Macafee Road Langdon Street Munro Court Baker Street sewerage pit pit PROPOSED SITE 19 Macafee Road, Castlemaine, Vic 3450 Total Area: 2.01 hectares greenhouse workshop muli purpose house common house c o e e d c o v e e d covered oudoor gathering 8 0 0 0 30000 37 dwellings common habitable building non-habitable building carparks water tanks Trees private open space Tree Protection Zone (TPZ) 31/03/2023 12:33:38 PM 11300 2000 1 : 1000 Section 1 Section 2 (Cross section) WINC Cohousing rev: description: date: client: WINC Cohousing rev: description: date: June 21st 12pm June 21st 3pm diagrams rev: description: date: Design 2 -shadow diagrams Dudley Street Cochrane Court Macafee Langdon sewerage pit pit PROPOSED 19 Macafee Castlemaine, Total Area: greenhouse workshop p p ho c on h e 30 0 37 dwellings common habitable building non-habitable building carparks water tanks Trees private open space Tree Protection Zone (TPZ) Concept Design 2 -shadow diagrams
Dudley Street Cochrane Court
tv seat 3.8 x 3.0 Bedroom 3 5.6 x 1.9 Mudroom/Laundry 3.0 X 5.0 Dining one ep o na u a g ound oneseptonatu alground 160M2 HOME desk ct/o /rh f m r r o highlightwindow 3.6 x 4.6 Study/guest 1.8 x 2.7 Bath 5.0 x 5.0 Lounge 3.8 x 3.8 Bedroom 1 2.6 x 3.7 Bath 3.8 x 3.0 Bedroom 2 optional door open q 3.3 x 3.9 Bed 3 3.9 x 5.0 Bed 2 3.2 x 3.9 Bed 4 4.1 x 4.2 Bed 1 bir 1.4 x 2.8 Pantry 1.0 x 1.7 WC 1.7 x 2.7 Bath 3.8 x 5.6 Lounge secret room kiddy passage through rooms? 3.2 x 1.7 Ldry solar light solar light linen solar light dr wm pull down drying racks above mudroom seat shoes below 3.2 x 2.2 Kids Play line of existing building
Firm: Smith and Tracey Architects
Role: Part of the design team from concept design through to documentation (Project cost 1.5 million)
Co-creating a concept design at a master plan level for the site, we developed a 3 stage design solution. Bringing together the Jewish community and the students through common spaces. Strong references have been made to Jewish culture and heritage through materiality such as Jerusalem stone and bronze screens.
Jewish School
Preforming Art Centre
Firm: Smith and Tracey Architects
Role: Primary designer concept design through to Construction Administration (Project cost 2 million)
After the initial concepts were done by others in the office, I took over design development and overseeing documentation of the $6 million project. I hadmajor design influence both iexternally and internally. I have worked with the construction manager on site, to solve construction issues and design adaption.
Discovery centre lear ning cluster 03 lear ning cluster 01 lear ning cluster 02 lear ning cluster 04 muisc room cultural kitchen kitchen table general principal kitchen wc wc music music music reception work room group room group pod student arrival toilets toilets toilets toilets toilets sta wc store sta elc arrival college arrival courtyard garden peace garden wc kitchen garden void shared zone
Situated in countr yside Victoria, this $4 million project used local materials and referenced r ural architectural styles. I managed the project independently through design development, documentation and constr uction administration with the client and local city Including all constr uction detailing and internal fit out. The building opened to the public in November
Yamaya Housing Project - India
Firm: Independent
Role: Volunteer Architectural Designer and Project Co-ordination.
Yamaya Housing Project - India
Firm: Independent
Role: Volunteer Architectural Designer and Project Co-ordination.
Over the past two years I have worked with local NGO’s in India of the development a rural and isolated villages in South West India. We have been working on one area in particular constructing a new school, housing for teachers, and a community building for learning and gathering. Students from Swinburne have come with us to India were I have co-ordinated their roles during construction and liaising with the locals. Construction is usually completed with local material and simple construction methods, in order to allow residence to continue future work
Over the past two years I have worked with local NGO’s in India of the development a rural and isolated villages in South West India. We have been working on one area in particular constructing a new school, housing for teachers, and a community building for learning and gathering. Students from Swinburne have come with us to India were I have co-ordinated their roles during construction and liaising with the locals. Construction is usually completed with local material and simple construction methods, in order to allow residence to continue future work
Cameron Court Firm: Rob Mills Architects
Cameron Firm: Rob
Role: Part of the design team from concept design, project lead through to tender. (Project cost 8 million)
Role: Part of the design team from concept design, project lead through to tender. (Project cost 8 million)
Single residence, conceptual design. Worked alongside the director on concept sketches, and concept revit models for clients, including client presentations, and lodgment of town planning application. I develop the design Precast modular design of the facade, internal layouts, building functionality and interior design pallet and joinery. I documented the entire interiors of this project for tender.
residence, conceptual Worked alongside the on concept clients, client lodgment planning design the internal functionality interior documented entire of for tender.
Role: Part of the design team from concept design through to design development (Project cost 23 million)
Single residence, conceptual design, competition, international presentations. Worked alongside the director with a design team on concept sketches, and concept revit models for international client, including client presentations. Worked on the design development and co-ordination of the consultant team.
Copyright Robert Mills Architects Pty Ltd
Byron Bay Firm: Rob Mills Architects
Copyright Robert Mills Architects Pty Ltd
Copyright Robert Mills Architects Pty Ltd
Copyright Robert Mills Architects Pty Ltd
Fawkner House Apartment and Display Suite
Firm: Rob Mills Architects
Role: Project Lead from design development through to construction
(Project cost 17 million)
10 high end apartments, developed the design after the design was approved in town planning. Lead a fully documented and coordinated tender set. Head consultant managing engineers and contractors. I also ran contract administration of the early stages of construction with a project management team, answering RFI’s and builders variations on site.
Adams St Apartment
Firm: Rob Mills Architects
Role: Project Lead for documentation (Project cost 14 million)
8 high end apartments, lead a fully documented and coordinated tender set. Head consultant managing engineers and contractors, answering tender RFI’s and managing the costing variations/ value management process.
Copyright Robert Mills Architects Pty Ltd
Schematic design Development Documentation Tendering Construction Administration Nightingale Apartments Urban Digestor & Breathe Architecture Environmental Designer
most sustainable apartment.” was to design and consult on the from concept design through to town planning. Additionally I provided ESD solutions lighting levels, energy consumption, heating cooling and green solutions. I worked Breathe Architecture to achieve optimum apartment layouts, window configurations, selections and internal fit outs. Nightingale Apartments Firm: Urban Digestor & Breathe Architecture Role: Environmental Designer “Australia’s most sustainable apartment.” My role was to design and consult on the project from concept design through to town planning. Additionally I provided ESD solutions for lighting levels, energy consumption, heating and cooling and green solutions. I worked with Breathe Architecture to achieve optimum apartment layouts, window configurations, material selections and internal fit outs. ESD solutions for lighting levels, energy consumption, heating and cooling and green solutions. I worked with Breathe Architecture to achieve optimum apartment layouts, window configurations, material selections Administration Apartments & Breathe Architecture Designer sustainable apartment.” design and consult on the design through to town provided ESD solutions consumption, heating green solutions. I worked Architecture to achieve optimum window configurations, and internal fit outs. Architecture apartment.” consult on the through to town ESD solutions consumption, heating solutions. I worked optimum configurations, outs. Schematic design Development Documentation Tendering Construction Administration cooling and green solutions. I worked Breathe Architecture to achieve optimum apartment layouts, window configurations, selections and internal fit outs. Schematic design Design Development Documentation Tendering Construction Administration Nightingale Apartments Firm: Urban Digestor & Breathe Architecture Role: Environmental Designer “Australia’s most sustainable apartment.” My role was to design and consult on the project from concept design through to town planning. Additionally I provided ESD solutions for lighting levels, energy consumption, heating and cooling and green solutions. I worked with Breathe Architecture to achieve optimum apartment layouts, window configurations, material selections and internal fit outs. Administration green solutions. I worked Architecture to achieve optimum window configurations, and internal fit outs. solutions. I worked optimum configurations, outs.
“Australia’s
Castle Redevelopment - Italy
Firm: Smith and Tracey Architects & Elenberg Fraser
Role: Part of the design team from concept design through to documentation
All modelling in Revit
Working in collaboration with a team Elenberg Fraser, we are in the process of redeveloping a castle in Tuscany into an event
17095_CASTELLO 1.01 THE 17095_CASTELLO 1.01 THE
/
Castle Redevelopment - Italy
Firm: Smith and Tracey Architects & Elenberg Fraser Role: Part of the design team from concept design through to documentation
Working in Collaboration with a team at Elenberg Fraser, we are in the process on redeveloping a Castle in Tuscany into an event and boutique apartments. The design process in completed in collaboration with builders in the local area, in order to overcome strict planning laws. The designed interventions are highly detailed and respect the history of the site and context
D S GN EPOR 095 CASTE LO D BRANC AL NO 1 095 CAST LO D BRANC AL NO DES GN REPORT 5 ED BR CK HERRINGBONE PATTERN METAL THRESHOLDS FLOATING TIMBER FLOORS HERRINGBONE PATTERN LOCAL MARBLE STONE WALLS STA NLESS STEEL BLACKENED STEEL CONTRAST MARBLE 01 PRECEDENTS_CASE STUDIES HE BELLAG O CENTER V LLA SERBELLON BELLAG O V LLA SASSOL NI MONTEVARCH V LLA LANTE BAGNAIA BULGAR HOTEL M LAN ARMAN HOTEL M LAN TORRE D MORAVOLA UMBR A PUL HOTEL SHANGHA DES GN RE ORT _CAS ELLO D B ANC AL NO CAS ELLO D B ANC AL NO D GN EPOR 2 APARTMENT 02 58 SQM APARTMENT 03 ENTRANCE HALLWAY S RECEPTION CHAPEL / WAITING LOUNGE ADMIN 160 QUEEN MELBOURNE AUSTRALIA 9600 WWW.ELENBERGFRASER.COMMAIL@ELENBERGFRASER.COM Number Revision Figured take precedence readings. Verify on site. any discrepancies Architect for decision proceeding with SCALE@A1 By issue SCALE@A3 3 02 COMMUNAL SPACES LOUNGE / CHAPEL G O CAST O C O CAST O C O S G O 38 5 01_MATER ALS RED BR CK HERR NGBONE PATTERN METAL THRESHOLDS FLOAT NG T MBER FLOORS HERRINGBONE PATTERN LOCAL MARBLE STONE WALLS STA NLESS STEEL BLACKENED STEEL CONTRAST MARBLE D GN POR 95_CAST LLO D BRANC AL NO 17 95 CASTE LO D BRANC AL NO D SIGN REPO T 8 01 PRECEDENTS_CASE STUDIES HE BELLAG O CENTER V LLA SERBELLON BELLAG O VILLA SASSOL N MONTEVARCH V LLA LANTE BAGNAIA BULGARI HOTEL M LAN ARMAN HOTEL MILAN TORRE D MORAVOLA UMBR A PUL HOTEL SHANGHA DES GN REPORT 1 095_CAST LLO D BRANC A NO 1 095 CAST LLO D BRANC A NO DE GN R PORT 2 2 APARTMENT 02 58 SQM APARTMENT 03 45 SQM ENTRANCE HALLWAY S RECEPTION CHAPEL / WAITING LOUNGE ADMIN LEVEL 1, STREET MELBOURNE VICTORIA 3000 AUSTRALIA +61 WWW.ELENBERGFRASER.COMMAIL@ELENBERGFRASER.COM Drawing Title Project Number Number Project Title dimensions take scale readings. dimensions Report any the Architect before proceeding work. SCALE@A1 Drawn Reason SCALE@A3 3 02 COMMUNAL SPACES LOUNGE / CHAPEL 5 01_MATERIALS ED BR CK HERRINGBONE PATTERN METAL THRESHOLDS FLOATING TIMBER FLOORS HERRINGBONE PATTERN LOCAL MARBLE STONE WALLS STA NLESS STEEL BLACKENED STEEL CONTRAST MARBLE D S GN REPORT 9 _CAS ELLO D BRANC A NO 09 CAST LLO D BRANC A NO DESIGN REPORT 8 01 PRECEDENTS_CASE STUDIES HE BELLAG O CENTER V LLA SERBELLON BELLAG O V LLA SASSOL NI MONTEVARCH V LLA LANTE BAGNAIA BULGAR HOTEL M LAN ARMAN HOTEL M LAN TORRE D MORAVOLA UMBR A PUL HOTEL SHANGHA DES GN RE ORT 17095_CAS ELLO D B ANC AL NO 7095 CAS ELLO D B ANC AL NO D GN EPOR 2 2 APARTMENT 02 58 SQM APARTMENT 03 45 SQM ENTRANCE HALLWAY S RECEPTION CHAPEL / WAITING LOUNGE ADMIN LEVEL 160 MELBOURNE 3000 AUSTRALIA +61 WWW.ELENBERGFRASER.COMMAIL@ELENBERGFRASER.COM Title Number Title dimensions take scale readings. dimensions on Report any discrepancies Architect proceeding SCALE@A1 Drawn SCALE@A3 3 02 COMMUNAL SPACES LOUNGE
CHAPEL
be transformed into a dwelling or workshop in the future. The client had strong views on the type of lighting and spaces needed. We created a series of exhibition spaces, a bathroom, kitchen and studio. The roof took on the shape of a folded copper lantern, with a twisted skylight as the feature for the building.
Concept design concept for this that could be workshop in the on the type We created bathroom, on the shape a twisted building. final phase of
St Ber nard ollege DD Wor kshop ntre e C ff ta S
+ trac ference Images
smith
St Ber nard ollege DD Wor kshop l pe ha C & ntre e C ff ta S 1 September 2016 y s College, Essendon erence Images St Ber nard ollege DD Wo C ff ta S smith 1 September 2016 l pe a chitects
Design - St
Inter nal Reference Images Sta Centre & Chapel Concept Design - St Ber nard’s College, Essendon Reference Imager y Sta Centre & Chapel Concept Design - St Ber nard’s College, Essendon Reference Imager y
Sta Centre & Chapel Concept
Bernard’s College, Essendon
Copyright Robert Mills Architects Pty
Ltd
Copyright Robert Mills Architects Pty Ltd
Ltd
Copyright Robert Mills Architects
Pty
Ltd
Copyright Robert Mills Architects
Pty
Copyright Robert Mills Architects Pty Ltd
Copyright Robert Mills Architects Pty Ltd Copyright Robert Mills Architects Pty Ltd