ipcm® n. 51 - May/June 2018

Page 61

BRAND-NEW

S P E C I A L AU TOMOTIV E

© Dürr

Dürr is Building for BMW Group a Smart and Resource-Efficient Paint Shop in Mexico

1

Figure 1: BMW was the first OEM to use EcoDryScrubber in its plant in Regensburg, Germany.

D

ürr is building a paint shop

Dürr is supplying the complete paint shop,

scope of services being provided by Dürr.

in Mexico for its customer

from pretreatment (PT) and electrocoating

The respective processes are designed

BMW Group that meets the

(EC) through to the spray booths with

around the consistent integration of smart

requirements for connected Industry

application technology to the ovens.

solutions.

4.0 production. This ultra-modern plant

The waste water treatment plant, the

In the first stage, the paint shop is being

featuring the first integrated smart factory

installations for the complete deionization

designed for a capacity of 30 vehicles

concept from Dürr in the world is being

system of the water (DI plant), and the

per hour, with the option to increase the

built at the San Luis Potosí site.

shop ventilation are also included in the

throughput to twice this capacity later.

international PAINT&COATING magazine - MAY/JUNE 2018 - N. 51

53


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
ipcm® n. 51 - May/June 2018 by ipcm® International Paint&Coating Magazine - Issuu