Backfilling Holes and Embankments

Do not drive too close to an excavation or ditch. Be sure the surrounding ground has adequate strength to support the weight of the machine and the load.

1. (Figure 74) Lower the bucket a few inches from the ground. Slowly drive forward until the front edge of the bucket extends halfway over the edge of the hole or embankment.

2. Tilt the bucket forward to dump the material.

3. Tilt back and raise the bucket. Inspect the hole/ embankment for proper filling.

4. Continue to dump material as necessary for proper fill.

5. Back away from the embankment while tilting the bucket back and lowering the lift arm.