Catalogue_2023-24_EN

Page 55

Compared to the list price of the single components

“5 years without breakage” “5 years without breakage”, it is the solution studied by our experts to allow the misting modules to work continuously and without interruptions, guaranteeing maximum performance

ZX.F70X33-5Y

Misting system complete with: Fog 70 Extra + water inlet kit + manifold 4 outlet + Humidity probe and temperature e Water hardness analysis kit Fog 70 Extra 33l/min

1

20” water inlet kit + sterilizer UV and pressure stabilizer

1

Water hardness analysis kit

1

Manifold 4 outlet kit with ball valves

1

Humidity probe Fog Extra

OPTIONAL

NEW SMART LINE 440 NOZZLES + smart coupling + tip + discharge valve + pipes BROCHURE Temperature probe Fog Extra

OPTIONAL

Polyamide pipe -ø9,6x5mm, 1m

152

Nozzle holder coupling smart + tip ot ø9,6 + nozzle 020

150

End of line kit with automatic discharge valve

1

Smart end line nozzle holder quick fitting, ø9,6

1

White rubber lined stainless steel clamp, for ø9,6x5mm pipe fixing

300

Tube cutter, for polyamide pipe

1

link

5 years maintenance kit calculated on 1000 working hours per year pump and machine Preventive maintenance 750 hours pump ts 26-33l

3

Preventive maintenance 1500 hrs pump ts 26-33l

2

Preventive maintenance e - Fog 70 Extra 750 hours

3

Preventive maintenance h - Fog 70 Extra 1500 hours

2

Nozzle replacement set 3000 hours

1

Advantages, are avoided: • no unexpected breakage • no machine downtime • no performance drop

Copyright© Idrobase Group. All rights reserved.

• no components wear • no economical damage

53


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Catalogue_2023-24_EN by Idrobase Group - Issuu