I-HSUAN LEE
Kontakt
Mail
remiiilee(at)gmail.com Mobil +49 152 5451 5297 Adresse Langenfelder Damm 12, 20257, HH Staatsangehörigkeit Taiwan
Publizierte Arbeiten
space of conflict, datapolis nai010 publishers erasmus, living stations BK BOOKS - Delft University of Technology
2
APR. 15. 1994 geboren in Taipeh
SEP. 2012 - JUN. 2013 National Taiwan Normal University | Taipeh - Graphic Arts Communication (nicht abgeschlossen)
OKT. 2014 - FEB. 2018 HafenCity Universität | Hamburg - B.A. Architektur
SEP. 2019 - JUL. 2021 Delft University of Technology | Delft - M.Sc. Architecture
BERUFLICHE ERFAHRUNGEN
NOV. 2016 - MAY. 2018 tun-architektur | Hamburg Werkstudentin - Gymnasium Corveystrasse, LPH 5 - Grundschule Alsterdorfstrasse, LPH 1 - Wettbewerbe: Jenfelder Au, Butterberg, Hedendorf, Wohnungen
AUG. 2017 - SEP. 2017 Edward Suzuki Associates | Tokio Praktikum - Kuo Housing, Modell - GAMO studio, Perspektiven - Wettbewerbe TSUTAYA book store T-Site Hills, Perspektiven
DEC. 2018 - JUL. 2019 BURG Architects & Associates | Taipeh Architektin - Taoyuan City Hall, Ausführungsplanung
SEP. 2021 - APB. Architekten und Stadtplaner | Hamburg Angestellterin
- Gaussstrasse, LPH 5 - Winterhude Hoefe, LPH 3&5
KOMPETENZEN & SPRACHEN
3 STUDIUM
auch auf Deutsch ArchiCAD auch auf Deutsch
auch auf Deutsch
CC Illustrator Photoshop Indesign After Effect Audition Premiere Pro Mandarin Chinesisch Muttersprache Deutsch Verhandlungssicher Englisch Verhandlungssicher
AutoCAD
Rhiniceros SketchUp
Adobe
Still artist
On-Stage artist
Passing-by audiences
On-Stage artist
On-Stage artist
On-Stage artist
On-Stage
On-Stage
4
Exploring audiences
Passing-by audiences Artist Still artist Open environment Still audiences Still audiences Closed environment
Passing-by audiences Passing-by audiences Exploring audiences Still audiences artists and audiences acting to each other On-Stage artist Exploring audiences Still artist Passing-by audiences Artist Still artist Open environment Still audiences Still audiences Closed environment On-Stage artist Passing-by audiences
Still
Still
artist Passing-by audiences Passing-by audiences Still artist Exploring audiences Acting artist Still audiences Still artist Acting audiences and audiences acting to each other On-Stage artist Exploring audiences Still artist Passing-by audiences Still artist environment
audiences
audiences Closed environment On-Stage artist Passing-by audiences On-Stage artist
On-Stage artist Passing-by audiences Passing-by audiences Still artist Exploring audiences Acting artist Still audiences Still artist Acting audiences artists and audiences acting to each other On-Stage artist Exploring audiences Still artist Passing-by audiences Artist Still artist Open environment Still audiences Still audiences Closed environment On-Stage artist Passing-by audiences On-Stage artist
Open
Still
Still
On-Stage artist Passing-by audiences Passing-by audiences Still artist Exploring audiences Acting artist Still audiences Still artist Acting audiences artists and audiences acting to each other On-Stage artist Exploring audiences Still artist Passing-by audiences Artist Still artist
environment
audiences
audiences Closed environment
artist Passing-by audiences On-Stage artist On-Stage artist Passing-by audiences Passing-by audiences Still artist Exploring audiences Acting artist Still audiences Still artist Acting audiences artists and audiences acting to each other On-Stage artist
12 PROBLEMS AND SOLUTION 12 PROBLEMS AND SOLUTION 12 13 PROBLEMS AND SOLUTION ENSEMBLE Ein Museum für Performance Art S. 6 SPACE OF CONFLICT Digitale auswirkungen auf den Menschen S. 20 LIVING STATION Überführung & Verkehrsknotenpunkt S. 28
Exploring audiences Still artist Passing-by audiences Artist Open environment Still audiences On-Stage artist Passing-by audiences
TRANSPIXEL
Moire Effect im Hafen S. 40
APPENDIX
Zeugnisse & Berufliche Projekte S. 46
5 INHALT
Ein Museum für Performance Art Rotterdam, NL
Studentisches Projekt TU Delft, chair of public building Einzelarbeit
6
VALUE 1 : DIRECT ENTRANCE - KATENDRECHT
VALUE 3 : WIDER VIEW
VALUE 4 : CLOSENESS TO WATERFRONT
VALUE 2 : DIRECT ENTRANCE - TARWEWIJK
Wenn ein Museum nicht nur ein Gebäude ist
Was passiert wenn ein Museum als Kontext, statt als ein wortwörtliches ‘Museumsgebäude‘ existiert?
In der Performance Kunst difinieren die Künstler den Raum, in dem sie ihre Idee umsetzen. Daher sollte das Museum ‘undifinierte Räume‘, statt Austellungsräume mit eingegebene Programme anbieten.
Das Museum bietet nicht nur ein Raum, sondern auch urbane plätze, die Zwischenräume sollte daher auch er neut in Betracht gezogen werden.
Urban EnsembleEine eigene Geste Definieren
Um das Grunstück mit Kunst zu verbinden und dadurch die Möglichkeit von spontanen Begegnungen zu schaff en, wird das Museum für Performance Art als Urban En semble geplannt.
Mit einem nicht-hierarchischen Netzwerk, werden die unterschiedliche Pavilions verbunden. Diese Route wird die Besucher durch den Hafen geführt, während sie ihre eigene Geste gleichzeitig definieren.
FREE-WILL GUIDANCE
8 KONZEPT
STARTING POINTS URBAN ENTRANCES OUT IN
Wer hat gesagt Raster sind zum folgen da?
Wenn Performance Art darum geht, dass die Künstler die Kunst durch ihre Körper schaffen, wie kann ein Museum für Performance Art die Seele davon zeigen?
Durch die Planung der Umgebung des Museums, ist es Straßenpflaster in einem Muster zu legen. Dieses Muster wird durch die Organisationen der Pavilions gebrochen. Auch die Besucher bewegen sich nicht entlang des Rasters.
let human behaviour break the boundary with the organisation of architecture - create the uncertainty of human movements, make the uncertainty become performance
9 URBAN & LANDSCHAFT
Pelican, Robert Rauschenberg, 1963
Cut Pieces, Yoko Ono, 1965
Ideen werden Bewegungen, Bewegungen formen die Räume.
Da der Fokus von Performance Art die Körperlichkeit ist, habe ich die Bewegung als architektonische Sprache für den Entwurf gewählt.
Hierzu gibt es eine Theorie von dem Architekten Bernard Tschumi: “There is no architecture without movement.“
STAGE 4 - LAYERED HIGH SPACE, 60qm
How To Explain Paintings to a Dead Hare, Joseph Beuys, 1965
ENTWURFSSPRACHE
Pieces, Yoko Ono, 1965 How To Explain Paintings to a Dead
Joseph
1965 Cut Pieces, Yoko Ono, 1965 How To Explain Paintings to a Dead Hare, Joseph Beuys, 1965 Inside Exit Entrance
Cut
Hare,
Beuys,
Entrance Exit Inside STAGE 3: centered surrounded 340 qm STORY 1:100 STAGE 10 - CENTERED SURROUNDED SPACE, 340qm
STAGE 4: display window 50 qm
Antropometries, Yves Klein, 1960
Pelican, Robert Rauschenberg, 1963 Antropometries, Yves Klein, 1960
Exit Inside 5.00 section b-b' section a-a' 1:100
6 - HUGE
75qm STORY :
Cut Pieces, Yoko Ono, 1965 How To Explain Paintings to a Dead Hare, Joseph Beuys, 1965Entrance Inside STAGE 2: huge floor 680 qm STAGE 1: huge surface of wall 75 qm Entrance
STAGE
WALL SURFACE,
Motoi,
Motoi,
Wall, Chiharu
Cut Papers, Abe Sachiko, 2010 Yamamoto
Artist is Present, Marina Abramovic, 2010 Wall, Chiharu Cut Papers, Abe Sachiko, 2010 Yamamoto
Artist is Present, Marina Abramovic, 2010
Entrance Exit Inside
section a-a' section b-b' a
STAGE 9: layered high space 50 qm 5.40
a
NORTH STAGE 2 huge floor surface STAGE 3 display window STAGE 6 center surrounded STAGE 9 high layered space café sk8 graphic exit exit exit exit exit dining STAGE 1 atrium STAGE 4 divided space STAGE 5 corner STAGE 7 pure white box STAGE 8 huge wall surface STAGE 10 semi-outdoor maze
SURROUNDED SPACE HIGH LAYERED SPACE
1:100 STORY :
CENTER
HUGE WALL SURFACE
11 KONTRAST IN-AND OUT
PHYSIKALISCHER ZUSAMMENHANG
artists and audiences acting to each other
Exploring audiences Still artist Passing-by audiences
Still artist Acting audiences
On-Stage artist Passing-by audiences
Exploring audiences
On-Stage artist
Artist
Exploring audiences
Artist
Still artist Exploring audiences
Still artist Open environment
Acting artist Still audiences
Still audiences Still audiences
Closed
Still artist
On-Stage artist
Passing-by audiences
Passing-by audiences
On-Stage artist Passing-by audiences
Still audiences
Still artist Open environment
Closed environment
Still audiences
Still artist Acting audiences
Still artist
audiences
Exploring audiences
Still artist
On-Stage artist
PHYSIKALISCHER ZUSAMMENHANG
Acting artist Still audiences
On-Stage artist
Passing-by audiences
Passing-by audiences
Closed environment
Still audiences
Exploring audiences Still artist
PHYSIKALISCHER ZUSAMMENHANG
On-Stage artist
artist Acting audiences
each other audiences
Still artist Exploring audiences
Still artist Acting audiences
Passing-by audiences Artist
Still artist Exploring audiences
Acting artist Still audiences
Passing-by audiences Passing-by
Still artist Open environment
Acting artist Still audiences
Still audiences Still audiences
Closed environment
On-Stage artist
On-Stage artist Passing-by audiences
On-Stage artist
On-Stage artist
On-Stage artist Passing-by audiences
Passing-by audiences Passing-by audiences
Still artist audiences Still audiences
artist audiences
Closed environment
Closed environment
Passing-by audiences
On-Stage artist Passing-by audiences
Still audiences
artists and audiences acting to each other On-Stage artist Exploring audiences Still artist Passing-by audiences Artist Open environment
Exploring audiences
Still artist Acting audiences
Still artist
audiences
Exploring audiences
Acting artist Still audiences
Still artist
On-Stage artist
On-Stage artist
Passing-by audiences
Still artist
Still audiences
On-Stage artist Passing-by
Exploring audiences
Closed environment
On-Stage artist
Acting artist Still audiences
Passing-by audiences
Still artist Acting audiences artists and audiences acting to each other
On-Stage artist
Passing-by audiences
audiences
PHYSIKALISCHER ZUSAMMENHANG
PHYSIKALISCHER ZUSAMMENHANG
Artist
artists and audiences acting to each other
Still artist
On-Stage artist
Still artist Exploring audiences PHYSIKALISCHER ZUSAMMENHANG
Exploring audiences
Still artist
On-Stage artist
Passing-by audiences
Open environment
Still audiences
Still artist
Closed
Still audiences
Passing-by audiences
URBAN ENSEMBLE
Ein theoretsiches Projekt, welches Bereiche zwischen der Architektur zur freien Exploration bietet, damit zeige ich eine Alternative zu Konventioneller Museumsarchitektur.
research projectDigitale Auswirkungen auf den Menschen
Hong Kong, Hong Kong
Studentisches Projekt TU Delft, chair of complex projects Gruppenarbeit mit Robert Bichlmaier, Susanne van de Pol
20
21
Wie ermöglicht die Technologie neue Formen des Protests?
22
Caribbean
Central
Southern
Middle
82
154 120 116 132 105 102 69 102 108 112 58 47
162 53 86 73 109 96 105 97 70 86 36 40 17 99
London
1 2 3 4 6 Atlanta 10 Chicago 13 5 7 8 9 Singapore 11 Abu Dhabi 12 Urumqi 14 Sydney 15 Baghdad 16 Moscow 18 Berlin 19 Warsaw 23 Vienna 24 Istanbul 25 Hong Kong 26 New Delhi 20 Nanchang 21 Changsha 27 Washington, D.C. 28 St.
29 Canberra 30 Islamabad 22 Dubai 17 Number of location for cctv from Department of transportation Number of location for cctv from Department of Hygiene Number of cctv from Department of Culture Protest location 離島 Islands 屯門 Tuen Mun 元朗 Yuen Long 荃灣 Tsuen Wan 中西區 Central and Western 葵青 Kwai Tsing 北區 Northern 油尖旺 Yau Tsim Wong 深水圳 Sham Shui Po 九龍 Kowloon 灣仔 Wan Chai 沙田 Sha Tin 黃大仙 Wong Tai Sin 觀塘 Kwun Tong 東區 Eastern 大埔 Tai Po 南區 Southern 西貢 Sai Kung 72 141 216 166 434 6 17 269 135 892 18 38 269 305 332 241 287 417 363 143 154 13 11 6 14 13 9 9 27 89 13 10 6 36 5 7 8 5 9 20 17 11 7 5 31 21 10 10 21 6 8 11 2 1 WORLD RANKING OF CCTV QUANTITY LOCAL QUANTITY OF CCTV
Eastern Asia Central Asia Eastern Africa Southern Africa
Eastern Europe Northern Europe Northern America
America Western Europe Northern Africa Southern Europe Western Asia Southern Asia Western Africa
America
Africa Southeast Asia 129 62 28 101 111 97 181
91 103 101 69
Oceania 108 100
Chongqing
Shenzhen Shanghai Tianjin Ji'nan Wuhan Guangzhou Beijing
Petersburg
23 Every 1000 people Chongqing, China 168 cctv London, U.K. 68 cctv Hong Kong, 6 cctv OWNER:Mrs. Chen WHITE COLOR A1001 B-16 5 CHECKED Mrs. Chen ID: 3184 Sex: MALE Age: YOUNG GLASSES: NO ADULT MALE SHORT SLEEVE SHORTS WHITE SALOON ADULT MALE SHORT SLEEVE SHORTS ADULT MALE SHORT SLEEVE TROUSERS ADULT FEMALE SHORT SLEEVE TROUSERS ADULT MALE SHORT SLEEVE SHORTS ADULT FEMALE SHORT SLEEVE TROUSERS ADULT FEMALE ADULT FEMALE ADULT FEMALE ADULT FEMALE ADULT FEMALE ADULT MALE ADULT MALE ADULT MALE CCTV Image Targeted Nothing
? CCTV IN HONG KONG
to hide, nothing to fear
24 Eastern Asia Central Asia Eastern Africa Southern Africa Caribbean Eastern Europe Northern Europe Northern America Central America Western Europe Northern Africa Southern Europe Western Asia Southern Asia Western Africa Southern America Middle Africa Southeast Asia Mobile connectivity in % Mobile internet usage in % All percentage based on total population 129 62 28 101 111 97 181 82 91 103 101 69 154 120 116 132 105 102 69 102 108 112 58 47 Oceania 108 100 162 53 86 73 109 96 105 97 70 86 36 40 17 99 SUBMARINE CABLE IN ASIA PACIFIC INTERNET CONNECTION VS OTHER CONNECTION
25 Telegram Ownership Location Information System Communicating Application in the protest Bridgefy Airdrop Twitter HKmap.live LIHKG Matters United States Instant Messaging Bluetooth InterPlanetary File System Web Forum GIS Street Map Hong Kong Taiwan United Arab Emirates Bridgefy Bridgefy Bridgefy Bridgefy Bridgefy Functions via bluetooth Old Bluetooth connection New Bluetooth connection since 2017 Bluetooth Mesh Network iOS - Android connections Offline location sharing Unlimited mesh network hops 100m >100m >100m 100m 100m 100m 200m APPS ANALYSIS APP WITH BLUETOOTH MESH NETWORK
Überführung & Verkehrsknotenpunkt Rotterdam, NL
Studentisches Projekt TU Delft, chair of complex projects Gruppenarbeit mit Sofia Pavlova, Coen Jager, Birte Zacharias
28
VISION
LAGEPLAN
4 Inseln werden von der Hauptstrasse abgeschnitten.
Die Stadt wird mit der U-Bahn Station und dem Verdichtungsplan verbunden.
Durch das potentielle Verkehrsaufkommen wird die Station ein wichtiger Knotenpunkt für den Stadtverkehr.
32 12 PROBLEMS AND
13 PROBLEME & LÖSUNGEN
SOLUTION
vehicles: light in the
the
CONCEPT
Connection of various vehicles: mobility hub
Verbindung der unterschiedlichen Verkehrsmittel - Mobility hub
1. connection of various vehicles:
Connection of the existing zones
2. penetration of natural light in the
Anbindung der existierenden Zonen
1. connection of various vehicles:
Connection of the existing zones Penetration of natural light in the station
2. penetration of natural light in the
Penetration of natural light in the station
Sonnenlicht in der Station
33
15
14
VERKEHRSKONZEPT
TFF
ISOMETRIE
-24m TFF -12m TFF -6m PEDESTRIAN
LEVEL 0. BRIDGE LEVEL -1. INTERCONNECTION LEVEL -2. CONCOURSE LEVEL -3. -24m PLATFORM -12m -6m PEDESTRIAN LEVEL ERKLÄRUNG
Strategie zum Verkehr
Das obere Diagramm zeigt die potentielle Route der Passagiere, sobald sie im Concourse ankommen. Verschiedene Wege werden zur Verfügung gestellt.
Das Konzept des Concurse richtet sich nach dem Bedarf der Passagiere. So könnte die erste Frage die Passagiere sich stellen sein -„muss ich ein Ticket kaufen“
Crowd Control
Aufgrund der zukünftigen Bevölkerung und dem Verdich tungsplan Rotterdams, sollte die Station Passagiere zur Hauptverkehrszeit umleiten.
Das untere Diagramm zeigt, wie durch eine Eingriff in den Laufweg, eine zu Dichte Menschenmenge verhindert werden kann.
CONCOURSE ENTWURF
CONCOURSE ENTWURF
Moire Effect im Hafen Hamburg, Germany
Studentisches Projekt HafenCity University Hamburg Gruppenarbeit mit Frederick Mohr
40
Hafen Impression
Um die geheimnisvolle Atmosphäre in der rauen Umgebung entlang der Süd-Elbe aufzugreifen, haben wir uns entschieden, die Fassade mit einem „moire Effekt“ zu entwerfen.
Die Fassade schafft unterschiedliche Eindrücke, je nach Perspektive und wertet den Eindruck des Hafens auf.
FASSADE DETAIL
FASSADENSCHNITT
APPENDIX
Berufliche Projekte & Zeugnisse
46
47
48 Änderung APB. Schneider Andresen Gez Format Maßstab Winterhuder Höfe Winterhuder Weg 62 68 22085 Hamburg Darstellung Architekten Bauherr Architekten und Stadplaner TGA Planung Tragwerksplanung Leitdetail FA Büro Stahlbalkon Leistungsphase LP 3 mei/jha Baunull:. ±0 00 = 5 70m über NHN im Höhensystem Höhen im Lageplan sind Höhen über NHN N B 1 ARC FA XX 004 3 Stat Baufeld Lph Planart Gewerk Inhalt GRAND IMMOBILIEN GmbH & Co KG KFP Ingenieure GmbH Steckelhörn 5 20457 Hamburg Tel: 040 3696800 info@hkp ingenieure de HKP Ingenieure GmbH Stahltwiete 21 22761 Hamburg Tel 49 40 5247726 0 info@kfp ingenieure de www kfp ingenieure de Bl schni B 1 ARC FA XX 004 3 Index Stat Baufeld Lph Planart Gewerk Inhalt f 01 Bl schni TP HÖHENHINWEIS HÖHENHINWEIS SCHNITT Fertig BAUSTOFFE PLANZEICHEN UNTERKANTE VORDERKANTE LICHTE HÖHE LICHTE ROHHÖHE OKFB bis UKRD IM MITTEL FUSSBODEN BRÜSTUNG UNTERZUG ÜBERZUG FERTIGTEIL BODENDURCHBRUCH DECKENSCHLITZ WANDDURCHBRUCH UNTERKANTE ROHDECKE FEUERHEMMEND FEUERBESTÄNDIG UK VK LH LRH M FB UZ ÜZ FT BD DS WD UKRD UK AHD F30 UNTERKANTE ABHANGDECKE ABHANGDECKE AHD NA NOTABLAUF LEGENDE FUSSBODENEINLAUF DACHEINLAUF REVISIONSÖFFNUNG FE DE REVI Montagewand d 10 15 doppelt beplankt Mauerwerk Montage Schachtwand/ Vorsatzschale einsei p Wärmedämmung Sta bewehrter Beton Änderungshinweis WÖ Nennmaß Höhe WÖ bez auf OKFF Brüstungshöhe bez auf OKFF Bodendurchbruch Wanddurchbruch Wandschlitz Kernbohrung Klärungsbedarf Mindestmaße Re WANDAUSSPARUNGEN TGA Planung Fläche verputzt Trockenputz Gipsbaupla ge Vormauerziegel Ansicht Fliesenfassade Ansicht 1189 x 841 mm +5,50 +5,35 +23,11 Attika First +23,64 15 30 26 15 37 16 10 59 30 26 15 23 23 1 23 28 23 49 EG REWE Technikraum Fertigteil Mauerziegeln pulverbeschichtet Farbkonzept Ziegel verfugt Verblendmauerwerk als P eiler 4 vorstehend roter Ziegel Dünnformat h 5 2 Wilder Verband rot verfugt 15 12 1,44 86 35 2 11 99 2 11 86 35 76 1 35 99 1 34 15 1,43 1,43 1,43 3 1,75 2 2 18 2 88 1,77 2 18 18 15 59 2 18 4 1 OG 2 OG 3 OG 4 OG 5 OG Technikraum 59 24 1 54 1 67 24 1 54 67 24 1 54 1 67 24 1 54 67 20 13 14 59 24 3,22 24 1 3,22 24 3,22 24 1 3,22 1 20 28 30 15 18 2,84 30 15 3,02 30 15 3,02 30 15 3,02 30 15 3,02 30 26 15 38 14 2,23 5 11 5 88 2 11 57 25 34 5 99 2 11 99 2 11 2,23 02 77 99 35 76 99 34 77 2,23 02 1,43 1,43 1,43 1,43 1,43 1,43 1,43 15 4 2 RW 2 OG Büro 88 2 2 18 2 88 18 2 56 25 23 11 92 2 18 92 2 18 1 58 26 34 5 00 ihl Planerstellung Einarbeitung Prüfanmerkungen Prüfprotokoll FASSADENSCHNITT
49 +0,10 -0,35 +4,15 +8,19 +11,59 -3,42 +4,60 +8,56 +11,96 24 1,52 24 1,52 Attika First +16,51 OK Verblend +12,76 24 1,52 2 +14,28 23 24 EG Empfang 1 OG Loft 2 OG Loft 3 OG Galerie UG Parking Aussenfensterbank d 3 mit Anti Dröhnbeschichtung Farbe nach Wahl des AG Fensterlaibung Fertigteilsturz mit Vorsatz Mauerziegeln Farbe Fensterlaibung Fertigteilsturz mit Vorsatz Mauerziegeln Dünnformat Betonrandstreife Antrazit Befestigung Halfenschienen Fensterlaibung Fertigteilsturz Mauerziegeln Dünnformat Untersicht Dünnformat Fertigteilsturz Mauerziegeln Dünnformat Untersicht Dünnformat Alu Fenster mit verdeckt liegendem Flügel Dreifachverglasung im Flügel verklebt pulverbeschichtet gem Materialkonzept Alu Fenster mit verdeckt Dreifachverglasung Flügel pulverbeschichtet gem Pfosten gem Abdeckung Maschenweite XPS Befestigung Rohbau Fentserbank Werkstein anthrazit schwarz Fentserbank Werkstein anthrazit schwarz Nachströmung geführte Verdeckte Laibung Abdeckgitter nach Akustische erforderlicher -0,05 +4,45 +8,41 +11,81 +15,32 65 3,07 45 4,05 45 3,59 37 3,03 37 02 65 3,52 4,50 3,96 3,40 02 65 2,27 80 30 15 3,78 2 25 30 15 77 2,15 60 22 15 77 2,15 2 22 15 85 1,44 67 82 82 90 X1 Attikablech pulverbeschichtet Farbe nach Material und Farbkonzept Wilder Verband Fuge dunkel Wilder Verband Fuge dunkel dunkel Wilder Verblendmauerwerk dunkel Wilder Neigung Abdichtung Dachdämmung Abdichtung Stb Decke Bodenaufbau Hohlraumboden 15cm Stb Decke 22cm Bodenaufbau Hohlraumboden 15 Stb Decke 22 Bodenaufbau Hohlraumboden 15cm Stb Decke 30cm Bodenaufbau Hohlraumboden 15 Stb Decke 22 22 15 16 33 54 15 24 2,11 12 24 2,11 12 XC XD 1,64 6,46 1,64 2 1,64 6,42 2 1,64 2 1 72 1,27 1,27 1,27 1,27 1,27 2 1 72 2 XC XD 1 OG Loft 11 18 25 1 24 25 65 56 X1 +0,10 -0,35 +4,15 +8,19 +11,59 -3,42 +4,60 +8,56 +11,96 45 67 74 1,31 18 2,22 1,56 18 2,22 24 1,52 -0,57 -1,02 74 1,31 12 2,22 1,56 12 2,22 24 1,52 Attika First +16,51 OK Verblend +12,76 OK Verblend 11 3 84 +0,10 1,12 74 1,49 2,22 1,74 2,22 24 1,52 14,18 2 +14,28 23 24 EG Empfang 1 OG Loft 2 OG Loft 3 OG Galerie UG Parking Aussenfensterbank d 3 mit Anti Dröhnbeschichtung Farbe nach Wahl des AG Fensterlaibung Fertigteilsturz mit Vorsatz Mauerziegeln Dröhnbeschichtung Farbe nach Wahl des AG Fensterlaibung Fertigteilsturz mit Vorsatz Mauerziegeln Dünnformat Betonrandstreife Antrazit Befestigung mittels Halfenschienen am Dröhnbeschichtung Fensterlaibung Verblend Fertigteilsturz Mauerziegeln Dünnformat h 5 Untersicht Wilder Verband Dünnformat Fertigteilsturz mit Vorsatz Mauerziegeln Dünnformat h 5 Untersicht Wilder Verband Dünnformat Alu Fenster mit verdeckt liegendem Flügel Dreifachverglasung im Flügel verklebt pulverbeschichtet gem Farb und Materialkonzept Alu Fenster mit verdeckt liegendem Flügel Dreifachverglasung Flügel pulverbeschichtet gem Materialkonzept Pfosten Riegel Fassade gem Farb und Materialkonzept Abdeckung Gitterrost Maschenweite 30 10 XPS Dämmung 7cm WLG 040 Befestigung Rohbau Fentserbank Werkstein anthrazit/schwarz Fentserbank Werkstein anthrazit/schwarz / Nachströmung über feuchte geführte Aussenluftdurchlässe Verdeckte Ansaugung in der Laibung über Einbau in Fassade Abdeckgitter außen farbbeschichtet nach Frab und Materialkonzept Akustische Dämpfung erforderlicher Luftwechsel Vorgabe -0,05 +4,45 +8,41 +11,81 +15,32 65 2,27 80 30 15 3,78 2 25 30 15 77 2,15 60 22 15 77 2,15 2 22 15 85 1,44 67 6 82 82 90 X1 Attikablech pulverbeschichtet Farbe nach Material und Farbkonzept Wilder Verband Fuge dunkel Wilder Verband Fuge dunkel dunkel Dünnformat h 2 Wilder Verband Fuge dunkel Verblendmauerwerk dunkel Dünnformat h 5 2 Wilder Verband Fuge dunkel Neigung Abdichtung Dachdämmung Abdichtung Stb Decke Bodenaufbau Hohlraumboden h 15 Stb Decke 22cm Bodenaufbau Hohlraumboden h 15 Stb Decke 22 Bodenaufbau Hohlraumboden h 15cm Stb Decke 30cm Bodenaufbau Hohlraumboden h 15 Stb Decke 22 -0,57 -1,02 1,64 1,64 1 72 37 1 72 2 RW 2 RW +0,10 3,95 25 30 15 77 2,22 60 22 15 77 2,22 22 15 85 1,51 16 33 54 15 74 1,49 2,22 1,74 2,22 24 1,52 2,11 12 74 1,33 16 2,22 1,58 16 2,22 24 1,52 2,11 12 XC XD EG 1 OG 2 OG 3 OG 1,64 6,46 1,64 2 1,64 2 6,42 2 1,64 2 1 72 1,27 1,27 1,27 1,27 1,27 2 1 72 XC XD 1 OG Loft 11 18 25 1 24 25 65 56 X1 FASSADENSCHNITT
52
53