Catalogo ESS (ingles)

Page 1

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

www.acecontainer.com

�TO BE A GOOD PARTNER�

ESS

Head Quarter · 80, Sapyeong-Daero, Seocho-Gu, Seoul, Korea Tel. Fax.

+82. 2. 578. 0491 +82. 2. 578. 0495

Factory · First factory 101, Mieumsandan-Ro, Gangseo-Gu, Busan, Korea · Second factory 77-1, Hagi-Gil, Daesan-Myeon, Haman-Gun, Gyeongsangnam-Do, Korea Tel. Fax.

www.acecontainer.com

+82. 51. 899. 9990 +82. 51. 899. 9980


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM Introduction

路 ESS General Information 路 ESS Type & Advantage 路 ESS Components 路 ESS Product Line-Up

www.acecontainer.com

2


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS General Information Device that storage and re-use the power when needed · There is a growing demand for stable power supply, efficient power utilization and high-quality power · Efficient power utilization and Securing high-quality power are expected to have greatest market potential

Stable Power Supply

Efficient Power Utilization

· Minimize outage damage, Prevent short-term outage Voltage 220

Secure Power Quality

· To prevent electric power shortage Peak Shift

Short-term Power Failure Time (~30Mins)

· According to expansion new renewable energy, Stabilization of power quality Power

Use daytime

Power storage at night

Wind power Generation

Time -220

Data Loss, Communication Failure, Facility Damage

[ For communication base station ] [ For UPS ]

www.acecontainer.com

Discharge

Midnight

Charge

Daytime Time

[ For Household ] [ For Commercial ]

0 [ For Solar and Wind Power ]

3

Planned Transmission

OUTPUT 12

24 Time


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Types & Advantage LIB technology is expected to lead ESS industry with its high efficiency, high capacity, long life and environment friendliness Non-Battery System

Battery System

Classification

Pumped-Storage Power Generation

Flywheel

Compressed Air

Type

Advantage

High efficiency, Wide range of usage

Long life, High capacity

Short charge time

Long life, High capacity

Disadvantage

Lack of verification performance

Environmental destruction

Danger of explosion

Terrain constraint

[Lithium-Ion Battery (LIB)]

[Lead Acid]

[Sodium-Sulfur Battery (NaS)]

Classification

Advantage

www.acecontainer.com

路 Long life(over 10 years), High capacity, High density. (1/3 weight and size comparison with lead acid) 路 Environment friendliness, Low maintenance cost

4

路 Low price, Proven technology

路 Low price, High capacity


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Components · Grid Solution (MW) [ Grid Storage Solution ] Energy Management System

Cell

Grid Battery System (GBS)

Power Conditioning System

Container Type

Module STANDARD SOLUTIONS Battery Rack

BMS

J/B

Temporary Building Type CUSTOM SOLUTIONS

www.acecontainer.com

5


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Components ¡ Energy solution [ Energy Storage Solution ]

Grid

PCS

Battery Monitoring System

Battery

Energy Management System (EMS)

Built-In Power Manager Power Communication

www.acecontainer.com

6


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Product Line-Up kW-class small to large-scale MW-class product line-up for various power issues [ ESS ] 3~10kWh

For Household

10~100kWh

[ PCS ]

UPS

1~20kWh

Communication Base Station Off Grid

30~500kWh

For Commercial

500kWh~

www.acecontainer.com

7

For Power


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Product Line-Up ESS Application

Peak Cut / Peak Shifting Frequency Regulation Load Leveling Renewables Integration - Renewable Time Shift Power Back Up Combining PV and Diesel Power - Factor Control Grid Integration Short / Long Duration UPS Function During the Blackout Multi Function ESS (Hybrid system in Micro Grid)

www.acecontainer.com

8


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Product Line-Up For Household : Saving Electricity Price, Peak Shift · Residential Energy Solution

· Why ESS + PV? · Unsynchronized energy generation and consumption pattern · High electricity price during daylight Solar Energy Generation

2.0

Electricity Consumption

1.5

PV Module

1.0 0.5

Energy

5.8 kWh

Capacity

120 Ah

Voltage

48V

Dimension

785x250x450

Weight

145kg

0.0

Inverter

Smart Meter

6

9

12

15

18

21

24

· Efficient power utilization

Inverter

ESS

3

· Electricity Bill & Energy Saving · Energy Independency(Net Zero Energy Home) Home appliances

Solar Energy Generation

2.0

Electricity Consumption

1.5 1.0 0.5 0.0

www.acecontainer.com

9

3

6

9

12

15

18

21

24


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Product Line-Up For UPS : Emergency Generator Replacement, Momentary Power Failure · UPS - IDC

· UPS - Telecom Tower

Value Proposition · Total area coverage reduction · Reduced TCO (Total Cost of Ownership)

Value Proposition · Longer Cycle Life with less Maintenance (4,000 cycles @ DOD 80%, 25℃) · Light Weight & Less Footprint (1/3 of Lead Acid Battery)

Centralized Data Center system

Telecom Tower Flow Diagram

UPS 5.8 kWh

Energy

Capacity Voltage Dimension Weight

120 Ah 48V 785x250x450 145kg

420V

AC/DC

DC/AC

420V

AC

AC AC DC

Telecom Energy

Capacity Voltage Dimension Weight

www.acecontainer.com

5.8 kWh

120 Ah 48V 785x250x450 145kg

PCS Battery

10


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Product Line-Up For Commercial : Peak Shift · Commercial Energy Solution

· Why ESS + PV? · High additional peak cost · High electricity cost during daylight

PCS

ESS

ESS for Commercial Main Specifications Energy

56.8 kWh

Capacity

60 Ah

Voltage

947 V

www.acecontainer.com

21

24

· Peak Shaving / Peak Cut / Energy Saving · Demand Response

Schools Hospital

1,250kg Parking Lot

Peak

· Value Proposition

Stadium

Dimension 1,084x600x1,763 Weight

kW 70 Electricity Consumption 60 50 40 Peak Time 30 20 Solar Energy Generation 10 0 3 6 9 12 15 18

Mall

11

kW 70 Reduction fromPV + ESS 60 50 40 Peak Time 30 20 10 Energy Saving 0 3 6 9 15 18 12

Peak Cut

21

24


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Product Line-Up High Capacity(MW-class) : Frequency Regulation · MW Scale Energy Solution

· Why ESS for Ancillary Service? · Frequency Regulation · Spinning Reserve · Grid Back-up for black out

Wind Farm

Solar Farm

LIB - Utility 1MWh

Capacity

1,022 Ah

Voltage

978 V

Dimension

45ft Container

Weight

20,000kg (Battery & Rack Only)

www.acecontainer.com

· Value Proposition · Cost Competitive than Fossil Power · Less Emission & No Noise · Less Footprint (Metropolitan)

Grid

Dynamic Response 50.2

ESS Power Plant (for Reserved Power)

Frequency (Hz)

Energy

50.0 49.8

49.5

49.2

12

Incident

10 s

30 s

60 s

Time

30 mins

Secondary (to 30 mins) Primary

Reserve

Dynamic and NonNon-Dynamic Service


To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM Turn-key & Total Solution Provider Product Reference

- Battery Energy Storage System - Power Conversion System

www.acecontainer.com

13


| WHO WE ARE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

Major Customer Global Customer

www.acecontainer.com

PCS Customer

Battery Customer

14

Electrocity Customer


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM _ ESS CONTAINER

Global ESS Projects Total Reference

: 162 Containers & Enclosures / 134 MW - 316 MWh

Posco ICT (Canada)

Samsung SDI (Pittsburgh, U.S.A) Samsung SDI (Clinton, U.S.A) Samsung SDI (California, U.S.A) Samsung SDI (Malyland, U.S.A) LS IS (Maryland, U.S.A) LG Chem (Charlotte, U.S.A)

Samsung SDI (Port of tyne, U.K.) Samsung SDI (Broxburn, U.K.) Samsung SDI (Tynemouth, U.K.)

Samsung SDI (China) Samsung SDI (Thkunoshima, Japan) Samsung SDI (Chitose, Japan) Samsung SDI (Hidaka, Japan) Samsung SDI (Obihiro, Japan) Sumitomo (Japan) LG Chem (Japan)

Samsung SDI (Galapagos, Ecuador)

Kokam-1 (Australia) Kokam-2 (Australia) FLUENCE (Australia)

www.acecontainer.com

15


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Project Reference Global ESS Project Customer

Location

System Type

Container Size

Q'ty PCS

Q'ty Q'ty Date of Operation BCS Combi (Incl. Test)

PCS Total Capacity (MW)

Battery Total Capacity (MWh)

Samsung SDI Samsung SDI Samsung SDI Samsung SDI POSCO ICT Sumitomo LG Chem Samsung SDI Samsung SDI

Dokunoshima, Japan

Battery Energy Storage System

20FT HC

2

2015.01.20

0.78

U.S.A

Battery Energy Storage System

40FT HC

1

2015.02.01

1

Xian, China

Battery Energy Storage System

40FT HC

1

2015.04.01

1.1

U.S.A

Battery Energy Storage System

45FT HC

3

2015.07.06

12

Canada

Power Conversion & Battery Energy Storage System

20FT HC

1

2016.03.23

Japan

Battery Energy Storage System

40FT HC

1

2016.06.01

1

KY, U.S

Battery Energy Storage System

3.048m x 2.896m x 6.058m

2

2016.12.31

2

Chitose, Japan

Battery Energy Storage System

40FT HC

9

2017.01.02

14.58

Hidaka, Japan

Battery Energy Storage System

40FT HC

7

2017.01.02

9.66

Samsung SDI

Obihiro, Japan

Battery Energy Storage System

40FT HC

2

2017.01.02

4.368

Kokam Samsung SDI LS IS Samsung SDI Samsung SDI Samsung SDI

Australia

Battery Energy Storage System

40FT HC

5

2017.03.30

11.1

U.S.A

Battery Energy Storage System

20FT HC

1

2017.05.01

0.99

U.S.A

Power Conversion System

20FT HC

Galapagos, Ecuador

Battery Energy Storage System

20FT HC

1

2017.05.10

0.333

U.S.A

Battery Energy Storage System

53FT HC

1

-

4.3

United Kingdom (PoT)

Battery Energy Storage System

45FT HC

8

The end of 2017

28

Battery Energy Storage System

45FT HC

6

The end of 2017

18

Battery Energy Storage System

45FT HC

6

The end of 2017

17.4

Japan, Korea

Battery Energy Storage System

2.896m x 2.438m x 12.192m

1

2018.03.31

1

Australia

Battery Energy Storage System

45FT HC

9

2018.4Q

35.928

Samsung SDI Samsung SDI LG Chem FLUENCE

www.acecontainer.com

United Kingdom (Broxburn) United Kingdom (Tynemouth)

16

1

1

2017.05.01

0.75

1

0.5

0


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM _ ESS CONTAINER

ESS Project In Korea Total Reference

: 162 Containers & Enclosures / 134 MW - 316 MWh LG Elec (Namyangju)

LG Chem (Ansan)

OCI (Sungnam) LG CNS (Yongin)

LG Chem (Ansung) LS IS (Ansung)

LS IS (Chungju) LG CNS (Ochang) LS Elec (Geochang)

LG Elec (Saejongsi)

E-TECH E&C (Cheonahn) LS IS (Gongju) H2 (Gongju)

LG Elec (Kyeryong) LG Chem (Daejeon) LG Elec (Daejeon) POSCO ICT (Pohang) LG Chem (Kyungsan) LS Elec (Gimchun) LS Elec (Yechun) Samsung SDI (Ulsan)

LG Chem (Gunsan) PLASPO (Gochang) Samsung SDI (Gochang) LG Chem (Gochang) LG Elec (Gochang)

LG CNS (Uiryeong)

Samsung SDI (Hwasoon)

LG Chem (Yeosu) LS IS (Yeosu)

Kokam (On the vessel) BOTARI Energy (Biyang-Do)

www.acecontainer.com

17


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Project Reference ESS Project In Korea Customer

Location

LG Elec

Daejeon

POSCO ICT

Pohang

LG Chem

PCS Total Capacity (MW)

Battery Total Capacity (MWh)

2014.03.21

2

1

1

2014.05.31

1

0.5

1

2014.07.26

Container Size

Q'ty PCS

Power Conversion & Battery Energy Storage System

40FT HC

1

1

Power Conversion & Battery Energy Storage System

20FT HC

1 1

System Type

Q'ty Q'ty Date of Operation BCS Combi (Incl. Test)

PCS

Daejeon

Power Conversion & Battery Energy Storage System

3.000m x 3.960m x 6.058m

BCS

3.000m x 3.960m x 12.192m

LG CNS

Yongin

Power Conversion System

40FT HC

2

2015.12.16

LG Chem

Seo-Ansung

Battery Energy Storage System

40FT HC

4

2014.12.16

LS IS

Seo-Ansung

Power Conversion System

40FT HC

3

2014.12.16

12

LG Chem

Yeosu

Battery Energy Storage System

2.438m x 3.200m x 12.192mm

2015.03.02

4

LS IS

Yeosu

Power Conversion System

40FT HC

1

2015.05.21

1

1

H2 & LS IS

Gongju

Power Conversion & Battery Energy Storage System

20FT HC & 20FT

1

2

2015.5.21

1

1

Kokam

Australia

Battery Energy Storage System

40FT HC

1

2015.08.30

0.8

LG Chem

Kyungsan, Uiryeong, Kyeryong

Battery Energy Storage System

40FT HC

18

2015.12.15

79.2

Hwasoon

Battery Energy Storage System

40FT HC

6

2015.12.15

24

Kyeryong

Power Conversion System

40FT HC

6

2015.12.15

24

Uiryeong

Power Conversion System

40FT HC

6

2015.12.15

24

Chungju

Power Conversion System

40FT HC

4

2015.12.15

16

Sungnam

Battery(RFB) Energy

3.000m x 3.200m x 9.125m

Changwon

LVRT 5 MW (Test Container for Windmill)

40FT HC

Ulsan

Battery Energy Storage System

2.626m x 3.100m x 12.192m

Samsung SDI LG Elec LG CNS GS NEOTEC OCI Plaspo Samsung SDI

www.acecontainer.com

18

2

1 1

-

8

0.5

2016.12.10 6

2016.12.10

24


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Energy Storage System Container

ESS Project Reference ESS Project In Korea Customer

Location

System Type

Container Size

Q'ty PCS

PCS Total Capacity (MW)

Battery Total Capacity (MWh)

2017.01.02

0.1

1

2017.03.10

4

Q'ty Q'ty Date of Operation BCS Combi (Incl. Test)

LS IS

Gimpo

Power Conversion & Battery Energy Storage System

2.438m x 2.896m x 9.058m

Plaspo

Seo-gochang

Power Conversion System

40FT HC

LG Chem

Sangju

Battery Energy Storage System

2.626m x 3.100m x 12.192m

1

2017.03.30

2

Samsung SDI

Gohung

Battery Energy Storage System

40FT HC

1

2017.03.31

1

LG Elec

Saejong

Power Conversion & Battery Energy Storage System

2.500m x 3.000m x 9.058m

LG Elec

Gochang

Power Conversion System

40FT HC

Botary Energy

Jeju Island

Power Conversion & Battery Energy Storage System

40FT HC

LG Chem

Gochang

Battery Energy Storage System

2.896m x 2.438m x 12.192m

Kokam

On the Vessel

Power Conversion & Battery Energy Storage System

40F HC

LG Elec

Geochang

Power Conversion & Battery Energy Storage System

2.500m x 3.000m x 9.058m

LG Elec LG Elec LG Chem LG Chem E-TECH E&C LG CNS LG Elec

Gimchun

Power Conversion & Battery Energy Storage System

Yechun

www.acecontainer.com

1 1

1 1 1

2017.05.24

1

2017.05.31

4

The end of 2017

1

1

1

6

2017

1

The end of 2017

1

3

1

2017.12.31

1

1

2.500m x 3.000m x 9.058m

1

2017.12.31

1

1

Power Conversion & Battery Energy Storage System

2.500m x 3.000m x 9.058m

1

2017.12.31

1

1

Gunsan

Battery Energy Storage System

7.040m x 2,450m x 2.896m

6

2017.12.31

18

Gunsan

Battery Energy Storage System

7.040m x 2,450m x 2.896m

2

2017.12.31

6

Cheonahn

Power Conversion & Battery Energy Storage System

12.192m x 3.500m x 3.100m

Ochang

Power Conversion & Battery Energy Storage System

13.000m x 3.500m x 3.500m

Namyangju

Power Conversion & Battery Energy Storage System

7.170m x 2.438m x 2.896m

19

1

1 1

1 1

13.2

2018.01.31

1

1

2018.03.31

1

6.3

2018.04.30

0.15

0.498


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM ESS CONTAINER

Ace Engineering has performed projects for ESS Container BCS

20ft 40ft 45ft 53ft NON-ISO

www.acecontainer.com

20

PCS

20ft 40ft NON-ISO

PCS + BCS 30ft 40ft NON-ISO


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) BCS Type & Contents

: 20ft, 40ft, 45ft, 53ft NON-ISO ∙ DC Panel ∙ Battery Rack ∙ Fire Fighting System

Battery Rack

DC Panel

Fire Fighting System

∙ HVAC ∙ AC Panel ∙ AUX. Panel ∙ UPS ∙ Small Power, etc. [BCS _ 20ft ]

HVAC

www.acecontainer.com

BCS _ 45ft ]

AC Panel

AUX. Panel

21

UPS

Small Power, etc.


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : General Electric Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

U.S.A End Client : General Electric(GE) Battery Supplier : Samsung SDI Battery Energy Storage System UPS, Battery, BCP, HVAC System, Fire Fighting System, Server Rack, etc. 2.438m x 2.896m x 12.192m (40ft HC) 12 tons

Products

[ Exterior ]

www.acecontainer.com

22


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Tokunoshima PV ESS Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Tokunoshima, Japan End Client : EDISON POWER Battery Supplier : Samsung SDI Battery Conditioning System UPS, Battery, BCP, HVAC System, Fire Fighting System, etc. 2.438m x 2.896m x 6.096m (20ft HC) 8 tons

Products

[ Exterior ]

www.acecontainer.com

23

[ Interior ]


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Trans Grid Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Australia End Client : Trans Grid Battery Supplier : Kokam Battery Storage System Battery Rack, BMS Panel, DC Control panel, Auto Fire Extinguisher, Air-conditioner, etc. 2.438m x 2.896m x 12.192m 16 tons

Products

[ Exterior ]

www.acecontainer.com

24

[ Interior ]


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Trans Grid Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Australia End Client : Trans Grid Battery Supplier : Kokam Battery Storage System Battery Rack, BMS Panel, DC Control panel, Auto Fire Extinguisher, Air-conditioner, etc. 2.438m x 2.896m x 12.192m (40ft HC) 16 tons

Products

[ Interior ]

www.acecontainer.com

25


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Clinton Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Clinton, U.S.A End Client : Renewable Energy System(RES) Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 13,716m (45ft HC) 12 tons

Products

[ Interior ]

www.acecontainer.com

26


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Electric Power Research Institute Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

KY, U.S.A End Client : EPRI Battery Supplier : LG Chem Battery Conditioning System Battery, BCP, HVAC System, Fire Fighting, etc. 3.048m x 2.896m x 6,058m 20 tons (Incl. Battery)

Products

[ Exterior ]

www.acecontainer.com

27

[ Interior ]


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Chitose PV ESS Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Chitose, Japan End Client : Korea Electric Power Corporation Japan Branch Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 12 tons

Products

[ Interior ]

www.acecontainer.com

28


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Siemens Galapagos Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Galapagos, Ecuador End Client : Siemens AG Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, HVAC System, etc. 2.438m x 2.896m x 6.058m (20ft HC) 7 tons

Products

[ Exterior ]

www.acecontainer.com

29

[ Interior ]


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS)

Project : Hidaka PV ESS Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

www.acecontainer.com

Project : Obihiro PV ESS Project

Hidaka, Japan End Client : Smart Solar Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, Air-conditions, Fire Fighting, etc.

Location

Customer Type Main Equipment Size (W x H x L) Total Weight

2.438m x 2.896m x 12.192m (40ft HC) 12 tons

30

Obihiro, Japan End Client : Japan Asia Investment Co Ltd Battery Supplier : Samsung SDI Battery Energy Storage System Battery, BCP, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 12 tons


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS)

Project : Xian Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

www.acecontainer.com

Project : Redox Flow Battery Container Project

Xi’an, China End Client : Samsung SDI local Subsidiary Battery Supplier : Samsung SDI Battery Conditioning System Battery, BCP, HVAC System, Fire Fighting System, Server Rack, etc.

Location

Customer Type Main Equipment Size (W x H x L) Total Weight

2.438m x 2.896m x 12.192m (40ft HC) 13.5 tons

31

Japan End Client : SUMITOMO Battery Supplier : SUMITOMO Battery Energy Storage System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc.

2.438m x 2.896m x 12,192m (40ft HC) 13.5 tons


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : KEPCO FR Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Ansung, Korea End Client : Korea Electric Power Corporation Battery Supplier : LG Chem Battery Energy Storage System Battery rack, AC & DC Panel, HVAC System, UPS, Fire Fighting etc. 2.438m x 2.896m x 12.192m (40ft HC) 13 tons

Products Passage Way

Panel for UPS

Lighting & ACIU

[ Interior ]

www.acecontainer.com

32


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Redox Flow Demonstrate Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Gong-ju, Korea End Client : Korea Electric Power Corporation Battery Supplier : H2 Power Conversion & Battery Energy Storage System (500kWh) Battery, BMS, etc. / PCS, Transformer, HVAC System, etc. 2.438m x 2.591m x 6.058m (20ft) 4.3 tons

Products

[ Exterior ]

www.acecontainer.com

33

[ Interior ]


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Redox Flow Demonstrate Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Sungnam, Korea End Client : OCI Battery Supplier : OCI VRFB System – Development of BOP & FBCU optimization technology

Battery Energy Storage System (Redox Flow Battery) Battery, Contactor panel, Control panel, Inverter Panel, Utility, Outlet fan, etc. 3.000m x 3.200m x 9.125m 19.3 tons

Products

[ Interior ]

www.acecontainer.com

34


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : KEPCO Research Institute Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Gochang, Korea End Client : Korea Electric Power Corporation Battery Supplier : Samsung SDI Battery Energy Storage System Battery Rack, DC & AC Panel, HVAC System, Fire Fighting, etc.

2.438m x 2.896m x 12.192m (40ft HC) 18 tons

Products

[ Interior ]

www.acecontainer.com

35


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Distribution ESS Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Sangju, Korea End Client : Korea Electric Power Corporation Battery Supplier : LG Chem Battery Energy Storage System Battery Rack, DC & AC Panel, HVAC System, Fire Fighting, etc. 2.626m x 3.100m x 12.192m 18 tons

Products

[ Exterior ]

www.acecontainer.com

36


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : RES UK PJT (Port of Tyne, Tynemouth, Broxburn) Location Customer Type Main Equipment Size (W x H x L) Total Weight

PoT, Tynemouth, Broxburn U.K. End Client : Renewable Energy System(RES) Battery Supplier : Samsung SDI Battery Control System Container Battery Rack, DC & AC Panel, HVAC System, Fire Fighting, etc. 2.896m x 2.438m x 13.716m 20 tons

Products

[ Interior ]

www.acecontainer.com

37


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS)

Project : KEPCO FR Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

www.acecontainer.com

Project : KEPCO FR Project

Kyungsan, Uiryeong, Kyeryong, Korea End Client : Korea Electric Power Corporation Battery Supplier : LG Chem Battery Energy Storage System Battery Rack, AC/DC Panel, HVAC System, Fire Fighting, etc.

Location

Customer Type Main Equipment Size (W x H x L) Total Weight

2.438m x 2.896m x 12.192m (40ft HC) 16 tons

38

Hwasoon, Korea End Client : Korea Electric Power Corporation Battery Supplier : Samsung SDI Battery Energy Storage System Battery Rack, BCP Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 16 tons


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Southern Power Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

California, U.S.A End Client : Renewable Energy System(RES) Battery Supplier : Samsung SDI Battery Energy Storage System HVAC System, Fire Fighting, Test Equipment, etc. 2.438m x 2.896m x 16.154m (53ft HC) 16 tons

Products

[ Exterior ]

www.acecontainer.com

39

[ Interior ]


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS) Project : Battery Outdoor Unit Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Gunsan, Ansan, Korea End Client : Hanwha, GS Enertec Battery Supplier : LG Chem Battery Control System Container Battery, DC Panel, PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc. 2.450m x 2.896m x 7.040m 10 tons

Products

[ Exterior ]

www.acecontainer.com

40

[ Interior ]


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS)

Project : KEPCO FR Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

www.acecontainer.com

Project : FLUENCE Ballarat Project

Ulsan, Korea End Client : Korea Electric Power Corporation Battery Supplier : Samsung SDI Battery Energy Storage System Battery Rack, AC/DC Panel, HVAC System, Fire Fighting, etc.

Location

Customer Type Main Equipment Size (W x H x L) Total Weight

2.626m x 3.100m x 12.192m 18 tons

41

Victoria, Australia End Client : AUSNET Battery Supplier : LG Chem Battery Energy Storage System Battery Rack, AC/DC Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 13.716m 18 tons


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ Battery Control System(BCS)

Project : Korea Electric Power Research Institute Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

www.acecontainer.com

Seo-Gochang, Korea End Client : Korea Electric Power Research Institute Battery Supplier : LG Chem Battery Energy Storage System HVAC System, Fire Fighting, etc. 2.896m x 2.438m x 12.192m (40ft HC) 18 tons

42


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM _ ESS CONTAINER

Energy Storage System _ Power Conversion System(PCS) PCS Type & Contents

: 20ft, 40ft NON-ISO ∙ PCS ∙ Transformer ∙ Fire Fighting System ∙ HVAC ∙ AC Panel ∙ UPS ∙ Small Power, etc.

Fire Fighting System

PCS

[ PCS _ 20ft ]

HVAC

www.acecontainer.com

AC Panel

UPS

43

Small Power, etc.

Transformer


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

Energy Storage System _ Power Conversion System(PCS) Project : KEPCO FR Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Yongin, Korea End Client : Korea Electric Power Corporation PCS Supplier : LG CNS Power Conversion System PCS, AC Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 23.5 tons

Products Smoke Detector

Thermo-hygrostat

Lighting

AC Panel & PCS

[ Interior ]

www.acecontainer.com

44


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

Energy Storage System _ Power Conversion System(PCS) Project : KEPCO RF Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Ansung, Korea End Client : Korea Electric Power Corporation PCS Supplier : LS IS Power Conversion System PCS, UPS, Battery, PLC, PDB, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 20 tons

Products

[ Interior ]

www.acecontainer.com

45


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

Energy Storage System _ Power Conversion System(PCS)

Project : KEPCO FR Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

www.acecontainer.com

Project : KEPCO FR Project

Kyeryong, Korea End Client : Korea Electric Power Corporation PCS Supplier : LG Elec Power Conversion System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc.

Location

Customer Type Main Equipment Size (W x H x L) Total Weight

2.438m x 2.896m x 12.192m (40ft HC) 20 tons

46

Uiryeng, Korea End Client : Korea Electric Power Corporation PCS Supplier : LG CNS Power Conditioning System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft HC) 18 tons


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

Energy Storage System _ Power Conversion System(PCS)

Project : KEPCO FR Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

www.acecontainer.com

Project : KEPCO Energy Institute Project

Chungju, Korea End Client : Korea Electric Power Corporation PCS Supplier : LS IS Power Conversion System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc.

Location

Customer Type Main Equipment Size (W x H x L) Total Weight

2.438m x 2.896m x 12.192m (40ft HC) 18 tons

47

Seo-Gochang, Korea End Clinent : Korea Institute of Energy Technology Evaluation and Planning PCS Supplier : PLASPO Power Conversion System PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40ft) 18 tons


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

Energy Storage System _ Power Conversion System(PCS)

Project : LVRT 5 MW Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

www.acecontainer.com

Project : KEPCO Energy Institute Project

Changwon, Korea End Client : Korea Electrotechnology Research Institute (KERI) PCS Supplier : PLASPO LVRT 5MW Test Container HVAC System, Fire Fighting, Test Equipment, etc.

Location

Customer Type Main Equipment Size (W x H x L) Total Weight

2.438m x 2.896m x 12.192m (40ft HC) 16 tons

48

Seo Gochang Korea End Client : Korea Electric Power Corporation PCS Supplier : LG Elec Power Conversion System PCS, HVAC System, Fire Fighting, etc. 2.896m x 2.438m x 12.192m (40ft HC) 18 tons


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS+PCS PCS+BCS Type & Contents

: 30ft, 40ft NON-ISO ∙ PCS

PCS

· Transformer

Fire Fighting System

UPS

Battery Rack

∙ Battery Rack · Fire Fighting System · HAVC ∙ AC Panel ∙ DC Panel · UPS · Small Power. etc [ PCS+BCS _ 40ft ]

AC Panel

www.acecontainer.com

Transformer

HVAC

49

DC Panel

Small Power, etc.


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS+PCS Project : POSCO ICT (Canada) Location

Customer Type Main Equipment Size (W x H x L) Total Weight

www.acecontainer.com

50

Canada End Client : Power stream Battery Supplier : Samsung SDI PCS Supplier : Destin Power Power Conversion System & Battery Energy Storage System (500 MWh) Battery, DC Panel, PCS, HVAC System, AC Panel, UPS, Fire Fighting, etc. 2.438m x 2.896m x 6,058m (20ft HC) BCS : 8 tons / PCS : 10 tons


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS+PCS Project : Smart Grid Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Daejeon, Korea End Client : LG Elec Battery Supplier : LG Chem PCS Supplier : LG Elec Power Conversion & Battery Energy Storage System Battery Rack Installation, FFS - NAF-3, PCS, ATS, HVAC System, etc. 2.438m x 2.896m x 12.192m BCS : 20 tons / PCS : 10 tons

Products DC Panel

Battery Rack

Smoke Detector

ACU in PCS Room

F&G System

Outlet Damper

[ Interior ]

www.acecontainer.com

51


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS+PCS Project : Peak-cut Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Pohang, Korea End Client : POSCO & POSCO ICT Battery Supplier : LG Chem PCS Supplier : POSCO ICT Power Conversion & Battery Energy Storage System PMU, Transformer, Switchgear, PCU, Incoming Panel, Fire fighting System, etc. 2.438m x 2.896m x 6.058m (20ft HC) BCS : 7.7 tons / PCS : 11.3 tons

Products Door

Passage way

Incoming Panel

Transformer

BCU Panel

Air Inlet Damper

[ Interior ]

www.acecontainer.com

52


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS+PCS Project : Yangjisa Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Gimpo, Korea End Client : Yangjisa Battery Supplier : Samsung SDI PCS Supplier : LS IS Power Conversion & Battery Energy Storage System PCS, Battery Rack, Fire Fighting System, AC/DC Panel, HVAC System, etc. 2.438m x 2.896m x 9.058m (30ft HC) BCS : 15 tons / PCS : 15 tons

Products

[ Interior ]

www.acecontainer.com

53


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS+PCS Project : Battery Research Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Daejeon, Korea End Client : LG Chem Battery Supplier : LG Chem Power Conversion & Battery Energy Storage System PCS, Control PC, Battery Rack, Fire Fighting System, AC/DC Panel, HVAC System, etc. BCS - 3.000m x 3.960m x 12.192m PCS - 3.000m x 3.960m x 6.058m BCS : 18.0 tons / PCS : 11.0 tons

Products AC Panel

Thermometer & Actuator

[ Interior ]

www.acecontainer.com

54

Lighting


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS+PCS Project : Korea Power Exchange Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Yeosu, Korea End Client : Korea Power Exchange Battery Supplier : LG Chem PCS Supplier : LS IS Power Conversion System PCS, AC Panel, HVAC System, Fire Fighting System, etc. BCS : 2.438m x 3.200m x 12.192m PCS : 2.438m x 2.896m x 12.192m (40ft HC) BCS : 10 tons / PCS : 13 tons

Products Passage way

DC Panel

Battery Rack

F&G System

[ Interior ]

www.acecontainer.com

55


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS+PCS Project : LG Electric ESS Location

Customer Type

Products

Main Equipment Size (W x H x L) Total Weight

Saejongsi, Geochang, Gimchun, Yechun, Korea

End Client : Korea Electric Power Corporation Battery Supplier : LG Chem PCS Supplier : LG Elec Power Conversion & Battery Energy Storage System PCS, Battery Rack, BCP Panel, HVAC System, Fire Fighting, etc. 2.500m x 3.000m x 9.058m 18 tons

[ Interior ]

www.acecontainer.com

56


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS + PCS Project : Chesapeake PJT Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Chesapeake College, KY End Client : Chesapeake College Battery Supplier : Samsung SDI PCS Supplier : LS IS Battery Energy Storage System PCS, Transformer, Battery Rack, DC & AC Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 6.058m (20ft HC) BCS : 8 tons / PCS : 11 tons

Products

[ Interior ]

www.acecontainer.com

57


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS + PCS Project : Biyangdo Micro Grid Project Location

Customer Type Main Equipment Size (W x H x L) Total Weight

Biyangdo, Jeju-Island, Korea End Client : Botari Energy Battery Supplier : Samsung SDI PCS Supplier : Destin Power Power Conversion & Battery Energy Storage System PCS, Battery Rack, BCP Panel, HVAC System, Fire Fighting, etc. 2.438m x 2.896m x 12.192m (40FT HC) 16 tons

Products

[ Interior ]

www.acecontainer.com

58


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

ENERGY STORAGE SYSTEM

ESS Container _ BCS+PCS

Project : ESS Project for Ship Thruster Location

Customer Type Size (W x H x L) Total Weight

www.acecontainer.com

Container Vessel End Clinent : Hyundai Merchant Marine Battery Supplier : Kokam PCS Supplier : Dawonsys Battery Control System & Power Conversion System 2.896m x 2.438m x 12.192m 16 tons

59


| WHAT WE MANUFACTURE

To build a lifelong mutualistic partnership Ace Engineering & Co.,Ltd.

Based on our firm motto to satisfy customers’ needs we are dealing with diverse valuable customers

Motto

Vision

To be a good PARTNER !!

Connecting the world through CONTAINER innovation

www.acecontainer.com

60


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.