Dinh Huynh_Portfolio

Page 1


Portfolio

LANDSCAPE

Mobile

+61404265276

Email

congdinh.huynh@outlook.com

LinkedIn

www.linkedin.com/in/congdinh-huynh/

10/2020-11/2021

Collaborate Landscape Architect (Fulltime)

AOUMMSrlStp-Milan,Italy

Working with international team on national and international projects, competitions, and investigations.

07/2019-10/2019

Intern Landscape Architect (Fulltime)

AOUMMSrlStp-Milan,Italy

09/2016-07/2018

Landscape Architect

ConicArchCo.,ltd-HoChiMinhCity,Vietnam

Two years experience in architecture, planning and landscape design. Worked on broad types of projects, mainly park and public spaces. Design team leader and construction supervisor.

2017-2018

Partner - Childhood Garden - Ho Chi Minh City, Vietnam

In charge of designing the community garden, activities management and gardening instruction.

EDUCATION

2018-2020

Politecnico di Milano, Italy

MSc with Honours in Landscape Architecture

110/110 cum Laude

2011-2016

University of Architecture Ho Chi Minh City, Vietnam

DegreeofArchitectInUrban&RegionalPlanning

ACHIEVEMENT

2018

Invest Your Talent in Italy Scholarship

Full scholarship from Italian government for 2 years of Master at Politecnico di Milano

2016

Special Prize

Excellent Graduation Project

Vietnam Urban Planning and Development Association

2015

Second Prize

Competition “Architectural design of Den 4 Ngon traffic circle” LongXuyencityPeople’sCommittee

LANGUAGE

Vietnamese(native)English (proficiency) Italian(basic)

SOFTWARE SKILL

2D|AutoCAD,Illustrator,Photoshop,Indesign...3D|

SketchUp,Vray,Lumion

QGIS

MSOffice

SELECTED PROFESSIONAL PROJECTS & COMPETITIONS

IECAVA PARK | Iecava, Latvia

Team AOUMM | Matteo Umberto Poli, Dinh Huynh

2020 - 2021

This project is the redesign and renovation of the central park of Iecava, in southern Latvia. Here we developed a theme-based division approach. A natural-based zone, an historical zone, and a recreational zone will illustrate and offer varied experiences rooted in the existing historical, environmental and social values of the park while reactivating some and preserving others. The project considers Iecava River as the main artery of the living system and aims to restore its banks from erosion through natural-based solutions, with a minimum impact on the existing environment. The planting proposal is preserving the existing while adding new essences to promote and create new interactions. My role within the project: research the park’s historical elements; developed concept and masterplan; representation.

MARINELLA RESORT | Sardinia, Italy

Team AOUMM | Luca Astorri, Simone Ottaviani, Micaela Ortega, Dinh Huynh

2019 - 2021

A 350.000 sqm resort designed for a private client in Sardinia, consists of 14 luxury villas together with leisure and recreational facilities. For the landscaping AOUMM adopted an environmental restorative approach, leaving the Mediterranean scrub free to grow on most of the area and implementing a system of meadows and ground covers for the denser core of the resort. My role within the project: developed master planning and layout of hotel area; developed typologies of villa’s landscape (sketches included), which ensure the privacy of each unit by using layers of vegetation; chose vegetation to be used for the whole project; graphic and representation.

AVEZZANO

PRIMARYSCHOOL | Avezzano,Italy

Team AOUMM | Rossella Locatelli, Simone Ottaviani, Micaela Ortega, Dinh Huynh

2019

The design developed by the office for the replacement of Giovanni XXIII primary school in Avezzano (AQ) revolves around the idea to turn the school into a small village: an intimate and cozy system, open to future needs and rich in spatial experience. The village encircles a park and will be experienced by students and citizens according to different needs all day long, thanks to soft filters which organize flows and open- air activities without creating any barrier. My role within the project: landscape concept and masterplanning; representation.

Clustersemi-pubblico

Clusterpubblico

Areasportesterna
Giardino didattico
Palestra
FuturaScuola Secondaria
Scuola Primaria
Mensa

Competition

PIAZZA SAN DONATO | Milan, Italy

Team AOUMM | Micaela Ortega, Zofia Kasinska, Lara Zentilomo, Dinh Huynh 2021

Thestartingpointwasthere-organizationofanoldsquare toaccommodatetheopen-airweeklymarket.Ourteam cametoanideaofcreatingamultifunctionalpublicspace whichisabletochangeindifferentmomentsandwelcome differentsocialneeds.

Themainlanguageofthesquareiscreatedbythe“pixel”. Thosepixels,withdifferentcolourandmaterials,formthe market plots and contain technical facilities such as electricity,watersupply.

Theprojectaswellfocusesonreusingthematerialsfrom the existing square, like fine wood of the old benches for the new convertable benches serving both the market and the square in ordinary days.

MENDRISIOSQUARE AND DINING HALL | Mendrisio, Switzerland

Nicola Probst Architetti + AOUMM

2021

Nicola Probst Architetti teamed up with AOUMM in the design of a proposal for a new dining hall and a new square for the socio-psychiatric clinic in Mendrisio. The project aims to give a clear and recognizable identity to the area through the insertion of a new landscape element, the esplanade. The landscaping concept with square rhythm was proposed to work with the existing trees on the square and the dinning hall structure. My role within the project: landscaping concept; representation.

Competition

THESCALATHEATRELABORATORY& LAMBRETTA PARK EXPANSION | Milan, Italy

In collaboration with Ar.ch.it Luca Srls.

2021

The international competition held by the Municipality of Milanfor for the creation of the Scala Theatre’s laboratories and warehouses and the expansion of Lambretta park. We developed the idea of ‘permeable landscape’ using the existing shape of parco della Lambretta and the inspiration from the lines of surrouding argicultural fields. Connecting the park with river Lambro by the concept “Room for river”, enhancing the river bed and reducing flooding risk. The park’s pond also works as a wetland that can absorb and filter rainwater from the surrounding area. Walking from the La Scala Laboratory, the scenery changes from indoor to outdoor, from a dense forest to a semiopen Palazzo di Cristallo, and an open waterfront.

NEW CITY PARK | Baku, Azerbaijan

Location|Baku,AzerbaijanClient|CobaltLtd

TeamAOUMM|DinhHuynh,MicaelaOrtega 2019

TheprojectoutlinedfortheNewCityParkinBaku employsbridgestoovercometheroadseparatingthe areafromtheparkofAğŞəhərBulvarıandtheCaspian sea.Bridgesareviewpointstowardstheparkandthe sea,andthedesignoftheareaisdefinedaccordingto differenteyelevels.Thereunitedgreenareabringsvalue totheurbanenvironmentandtheseafront,and becomesthecoreofagreensysteminvolvingthe surroundingcity:theBoulevard,theFransizpark,theold railway,theCrescentCityunderconstruction.

PHUMYHUNG SPRING FESTIVAL | Ho Chi Minh City, Vietnam

Team GIA TRI CONIC | Dinh Huynh, Hien Nguyen 2016 and 2017

PhuMyHungSpringFestival,thesecondlargestSpring festivalinHoChiMinh,heldannuallyinDistrict7.Inthe middleofamodernurbanarea,themainconceptis TraditionalcountrysideofVietnamwithrawmaterialslike bamboo,coconutleaf,straw…combinedwiththevariety ofcolorfulflowers. Thefestivalwasmychallengetocombinethetraditional materialswithcontemporarystructure.Creatinganew imageforthe10yearsoldfestival.

In the 2018 edition of the Festival, my design took the inspirtion from Nipa palm - a very familiar plant in Southern Vietnam

SELECTEDACADEMICPROJECTS

WATERKEEPER

Masterthesisin LandscapeArchitecture.LandLandscapeHeritage.

Politecnico di Milano

Location|MekongDelta,Vietnam

VietnamMekongDeltaistheendingpointofMekong’s longjourney,wheretherivercreatesaprosperousdelta beforepouringintothesea.

However,thedeltaislosingitswealthy,noticeablyduring thelastdecade,duetobothnaturaldisastersandhuman alterations.Climatechange,hydropowerplantson Mekong’smainstreamandtheintensiveagricultural practicearedegradingwaterandsoilquality,increasing thevulnerabilityofthewholedelta,especiallytheseverewaterstress.

Thethesisfocusonseekingasustainablewaterstorage

system,toensuretheinitiativeinwaterresourceand protectpeople’slivelihoods.

Thesolutioncametoacharacteristicfloodedforestof thedelta,MelaleucaCajuputi.Inordertoincreasethe waterretentioncapacityofthedelta’sfloodplainsand makeitabletostorewaterfordryseason,asystemof Greencanalwillbeestablishedbaseontheexisting excavatedcanal.

A small area will be selected to apply the pilot model, in order to demonstrate the feasibility and persuade the locals before applying on a whole delta.

Sluice gate opened - throughout the year, except storage period

-Fromfloodpeaktodryseason(October-February)

Sluicegateclosed

TheGreencanalswillworkas“waterbags”,accumulating waterduringfloodseasonandreleasingduringdryseason for irrigation needs.

Existingcanal
CrosssectionoftheCajuputforest
NewGreencanal(Cajuputforest)

AMONG THE WATER

DesignStudioPolitecnico di Milano

Team|FabioCassingena,ValeriaGiovenco,HuynhCong Dinh,NoraNemeth

Location | Torre Rinalda, Puglia, Italy

Torre Rinalda is located in the South of Italy. The flat and low-laying landscape is strongly connected to water, not only because the seaside location but also the high level of groundwater. Causing hydrogeological risk by both salt and fresh water. We determine safe and risk areas of the built environment according to its land altitude and the impact of different scenarios of sea level rise. Our aim is to enhance the interface between the built and natural environment and create a resilient coastal settlement. Turning the environmental risk into an opportunity by strengthening the interaction with the surrounding nature. The green boundary around the settlement will not only create a transition between built and natural environment but also provide an open space and serve recreational facilities for the inhabitants.

PARCO DELL’ACQUIFERA

LandscapeDesignStudioPolitecnico di Milano

Team|BigliardiRiccardo,DinhHuynh,LaMonacaFrancesca,LamaMaddalena

Location|Carrara,Tuscany,Italia

DuetotheveryhighrainfallthatcharacterisetheApuane Mountainsandtheveryhighdensityurbanizationthathas developedallalongit’sflow,Carrionehaspresentedavery highriskofoverloading.

Ourprojectaimstoreducethewaterriskbyconverting theabandonedrailwaytrackintoadiversionchannelto divertexceedwaterflowingfromthemoutain,socalled Acquifera(Therailwaycarryingwater)

ThemainpointoftheprojectisthesituationwhenAcquiferacrossingtheriver,createanintersectionoftwowater line,namedParcodell’Acquifera(AcquiferaPark).

Carrara territorial strategy
Parco
The water bridge

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Dinh Huynh_Portfolio by Dinh Huynh - Issuu