To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
www.acecontainer.com
�TO BE A GOOD PARTNER�
ESS
Head Quarter · 80, Sapyeong-Daero, Seocho-Gu, Seoul, Korea Tel. Fax.
+82. 2. 578. 0491 +82. 2. 578. 0495
Factory · First factory 101, Mieumsandan-Ro, Gangseo-Gu, Busan, Korea · Second factory 77-1, Hagi-Gil, Daesan-Myeon, Haman-Gun, Gyeongsangnam-Do, Korea Tel. Fax.
www.acecontainer.com
+82. 51. 899. 9990 +82. 51. 899. 9980
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM Introduction
路 ESS General Information 路 ESS Type & Advantage 路 ESS Components 路 ESS Product Line-Up
www.acecontainer.com
2
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS General Information Device that storage and re-use the power when needed · There is a growing demand for stable power supply, efficient power utilization and high-quality power · Efficient power utilization and Securing high-quality power are expected to have greatest market potential
Stable Power Supply
Efficient Power Utilization
· Minimize outage damage, Prevent short-term outage Voltage 220
Secure Power Quality
· To prevent electric power shortage Peak Shift
Short-term Power Failure Time (~30Mins)
· According to expansion new renewable energy, Stabilization of power quality Power
Use daytime
Power storage at night
Wind power Generation
Time -220
Data Loss, Communication Failure, Facility Damage
[ For communication base station ] [ For UPS ]
www.acecontainer.com
Discharge
Midnight
Charge
Daytime Time
[ For Household ] [ For Commercial ]
0 [ For Solar and Wind Power ]
3
Planned Transmission
OUTPUT 12
24 Time
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Types & Advantage LIB technology is expected to lead ESS industry with its high efficiency, high capacity, long life and environment friendliness Non-Battery System
Battery System
Classification
Pumped-Storage Power Generation
Flywheel
Compressed Air
Type
Advantage
High efficiency, Wide range of usage
Long life, High capacity
Short charge time
Long life, High capacity
Disadvantage
Lack of verification performance
Environmental destruction
Danger of explosion
Terrain constraint
[Lithium-Ion Battery (LIB)]
[Lead Acid]
[Sodium-Sulfur Battery (NaS)]
Classification
Advantage
www.acecontainer.com
路 Long life(over 10 years), High capacity, High density. (1/3 weight and size comparison with lead acid) 路 Environment friendliness, Low maintenance cost
4
路 Low price, Proven technology
路 Low price, High capacity
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Components · Grid Solution (MW) [ Grid Storage Solution ] Energy Management System
Cell
Grid Battery System (GBS)
Power Conditioning System
Container Type
Module STANDARD SOLUTIONS Battery Rack
BMS
J/B
Temporary Building Type CUSTOM SOLUTIONS
www.acecontainer.com
5
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Components ¡ Energy solution [ Energy Storage Solution ]
Grid
PCS
Battery Monitoring System
Battery
Energy Management System (EMS)
Built-In Power Manager Power Communication
www.acecontainer.com
6
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Product Line-Up kW-class small to large-scale MW-class product line-up for various power issues [ ESS ] 3~10kWh
For Household
10~100kWh
[ PCS ]
UPS
1~20kWh
Communication Base Station Off Grid
30~500kWh
For Commercial
500kWh~
www.acecontainer.com
7
For Power
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Product Line-Up ESS Application
Peak Cut / Peak Shifting Frequency Regulation Load Leveling Renewables Integration - Renewable Time Shift Power Back Up Combining PV and Diesel Power - Factor Control Grid Integration Short / Long Duration UPS Function During the Blackout Multi Function ESS (Hybrid system in Micro Grid)
www.acecontainer.com
8
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Product Line-Up For Household : Saving Electricity Price, Peak Shift · Residential Energy Solution
· Why ESS + PV? · Unsynchronized energy generation and consumption pattern · High electricity price during daylight Solar Energy Generation
2.0
Electricity Consumption
1.5
PV Module
1.0 0.5
Energy
5.8 kWh
Capacity
120 Ah
Voltage
48V
Dimension
785x250x450
Weight
145kg
0.0
Inverter
Smart Meter
6
9
12
15
18
21
24
· Efficient power utilization
Inverter
ESS
3
· Electricity Bill & Energy Saving · Energy Independency(Net Zero Energy Home) Home appliances
Solar Energy Generation
2.0
Electricity Consumption
1.5 1.0 0.5 0.0
www.acecontainer.com
9
3
6
9
12
15
18
21
24
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Product Line-Up For UPS : Emergency Generator Replacement, Momentary Power Failure · UPS - IDC
· UPS - Telecom Tower
Value Proposition · Total area coverage reduction · Reduced TCO (Total Cost of Ownership)
Value Proposition · Longer Cycle Life with less Maintenance (4,000 cycles @ DOD 80%, 25℃) · Light Weight & Less Footprint (1/3 of Lead Acid Battery)
Centralized Data Center system
Telecom Tower Flow Diagram
UPS 5.8 kWh
Energy
Capacity Voltage Dimension Weight
120 Ah 48V 785x250x450 145kg
420V
AC/DC
DC/AC
420V
AC
AC AC DC
Telecom Energy
Capacity Voltage Dimension Weight
www.acecontainer.com
5.8 kWh
120 Ah 48V 785x250x450 145kg
PCS Battery
10
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Product Line-Up For Commercial : Peak Shift · Commercial Energy Solution
· Why ESS + PV? · High additional peak cost · High electricity cost during daylight
PCS
ESS
ESS for Commercial Main Specifications Energy
56.8 kWh
Capacity
60 Ah
Voltage
947 V
www.acecontainer.com
21
24
· Peak Shaving / Peak Cut / Energy Saving · Demand Response
Schools Hospital
1,250kg Parking Lot
Peak
· Value Proposition
Stadium
Dimension 1,084x600x1,763 Weight
kW 70 Electricity Consumption 60 50 40 Peak Time 30 20 Solar Energy Generation 10 0 3 6 9 12 15 18
Mall
11
kW 70 Reduction fromPV + ESS 60 50 40 Peak Time 30 20 10 Energy Saving 0 3 6 9 15 18 12
Peak Cut
21
24
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Product Line-Up High Capacity(MW-class) : Frequency Regulation · MW Scale Energy Solution
· Why ESS for Ancillary Service? · Frequency Regulation · Spinning Reserve · Grid Back-up for black out
Wind Farm
Solar Farm
LIB - Utility 1MWh
Capacity
1,022 Ah
Voltage
978 V
Dimension
45ft Container
Weight
20,000kg (Battery & Rack Only)
www.acecontainer.com
· Value Proposition · Cost Competitive than Fossil Power · Less Emission & No Noise · Less Footprint (Metropolitan)
Grid
Dynamic Response 50.2
ESS Power Plant (for Reserved Power)
Frequency (Hz)
Energy
50.0 49.8
49.5
49.2
12
Incident
10 s
30 s
60 s
Time
30 mins
Secondary (to 30 mins) Primary
Reserve
Dynamic and NonNon-Dynamic Service
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM Turn-key & Total Solution Provider Product Reference
- Battery Energy Storage System - Power Conversion System
www.acecontainer.com
13
| WHO WE ARE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
Major Customer Global Customer
www.acecontainer.com
PCS Customer
Battery Customer
14
Electrocity Customer
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM _ ESS CONTAINER
Global ESS Projects Total Reference
: 162 Containers & Enclosures / 134 MW - 316 MWh
Posco ICT (Canada)
Samsung SDI (Pittsburgh, U.S.A) Samsung SDI (Clinton, U.S.A) Samsung SDI (California, U.S.A) Samsung SDI (Malyland, U.S.A) LS IS (Maryland, U.S.A) LG Chem (Charlotte, U.S.A)
Samsung SDI (Port of tyne, U.K.) Samsung SDI (Broxburn, U.K.) Samsung SDI (Tynemouth, U.K.)
Samsung SDI (China) Samsung SDI (Thkunoshima, Japan) Samsung SDI (Chitose, Japan) Samsung SDI (Hidaka, Japan) Samsung SDI (Obihiro, Japan) Sumitomo (Japan) LG Chem (Japan)
Samsung SDI (Galapagos, Ecuador)
Kokam-1 (Australia) Kokam-2 (Australia) FLUENCE (Australia)
www.acecontainer.com
15
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Project Reference Global ESS Project Customer
Location
System Type
Container Size
Q'ty PCS
Q'ty Q'ty Date of Operation BCS Combi (Incl. Test)
PCS Total Capacity (MW)
Battery Total Capacity (MWh)
Samsung SDI Samsung SDI Samsung SDI Samsung SDI POSCO ICT Sumitomo LG Chem Samsung SDI Samsung SDI
Dokunoshima, Japan
Battery Energy Storage System
20FT HC
2
2015.01.20
0.78
U.S.A
Battery Energy Storage System
40FT HC
1
2015.02.01
1
Xian, China
Battery Energy Storage System
40FT HC
1
2015.04.01
1.1
U.S.A
Battery Energy Storage System
45FT HC
3
2015.07.06
12
Canada
Power Conversion & Battery Energy Storage System
20FT HC
1
2016.03.23
Japan
Battery Energy Storage System
40FT HC
1
2016.06.01
1
KY, U.S
Battery Energy Storage System
3.048m x 2.896m x 6.058m
2
2016.12.31
2
Chitose, Japan
Battery Energy Storage System
40FT HC
9
2017.01.02
14.58
Hidaka, Japan
Battery Energy Storage System
40FT HC
7
2017.01.02
9.66
Samsung SDI
Obihiro, Japan
Battery Energy Storage System
40FT HC
2
2017.01.02
4.368
Kokam Samsung SDI LS IS Samsung SDI Samsung SDI Samsung SDI
Australia
Battery Energy Storage System
40FT HC
5
2017.03.30
11.1
U.S.A
Battery Energy Storage System
20FT HC
1
2017.05.01
0.99
U.S.A
Power Conversion System
20FT HC
Galapagos, Ecuador
Battery Energy Storage System
20FT HC
1
2017.05.10
0.333
U.S.A
Battery Energy Storage System
53FT HC
1
-
4.3
United Kingdom (PoT)
Battery Energy Storage System
45FT HC
8
The end of 2017
28
Battery Energy Storage System
45FT HC
6
The end of 2017
18
Battery Energy Storage System
45FT HC
6
The end of 2017
17.4
Japan, Korea
Battery Energy Storage System
2.896m x 2.438m x 12.192m
1
2018.03.31
1
Australia
Battery Energy Storage System
45FT HC
9
2018.4Q
35.928
Samsung SDI Samsung SDI LG Chem FLUENCE
www.acecontainer.com
United Kingdom (Broxburn) United Kingdom (Tynemouth)
16
1
1
2017.05.01
0.75
1
0.5
0
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM _ ESS CONTAINER
ESS Project In Korea Total Reference
: 162 Containers & Enclosures / 134 MW - 316 MWh LG Elec (Namyangju)
LG Chem (Ansan)
OCI (Sungnam) LG CNS (Yongin)
LG Chem (Ansung) LS IS (Ansung)
LS IS (Chungju) LG CNS (Ochang) LS Elec (Geochang)
LG Elec (Saejongsi)
E-TECH E&C (Cheonahn) LS IS (Gongju) H2 (Gongju)
LG Elec (Kyeryong) LG Chem (Daejeon) LG Elec (Daejeon) POSCO ICT (Pohang) LG Chem (Kyungsan) LS Elec (Gimchun) LS Elec (Yechun) Samsung SDI (Ulsan)
LG Chem (Gunsan) PLASPO (Gochang) Samsung SDI (Gochang) LG Chem (Gochang) LG Elec (Gochang)
LG CNS (Uiryeong)
Samsung SDI (Hwasoon)
LG Chem (Yeosu) LS IS (Yeosu)
Kokam (On the vessel) BOTARI Energy (Biyang-Do)
www.acecontainer.com
17
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Project Reference ESS Project In Korea Customer
Location
LG Elec
Daejeon
POSCO ICT
Pohang
LG Chem
PCS Total Capacity (MW)
Battery Total Capacity (MWh)
2014.03.21
2
1
1
2014.05.31
1
0.5
1
2014.07.26
Container Size
Q'ty PCS
Power Conversion & Battery Energy Storage System
40FT HC
1
1
Power Conversion & Battery Energy Storage System
20FT HC
1 1
System Type
Q'ty Q'ty Date of Operation BCS Combi (Incl. Test)
PCS
Daejeon
Power Conversion & Battery Energy Storage System
3.000m x 3.960m x 6.058m
BCS
3.000m x 3.960m x 12.192m
LG CNS
Yongin
Power Conversion System
40FT HC
2
2015.12.16
LG Chem
Seo-Ansung
Battery Energy Storage System
40FT HC
4
2014.12.16
LS IS
Seo-Ansung
Power Conversion System
40FT HC
3
2014.12.16
12
LG Chem
Yeosu
Battery Energy Storage System
2.438m x 3.200m x 12.192mm
2015.03.02
4
LS IS
Yeosu
Power Conversion System
40FT HC
1
2015.05.21
1
1
H2 & LS IS
Gongju
Power Conversion & Battery Energy Storage System
20FT HC & 20FT
1
2
2015.5.21
1
1
Kokam
Australia
Battery Energy Storage System
40FT HC
1
2015.08.30
0.8
LG Chem
Kyungsan, Uiryeong, Kyeryong
Battery Energy Storage System
40FT HC
18
2015.12.15
79.2
Hwasoon
Battery Energy Storage System
40FT HC
6
2015.12.15
24
Kyeryong
Power Conversion System
40FT HC
6
2015.12.15
24
Uiryeong
Power Conversion System
40FT HC
6
2015.12.15
24
Chungju
Power Conversion System
40FT HC
4
2015.12.15
16
Sungnam
Battery(RFB) Energy
3.000m x 3.200m x 9.125m
Changwon
LVRT 5 MW (Test Container for Windmill)
40FT HC
Ulsan
Battery Energy Storage System
2.626m x 3.100m x 12.192m
Samsung SDI LG Elec LG CNS GS NEOTEC OCI Plaspo Samsung SDI
www.acecontainer.com
18
2
1 1
-
8
0.5
2016.12.10 6
2016.12.10
24
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Energy Storage System Container
ESS Project Reference ESS Project In Korea Customer
Location
System Type
Container Size
Q'ty PCS
PCS Total Capacity (MW)
Battery Total Capacity (MWh)
2017.01.02
0.1
1
2017.03.10
4
Q'ty Q'ty Date of Operation BCS Combi (Incl. Test)
LS IS
Gimpo
Power Conversion & Battery Energy Storage System
2.438m x 2.896m x 9.058m
Plaspo
Seo-gochang
Power Conversion System
40FT HC
LG Chem
Sangju
Battery Energy Storage System
2.626m x 3.100m x 12.192m
1
2017.03.30
2
Samsung SDI
Gohung
Battery Energy Storage System
40FT HC
1
2017.03.31
1
LG Elec
Saejong
Power Conversion & Battery Energy Storage System
2.500m x 3.000m x 9.058m
LG Elec
Gochang
Power Conversion System
40FT HC
Botary Energy
Jeju Island
Power Conversion & Battery Energy Storage System
40FT HC
LG Chem
Gochang
Battery Energy Storage System
2.896m x 2.438m x 12.192m
Kokam
On the Vessel
Power Conversion & Battery Energy Storage System
40F HC
LG Elec
Geochang
Power Conversion & Battery Energy Storage System
2.500m x 3.000m x 9.058m
LG Elec LG Elec LG Chem LG Chem E-TECH E&C LG CNS LG Elec
Gimchun
Power Conversion & Battery Energy Storage System
Yechun
www.acecontainer.com
1 1
1 1 1
2017.05.24
1
2017.05.31
4
The end of 2017
1
1
1
6
2017
1
The end of 2017
1
3
1
2017.12.31
1
1
2.500m x 3.000m x 9.058m
1
2017.12.31
1
1
Power Conversion & Battery Energy Storage System
2.500m x 3.000m x 9.058m
1
2017.12.31
1
1
Gunsan
Battery Energy Storage System
7.040m x 2,450m x 2.896m
6
2017.12.31
18
Gunsan
Battery Energy Storage System
7.040m x 2,450m x 2.896m
2
2017.12.31
6
Cheonahn
Power Conversion & Battery Energy Storage System
12.192m x 3.500m x 3.100m
Ochang
Power Conversion & Battery Energy Storage System
13.000m x 3.500m x 3.500m
Namyangju
Power Conversion & Battery Energy Storage System
7.170m x 2.438m x 2.896m
19
1
1 1
1 1
13.2
2018.01.31
1
1
2018.03.31
1
6.3
2018.04.30
0.15
0.498
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM ESS CONTAINER
Ace Engineering has performed projects for ESS Container BCS
20ft 40ft 45ft 53ft NON-ISO
www.acecontainer.com
20
PCS
20ft 40ft NON-ISO
PCS + BCS 30ft 40ft NON-ISO
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) BCS Type & Contents
: 20ft, 40ft, 45ft, 53ft NON-ISO ∙ DC Panel ∙ Battery Rack ∙ Fire Fighting System
Battery Rack
DC Panel
Fire Fighting System
∙ HVAC ∙ AC Panel ∙ AUX. Panel ∙ UPS ∙ Small Power, etc. [BCS _ 20ft ]
HVAC
www.acecontainer.com
BCS _ 45ft ]
AC Panel
AUX. Panel
21
UPS
Small Power, etc.
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : General Electric Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
U.S.A End Client : General Electric(GE) Battery Supplier : Samsung SDI Battery Energy Storage System UPS, Battery, BCP, HVAC System, Fire Fighting System, Server Rack, etc. 2.438m x 2.896m x 12.192m (40ft HC) 12 tons
Products
[ Exterior ]
www.acecontainer.com
22
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Tokunoshima PV ESS Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Tokunoshima, Japan End Client : EDISON POWER Battery Supplier : Samsung SDI Battery Conditioning System UPS, Battery, BCP, HVAC System, Fire Fighting System, etc. 2.438m x 2.896m x 6.096m (20ft HC) 8 tons
Products
[ Exterior ]
www.acecontainer.com
23
[ Interior ]
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Trans Grid Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Australia End Client : Trans Grid Battery Supplier : Kokam Battery Storage System Battery Rack, BMS Panel, DC Control panel, Auto Fire Extinguisher, Air-conditioner, etc. 2.438m x 2.896m x 12.192m 16 tons
Products
[ Exterior ]
www.acecontainer.com
24
[ Interior ]
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Trans Grid Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Australia End Client : Trans Grid Battery Supplier : Kokam Battery Storage System Battery Rack, BMS Panel, DC Control panel, Auto Fire Extinguisher, Air-conditioner, etc. 2.438m x 2.896m x 12.192m (40ft HC) 16 tons
Products
[ Interior ]
www.acecontainer.com
25
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Clinton Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Clinton, U.S.A End Client : Renewable Energy System(RES) Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 13,716m (45ft HC) 12 tons
Products
[ Interior ]
www.acecontainer.com
26
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Electric Power Research Institute Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
KY, U.S.A End Client : EPRI Battery Supplier : LG Chem Battery Conditioning System Battery, BCP, HVAC System, Fire Fighting, etc. 3.048m x 2.896m x 6,058m 20 tons (Incl. Battery)
Products
[ Exterior ]
www.acecontainer.com
27
[ Interior ]
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Chitose PV ESS Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Chitose, Japan End Client : Korea Electric Power Corporation Japan Branch Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 12 tons
Products
[ Interior ]
www.acecontainer.com
28
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Siemens Galapagos Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Galapagos, Ecuador End Client : Siemens AG Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, HVAC System, etc. 2.438m x 2.896m x 6.058m (20ft HC) 7 tons
Products
[ Exterior ]
www.acecontainer.com
29
[ Interior ]
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS)
Project : Hidaka PV ESS Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
www.acecontainer.com
Project : Obihiro PV ESS Project
Hidaka, Japan End Client : Smart Solar Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, Air-conditions, Fire Fighting, etc.
Location
Customer Type Main Equipment Size (W x H x L) Total Weight
2.438m x 2.896m x 12.192m (40ft HC) 12 tons
30
Obihiro, Japan End Client : Japan Asia Investment Co Ltd Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 12 tons
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS)
Project : Xian Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
www.acecontainer.com
Project : Redox Flow Battery Container Project
Xi’an, China End Client : Samsung SDI local Subsidiary Battery Supplier : Samsung SDI Battery Conditioning System Battery, BCP, HVAC System, Fire Fighting System, Server Rack, etc.
Location
Customer Type Main Equipment Size (W x H x L) Total Weight
2.438m x 2.896m x 12.192m (40ft HC) 13.5 tons
31
Japan End Client : SUMITOMO Battery Supplier : SUMITOMO Battery Energy Storage System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc.
2.438m x 2.896m x 12,192m (40ft HC) 13.5 tons
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : KEPCO FR Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Ansung, Korea End Client : Korea Electric Power Corporation Battery Supplier : LG Chem Battery Energy Storage System Battery rack, AC & DC Panel, HVAC System, UPS, Fire Fighting etc. 2.438m x 2.896m x 12.192m (40ft HC) 13 tons
Products Passage Way
Panel for UPS
Lighting & ACIU
[ Interior ]
www.acecontainer.com
32
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Redox Flow Demonstrate Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Gong-ju, Korea End Client : Korea Electric Power Corporation Battery Supplier : H2 Power Conversion & Battery Energy Storage System (500kWh) Battery, BMS, etc. / PCS, Transformer, HVAC System, etc. 2.438m x 2.591m x 6.058m (20ft) 4.3 tons
Products
[ Exterior ]
www.acecontainer.com
33
[ Interior ]
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Redox Flow Demonstrate Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Sungnam, Korea End Client : OCI Battery Supplier : OCI VRFB System – Development of BOP & FBCU optimization technology
Battery Energy Storage System (Redox Flow Battery) Battery, Contactor panel, Control panel, Inverter Panel, Utility, Outlet fan, etc. 3.000m x 3.200m x 9.125m 19.3 tons
Products
[ Interior ]
www.acecontainer.com
34
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : KEPCO Research Institute Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Gochang, Korea End Client : Korea Electric Power Corporation Battery Supplier : Samsung SDI Battery Energy Storage System Battery Rack, DC & AC Panel, HVAC System, Fire Fighting, etc.
2.438m x 2.896m x 12.192m (40ft HC) 18 tons
Products
[ Interior ]
www.acecontainer.com
35
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Distribution ESS Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Sangju, Korea End Client : Korea Electric Power Corporation Battery Supplier : LG Chem Battery Energy Storage System Battery Rack, DC & AC Panel, HVAC System, Fire Fighting, etc. 2.626m x 3.100m x 12.192m 18 tons
Products
[ Exterior ]
www.acecontainer.com
36
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : RES UK PJT (Port of Tyne, Tynemouth, Broxburn) Location Customer Type Main Equipment Size (W x H x L) Total Weight
PoT, Tynemouth, Broxburn U.K. End Client : Renewable Energy System(RES) Battery Supplier : Samsung SDI Battery Control System Container Battery Rack, DC & AC Panel, HVAC System, Fire Fighting, etc. 2.896m x 2.438m x 13.716m 20 tons
Products
[ Interior ]
www.acecontainer.com
37
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS)
Project : KEPCO FR Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
www.acecontainer.com
Project : KEPCO FR Project
Kyungsan, Uiryeong, Kyeryong, Korea End Client : Korea Electric Power Corporation Battery Supplier : LG Chem Battery Energy Storage System Battery Rack, AC/DC Panel, HVAC System, Fire Fighting, etc.
Location
Customer Type Main Equipment Size (W x H x L) Total Weight
2.438m x 2.896m x 12.192m (40ft HC) 16 tons
38
Hwasoon, Korea End Client : Korea Electric Power Corporation Battery Supplier : Samsung SDI Battery Energy Storage System Battery Rack, BCP Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 16 tons
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Southern Power Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
California, U.S.A End Client : Renewable Energy System(RES) Battery Supplier : Samsung SDI Battery Energy Storage System HVAC System, Fire Fighting, Test Equipment, etc. 2.438m x 2.896m x 16.154m (53ft HC) 16 tons
Products
[ Exterior ]
www.acecontainer.com
39
[ Interior ]
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS) Project : Battery Outdoor Unit Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Gunsan, Ansan, Korea End Client : Hanwha, GS Enertec Battery Supplier : LG Chem Battery Control System Container Battery, DC Panel, PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc. 2.450m x 2.896m x 7.040m 10 tons
Products
[ Exterior ]
www.acecontainer.com
40
[ Interior ]
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS)
Project : KEPCO FR Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
www.acecontainer.com
Project : FLUENCE Ballarat Project
Ulsan, Korea End Client : Korea Electric Power Corporation Battery Supplier : Samsung SDI Battery Energy Storage System Battery Rack, AC/DC Panel, HVAC System, Fire Fighting, etc.
Location
Customer Type Main Equipment Size (W x H x L) Total Weight
2.626m x 3.100m x 12.192m 18 tons
41
Victoria, Australia End Client : AUSNET Battery Supplier : LG Chem Battery Energy Storage System Battery Rack, AC/DC Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 13.716m 18 tons
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ Battery Control System(BCS)
Project : Korea Electric Power Research Institute Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
www.acecontainer.com
Seo-Gochang, Korea End Client : Korea Electric Power Research Institute Battery Supplier : LG Chem Battery Energy Storage System HVAC System, Fire Fighting, etc. 2.896m x 2.438m x 12.192m (40ft HC) 18 tons
42
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM _ ESS CONTAINER
Energy Storage System _ Power Conversion System(PCS) PCS Type & Contents
: 20ft, 40ft NON-ISO ∙ PCS ∙ Transformer ∙ Fire Fighting System ∙ HVAC ∙ AC Panel ∙ UPS ∙ Small Power, etc.
Fire Fighting System
PCS
[ PCS _ 20ft ]
HVAC
www.acecontainer.com
AC Panel
UPS
43
Small Power, etc.
Transformer
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
Energy Storage System _ Power Conversion System(PCS) Project : KEPCO FR Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Yongin, Korea End Client : Korea Electric Power Corporation PCS Supplier : LG CNS Power Conversion System PCS, AC Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 23.5 tons
Products Smoke Detector
Thermo-hygrostat
Lighting
AC Panel & PCS
[ Interior ]
www.acecontainer.com
44
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
Energy Storage System _ Power Conversion System(PCS) Project : KEPCO RF Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Ansung, Korea End Client : Korea Electric Power Corporation PCS Supplier : LS IS Power Conversion System PCS, UPS, Battery, PLC, PDB, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 20 tons
Products
[ Interior ]
www.acecontainer.com
45
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
Energy Storage System _ Power Conversion System(PCS)
Project : KEPCO FR Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
www.acecontainer.com
Project : KEPCO FR Project
Kyeryong, Korea End Client : Korea Electric Power Corporation PCS Supplier : LG Elec Power Conversion System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc.
Location
Customer Type Main Equipment Size (W x H x L) Total Weight
2.438m x 2.896m x 12.192m (40ft HC) 20 tons
46
Uiryeng, Korea End Client : Korea Electric Power Corporation PCS Supplier : LG CNS Power Conditioning System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 18 tons
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
Energy Storage System _ Power Conversion System(PCS)
Project : KEPCO FR Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
www.acecontainer.com
Project : KEPCO Energy Institute Project
Chungju, Korea End Client : Korea Electric Power Corporation PCS Supplier : LS IS Power Conversion System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc.
Location
Customer Type Main Equipment Size (W x H x L) Total Weight
2.438m x 2.896m x 12.192m (40ft HC) 18 tons
47
Seo-Gochang, Korea End Clinent : Korea Institute of Energy Technology Evaluation and Planning PCS Supplier : PLASPO Power Conversion System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft) 18 tons
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
Energy Storage System _ Power Conversion System(PCS)
Project : LVRT 5 MW Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
www.acecontainer.com
Project : KEPCO Energy Institute Project
Changwon, Korea End Client : Korea Electrotechnology Research Institute (KERI) PCS Supplier : PLASPO LVRT 5MW Test Container HVAC System, Fire Fighting, Test Equipment, etc.
Location
Customer Type Main Equipment Size (W x H x L) Total Weight
2.438m x 2.896m x 12.192m (40ft HC) 16 tons
48
Seo Gochang Korea End Client : Korea Electric Power Corporation PCS Supplier : LG Elec Power Conversion System PCS, HVAC System, Fire Fighting, etc. 2.896m x 2.438m x 12.192m (40ft HC) 18 tons
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS+PCS PCS+BCS Type & Contents
: 30ft, 40ft NON-ISO ∙ PCS
PCS
· Transformer
Fire Fighting System
UPS
Battery Rack
∙ Battery Rack · Fire Fighting System · HAVC ∙ AC Panel ∙ DC Panel · UPS · Small Power. etc [ PCS+BCS _ 40ft ]
AC Panel
www.acecontainer.com
Transformer
HVAC
49
DC Panel
Small Power, etc.
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS+PCS Project : POSCO ICT (Canada) Location
Customer Type Main Equipment Size (W x H x L) Total Weight
www.acecontainer.com
50
Canada End Client : Power stream Battery Supplier : Samsung SDI PCS Supplier : Destin Power Power Conversion System & Battery Energy Storage System (500 MWh) Battery, DC Panel, PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc. 2.438m x 2.896m x 6,058m (20ft HC) BCS : 8 tons / PCS : 10 tons
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS+PCS Project : Smart Grid Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Daejeon, Korea End Client : LG Elec Battery Supplier : LG Chem PCS Supplier : LG Elec Power Conversion & Battery Energy Storage System Battery Rack Installation, FFS - NAF-3, PCS, ATS, HVAC System, etc. 2.438m x 2.896m x 12.192m BCS : 20 tons / PCS : 10 tons
Products DC Panel
Battery Rack
Smoke Detector
ACU in PCS Room
F&G System
Outlet Damper
[ Interior ]
www.acecontainer.com
51
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS+PCS Project : Peak-cut Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Pohang, Korea End Client : POSCO & POSCO ICT Battery Supplier : LG Chem PCS Supplier : POSCO ICT Power Conversion & Battery Energy Storage System PMU, Transformer, Switchgear, PCU, Incoming Panel, Fire fighting System, etc. 2.438m x 2.896m x 6.058m (20ft HC) BCS : 7.7 tons / PCS : 11.3 tons
Products Door
Passage way
Incoming Panel
Transformer
BCU Panel
Air Inlet Damper
[ Interior ]
www.acecontainer.com
52
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS+PCS Project : Yangjisa Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Gimpo, Korea End Client : Yangjisa Battery Supplier : Samsung SDI PCS Supplier : LS IS Power Conversion & Battery Energy Storage System PCS, Battery Rack, Fire Fighting System, AC/DC Panel, HVAC System, etc. 2.438m x 2.896m x 9.058m (30ft HC) BCS : 15 tons / PCS : 15 tons
Products
[ Interior ]
www.acecontainer.com
53
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS+PCS Project : Battery Research Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Daejeon, Korea End Client : LG Chem Battery Supplier : LG Chem Power Conversion & Battery Energy Storage System PCS, Control PC, Battery Rack, Fire Fighting System, AC/DC Panel, HVAC System, etc. BCS - 3.000m x 3.960m x 12.192m PCS - 3.000m x 3.960m x 6.058m BCS : 18.0 tons / PCS : 11.0 tons
Products AC Panel
Thermometer & Actuator
[ Interior ]
www.acecontainer.com
54
Lighting
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS+PCS Project : Korea Power Exchange Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Yeosu, Korea End Client : Korea Power Exchange Battery Supplier : LG Chem PCS Supplier : LS IS Power Conversion System PCS, AC Panel, HVAC System, Fire Fighting System, etc. BCS : 2.438m x 3.200m x 12.192m PCS : 2.438m x 2.896m x 12.192m (40ft HC) BCS : 10 tons / PCS : 13 tons
Products Passage way
DC Panel
Battery Rack
F&G System
[ Interior ]
www.acecontainer.com
55
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS+PCS Project : LG Electric ESS Location
Customer Type
Products
Main Equipment Size (W x H x L) Total Weight
Saejongsi, Geochang, Gimchun, Yechun, Korea
End Client : Korea Electric Power Corporation Battery Supplier : LG Chem PCS Supplier : LG Elec Power Conversion & Battery Energy Storage System PCS, Battery Rack, BCP Panel, HVAC System, Fire Fighting, etc. 2.500m x 3.000m x 9.058m 18 tons
[ Interior ]
www.acecontainer.com
56
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS + PCS Project : Chesapeake PJT Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Chesapeake College, KY End Client : Chesapeake College Battery Supplier : Samsung SDI PCS Supplier : LS IS Battery Energy Storage System PCS, Transformer, Battery Rack, DC & AC Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 6.058m (20ft HC) BCS : 8 tons / PCS : 11 tons
Products
[ Interior ]
www.acecontainer.com
57
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS + PCS Project : Biyangdo Micro Grid Project Location
Customer Type Main Equipment Size (W x H x L) Total Weight
Biyangdo, Jeju-Island, Korea End Client : Botari Energy Battery Supplier : Samsung SDI PCS Supplier : Destin Power Power Conversion & Battery Energy Storage System PCS, Battery Rack, BCP Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40FT HC) 16 tons
Products
[ Interior ]
www.acecontainer.com
58
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
ENERGY STORAGE SYSTEM
ESS Container _ BCS+PCS
Project : ESS Project for Ship Thruster Location
Customer Type Size (W x H x L) Total Weight
www.acecontainer.com
Container Vessel End Clinent : Hyundai Merchant Marine Battery Supplier : Kokam PCS Supplier : Dawonsys Battery Control System & Power Conversion System 2.896m x 2.438m x 12.192m 16 tons
59
| WHAT WE MANUFACTURE
To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.
Based on our firm motto to satisfy customers’ needs we are dealing with diverse valuable customers
Motto
Vision
To be a good PARTNER !!
Connecting the world through CONTAINER innovation
www.acecontainer.com
60