1 A-105 24'4" EXISTING FOREST OF WOODLAWN CEMETRY NEW SITE WORK NEW SITE WORK NEW SITE WORK HOLIDAY LANE HOLIDAY LANE HOLIDAY LANE 14' - 0" 16' 0" SETBACK PROPERTY LINE www.warfielddesigns.com/designs Scale Project number Date Drawn by Checked by Isabelle Warfield 10 Upper College Dr Alfred, NY 14802 (123)555-8888 warfieij@alfredstate.edu 1/8" = 1'-0" 1/24/2023 9:10:56 AM A-101 SITE PLAN 13 139 HOLIDAY LANE ELIZABETH LAFEVER DECEMBER 16th ISABELLE WARFIELD PROFESSOR V 1/8" = 1'-0" 1 SITE PLAN No. Description Date
1 A-105 1 A-106 20' 1" 21' 1 1/2" 14' 1 1/2" 1'8" 1'8" 27'4" 8" REINFORCED CONCRETE FOUNDATION WALL 16" WIDE x 8" DEEP CONTINOUS CONCRETE FOOTING 55' - 4" 55' - 4" 6'6" 20'10" 21' - 1" 34' 3" www.warfielddesigns.com/designs Scale Project number Date Drawn by Checked by Isabelle Warfield 10 Upper College Dr Alfred, NY 14802 (123)555-8888 warfieij@alfredstate.edu 1/4" = 1'-0" 1/24/2023 9:11:42 AM A-102 FOUNDATION PLAN 13 139 HOLIDAY LANE ELIZABETH LAFEVER DECEMBER 16th ISABELLE WARFIELD PROFESSOR V 1/4" = 1'-0" 1 FOUNDATION PLAN No. Description Date
GENERAL NOTES:
- 7/16" O.S.B. SHEATHING WITH HOUSE WRAP OVER 2x4 STUDS @16" O.C. AND 1/2" DRYWALL AT GARAGE WALLS
- 7/16"
O.S.B.SHEATHING WITH HOUSE WRAP OVER 2x6 STUDS @16" O.C WITH R-21 INSULATION W/ KRAFT VAPOR BARRIER AND 1/2" DRYWALL AT EXTERIOR WALLS
- 2x4 STUDS @16" O.C. WITH ONE (1) LAYER1/2" DRYWALL EACH SIDE AT INTERIOR WALLS
-5'6" x 11'0" CONCRETE SLAB
CONCRETE STEPS
1 A-105 A-107 1 3 1 A-106 29 29 29 29 46 22 29 29 29 23 44 29 45 29 29 R @ 0' 6 21/32" 18 402 SF LIVING ROOM 25 71 SF FOYER 28 263 SF GARAGE 15 37 SF HALF BATH 18 11'10" 14'1 5/8" 19' 9" 6' 6" 13' 3" 20'0" 6'0" 29 29 29 28 6'7" 4'7" 14'10" 13'11" 9'1" 4'4" 4' 1" 16' 0" 10' 6 1/2" 10' 6 1/2" 3'1" 3'5" 5'4" 5'2" 5'2" 5'1 5/8" 6'6" 20'9 5/8" 1'8 3/8" 1'8" 27'4" 237 SF DINING ROOM 27 13' 1" 5' 1" 5' 10" 3' 4 1/2"3' 4 1/2"3' 4 1/2" 21' 2 1/2" 21' 1" 20' - 1" 14' - 2" 55' 4" 26'0" 4' 10" 16' - 3" 30' 7" 3' 8" 20' 1" 21' 1" 14' - 2" 55' 4" 13' 11 1/2" 6' 1 1/2" 21' 1" 6' 9" 7' 5"
R @ 0' 6" 4 R @ 0' - 6" 4 R @ 0' - 6" 4 5'6" 11' 0" 13 A-106 3 275 SF KITCHEN 29 13' 6"
Scale Project number Date Drawn by Checked by Isabelle
1/4" = 1'-0" 1/24/2023 9:13:15 AM A-103A
13
DECEMBER 16th ISABELLE WARFIELD PROFESSOR V 1/4" = 1'-0" 1
PLAN No. Description Date
-PRECAST
www.warfielddesigns.com/designs
Warfield 10 Upper College Dr Alfred, NY 14802 (123)555-8888 warfieij@alfredstate.edu
FIRST FLOOR PLAN
139 HOLIDAY LANE ELIZABETH LAFEVER
FIRST FLOOR
1 A-105 A-107 4 2 1 A-106 29 29 28 28 29 29 29 29 29 29 15 41 40 8 38 29 29 29 42 43 99 SF MASTER BATHROOM 6 157 SF HALLWAY 7 15 SF LINEN CLOSET 8 157 SF OFFICE 9 29 SF CLOSET 10 266 SF MASTER BEDROOM 11 208 SF GUEST BEDROOM 12 33 SF GUEST CLOSET 13 30 SF LAUNDRY ROOM 14 20' 1" 21' 1" 9' 9 5/8" 10' 3 3/8" 10' 6 1/2" 10' - 6 1/2" 41' 2" 1'8" 27'4" 13'11" 9'1" 4'4" 8' 0" 5' 1" 5' 1"2' 11" 6' - 3 1/2"3' 4 1/2"3' 4 1/2" 7' 0 1/2" 21' 1" 20' - 1" 41' 2" 5'3 5/8" 11'0 3/4" 7'10 1/4" 3'1" 1'8" 25'7 5/8" 1'8 3/8" 3'3 3/4" 9' 2" 10'9" 9' 2" 2' 11 1/2" 16' - 9 1/2" 20' - 1" 10' 6" 10'9 5/8" 3'0 3/4" 12'1 1/4" 10' 7" 4' - 9" 15' 0" LINE OF EXTERIOR FIRST FLOOR WALL GENERAL NOTES: - 7/16" O.S.B. SHEATHING WITH HOUSE WRAP OVER 2x6 STUDS @16" O.C. WITH R-21 INSULATION W/ KRAFT VAPOR BARRIERAND 1/2" DRYWALL AT EXTERIOR WALLS - 2x4 STUDS
12'2" R @ 0' - 6 21/32" 18 35 LINE OF FIRST FLOOR ROOF 13'6" www.warfielddesigns.com/designs Scale Project number Date Drawn by Checked by Isabelle Warfield 10 Upper College Dr Alfred, NY 14802 (123)555-8888 warfieij@alfredstate.edu 1/4" = 1'-0" 1/24/2023 9:13:49 AM A-103B SECOND FLOOR PLAN 13 139 HOLIDAY LANE ELIZABETH LAFEVER DECEMBER 16th ISABELLE WARFIELD PROFESSOR V 1/4" = 1'-0" 1 SECOND FLOOR PLAN No. Description Date
@16" O.C. WITH ONE (1) LAYER1/2" DRYWALL EACH SIDE AT INTERIOR WALLS
FIRST FLOOR 17' - 4 15/16" B.O SECOND FLOOR 27' - 5" T.O SECOND FLOOR 37' - 4" GROUND 16' - 4 15/16" T.O. ROOF 44' - 0 21/32" FOUNDATION PLAN 12' - 4" 1 A-106 6'6" LINE OF FOUNDATION BELOW GRADE FINISHED GRADE VINYL SIDING STONE VENEER TILE ROOF LINE OF CONCRETE SLAB 1'8 5/16" 5'11 11/16" 3'6 1/16" 1'9" 4'3" 2'9" FIRST FLOOR 17' - 4 15/16" B.O SECOND FLOOR 27' 5" T.O SECOND FLOOR 37' 4" GROUND 16' - 4 15/16" T.O. ROOF 44' - 0 21/32" FOUNDATION PLAN 12' 4" 1 A-106 6'10" LINE OF FOUNDATION BELOW GRADE FINISHED GRADE VINYL SIDING TILE ROOF 2'9" 4'1"1'11"3'6 1/16" 6'0"1'8" www.warfielddesigns.com/designs Scale Project number Date Drawn by Checked by Isabelle Warfield 10 Upper College Dr Alfred, NY 14802 (123)555-8888 warfieij@alfredstate.edu 1/4" = 1'-0" 1/24/2023 9:14:55 AM A-104A ELEVATIONS 13 139 HOLIDAY LANE ELIZABETH LAFEVER DECEMBER 16th ISABELLE WARFIELD PROFESSOR V 1/4" = 1'-0" 2 SOUTH 1/4" = 1'-0" 1 NORTH No. Description Date
www.warfielddesigns.com/designs
Warfield 10 Upper College Dr Alfred, NY 14802 (123)555-8888 warfieij@alfredstate.edu
139 HOLIDAY LANE ELIZABETH LAFEVER
ELEVATIONS
FIRST FLOOR 17' - 4 15/16" B.O SECOND FLOOR 27' - 5" T.O SECOND FLOOR 37' - 4" 1 A-105 GROUND 16' - 4 15/16" T.O. ROOF 44' - 0 21/32" FOUNDATION PLAN 12' - 4" STONE VENEER TILE ROOF VINYL SIDING FINISHED GRADE LINE OF FOUNDATION BELOW GRADE CONCRETE SLAB 1'4 1/2" 6'0" 3'10" 5'8 1/16" 1'3" 1'6" FIRST FLOOR 17' - 4 15/16" B.O SECOND FLOOR 27' 5" T.O SECOND FLOOR 37' 4" GROUND 16' - 4 15/16" T.O. ROOF 44' - 0 21/32" FOUNDATION PLAN 12' 4" 8'5 1/16" LINE OF FOUNDATION BELOW GRADE FINISHED GRADE VINYL SIDING TILE ROOF STONE VENEER CONCRETE SLAB 1'4 1/2" 6'0" 3'6 1/16" 6'0" 2'9"
Scale Project number Date Drawn by Checked by Isabelle
1/4" = 1'-0" 1/24/2023 9:15:45 AM A-104B
13
DECEMBER 16th Author Checker 1/4" = 1'-0" 1 EAST 1/4" = 1'-0" 2 WEST No. Description Date
12 3 1/2"
R-38 FIBERGLASS BATT INSULATION
2x12 WOOD CEILING
JOIST @16" O.C.
1/2" GYPSUM BOARD
(3) 2x8 HEADER
R-19 FIBERGLASS BATT INSULATION
2x6 WOOD STUDS @16" O.C.
PAINTED GYPSUM BOARD
FINISHED HARDWOOD FLOOR
R-19 FIBERGLASS BATT INSULATION
14" TJI 360 FLOOR JOISTS @16" O.C.
3/4" ADVANTECH T&G SUBFLOOR
T.O
1/2" GYPSUM BOARD PANELED CEILING
(2) 2x6 TOP PLATE
2x6 STUDS @16" O.C.
R-19 FIBERGLASS BATT INSULATION
PAINTED GYPSUM BOARD
B.O
3/4" ADVANTECH T&G SUBFLOOR
14" TJI 360 FLOOR JOISTS
2 x 12 RAFTER @ 16" O.C. BLACK TILE ROOF ROOFING PAPER UNDERLAYMENT
7/16" OSB SHEATHING
ALUMINUM DRIP EDGE
2X FASCIA BOARD VENTED SOFFIT
DOUBLE TOP PLATE VINYL SIDING
5/8" OSB SHEATHING
T.O SECOND FLOOR 37' - 4"
VINYL SIDING
5/8" OSB SHEATHING
2x6 BOTTOM PLATE
2x6 WOOD STUDS @16" O.C.
R-19 FIBERGLASS BATT INSULATION
FIRST FLOOR 17' - 4 15/16"
SECOND FLOOR 27' - 5"
SECOND FLOOR 37' - 4" GROUND 16'
4 15/16"
ROOF
0 21/32" FOUNDATION PLAN 12' - 4" 1 A-106 A-105 2 GUEST BEDROOM MASTER BEDROOM FOYER KITCHEN HALF BATH CLOSET FINISHED GRADE BLACK TILE ROOF VINYL SIDING FASCIA BOARD AT RAKE FASCIA BOARD AT OVERHANG 12 3 1/2 DINING ROOM 12 3 1/2 FIRST FLOOR
-
T.O.
44' -
17' - 4 15/16"
B.O SECOND FLOOR 27' - 5"
GROUND 16' - 4 15/16" FOUNDATION PLAN 12' - 4"
@16" O.C. FINISHED HARDWOOD FLOOR R-19 FIBERGLASS BATT INSULATION 5/8" OSB SHEATHING VINYL SIDING 3/8" DIAMETER ANCHOR BOLT 24" x 12" CONTINUOS CONCRETE FOOTINGWITH (2) #4 CONTINOUS REBAR AND COVE BASE 2x10 RIM JOIST (2) 2x12 RIM JOIST 2x6 SILL PLATE FLOOR TRIM FLOOR TRIM R-19 FIBERGLASS BATT INSULATION 1/2" GYPSUM BOARD TYVEK VAPOR BARRIER TYVEK VAPOR BARRIER FINISHED GRADE www.warfielddesigns.com/designs Scale Project number Date Drawn by Checked by Isabelle Warfield 10 Upper College Dr Alfred, NY 14802 (123)555-8888 warfieij@alfredstate.edu As indicated 1/24/2023 9:16:52 AM A-105 SECTION AND WALL SECTION 13 139 HOLIDAY LANE ELIZABETH LAFEVER DECEMBER 16th ISABELLE WARFIELD PROFESSOR V 1/4" = 1'-0" 1 LONGITUDINAL SECTION 1/2" = 1'-0" 2 WALL SECTION No. Description Date
FIRST FLOOR 17' - 4 15/16" B.O SECOND FLOOR 27' 5" T.O SECOND FLOOR 37' 4" 1 A-105 GROUND 16' - 4 15/16" T.O. ROOF 44' - 0 21/32" FOUNDATION PLAN 12' 4" A-106 2 GUEST BEDROOM HALLWAY FOYER LIVING ROOM BLACK TILE ROOF STONE VENEER VINYL SIDING FINISHED GRADE 2 x 6 STUD VINYL SIDING 5/8" OSB SHEATHING PAINTED GYPSUM BOARD VINYL SIDING 5/8" OSB SHEATHING R19 FIBERGLASS BATT INSULATION FLOOR TRIM PAINTED GYPSUM BOARD B.O SECOND FLOOR 27' - 5" VINYL SIDING (1) LAYER WRB EXTEND WRB FROM WALL BELOW 6" MIN. ABOVE CLADDING TRANSITION FLASHING WITH DRIP EDGE LATH FASTENER ADHERED MANUFACTURED STONE VENEER SUPPORT ANGLE BEDDING SEAL UNDER FLASHING ADHERED MANUFACTURED STONE VENEER MORTAR SETTING BED MORTAR SCRATCH COAT (2) LAYERS WRB LATH MORTAR JOINT SHEATHING
Scale Project number Date Drawn by Checked by Isabelle
As indicated 1/24/2023 9:18:04 AM A-106 SECTION AND DETAILS 13 139 HOLIDAY LANE ELIZABETH LAFEVER DECEMBER 16th ISABELLE WARFIELD PROFESSOR V 1/4" = 1'-0" 1 TRANSVERSE SECTION 3" = 1'-0" 3 CORNER CONNECTION DETAIL 3" = 1'-0" 2 STONE DETAIL No. Description Date
www.warfielddesigns.com/designs
Warfield 10 Upper College Dr Alfred, NY 14802 (123)555-8888 warfieij@alfredstate.edu
ROOM SCHEDULE
NAMEFLOOR FINISHWALL FINISH CEILING FINISH
MASTER BATHROOM TILE PAINT COFFERED CEILING PANELS
HALLWAYHARD WOODPAINT GWB
LINEN CLOSET HARD WOODPAINT GWB
OFFICEHARD WOODPAINT COFFERED CEILING PANELS
CLOSETHARD WOODPAINT GWB
MASTER BEDROOM HARD WOODPAINT COFFERED CEILING PANELS
GUEST BEDROOM HARD WOODPAINT COFFERED CEILING PANELS
GUEST CLOSET HARD WOODPAINT GWB
LAUNDRY ROOM TILE PAINT GWB
GARAGEPRECAST CONCRETEPRECAST CONCRETEN/A
HALF BATHTILE PAINT GWB
KITCHENHARD WOODPAINT COFFERED CEILING PANELS
LIVING ROOM HARD WOODPAINT COFFERED CEILING PANELS
DINING ROOM HARD WOODPAINT COFFERED CEILING PANELS
FOYERHARD WOODPAINT COFFERED CEILING PANELS
KITCHENHARD WOODPAINT COFFERED CEILING PANELS
6'0" 5'2" 3' - 3" 2' - 9" 6'1" 5'9 1/2" 8' - 1" 7' - 9 1/2" 1' 9 1/2" 3' - 9 1/2" 1' - 9 1/2" 28 29 22 13 & 15 40 & 41 35 & 8 43 42 38 45 23 44 6'10 9/32" 2' 11 13/16" 2' 8 11/16" 6'10 11/16" 6'8 3/4" 6'9 7/32" 2' 11 13/16" 2' 9 9/32" 6'6 3/4" 6'5 9/32" 2' - 7 7/8" 2' 5 11/32" 6'11 1/16" 6'8 1/4" 4' 2 11/32" 3' - 11 7/32" 7'1 9/32" 6'9 5/8" 5' - 7 13/16" 5' - 0 17/32" 6'6 3/4" 6'5 9/32" 2' 11 13/16" 2' 9 9/32" 6'11 1/16" 6'9 11/32" 2' 2 23/32" 1' 11 19/32" 6'10 11/16" 6'9 7/32" 4' 11 7/16" 4' 8 27/32" 6'6" 8' 0" 7' 8" 6'4" 7'5 1/2" 7'0" 6' - 11" 6' - 0" www.warfielddesigns.com/designs Scale Project number Date Drawn by Checked by Isabelle Warfield 10 Upper College Dr Alfred, NY 14802 (123)555-8888 warfieij@alfredstate.edu 1/4" = 1'-0" 12/8/2022 12:41:33 PM A-108 SCHEDULES 13 139 HOLIDAY LANE ELIZABETH LAFEVER DECEMBER 16th ISABELLE WARFIELD PROFESSOR V No. Description Date
DOOR SCHEDULE MarkWidthHeight Frame Material Finish 84' - 1 1/32" 6' - 10 11/16" OAKSTAINED OAK 132' - 11 1/32" 6' - 10 9/32" OAKSTAINED OAK 152' - 11 1/32" 6' - 10 9/32" OAKSTAINED OAK 222' - 10 31/32" 6' - 9 7/8"OAKSTAINED OAK 238' - 0"6' - 6"ALUMIN UM VINYL PANELS 354' - 1 1/32" 6' - 10 11/16" OAKSTAINED OAK 382' - 1 13/32" 6' - 10 11/16" OAKSTAINED OAK 402' - 7 3/32" 6' - 6 11/32" OAKSTAINED OAK 412' - 7 3/32" 6' - 6 11/32" OAKSTAINED OAK 422' - 11 1/32" 6' - 6 11/32" OAKSTAINED OAK 435' - 0"6' - 8"OAKSTAINED OAK 446' - 0"7' - 0"OAKSTAINED OAK 454' - 10 21/32" 6' - 10 9/32" OAKSTAINED OAK 462' - 7 3/32" 6' - 6 11/32" OAKSTAINED OAK 480' - 5 5/16" 0' - 2 3/8"OAKSTAINED OAK 500' - 5 5/16" 0' - 2 3/8"OAKSTAINED OAK 510' - 5 5/16" 0' - 2 3/8"OAKSTAINED OAK WINDOW SCHEDULE Type MarkWidthHeightSill HeightCount 284' 0"6' - 0"2' 9"1 284' 0"6' - 0"2' 3"1 292' 9"5' - 6"2' 6"1 292' 9"5' - 6"2' 6"1 292' 9"5' - 6"2' 6"1 292' 9"5' - 6"2' 6"1 292' 9"5' - 6"2' 6"1 292' 9"5' - 6"2' 6"1 292' 9"5' - 6"2' 6"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"2' 9"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"2' 6"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"3' 0"1 292' 9"5' - 6"2' 6"1 292' 9"5' - 6"2' 6"1 284' 0"6' - 0"2' 3"1 292' 9"5' - 6"2' 9"1 292' 9"5' - 6"2' 9"1 292' 9"5' - 6"2' 9"1 1/4" = 1'-0" WINDOW TYPES 1/4" = 1'-0" DOOR TYPES