DEMOLISH EXISTING VARIABLE-DEPTH CONCRETE TOPPING. DEMOLISH EXISTING DOOR AND FRAME. DEMOLISH EXISTING DOOR. PROTECT EXISTING FRAME TO REMAIN.

6

DEMOLISH EXISTING WINDOW, FRAME, & WOOD BLOCKING.

7

DEMOLISH EXISTING PLUMBING FIXTURES. SEE ALSO PLUMBING DRAWINGS.

9

1

DEMOLISH EXISTING LOBBY AND OFFICES IN THEIR ENTIRETY, INCLUDING WOOD FRAMING, STOREFRONT SYSTEM, ROOFING, WALLS, FLOORS AND FOUNDATIONS. SEE ALSO STRUCTURAL AND MEP DRAWINGS.

5

8 1

SCOPE OF WORK NOTES DEMOLISH EXISTING POOL AND DECK IN ITS ENTIRETY, INCLUDING STEEL FRAMING, ROOFING, WALLS, FLOORS AND FOUNDATIONS. REMOVE EXISTING CEDAR ROOF DECKING AND GLUE LAMINATED BEAMS. CONTRACTOR HAS RIGHTS TO SALVAGED AND RE-USABLE MATERIAL. SEE ALSO CIVIL, STRUCTURAL, AND MEP DRAWINGS.

WAYLAND COMMUNITY POOL

SAW CUT NEW MASONRY OPENING.

Wayland, Massachusetts

DEMOLISH EXISTING FLOORING, PROTECT CONCRETE BELOW TO REMAIN. EXTENT OF ASBESTOS CONTAINING MATERIALS IS UNKNOWN AT THE DATE OF THIS DRAWING.

10

WITHIN THE BASE SCOPE, INCLUDE THE COST TO REPLACE DAMAGED CEDAR SIDING, WOOD SHEATHING AND INSULATION NOT TO EXCEED $15,000 MATERIALS AND LABOR.

11

DEMOLISH EXISTING METAL ENCLOSURE.

12

DEMOLISH EXISTING TOILET PARTITIONS AND TOILET PAPER DISPENSERS.

13

DEMOLISH CMU WALL

GMP DRAWINGS REVISED: 3/3/10 REVISED: 3/30/10 REVISED: 4/7/10

GENERAL NOTES: 1.

REMOVE LOOSE PAINT USING APPROPRIATE PRECAUTIONS FOR POTENTIAL LEAD-CONTAINING PAINT.

2.

EXTENT OF POSSIBLE ASBESTOS-CONTAINING MATERIALS IS UNKNOWN AS OF THE DATE OF THIS DRAWING.

3.

NO INFORMATION ON ANY OTHER POTENTIAL HAZARDOUS MATERIALS HAS BEEN MADE KNOWN TO THE DESIGNERS AS OF THE DATE OF THIS DRAWING.

4.

COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS, LAWS, AND ORDINANCES REGARDING KNOW OR SUSPECTED HAZARDOUS MATERIALS DURING EXCAVATION AND DEMOLITION WORK.

11

1

2

2

11

13 6

6

4

4 7

10

1

1 10 13

4 8 8

2

2

11 10

3

3

2 4

2

2

7

7

7

10

4 2 2

9

KEY PLAN

5

9 4 10

10

2

1

2

1

10

DEMOLITION BASEMENT & FIRST FLOOR PLAN

2

DEMOLITION BASEMENT PLAN SCALE: 1/8" = 1'-0

1

DEMOLITION FIRST FLOOR PLAN SCALE: 1/8" = 1'-0