Sunkoshi-II Storage Hydroelectric Project

Page 1

SUNKOSHI-II STORAGE HYDROELECTRIC PROJECT

SALIENT FEATURES SN

FEATURES

CHARACTERISTICS

GENERAL 1 2 3

Name of the Project Sector Type

Sunkoshi-II Storage Hydroelectric Project Hydropower Storage Type (1,110 MW capacity dam-toe power Station as per JICA Master Plan Study 1985)

PROJECT LOCATION 1 2 3

Province Project Location Project Area

Province 3 Ramechap and Sindhuli districts (Location Map) The project is located 130 Km east from Kathmandu, the capital city of Nepal. The proposed Headworks plus powerhouse location is along the B.P highway, around 20 Km drive from Khurkot (the nearest market centre). Proposed Dam-toe- powerhouse coordinates: 27°16’4.91”N and 86° 6’6.47”E )

PROJECT FEATURES (JICA MASTER PLAN STUDY 1985) 1

Project Layout

2

Hydrology

Concrete Gravity Dam is arranged at the riverbed, with penstock pipe to carry discharge to surface powerhouse on the left bank on dam toe with installed capacity of 1100 MW. Catchment Area: 10396 km2 Design flow: 1050 m3/s (Note: There is a Hydrological station of Department of Hydrology and Meteorology (DHM) namely: Station Number 652: Khurkot)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.