CONSEQUENCES OF FLOODING
DAMAGE FROM FLOODING
FINANCIAL Costs which can be expressed in dollars
Damage caused by floodwaters coming into contact with items. This can be expressed as ‘Potential’ (max. damage) and ‘Actual’ (reduced, damages due to moving items)
EXTERNAL INTERNAL STRUCTURAL
RESIDENTIALContents of Buildings: clothes, carpets, furniture, valuables, fittings, appliances
FINANCIAL CLEANUP OPPORTUNITY
SOCIAL
Costs which cannot be expressed in dollars, eg:
• stress
• loss of life
• serious injury
• depression
• inconvenience
• insecurity
Costs associated with the flood event occurring, but not as readily quantifiable
COMMERCIALContents of buildings: products, stock, fittings, tools, machinery, raw materials
PUBLIC AUTHORITIES Contents of public buildings and facilities
External items: Vehicles, laundries, caravans, sheds, tools, gardens, fences
Physical damage to buildings: Gyprock, cupboards, scour of footings, houses becoming buoyant bracket (floating off footings)
Clean carpets, walls, clothes, reinstate furniture, remove mud and debris
Loss of wages, living costs (temporary accommodation and food), time to repair/ replace damaged items
Not applicable
External items: vehicles, machinery, display, raw materials/stockpiles, fences
Public property and facilities: parks, signs, machinery, equipment
Physical damage to buildings
Dispose of damaged products, stock, materials, cleaning and reinstatement
Loss of productivity and income, bank interest charges
Loss of existing and/or potential trade
Physical damage to infrastructure: electricity, water, telephone, gas, road and rail transport links
Remove mud and debris from facilities, public and private property repairs (temporary and permanent)
PRESENT DISPLAYS OF FLOODING
Disruption of services, community service relief grants
Provision of public service
FLOODMARKS AT RESIDENCE ENTRANCE ON VICTORIA ST, POTTS POINT FLOODMARKS AT RESIDENCE ENTRANCE ON VICTORIA ST FLOODGATES INSTALLED TO AVOID INUNDATION AT VICTORIA ST, WITH APPROXIMATE ELEVATION OF FLOODING IN FEBRUARY 2010 FLOODING, VICTORIA ST, APRIL 2012 APPROXIMATE ELEVATION OF FLOODING ON VICTORIA ST DURING JUNE 2007 STORM
TANGIBLE INTANGIBLE DIRECT INDIRECT
FLOODING RESPONSE SUMMARY OF ESTIMATED FLOOD DAMAGES
TOTAL PROPERTIES FLOODED ABOVE FLOOR LEVEL COMMERCIAL PROPERTIES FLOODED ABOVE FLOOR LEVEL RESIDENTIAL PROPERTIES FLOODED ABOVE FLOOR LEVEL DESIGN FLOOD EVENT 2 Year ARI EXCLUDES ALL DAMAGES TO PUBLIC ASSETS $ 2,339,000 $ 3,090,000 $ 3,550,000 $ 4,420,000 $ 5,800,000 $ 6,410,000 $ 9,480,000 $ 621,000 $ 746,000 $ 890,000 $ 1,140,000 $ 2,390,000 $ 3,000,000 $ 7,070,000 $ 2,950,000 $ 3,840,000 $ 4,440,000 $ 5,580,000 $ 8,190,000 $ 9,410,000 $ 16,600,000 $ 2,840,000 AWARENESS OF FLOODING RESPONSE RATE PROPERTY AREAS FLOODED DID NOT RESPOND, 537 RESPONDED 38 STORM EVENTS CAUSING FLOODING NUMBER OF RESPONDENTS LESS THAN 5 YEARS 5-10 YEARS 10-15 YEARS 15-30 YEARS MORE THAN 30 YEARS 12 10 8 6 4 2 0 PERIOD OF RESIDENCY 6 5 4 3 2 1 0 number of respondents JUN-07 APR-98 FEB-01 OCT-12 FEB-10 MAY-11 JUL-11 FEB-08 MAR-12 APR-12 5 Year ARI 10 Year ARI 20 Year ARI 50 Year ARI 100 Year ARI PMF 35 56 58 77 105 106 142 16 21 29 40 51 54 65 51 77 87 117 156 106 207 TOTAL PROPERTIES FLOODED ABOVE FLOOR LEVEL COMMERCIAL PROPERTIES FLOODED ABOVE FLOOR LEVEL RESIDENTIAL PROPERTIES FLOODED ABOVE FLOOR LEVEL DESIGN FLOOD EVENT 2 Year ARI 5 Year ARI 10 Year ARI 20 Year ARI 50 Year ARI 100 Year ARI PMF Average Annual Damages COMMERCIAL (BELOW FLOOR LEVEL) 2 AWARE 22 NOT AWARE 11 SOME KNOWLEDGE 4 COMMERCIAL (ABOVE FLOOR LEVEL) 2 OTHER 3 RESIDENTIAL (ABOVE FLOOR LEVEL) 4 RESIDENTIAL (BELOW FLOOR LEVEL) 2 FRONTYARD OR BACKYARD 5 GARAGE OR SHED 2
FLOODING ANALYSIS 2015 AS OF 2013 2018 2023
GOAL
TO FACILITATE A RECLAMATION OF LAND THAT PROVIDES A HABITABLE BRIDGE SYSTEM THAT WOULD INTERCONNECT THE PUBLIC BOTANICAL GARDEN SPACE WITH THAT OF THE PUBLIC GARDEN ISALND PRECINCT ALONGSIDE THE ROYAL AUSTRLIAN NAVY BASE, AS WELL AS THE LOCAL COASTAL REGION.
OBJECTIVE 1
FLOODING
Generate a proposal that will pre-emptively be able to handle flooding conditions and be flood resistant
FITNESS OBJECTIVE 1
MAXIMISE DENSITY
In order to make the best use of space and maintain a navigational system it is ideal that the structures density is maximised and to help deal with the quantity of structures being replaced and the needs of the community
CONFLICTS: Maximise Solar Gain and Maximise Communal Space
OBJECTIVE 2
CONNECTION
Create connectivity between public space through the application of residential housing
FITNESS OBJECTIVE 2
MAXIMISE COMMUNAL SPACE
In an effort to improve the social interaction through public and easily accessible open space we would like communal spaces to be a large factor in the community
CONFLICTS: Maximise Building Volume and Minimise Bridge Length
FITNESS OBJECTIVE 3 MAXIMISE SOLAR GAIN
To allow for maximum solar gain on bridge surface to increase the likely hood of communa gathering in community spaces
CONFLICTS: Maximise Building Volume and Minimuse Bridge Length
OBJECTIVE 3
OPEN SPACE
Improve social interaction through the use of public and easily accessible open space
OBJECTIVE 4
NAVIGATION
Increased foot traffic and decrease car necessity through the diversification of navigational space
FITNESS OBJECTIVE 4 MAXIMISE BUILDING OVERLAP
Increased foot traffic and decrease car necessity will require spaces that are easy to navigate and having shorter spans of walkways will ideally aid with the issue
CONFLICTS: Maximise Density
FITNESS OBJECTIVE 5 MINIMISE ODD BUILDINGS
In order to make the best use of the structures density to help deal with the quantity of structures being replaced and the needs of the community odd buildings should be minimised
CONFLICTS: Maximise Density and Maximise Junction Space
CHROMOSOME 1 ANCHOR POINTS ALONG SHORELINE
CHROMOSOME 2 WIDTH OF BRIDGES CHROMOSOME 3 CULL PATTERN FOR BUILDING PROXIMITY
CHROMOSOME 4 BUILDING SCALE CHROMOSOME 5 BUILDING ROTATION
CHROMOSOME 6 BUILDING HEIGHT
PHENOTYPE
1.5 X 1.5KM SUPERBLOCK COMPRISED OF BOTH LAND AND SEA
MATRIX
FITNESS OBJECTIVE
CHROMOSOME 1 ANCHOR POINTS ALONG SHORELINE
CHROMOSOME 2 WIDTH OF BRIDGES
CHROMOSOME 3 CULL PATTERN FOR BUILDING PROXIMITY
CHROMOSOMES
CHROMOSOME 4 BUILDING SCALE
CHROMOSOME 5 BUILDING ROTATION
CHROMOSOME 6 BUILDING HEIGHT
FITNESS OBJECTIVE 1
MAXIMISE DENSITY
FITNESS OBJECTIVE 2 MAXIMISE COMMUNAL SPACE
FITNESS OBJECTIVE 3
MAXIMISE SOLAR GAIN
FITNESS OBJECTIVE 4
MAXIMISE BUILDING OVERLAP
FITNESS OBJECTIVE 5
MINIMISE ODD BUILDINGS
MATRIX
CONSTRUCTION
STEP 7
OF PHENOTYPE
CONSTRUCTION
STEP 8
OF PHENOTYPE
CONSTRUCTION OF
STEP 9
PHENOTYPE
STEP 10
CONSTRUCTION OF PHENOTYPE
STEP 13
CONSTRUCTION OF PHENOTYPE
STEP 14
CONSTRUCTION OF PHENOTYPE
CONSTRUCTION
STEP 17
OF PHENOTYPE
STEP 18
CONSTRUCTION OF PHENOTYPE
STEP 19
CONSTRUCTION OF PHENOTYPE
STEP 20
CONSTRUCTION OF PHENOTYPE
STEP 22
CONSTRUCTION OF PHENOTYPE
STEP 25
CONSTRUCTION OF PHENOTYPE
CONSTRUCTION OF PHENOTYPE
STEP 27
POPULATION
GENERATION SIZE: 50
GENERATION COUNT: 100
POPULATION SIZE: 5000
NUMBER OF PARETO FRONTS: 50
SIMULATION RUNTIME: 12:46:53
SIMULATION PARAMETERS
No. OF GENES (SLIDERS): 3240
No. OF VALUES (SLIDER VALUES): 429640
No. OF FITNESS VALUES: 5
ENTIRE POPULATION
WALLACEI RESULTS
F01
F02
F03
F04
LAST GENERATION LAST GENERATION ENTIRE POPULATION
F05
PARALLEL COORDINATE PLOT OBJECTIVE SPACE SIMULATION INFORMATION
WALLACEIRESULTS FO1:
DENSITY
SPACE FO3:
SPACE
STANDARD DEVIATION FITNESS VALUE SD VALUE TRENDLINE MEAN VALUE TRENDLINE
MAXIMISE BUILDING
FO2: MAXIMISE COMMUNAL
MAXIMISE JUNCTION
FO4: MAXIMISE SOLAR GAIN FO5: MINIMISE INHABITABLE BUILDING AREA
F01 F02 F03 F04 F05
OF REFINEMENT
NUMBER OF PARETO FRONTS: 50 GENERATION: 99 NUMBER OF CLUSTERS: 10 UNSUPERVISED MACHINE LEARNING HIERARCHICAL: AVERAGE LINKAGE CLUSTER 1: CLUSTER 2: CLUSTER 3: CLUSTER 4: CLUSTER 5: CLUSTER 6: CLUSTER 7: CLUSTER 8: CLUSTER 9: CLUSTER 10: GENERATION 99 GENERATION 99 GENERATION 99 GENERATION 99 GENERATION 99 GENERATION 99 GENERATION 99 GENERATION 99 GENERATION 99 GENERATION 99 INDIVIDUAL 4 INDIVIDUAL 1 INDIVIDUAL 24 INDIVIDUAL 22 INDIVIDUAL 21 INDIVIDUAL 38 INDIVIDUAL 31 INDIVIDUAL 6 INDIVIDUAL 30 INDIVIDUAL 11 DENDROGRAM SELECTED CLUSTERS CLUSTERING METHOD
PROCESS
STAGE 1
3D CLUSTERING
PARALLEL COORDINATE PLOT
PROCESS OF
1 CLUSTER 1: CLUSTER 2: CLUSTER 3: CLUSTER 4: CLUSTER 6: INDIVIDUAL 4: INDIVIDUAL 16: INDIVIDUAL 41: INDIVIDUAL 47: INDIVIDUAL 3: INDIVIDUAL 40: INDIVIDUAL 1: INDIVIDUAL 23: INDIVIDUAL 46: INDIVIDUAL 24: INDIVIDUAL 37: INDIVIDUAL 22: INDIVIDUAL 42: INDIVIDUAL 17: INDIVIDUAL 49: INDIVIDUAL 45: INDIVIDUAL 32: INDIVIDUAL 39: INDIVIDUAL 8: INDIVIDUAL 38: INDIVIDUAL 14: INDIVIDUAL 15: INDIVIDUAL 48: INDIVIDUAL 44: INDIVIDUAL 29: INDIVIDUAL 5: 14290/24995 14331/24995 14691/24995 13974/24995 14421/24995 13921/24995 14976/24995 14962/24995 15043/24995 13067/24995 12772/24995 10394/24995 10364/24995 11885/24995 11191/24995 12018/24995 11437/24995 11308/24995 12537/24995 13944/24995 12704/24995 13477/24995 14276/24995 13322/24995 11717/24995 14058/24995-----2 1 7 3 8 5 4 910-6CLUSTER 1: CLUSTER 2: CLUSTER 3: CLUSTER 4: CLUSTER 6: INDIVIDUAL 4: INDIVIDUAL 16: INDIVIDUAL 41: INDIVIDUAL 47: INDIVIDUAL 3: INDIVIDUAL 40: INDIVIDUAL 1: INDIVIDUAL 23: INDIVIDUAL 46: INDIVIDUAL 24: INDIVIDUAL 37: INDIVIDUAL 22: INDIVIDUAL 42: INDIVIDUAL 17: INDIVIDUAL 49: INDIVIDUAL 45: INDIVIDUAL 32: INDIVIDUAL 39: INDIVIDUAL 8: INDIVIDUAL 38: INDIVIDUAL 14: INDIVIDUAL 15: INDIVIDUAL 48: INDIVIDUAL 44: INDIVIDUAL 29: INDIVIDUAL 5: FITNESS OBJECTIVESF01 (4999) F03 (4999) F02 (4999) F05 (4999) F04 (4999) 334 88 326 221 0 547 772 821 1128 223 387 1801 1786 1425 2186 2211 1348 2323 1016 3456 2820 2910 3927 2456 2545 4039 0 176 244 159 46 173 200 231 402 60 80 1254 1716 1840 993 2411 1592 1737 3299 3540 3065 4122 3930 3295 2339 3457 4681 4750 4743 4574 4727 4589 4705 4749 4639 4835 4886 510 313 1367 1259 1259 830 1654 0 3906 4069 3983 3906 2206 2793 2387 4722 4891 4656 4766 4993 4516 4318 4181 3915 2711 2540 3336 3244 3553 3115 3072 3823 2849 3966 1910 2300 2157 1668 2122 2734 1175 4553 4426 4722 4254 4655 4096 4981 4980 4959 4238 4879 3493 3305 3700 3638 3065 3844 2754 4256 1132 450 305 845 2243 1306 0 TOTAL TOTAL (24995) 14290 14331 14691 13974 14421 13921 14976 14962 15043 13067 12772 10394 10364 11885 11191 12018 11437 11308 12537 13944 12704 13477 14276 13322 11717 14058 RANK
REFINEMENT STAGE
No. 1 GENERATION: 99 INDIVIDUAL: 42
No. 2 GENERATION: 99 INDIVIDUAL: 22
No. 3 GENERATION: 99 INDIVIDUAL: 49
No.4 GENERATION: 99 INDIVIDUAL: 39
No. 5 GENERATION: 99 INDIVIDUAL: 32
No. 6 GENERATION: 99 INDIVIDUAL: 29
No. 7 GENERATION: 99 INDIVIDUAL: 17
No.8 GENERATION: 99 INDIVIDUAL: 45
No. 9 GENERATION: 99 INDIVIDUAL: 8
No. 10 GENERATION: 99 INDIVIDUAL: 14
DIAMOND CHART PROCESS OF REFINEMENT STAGE 2
No. 1
GENERATION: 99
INDIVIDUAL: 42
No. 2 GENERATION: 99 INDIVIDUAL: 22
No. 3 GENERATION: 99 INDIVIDUAL: 49
No.4 GENERATION: 99 INDIVIDUAL: 39
No. 5 GENERATION: 99 INDIVIDUAL: 32
BUILDING QUANTITY: 117
BUILDING AREA: 163173m2
POPULATION: 8,159 (20m2)
BUILDING QUANTITY: 139
BUILDING AREA: 163438m2
POPULATION: 8, 172 (20m2)
BUILDING QUANTITY: 115
BUILDING AREA: 144338m2
POPULATION: 7,213 (20m2)
BUILDING QUANTITY: 100
BUILDING AREA: 135448m2
POPULATION: 6,772 (20m2)
BUILDING QUANTITY: 164
BUILDING AREA: 191945m2
POPULATION: 9,597 (20m2)
No. 6
GENERATION: 99 INDIVIDUAL: 29
No. 7 GENERATION: 99 INDIVIDUAL: 17
No.8 GENERATION: 99 INDIVIDUAL: 45
No. 9 GENERATION: 99 INDIVIDUAL: 8
No. 10 GENERATION: 99 INDIVIDUAL: 14
BUILDING QUANTITY: 97
BUILDING AREA: 120763m2
POPULATION: 6,038 (20m2)
PROCESS OF REFINEMENT STAGE 2
BUILDING QUANTITY: 134
BUILDING AREA: 186706m2
POPULATION: 9,335 (20m2)
BUILDING QUANTITY: 111
BUILDING AREA: 143776m
POPULATION: 7,189 (20m2)
BUILDING QUANTITY: 148
BUILDING AREA: 210286m2
POPULATION: 10,514 (20m2)
BUILDING QUANTITY: 70
BUILDING AREA: 105026m2
POPULATION: 5,251 (20m2)
PHENOTYPE
No. 1 GENERATION: 99 INDIVIDUAL: 42
No. 2 GENERATION: 99 INDIVIDUAL: 22
No. 3 GENERATION: 99 INDIVIDUAL: 49
No.4 GENERATION: 99 INDIVIDUAL: 39
No. 5 GENERATION: 99 INDIVIDUAL: 32
No. 6 GENERATION: 99 INDIVIDUAL: 29
No. 7 GENERATION: 99 INDIVIDUAL: 17
No.8 GENERATION: 99 INDIVIDUAL: 45
No. 9 GENERATION: 99 INDIVIDUAL: 8
No. 10 GENERATION: 99 INDIVIDUAL: 14
VIEW POINTS FROM COMMUNAL
INTERSECTIONS PROCESS OF REFINEMENT STAGE 2
No. 1 GENERATION: 99 INDIVIDUAL: 42
No. 2 GENERATION: 99 INDIVIDUAL: 22
No. 3 GENERATION: 99 INDIVIDUAL: 49
No.4 GENERATION: 99 INDIVIDUAL: 39
No. 5 GENERATION: 99 INDIVIDUAL: 32
AREA: 123146m2
QUANTITY: 6
UNSERVICED BUILDINGS: 30
AREA: 29399m2
QUANTITY: 9
UNSERVICED BUILDINGS: 40
AREA: 32877m
QUANTITY: 9
UNSERVICED BUILDINGS: 25
AREA: 22785m2
QUANTITY: 6
UNSERVICED BUILDINGS: 13
AREA: 24149m2
QUANTITY: 6
UNSERVICED BUILDINGS: 34
No. 6 GENERATION: 99 INDIVIDUAL: 29
No. 7 GENERATION: 99 INDIVIDUAL: 17
No.8 GENERATION: 99 INDIVIDUAL: 45
No. 9 GENERATION: 99 INDIVIDUAL: 8
No. 10 GENERATION: 99 INDIVIDUAL: 14
AREA: 17370m
QUANTITY: 7
UNSERVICED BUILDINGS: 14
AREA: 21577m2
QUANTITY: 7
UNSERVICED BUILDINGS: 37
AREA: 16210m2
QUANTITY: 6
UNSERVICED BUILDINGS: 25
AREA: 7047m2
QUANTITY: 3
UNSERVICED BUILDINGS: 81
AREA: 9618m2
QUANTITY: 5
UNSERVICED BUILDINGS: 12
COMMUNAL SPACES PROCESS OF REFINEMENT STAGE 2
No. 1
GENERATION: 99 INDIVIDUAL: 42
No. 2 GENERATION: 99 INDIVIDUAL: 22
No. 3 GENERATION: 99 INDIVIDUAL: 49
No.4 GENERATION: 99 INDIVIDUAL: 39
No. 5 GENERATION: 99 INDIVIDUAL: 32
AREA: 1146m2
QUANTITY: 25
UNSERVICED BUILDINGS: 35
AREA: 1269m2
QUANTITY: 30
UNSERVICED BUILDINGS: 18
AREA: 1375m2
QUANTITY: 43
UNSERVICED BUILDINGS: 42
AREA: 827m
QUANTITY: 28
UNSERVICED BUILDINGS: 12
AREA: 1520m
QUANTITY: 43
UNSERVICED BUILDINGS: 22
No. 6
GENERATION: 99 INDIVIDUAL: 29
No. 7 GENERATION: 99 INDIVIDUAL: 17
No.8 GENERATION: 99 INDIVIDUAL: 45
No. 9 GENERATION: 99 INDIVIDUAL: 8
No. 10 GENERATION: 99 INDIVIDUAL: 14
AREA: 353m2
QUANTITY: 20
UNSERVICED BUILDINGS: 12
AREA: 1448m2
QUANTITY: 37
UNSERVICED BUILDINGS: 16
AREA: 1009m
QUANTITY: 31
UNSERVICED BUILDINGS: 23
AREA: 1801m2
QUANTITY: 45
UNSERVICED BUILDINGS: 22
AREA: 180m2
QUANTITY: 7
UNSERVICED BUILDINGS: 31
JUNCTION SPACES
PROCESS OF REFINEMENT STAGE 2
BRIDGE
No. 1 GENERATION: 99 INDIVIDUAL: 42
No. 2 GENERATION: 99 INDIVIDUAL: 22
No. 3 GENERATION: 99 INDIVIDUAL: 49
No.4 GENERATION: 99 INDIVIDUAL: 39
No. 5 GENERATION: 99 INDIVIDUAL: 32
QUANTITY
AREA: 125636.837341 QUANTITY: 8
AREA: 128886.675676 QUANTITY: 8
AREA: 126002.736545 QUANTITY: 8
AREA: 107847.894596 QUANTITY: 8
AREA: 139247.25502 QUANTITY: 8
No. 6 GENERATION: 99 INDIVIDUAL: 29
No. 7 GENERATION: 99 INDIVIDUAL: 17
No.8 GENERATION: 99 INDIVIDUAL: 45
No. 9 GENERATION: 99 INDIVIDUAL: 8
No. 10 GENERATION: 99 INDIVIDUAL: 14
AREA: 90584.554926 QUANTITY: 6
AREA: 128494.289752 QUANTITY: 8
AREA: 109404.319969 QUANTITY: 6
AREA: 142259.566652 QUANTITY: 7
AREA: 72765.951518 QUANTITY: 5
AREA &
PROCESS OF REFINEMENT STAGE 2
No. 1 GENERATION: 99 INDIVIDUAL: 42
No. 2 GENERATION: 99 INDIVIDUAL: 22
No. 3 GENERATION: 99 INDIVIDUAL: 49
No.4 GENERATION: 99 INDIVIDUAL: 39
No. 5 GENERATION: 99 INDIVIDUAL: 32
No. 6 GENERATION: 99 INDIVIDUAL: 29
No. 7 GENERATION: 99 INDIVIDUAL: 17
No.8 GENERATION: 99 INDIVIDUAL: 45
No. 9 GENERATION: 99 INDIVIDUAL: 8
No. 10 GENERATION: 99 INDIVIDUAL: 14
PROCESS OF REFINEMENT STAGE 2
SOLAR GAIN ON BRIDGE SURFACE
No. 1 GENERATION: 99 INDIVIDUAL: 42
No. 2 GENERATION: 99 INDIVIDUAL: 22
No. 3 GENERATION: 99 INDIVIDUAL: 49
No.4 GENERATION: 99 INDIVIDUAL: 39
No. 5 GENERATION: 99 INDIVIDUAL: 32
No. 6 GENERATION: 99 INDIVIDUAL: 29
No. 7 GENERATION: 99 INDIVIDUAL: 17
No.8 GENERATION: 99 INDIVIDUAL: 45
No. 9 GENERATION: 99 INDIVIDUAL: 8
No. 10 GENERATION: 99 INDIVIDUAL: 14
SHORTEST WALK FROM PROMINENT COMMUNAL SPACE TO ANCHOR POINTS
PROCESS OF REFINEMENT STAGE 2
No. 7
GENERATION: 99
INDIVIDUAL: 17
No. 5
GENERATION: 99
INDIVIDUAL: 32
No. 2
GENERATION: 99
INDIVIDUAL: 22
PROCESS OF REFINEMENT STAGE 3
FITNESS DIAMOND CHART
PHENOTYPE
BUILDING QUANTITY: 134
BUILDING AREA: 186706m2
POPULATION: 9,335 (20m2)
COMMUNAL
AREA: 21577m2
QUANTITY: 7
UNSERVICED BUILDINGS: 37
JUNCTION POINTS
AREA: 1448m
QUANTITY: 37
UNSERVICED BUILDINGS: 16
BRIDGES AREA: 128494.289752
QUANTITY: 8
F01: MAXIMISE BUILDING DENSITY
FITNESS VALUE: 2.0748E-06
FITNESS RANK: 1425/4999
F02: MAXIMISE COMMUNAL SPACE
FITNESS VALUE: 4.6E-05
FITNESS RANK: 1840/4999
F03: MAXIMISE JUNCTION SPACE
FITNESS VALUE: 6.9E-05
FITNESS RANK: 1367/4999
F04: MAXIMISE COMMUNAL SPACE
FITNESS VALUE: 4659
FITNESS RANK: 3553/4999
F05: MINIMISE INHABITABLE BUILDING AREA
FITNESS VALUE: 1448.063082
FITNESS RANK: 3700/4999
No. 1
GENERATION: 99
INDIVIDUAL: 17
PROCESS OF REFINEMENT STAGE 3
SOLAR GAIN ON BRIDGE SURFACE
WALK FROM PROMINENT COMMUNAL
VIEW POINTS FROM COMMUNAL INTERSECTIONS COMMUNAL SPACES JUNCTION POINTS BRIDGE AREA & QUANTITY
SHORTEST
SPACE TO ANCHOR POINTS
FITNESS DIAMOND CHART
PHENOTYPE
BUILDING QUANTITY: 139
BUILDING AREA: 163438m2
POPULATION: 8, 172 (20m2)
COMMUNAL AREA: 29399m2
QUANTITY: 9
UNSERVICED BUILDINGS: 40
JUNCTION POINTS
AREA: 1269m
QUANTITY: 30
UNSERVICED BUILDINGS: 18
BRIDGES
AREA: 128886.675676
QUANTITY: 8
F01: MAXIMISE BUILDING DENSITY
FITNESS VALUE: 2.3703E-06
FITNESS RANK: 1801/4999
F02: MAXIMISE COMMUNAL SPACE
FITNESS VALUE: 3.4E-05
FITNESS RANK: 1254/4999
F03: MAXIMISE JUNCTION SPACE
FITNESS VALUE: 5.2E-05
FITNESS RANK: 510/4999
F04: MAXIMISE COMMUNAL SPACE
FITNESS VALUE: 4319
FITNESS RANK: 3336/4999
F05: MINIMISE INHABITABLE BUILDING AREA
FITNESS VALUE: 1269.526931
FITNESS RANK: 3493/4999
No.3
GENERATION: 99
INDIVIDUAL: 22
PROCESS OF REFINEMENT STAGE 3
SOLAR GAIN ON BRIDGE
WALK
PROMINENT COMMUNAL
VIEW POINTS FROM COMMUNAL INTERSECTIONS COMMUNAL SPACES JUNCTION POINTS BRIDGE AREA & QUANTITY
SURFACE SHORTEST
FROM
SPACE TO ANCHOR POINTS
FITNESS DIAMOND CHART
PHENOTYPE
BUILDING QUANTITY: 164
BUILDING AREA: 191945m2
POPULATION: 9,597 (20m2)
COMMUNAL
AREA: 24149m2
QUANTITY: 6
UNSERVICED BUILDINGS: 34
JUNCTION POINTS
AREA: 1520m
QUANTITY: 43
UNSERVICED BUILDINGS: 22
BRIDGES
AREA: 139247.25502
QUANTITY: 8
F01: MAXIMISE BUILDING DENSITY
FITNESS VALUE: 2.0273E-06
FITNESS RANK: 1348/4999
F02: MAXIMISE COMMUNAL SPACE
FITNESS VALUE: 4.1E-05
FITNESS RANK: 1592/4999
F03: MAXIMISE JUNCTION SPACE
FITNESS VALUE: 5.8E-05
FITNESS RANK: 830/4999
F04: MAXIMISE COMMUNAL SPACE
FITNESS VALUE: 5029
FITNESS RANK: 3823/4999
F05: MINIMISE INHABITABLE BUILDING AREA
FITNESS VALUE: 1520.404948
FITNESS RANK: 3844/4999
PROCESS OF REFINEMENT STAGE 3
No. 2
GENERATION: 99
INDIVIDUAL: 32
SOLAR GAIN ON BRIDGE
COMMUNAL
VIEW POINTS FROM COMMUNAL INTERSECTIONS COMMUNAL SPACES JUNCTION POINTS BRIDGE AREA & QUANTITY
SURFACE SHORTEST WALK FROM PROMINENT
SPACE TO ANCHOR POINTS
FOCAL POINTS FOCAL POINT 1: SHARED SPACE FOCAL POINT 2: COMMUNAL SPACE FOCAL POINT3: PRIVATE SPACE
COMMUNITY ACTIVITY STATIONS HOSPITALITY JUNCTIONS SEMI-PUBLIC SPACES SPORTS QUADRANT
ADAPTABLE AWNING STRUCTURES THAT HELP DESIGNATE PORTIONS OF COMMUNAL SPACE FOR HOSPITALITY AND RETAIL USE IN AN UN-OBSTRUCTIVE MANNER