TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNEL IN JAMMU – POONCH HIG

Page 1

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNEL IN JAMMU – POONCH HIGHWAY

ALIGNMENT AREAS OF J&K (UT)

Vishal verma1 , Er. Shilpa Chauhan2

1M.tech Student, Rayat Bahra Univeristy

2Asst.Professor, Rayat Bahra Univeristy, Mohali, India. ***

Abstract

TheSungalTunnelWorkisongoingProjectusingNATMmethodinJammuRegionFallsunderChowkichaura(Akhnoor)and Bhambla(Reasi)ofJ&K(UT).BasedonNATMmethodthetunnelworkbecamemoresophicated,easierandwithsafetythat bearspressurebuildupbyenclosingrockmassandalsomadesismologicallyresistantzone.AbriefaboutNATMmethodsin tunnelinginHimalayaszonespecialwiththeSungaltunnelisalsodiscussedinthepresentpaper.

Key Words: SungalTunnel,NATM,Shotcrete,Mucking,Rockbolting,chowkichaura(Akhnnor),Bhambla(Reasi)J&K(UT)

INTRODUCTION

This paper is based on the observations made during the construction of the tunnels in Jammu Akhnoor- Poonch Highway Project(NH-144AProject).TheprojectisinHimalayanrangewithvaryinggeologicalconditionsthemosteffectivemethodfor tunnel construction seems to be the New Austrian Tunneling Method (NATM) which works on the principle of continuous observationsaftereachexecutioncycle.

TunnelingintheyoungHimalayanMountainshavingchallengesdueto existingPhysical structurelikefaultsandfolds,other stratigraphic and tectonic activities. Performing detailed site investigation in this type of area becomes most prerequisite criteriatodesignaparticulartunnelwhichwillfacilitatethesmoothconstructionofthetunnel.TheSungal tunnelahighway tunnelunderNH-144Aconstructinginthisarea.Duringtheconstructionweusedifferentmethodtoexcavatethetunnel.

Among all available tunneling construction methods, the New Austrian Tunneling Method is the most suitable method of tunneling constructioninsuchvarying unfavorablecondition.Thegroundopeningactasloadbearingstructural component. DrillingandblastingmethodsareadoptedintheexcavationoftunnelinNATMtechniqueinrockwiththeshotcreteandrock bolts used as the main support system (Sauer and Gold 1989). The New Austrian Tunneling Method is flexible to adopt differentexactiongeometries,largecrosssectionarea,changeofsupportsystematanytime,easytoinstalletc.

International Research Journal of Engineering and Technology (IRJET) e-ISSN:2395-0056 Volume: 11 Issue: 01 | Jan 2024 www.irjet.net p-ISSN:2395-0072 © 2024, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page747

PROJECT OVERVIEW

ThestudyarealiesinthefoothillsofHimalayaandhenceismarkedbyruggedreliefconsistingloftyridgesanddeepV-shaped valleysandgorges.TheareaofinterestisdrainedbythemightyChenabRiverintheeastandChanderKhadandBarakhKhad tothewestoftheProjectside.

TheSungalTunnelisof 677.469m and western portal at EI. 697.860m. Tunnel alignment is marked by undulating topography with 3 apex and 3 valleys.Thefirstapexalongthetunnelalignmentexistsatelevationof762mprovidingrockcover72mabovethetunnel.The secondapexhavingelevationof1006mwithassociatedrockcoverof300m.Thethirdapexwithelevationof970m providing rockcoverof270m.

Seismology

As per seismic zone map of India the project lies in the seismic zone IV and according to GSHAP (Global seismic Hazards AssessmentProgram),theareafallsinaregionofhighseismichazard. Historically,partsoftheJammuandKashmirUThave experiencedseismicactivityin6.0-6.5Richterscalerange.

METHODOLOGY

NATM(NewAustrianTunnelingMethod)NATMisbothaconstructionandadesignphilosophy.Thephilosophyistousethe strength of the surrounding soil to the extent possible to strengthen the tunnel structure. Another mean, ground condition drivethetunnelingoperation.TheNATMphilosophypromotesconstantmonitoring.

International Research Journal of Engineering and Technology (IRJET) e-ISSN:2395-0056 Volume: 11 Issue: 01 | Jan 2024 www.irjet.net p-ISSN:2395-0072 © 2024, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page748
Photo 1: Showing overview of study area

T NATM ’ c cfc

xc f cf c piece of equipment. NATM is adapted to each project and it is often updated during excavation in order to changes in geometric conditionsandthenatureoftheground.NATMmethodmakesextensiveuseofshotcreteforthetemporarylinerinanattempt tooptimizeboththeamountandtimingofsupport.

Prior to Excavate the tunnel Geotechnical Investigation performed. The Austrian Guideline procedure of geotechnical design is represented as an array of studies depicted in the flow chart below.

Geotechnical relevant parameters

Determination of GROUND TYPES(Rock classes)

Ground Water

Primary stresses

Orientation

Ground structure-tunnel Size, shape, location of structure

Determination of GROUND BEHAVIOUR

Assessment of boundary conditions

Definition of requirement (RQ)

Selection of construction concept

Evaluation of system behavior in excavation area

Detailed determination of construction measures and evaluation of

SYSTEM BEHAVIOUR (SB)

International Research Journal of Engineering and Technology (IRJET) e-ISSN:2395-0056 Volume: 11 Issue: 01 | Jan 2024 www.irjet.net p-ISSN:2395-0072 © 2024, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page749
f f
c
Tabular table: Showing Systematic Procedure for geotechnical design for tunnel

NATM METHODS IN CONSTRUCTION OF TUNNELS

Tunnel:Atunnelisanundergroundorunderseapassageway. Itisdugthroughsurroundingsoil,earthorrock,orlaidunder water, and is enclosed except for the entrance and exist, commonly at each end. Tunnels are constructed for Railway and Highway facilities for publicconvenient.InIndia first tunnel was Parsik Railwaytunnel whichwasconstructed in theParsik hillinThane,Maharashtra,India.Initiallytunnelswereconstructedwithconventialmethodwhichisoldestmethodbutnowa daysNATMmethodismostusefultechniquetoexcavatetunnels.

Tunnel includes two types of support

1. Primary support:

a)Profilemarking

c)Defuming d)mucking

f)Bottomcleaning

h) Initialshotcretelayer

j)Secondshotcretelayer

2. Secondary support:Lining

b)Drilling,Loading,chargingandBlast

e)Chipping/breakingandscaling

g)GeologicalFacemapping

i) RIB(ISHB)/LG(Latticesgirder)

FormakingtunnelsweshouldhaveclearlandnearthePortals andthereshouldbenopopulatedareaswhichcanbeaffected by the tunnels works. In prior tunnels were made by conventional methods but present days we are using NATM(NEW AUSTRIA TUNNELING METHOD).There are two approaches for making tunnels i.e outside and inside the tunnels, Outside tunnelconsistsofportalmakingworksandInsideactivitiesareasfollows:

1. Profile marking: In profilemarkingsurveyormarkthefaceofthetunnelwithpaints/spraysforfurtheractivity.

International Research Journal of Engineering and Technology (IRJET) e-ISSN:2395-0056 Volume: 11
www.irjet.net p-ISSN:
© 2024, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page750
Issue: 01 | Jan 2024
2395-0072
2. Drilling, Loading, charging and Blast:Itcomprisesdrillingattunnelfaceatgivenmarksbythesurveyor.After completionofdrillingloadingandchargingworkstartedandtakenBlast.
International Research Journal of Engineering and Technology (IRJET) e-ISSN:2395-0056 Volume: 11 Issue: 01 | Jan 2024 www.irjet.net p-ISSN:2395-0072 © 2024, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page751
3. Defuming:AfterblastmanygasesandfogsdefumedbyventilationFan 4. Mucking:Muckmeansbrokenfragmentsofrocksresultingafterblast MuckTransportedfrominsidetooutsidethe tunnelbyusingdumperanddumpedatapproveddumpingyard. 5. Chipping /breaking and scaling:Aftercompletionofmuckingthehangedrockmassarescaledbybreaker. 6. Bottom cleaning:Bottomcleaningcomprisesmakingplatformforthemachineriesforthefurtheractivities.

7. Geological Face mapping:Aftercompletionofchipping,breakingandbottomcleaningageologisthastopreparefacelog throughobservingtherock,jointpatterns,orientationspresentattunnelface.

8. Initial shortcrete layer: Tomaintainstanduptimeandreducemoisturecontentoftherockinitialshotcretelayerhasto bedone.

9. RIB (ISHB)/LG (Lattices girder): Afterinitiallayerofshotcrete,heavysteelbeamsareusedtostrengthenthetunneland maintainthetunnelprofile.

International Research Journal of Engineering and Technology (IRJET) e-ISSN:2395-0056 Volume: 11 Issue: 01 | Jan 2024 www.irjet.net p-ISSN:2395-0072 © 2024, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page752

SECONDARY SUPPORT

TheLiningisthesecondarysupportintunnelingusingNATMmethodwhichconsistsofnumberofstages

a) Cutting, padding and smooth layer of shotcrete

b) Stitching of water proofing

International Research Journal of Engineering and Technology (IRJET) e-ISSN:2395-0056 Volume: 11 Issue: 01 | Jan 2024 www.irjet.net p-ISSN:2395-0072 © 2024, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page753
10. Second shotcrete layer :Aftertheinstallationofheavybeamsofsteelssecondlayerofshotcretehasto
bedone

CONCLUSION

AfteradetailedstudycarriedoutonthetunnelingintheHimalayawithspecialreferencestoSungaltunnelunderNH-144Ain the Jammu – Poonch alignment with respect to NATM method. It has been observed that construction of tunnel in Himalaya zonewithNATMismoreconvenientascomparedtoconventionalmethod.

NATM is based on the observational approach whole outcome depends on the Geological interpretation and 3D Monitoring data.Thismethodprovidesflexibilitytochangethesupportsystemsatregularintervalsdependingonreceiveddatafromface logsand3Dmonitoring.Aquickanalysisisdoneandappliedonthefieldsavingtime,moneyandmaterial.Withthisapproach andsequencefollowedbetterprogressisachievedinasaferenvironment.

REFERENCES

1. Adachi, T., "Some Supporting Methods for Tunneling in J T A y c S ,” P c , Ff lntemationalConferenceonNumericalMethodsinGeomechanics,Vol.4,1985,pp.1747-1754.

2. A c , T, T , T, S k , M ”A y c Ex S y T S System" Proceedings, 4th IntemationalConferenceonNumericalMethodsinGeomechanics,Vol.2,1982,pp.513-522.

3. KovariK.1994.ErronomeousconceptsbehindtheNewAustrianTunnellingMethod,TunnelsandTunnelling,November 1994,Vol.26,38-42

International Research Journal of Engineering and Technology (IRJET) e-ISSN:2395-0056 Volume: 11 Issue: 01 | Jan 2024 www.irjet.net p-ISSN:2395-0072 © 2024, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page754
c) Leveling PCC and construction of kicker kerbs. d) Erection of Gantry and pouring.

4. Alan Muir Wood (2002). Tunneling: Management by Design. Abingdon, UK: Taylor & Francis. p. 328. ISBN 978-0-41923200-1.

5. Cater, R. W., Shirlaw, J. N., Sullivan, C. A., Chan, W. T. "Tunnels Constructed for the Hong Kong Mass Transit Railway/' HongKongEngineer,October1984,pp.37-49.

6. LeventÖzdemir(2006).NorthAmericanTunneling.Abingdon,UK:Taylor&Francis.p.246.ISBN0-415-40128-3

7. DeinardM,PrinzHandZeidlerK(1991),VariationsonaNATMTheme,TunnelsandTunnellingNovember.

8. Barton N., Lien R. and Lunde J., 1974. Engineering classification of rock masses for the design of tunnel support. Rock Mechanics,Vol.6,Pages189-236.

9. Suuer G. 1988.When an invention is something is new: from practice to theory in tunneling, Transactions of the Institutionofminingandmetallurgy,vol97,sectionA94-A108.

10. WallisS.(1995),FirstprinciplesofNATM,WorldTunnelling,Vol.8,197-200.

International Research Journal of Engineering and Technology (IRJET) e-ISSN:2395-0056 Volume: 11 Issue: 01 |
2024 www.irjet.net p-ISSN:
© 2024, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page755