found in Appendix???

Page | 16


Photo of community outreach during Kite Day at Bayfront Park

Photo of community outreach in Downtown Menlo Park

Page | 17


The following is a list of the West Haven Waterfront Plan goals and the survey data that was utilized to form those goals. Goal 1 Form an active, safe, healthy community Community outreach efforts resulted in input regarding the need for more public space, walkable and bikeable areas, to encourage beautification of the streetscapes, and for increased safety in the plan area. As a result, one of the goals for the plan area is to form an active, safe, healthy community. Goal 2 Accommodate residents and businesses Community outreach efforts resulted in both communities expressing their desire to have a more pedestrian friendly and aesthetically pleasing area that incorporates a variety of uses, and takes advantage of the many natural resources surrounding the project area. Furthermore outreach participants wanted to see a variety of housing options and local amenities to complement new housing development. Goal 3 Physically and visually connect the area with the rest of Menlo Park Community outreach efforts resulted in ideas for improving physical and visual connectivity within the plan area. Overall, there were many comments about bicycle access through the site, where a major gap in the Bay Trail is located. Residents expressed concerns about the safety of the area’s bike infrastructure, especially due to increasing traffic along Haven Avenue. Respondents were also concerned about the lack of visual interest and amenities in the area, for those that were passing through via bike or transit. The appearance is not conducive to bicyclists, pedestrians, or those using transit options that move through the area. Location near Hwy 101 was seen as an asset to some respondents, but an issue area for others. Some residents expressed concern for health issues that may be associated with highway pollution. The proximity to the highway, however, brought people to the area and was expressed as an asset to businesses located in the project area. The public spaces were important to respondents, who expressed that public spaces such as Bedwell-Bayfront Park draw them to the area. Though some expressed discontent with the smell or aesthetics of the salt ponds, generally participants saw bay front access as an asset to the area’s potential residential developments. Goal 4 Provide access to natural elements Community outreach efforts resulted in repeated requests for things like parks, open space, and dog-friendly areas. As a result, Goal 4 incorporates ways in which to include those types of things in both public and private spaces within our project area. In addition, Goal 4 addresses

Page | 18


the connections between those areas and the greater Menlo Park and Redwood City communities, and makes those areas safe, visible, and educational (when applicable). Goal 5 Create a destination for residents and visitors During community outreach efforts many of the residents of Menlo Park and Redwood City commented that they there were unaware of the plan area or had only driven by it while heading towards other activities. It was never mentioned as a destination area. As a result, one of the goals for the plan area is to create a destination for residents and visitors.

Page | 19


City of Menlo Park West Haven Waterfront Plan

CHAPTER 3: CONCEPTUAL DIAGRAM

Page | 20


Page | 21


City of Menlo Park West Haven Waterfront Plan

CHAPTER 4: GOALS, CONCEPTS, AND PRINCIPLES

Page | 22


Goal 1

Form an active, safe, healthy community

Located next to Bedwell Bayfront Park, the Bay Trail, and the San Francisco Bay, there are numerous opportunities for the West Haven Waterfront area to encourage and provide infrastructure for active and healthy lifestyles. The following concepts and principles focus on ways future development can help achieve this goal. Public Spaces Concept 1.1 Provide safer and more walkable sidewalks

Principle 1.1.1 Complete sidewalks to better link streets together Principle 1.1.2 Improve sidewalk conditions with better street lighting Principle 1.1.3 Frame streets with smaller setbacks for better enclosure Principle 1.1.4 Create wider sidewalks along Haven Avenue to encourage mixed-use

http://www.chibarproject.com/Reviews/Redmond's/Redmond'sSidewalkCafeSP.JPG

Concept 1.2 Promote an environment that supports pedestrian activity

Principle 1.2.1 Include bike lane along Haven Ave to promote pedestrian and bike activity Principle 1.2.2 Include a pedestrian bike path along the Bayfront Park Trail Concept 1.3 Minimize conflicts between vehicular, bicycle and pedestrian traffic

Principle 1.3.1 Reduce congestion by using traffic calming measures to reduce vehicle speeds and through traffic, i.e. contrasting pedestrian crosswalks and a landscaped median

Page | 23


Source?

Concept 1.4 Encourage community programs and involvement

Principle 1.4.1 Encourage the development of shared parking areas Principle 1.4.2 Incorporate a bike-share program to encourage alternative transportation, and increase family recreation opportunities

http://www.borderstan.com/wp-content/uploads/2010/09/BikeShare3-550x392.jpg

Concept 1.5 Improve streetscape aesthetics to promote pedestrian activity

Principle 1.5.1 Provide lighting for pedestrian and bicycle routes Principle 1.5.2 Maintain existing trees on Haven Avenue and add trees along Bayfront Park Principle 1.5.3 Plant street trees (of an appropriate species) along Haven Avenue to provide shading and cover

Page | 24


Principle 1.5.4 Maintain vegetation and green space that is consistent with Menlo Park,

i.e. heritage trees http://www.athertontree.org/images/high_speed_rail/south_from_watkins.jpg

Concept 1.6 Encourage environmental and economic sustainability within project

area Principle 1.6.1 Use Low Impact Development (LID) where possible, e.g. have high albedo (light color reflective) sidewalks, to reduce heat island effect Principle 1.6.2 Construct stormwater infrastructure to reduce sheet-flow Principle 1.6.3 Use LID techniques that reduce flooding during rain events and clean runoff prior to entering the bay

http://greatergreater.com/images/201008/302142.jpg

Principle 1.6.4 Rehabilitate Atherton creek Concept 1.7 Educate and protect the community from hazards

Principle 1.7.1 Create educational signs and art exhibits that address and educate the public about hazards- the potential impact of sea level rise on the region/waterfront, sea level rise, and earthquakes Page | 25


http://allamakeeswcd.org/wp-content/uploads/2012/07/Installed-watershed-sign.jpg

Private Spaces Concept 1.8 Promote a visually interesting environment that promotes

pedestrian activity Principle 1.8.1 Improve landscaping in parking areas, pedestrian spaces, and along streets Principle 1.8.2 Use landscaping to further buffer development from Hwy 101 traffic Principle 1.8.3 Add more trees to keep Menlo Park more green Concept 1.9 Make private spaces safe and accessible

Principle 1.9.1 Create walkable streets to promote social interaction through better streetscaping Concept 1.10 Protect residential areas from hazards

Principle 1.10.1 Promote infill development in the RWC strip to form a buffer between Hwy 101 noise and pollution Principle 1.10.2 Use LID techniques that reduce flooding during rain events and clean runoff prior to entering the bay Principle 1.10.3 Create building standards to address flooding Concept 1.11 Encourage environmental and economic sustainability within

project area Principle 1.11.1 Encourage infill development Principle 1.11.2 Infill development to create continuity within the Haven Avenue area Principle 1.11.3 Reuse of existing structures Principle 1.11.4 Promote resource efficient development Page | 26


Principle 1.11.5 High albedo (light color reflective) surfaces Concept 1.12 Focus on bringing in commercial and retail businesses that espouse

this philosophy Principle 1.12.1 Provide incentives for businesses like bike shops, health food markets, and coffee shops to come to the area Principle 1.12.2 Create design guidelines that mandate adequate lighting and open space around commercial areas Principle 1.12.3 Provide additional space for outdoor seating, fixed street furniture and other like amenities on public right-of-way

http://3.bp.blogspot.com/T4fX0K7Oy_0/T7UD13LKXQI/AAAAAAAASZA/dVqnppuzicU/s1600/IMG_9242.JPG

Principle 1.12.4 Quasi-public spaces provided in coordination with private development throughout the plan area Principle 1.12.5 Create an area-wide Industrial aesthetic mixed with existing Menlo Park character

Page | 27


http://1.bp.blogspot.com/-aGHvA_VseTg/TWfknfQAtAI/AAAAAAAAKt4/PPLQxLF70o/s400/Illuminee%252C+Santa+Cruz.jpg

Swift Street, Santa Cruz, C.A.

Goal 2

Accommodate residents and businesses

The West-Haven Waterfront planning area can become a model of planned mixed-use residential and business development, ensuring sufficient economic growth to enhance the quality of life of area residents and visitors. Attracting desired uses and new businesses that are responsive to the needs of the area is paramount for creating a livable, self-sustaining, and harmonious space. The following planning concepts and principals support the attainment of this goal.

Public Space Concept 2.1 Improve aesthetics to accommodate new residents

Principle 2.1.1 Screen or improve unattractive uses Principle 2.1.2 Protect and enhance views of the bay Principle 2.1.3 Incorporate public art on building façades, reduce visual bulk, and include entranceways on large manufacturing and distribution structures Concept 2.2 Improve the jobs-housing balance in Menlo Park

Principle 2.2.1 Provide affordable housing options within the Plan Area Principle 2.2.2 Provide a variety of residential opportunities Principle 2.2.3 Expand housing opportunities for young professionals Concept 2.3 Develop a parking strategy that addresses the commercial and

residential needs of the area Page | 28


Principle 2.3.1 Encourage the development of shared parking resources to reduce the need for surface parking Principle 2.3.2 Parking strategies should aim to reduce parking along Haven Avenue. Concept 2.4 Minimize land use conflicts

Principle 2.4.1 Phase land uses near residential to protect residents from light, noise, and pollution Principle 2.4.2 Create a streetscape along Haven Avenue that accommodates resident and business needs Principle 2.4.3 Create vehicle-free spaces for the enjoyment of residents and employees Concept 2.5 Preserve light industrial uses

Principle 2.5.1 Compile design guidelines that add visual interest to existing buildings and accommodate commercial uses without full demolition or remodeling of buildings Principle 2.5.2 Create a neighborhood industrial zone Principle 2.5.3 Maintain delivery truck access for local commercial and industrial businesses Private Space Concept 2.6 Improve aesthetics to promote an attractive business environment

Principle 2.6.1 Revitalize underutilized parcels and buildings Principle 2.6.2 Encourage infill development Principle 2.6.3 Residential development should reflect industrial character of area Principle 2.6.4 Where possible, parking should be located behind or under structures and away from streets Concept 2.7 Develop parking strategy that addresses the commercial and

residential needs of the area Principle 2.7.1 Encourage the development of shared parking resources to serve the needs of all users Page | 29


Principle 2.7.2 Preserve surface storefront parking that accommodates patrons, to encourage greater Haven Avenue visits Concept 2.8 Minimize land use conflicts

Principle 2.8.1 New development should be built according to the context of adjacent uses and neighborhoods Principle 2.8.2 Utilize infill development along Haven Avenue to create a freeway buffer Principle 2.8.3 Allow a mix of businesses, residences, and industries that can coexist harmoniously

Goal 3

Physically and visually connect the area with the rest of Menlo Park

The West Haven Waterfront area has the potential for good physical and visual connectivity. An increase in pedestrian, bicycle, and transit circulation will contribute to the creation of an area suitable to the residents, visitors, and employees that frequent the neighborhood. This area will become an easily accessible asset to both Menlo Park and Redwood City. The following planning concepts and principals will support attainment of this goal. Public Space Concept 3.1 Provide pedestrian and bicycle access to and within the area

Principle 3.1.1 Construct bicycle and pedestrian lanes over US Highway 101 Page | 30


Artwork by Matt Orbach

Principle 3.1.2 Provide lighting for pedestrian and bicycle routes

Retrieved from: http://www.muscatinedowntown.com/images/PathLights.png

Principle 3.1.3 Provide signage to allow easy navigation in and around the area

Page | 31


Retrieved from: http://www.streetscapes.biz/catalog/products-pedestrian-amenities-wayfinding-signage-c2409_8101_2414.html

Principle 3.1.4 Create a bike share program for residents and visitors Concept 3.2 Improve connectivity along Haven Ave and connect project area to

nearby residential neighborhoods Principle 3.2.1 Extend bike lanes along Haven Avenue Principle 3.2.2 Improve sidewalk condition and complete sidewalks network Concept 3.3 Increase regional connectivity

Principle 3.3.1 Create safe, multimodal connections to Menlo Park Station and Downtown Menlo Park Principle 3.3.2 Complete the bay trail through the project area

Page | 32


Retrieved from: http://www.baytrail.org/Maps/South_Bay.pdf

Page | 33


Concept 3.4 Create a multi-modal transit hub

Principle 3.4.1 Provide bike lockers and cyclist amenities

Retrieved from: http://static2.businessinsider.com/image/5149e61fecad043938000001-900/best-parkingstructure-jury-bicycle-station-ice-bahnhof-erfurt-in-germany-osterwoldschmidt.jpg

Principle 3.4.2 Connect parking and public areas to the Bay Trail Principle 3.4.3 Extend Menlo Park shuttle service along Haven Avenue Principle 3.4.4 Create a bus pull-out for safe access and traffic flow Concept 3.5 Infuse Menlo Park character into the area

Principle 3.5.1 Incorporate public art that reflects local history and town character Principle 3.5.2 Incorporate design elements found in downtown Menlo Park, such as community bulletin boards and hanging signs Principle 3.5.3 Integrate tree and vegetation elements consistent with downtown Menlo Park Concept 3.6 Accentuate the history and character of the project area through

design elements Principle 3.6.1 Incorporate public pieces of art using materials from existing Menlo Park sites Principle 3.6.2 Maintain an industrial aesthetic in public areas Page | 34


Private Space Concept 3.7 Create a neighborhood aesthetic that incorporates Menlo Park

character with elements unique to the project area Principle 3.7.1 Encourage public art on exteriors of buildings along the Bay Trail Principle 3.7.2 Integrate low-cost, high-impact retrofitting in areas to remain lightindustrial Principle 3.7.3 Encourage a unique mix of uses and building styles Concept 3.8 Provide bicycle and pedestrian infrastructure

Principle 3.8.1 Create incentives to encourage pedestrian-oriented spaces Principle 3.8.2 Provide bike storage spaces for residents, employees, and customers

Goal 4

Provide access to natural elements

One of the most important and under-utilized assets of the project site is its close proximity to Bedwell Bayfront Park and the San Francisco Bay. There are also many ways in which open spaces and natural elements can be incorporated within the site itself. This goal, and the supporting concepts and principles, focus on the ways in which future development can take advantage of these opportunities. Public Space Concept 4.1 Provide connections between residential, commercial, and public

spaces Principle 4.1.1 Create accessible and visible routes from parking areas and residential areas to Bayfront Park and other public spaces within the project area Principle 4.1.2 Complete Bay Trail missing link and provide access point(s) to the project area

Page | 35


Retrieved from: http://parksandrecreation.idaho.gov/sites/default/files/uploads/BIKE_kid.jpg

Principle 4.1.3 Create an esplanade and public space adjacent to the waterfront Principle 4.1.4 Create view corridors from Haven Avenue to the waterfront Concept 4.2 Provide public education elements along the waterfront

Principle 4.2.1 Erect informational plaques to educate visitors about the salt marshes, history of area, visible features across the bay, environmental information, and animal and plant species Concept 4.3 Increase signage to guide visitors

Principle 4.3.1 Provide directory maps at bus stops, parking areas, and at Bay Trail access points

Retrieved from: http://www.thinkconfluence.com/wp-content/uploads/2012/08/work-corridors-main-st-6.jpg

Page | 36


Private Space Concept 4.4 Encourage local businesses to take advantage of views

Principle 4.4.1 Encourage building design along the waterfront that encourages and takes advantage of views of open space (windows, decks, mounted binoculars, etc.) Principle 4.4.2 Where possible, provide areas for enjoyment of salt ponds and Bayfront Park views from rooftops Concept 4.5 Increase areas where people can reach the water’s edge on both

public and private property Principle 4.5.1 Create 1-2 access points to the waterfront through private areas Principle 4.5.2 Create a boardwalk that is adjacent to the waterfront Principle 4.5.3 Provide pathways, viewpoints, and other infrastructure that gives the public access to natural elements in and around private areas

Artwork by Matt Orbach

Goal 5 Page | 37

Create a destination for residents and visitors


The West Haven Waterfront plan area has the potential to become a destination for residents and visitors. The plan area has been unknown to many City of Menlo Park and Redwood City community members up to this point. However, with the introduction of public art, improved streetscapes, and improved urban design qualities into the plan area, residents and visitors will be drawn to stay and recreate within the area. The following planning concepts and principals support the attainment of this goal. Public Space Concept 5.1 Make areas of interest visible, including: Haven Avenue, Bayfront

Park, and the City of Menlo Park (from the 101) Principle 5.1.1 Signage and Gateway Arch

City of Encino gateway sign, retrieved from http://activerain.com/blogsview/2544700/encino-commons-in-encinocalifornia-is-considered-the-san-fernando-valley-s-miracle-mile

Principle 5.1.2 Public art

Page | 38


City of San Luis Obispo Utility Box Beautification project, retrieved from: http://www.joebachelor.net/bachelor_web/box_art/content/_4560456972_large.html

Concept 5.2 Create a streetscape to accommodate residents and visitors

Principle 5.2.1 Sidewalks that are wide enough to accommodate outdoor seating, outdoor dining areas, and pedestrian-oriented areas Principle 5.2.2 Short-term street parking and bike racks Principle 5.2.3 A designated area for food trucks

Page | 39


Principle 5.2.4 Install way-finding signs Principle 5.2.5 Create a pedestrian street Concept 5.3 Create spaces that accommodate families and children

Principle 5.3.1 Provide pedestrian spaces separated from vehicular traffic Principle 5.3.2 Provide a playground within walking distance from residential areas Concept 5.4 Create active and passive recreation areas

Principle 5.4.1 Provide public furniture on streets to encourage socialization areas for users

Page | 40


Photo of street furniture in Taiwan, retrieved from http://www.archithings.com/street-furniture-intaiwan/2011/07/20

Page | 41


Photo of modular street furniture, retrieved from http://www.coroflot.com/Rachel_Pownall/Modular-StreetFurniture

Concept 5.5 Provide access to the area

Principle 5.5.1 Locate bus stop(s) close to areas that will provide services Principle 5.5.2 Put up maps indicating routes to public spaces such as bus stops and parking areas Concept 5.6 Encourage urban design qualities that attract residents and visitors

Principle 5.6.1 Imageability – Include courtyards and plazas Principle 5.6.2 Human scale – Increase number of small planters, increase number of street furniture Principle 5.6.3 Complexity –Increase number of pieces of public art

Chain link fence art piece by Christian Moeller, retrieved from: http://www.4culture.org/publicart/collection/profile.aspx?projectid=1&cat1=Collection&cat2=Built&cat3=Parking&c at3b=19

Private Space Concept 5.7 Create a diverse mixture of uses and activities within the plan area

that encourage both day time and night time use by residents and visitors Principle 5.7.1 Allow tourist, retail, office, commercial, and continued light industrial uses in project area, especially along Haven Avenue and the pedestrian street(hotels, shopping, dining)

Page | 42


Principle 5.7.2 Increase uses that are open during nighttime hours (movie theatre, brewery) Principle 5.7.3 Provide amenities for incoming residents (grocery store, school)

Photo of The Willows Market, Menlo Park. Example of small neighborhood serving grocery store/deli. Retrieved from http://www.yelp.com/biz_photos/the-willows-market-menlo-park?select=ZVn6e9BSXl3Hpc9o9pIBg#kk7atdnhYHvNXTgvAtbUpg

Principle 5.7.4 Mixed-use development that encourages active street level retail uses Principle 5.7.5 Encourage new housing development Principle 5.7.6 Promote an environment that encourages non-insular development Concept 5.8 Take advantage of attributes of the area such as the view and the

industrial character of the community Principle 5.8.1 Require that new development allow rooftop access to the public, and includes rooftop landscaping that is aesthetically pleasing

Page | 43


Photo of rooftop garden. Retrieved on http://www.relaxationworldnetwork.com/gardening-forrelaxation.html

Photo of public rooftop garden in New York City. Retrieved on http://5000plus.net.au/ideas/90

Principle 5.8.2 For new commercial developments require the use of outside construction materials that evoke an industrial feel

Page | 44


Photo of the front of Verne Coffee Roasters, Santa Cruz.

Concept 5.9 Maintain and provide accessibility

Principle 5.9.1 Create public transit stops Principle 5.9.2 Create a transit hub that will provide resources for buses and bicycles Principle 5.9.3 Work with incoming commercial and retail businesses to provide parking Concept 5.10 Encourage urban design qualities that attract residents and visitors

Principle 5.10.1 Imageability – Include courtyards and plazas, increase identifiers on buildings, include the development of buildings with non-rectangular shapes, and increase the presence of outdoor dining

Page | 45


Washington D.C. outdoor dining area, retrieved from: http://blog.preservationnation.org/author/davidgarber/page/26/#.UZ2DkOuHoYQ

Principle 5.10.2 Human scale – Increase proportion of windows at street level, increase number of small planters Principle 5.10.3 Transparency – Increase proportion of street wall on both side of streets, increase proportion of active uses fronting the street Principle 5.10.4 Complexity – Increase number of basic building colors, increase number of accent building colors

Page | 46


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.