
1 minute read
Chapter 10 MAINTENANCE
from Gehl RS6-42 GEN2 RS8-42 44 GEN2 RS9-50 GEN2 RS10-44 55 GEN2 RS12-42 GEN2 Handler Operator's Manual
This Maintenance Interval Chart was developed to match the Service and Storage chapter of this manual. Detailed information on each Service Procedure is in the Service and Storage chapter. A Maintenance Log follows the Maintenance Interval Chart for recording the maintenance procedures performed. Recording the 10 Hour (or Daily) service intervals is impractical and is therefore not recommended.
IMPORTANT: Under severe operating conditions, more frequent service than the recommended intervals may be required. Users must decide if the severity of their operation requires more frequent service than normal.
Maintenance Interval Chart
1 - On new machines or when a wheel has been removed, until 450 ft.-lbs. (610 Nm) is maintained.
2 - Only new machines.
3 - On new machines or when a chain has been replaced. The two chains on the front of the three-section boom should be torqued to 30 ft.-lbs. (40 Nm), and the three chains on the front of the four-section boom should be torqued to 50 ft.lbs. (68 Nm).