UPPER BALEPHI HYDROPOWER PROJECT
SALIENT FEATURES SN
FEATURES
CHARACTERISTICS
GENERAL 1 2 3 4
Name of Project Type Install Capacity Progress
Upper Balephi Hydropower Project Run of River 46 MW Infrastructure Development (Access Road, Labor camp) construction work on progress
PROJECT LOCATION 1 2 3
Latitude of Project Area Longitude of Project Area Project Area
27° 58’ 59’’ N and 28° 01’ 23’’ N 85° 46’ 46’’E and 85° 48’ 03’’ E Jugal Rural Municipality, Sindhupalchowk, Province 3
TECHNICAL INFORMATION 1 2 3
Hydrology Catchment Area Design Discharge (Q 40 %) Weir and Intake No. of Intake Type of Weir Length Desanding Basin Type
270.38 km2 12.72 m3/s
Diversion weir with side intake 42 m Hopper Type, Single bay with Bypass channel