HENRY TAIBI
Mobile: 973-775-2836
Email: henry.taibi@gmail.com
Education
Rice University
BachelorofArtsinArchitecture(2016-2020)
RicePreceptorship(2021-2022)
BachelorofArchitecture(2022)
Work Experience
IKM (June 2022 - September 2023) Pittsburgh, PA
SEHACornicheWomen’sHospital,AbuDhabi;800,000-SF
• Assistedwiththeassemblyofconstructiondocumentsforabridgeddesignprojectin AbuDhabi.Workedwithaprojectteamtocreatetypicalhospitalroomplans,elevations, andRCPs,aswellascoordinatemodelchangesinBIM360.
PassavantHospitalRenovationsandStarbucks,Pittsburgh;35,000-SF
• TranslateddesignintentfromStarbuck’steamDDdrawingsintocompletedCDsetfor construction
• Ivolvedinmulti-phaseconstructionadministrationprocesses,includingongoingengineeringconsultantmeetings,weeklyOACmeetings,andattendingon-siteprogress checks
• ReviewedandansweredsubmittalsandRFIsthroughoutconstructionprocess
Forbes’EDSuite,Pittsburgh;1,500-SF
• DevelopedadrawingsetfromtheSDthroughCDphaseforasmallhospitalrenovation
• Createddetails,exploredproductsolutions,andexaminedaestheticimplicationsofdesignchangesforproject
• Participatedinengineeringconsultantdesignreviewmeetingsthroughoutdesignphase
VitalantBlood-bankOfficeRetrofit,Pittsburgh;10,000-SF
• DevelopedconstructiondocumentsfromtheSDphasethroughstartofconstruction
• ReviewedandansweredsubmittalsandRFIsthroughouttheconstructionprocess
• AttendedregularsiteprogressvisitsandcreatedFieldReports
Salem’sMarketRenderings,Pittsburgh
• UsedRhino,Revit,andEnscapetocreateaseriesofrenderingsfortheDesignReview CommitteeatCarnegie-MellonUniversityforthenewdesignofastudentmarketspace
• Wasinvolvedincoordinatingdesignwithclientcommittee,participatingindesignmeetings,andcreatingaseriesofprogressrenderingstoshowcasedesignintent
AHNCompetitionModel,Pittsburgh
• Assistedwiththecreationofa40:1competitionmodelforalocalhospitalproject.The modelwasroughly36”x48”andrepresentedtheentiretyofthehospitalcomplex,includingthe400,000SFadditiondesign
• Assistedwiththe3Dmodelsforexistingsiteconditions,andthecoordinationofseveral teammembers’modelworktoensureall3Dprintedpiecesproperlyfittogether
Payette (September 2020 - June 2021) Boston, MA
HolyokeSoldier’sHome,Massachusetts;250,000-SFElderHousingUnit
• CreatedandupdatedSDdocumentationaspartofa6personteam
• Physicalconstructionofafullscale(10’x25’)mockuppatientroom.Mockupwasconstructedonsiteinonedaytogetfeedbackfrompatients.Constructioninvolvedfabricatingwallsupportsandpanelsoffsite(CNCwoodpanels,falconboard)andthenerected onsite.Coordinatedconstructionwithdesigndocumentation.
• Legmodelingandrepresentationforbrickfacadedeisgnforthree~40,000-SFbrickfacades.Createduniquebrickpatternsforeachapplicationandmodeleddesignschemesfor weeklydesignmeetings.Gatheredfeedbackandupdatedmodels.
Skills
Presentation
AdobePhotoshop
AdobeIllustrator
AdobeInDesign
Builtprojectandmodelphotography
Digital Modeling
Rhinoceros Grasshopper
V-Ray Enscape
Revit
AutoCAD
BIM360
Fabrication
LaserCutting
3DPrinting
CNC
WoodShop Procore eBuilder Bluebeam
Construction Administration
Competitions
DesignHoustonADU2021competition, DetachedCategoryWinner
AccessoryDwellingUnit“startingpoint” designchosenfrom25applicants.