Fischer Samontec PV

Page 3

2

2. Assembly of support system The support system are customized for the individual needs of each building and are capable of making the adjustments necessary for a proper installation. The number of supports and the distance between the supports is dependant upon the requirements of each project (number of panels, inclination) and the required load combinations of the specific location.

2.1 INSTALLING THE FIRST SUPPORT Depending on the requirements of the project the support bracket can be either mounted directly to the ground or elevated by using a small front leg.

517202

For mounting directly to the ground use the variable angle bracket (517201) which is anchored to the cement with the appropriate anchor bolt (depending on the project Fischer has the appropriate anchor bolt).

517205

Then the connector (517202) is attached to the angle bracket (517201) with a bolt (517158) and fastened with the washer (517206) and nut (517205).

517206

517201

517158

For mounting with an elevated front leg, choose the appropriate leg (517411/ 517412/ 517413/ 517414) which will be anchored to the cement with the appropriate anchor bolt (depending on the project Fischer has the appropriate anchor bolt).

517205 517206 517202

Then the connector sleeve (517202) is fastened to the leg with a bolt (517757) to the threaded holes in the connector sleeve (517202). Finally the variable angle bracket (517201) is fastened to the connector sleeve (517202) with a through bolt (517158) and fastened with a washer (517206) and nut (517205).

Αγκύριο

517201 517206

517757

517158 Anchor bolt

517411 517412 517413 517414


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.