Carpe Diem Engine Removal and Rebuild Jan-Mar 2024
Dry Weight 32,000kg
Direct Drive
LOA 17m
Beam 4.8m
Min Draft 1.7m
Built at prestigious Joyce Yard.
Carpe Diem was surveyed on 7th October 2023 with no material defects noted.
Crew moved the vessel from Crinan Basin to Ardfern Marina (7nm) and reported smoke / engine overheating.
At Ardfern the water pump was found to be unserviceable and a new water pump and impeller installed.
01Van de Stadt 16.5 - Steel Cutter - Carpe Diem
Ford Lehman 1997
6.2L naturally aspirated
6 cylinder - Parent/Native 107mm/4.221 inch -bore
115mm stroke
136 hp
Crank Mains 76,20
Block Mains 80,44
Crank Pins 66,68
RPM 1250-2700 - 26l/ph at max revs.
Fuel Sys AA
Twin Disk MG-502
Gear Ratio 3.1ins, 32” prop, 2” ss shaft, 6-12 knots
380 cubic inch displacement
Raw water pump removed, gaskets replaced and unit refurbished.
All sections of the impeller within the raw water pump.
01Impeller & Raw Waterpump
New brass threaded hose attachments and impeller.
02Engine Overheat - Second Trip
Second Trip
After the water pump repair we checked the engine was drawing water as part of routine start up.
We moved about 4nm travelling at 7knots / 1,200 RPM when the engine began to lose power, smoke and steam.
An emergency tow back to Ardfern Marina by RIB (rather than calling the RNLI).
Saloon seating removed
Companion way stairs removed
03Engine Removal
Repainted engine bay and room
03Engine Removal
Welded Hoist Frame
Weighing in at 467kg, the engine required a hoist to be welded and the removal of the cabinetry in the saloon and companion ways (beech and holy/oak sole).
The engine well contained about 100L of oil/water/coolant/hydraulic fluid and transmission fluid which had to be drained.
The oil drained from the engine was tested to ensure no metallic residues.
Engine subassemblies removed.
Once dry, the engine bay was degreased, steam cleaned, primed and repainted in red oxide and metal white paint.
Engine Fault Identification
Head Gasket
3/6 Cylinders
Excessive carbon
Seized piston
Fractured heat exchanger
04
Connecting rod and Crankshaft refurb
05Engine Rebuild
Valves and rockers stripped big end and camshaft bearing replaced.
Engine Rebuild
Cylinder Head Covers Removed.
Rocker Gear and Injectors removed
Injector replaced
Pushrods removed
Pistons and connecting rods removed
Cylinder liners removed
Crankshaft rotated for degrease and grinding
Bottom and crankcase removed
Main bearing and camshaft replaced
05
05 Engine
Rebuild
New heat exchanger, injectors and fuel nozzles.
Primed and repainted in Ford New Holland Blue
Prices March 2024
Guarantee 8,000 hours
01Van de Stadt 16.5 - Steel Cutter - Carpe Diem Raw water pump replacement 0.5 Lift out2.2 Emergency Tow0.4 Engine Removal6.2 Engine Rebuild6.4 Engine Courier Fees0.6 Engine Reinstall4.3 Cabinet Work1.2 £21.8k €/$27.6k