
1 minute read
Accumulator bracket 1
from CNH Ride Control Conversion Kit 821G 921G W190D W230D Wheel Loader Installation Instructions Manual
2 - KIT CONTENT
Kit overview
NOTICE: check the items part numbers this kit, please refer the Parts Catalogue. NOTE: the following table shows the items numbered in the installation instruction.
Item Description Quantity
2 Ride control valve 1 3 Ride control accumulator 3.8L 1 4 Accumulator bracket 1 5 Accumulator bracket 1 6 Straight connector 2 7 W asher 13.5x28x4mm 6 8 W asher 1 1x24x3mm 6 9 Bolt M10x40 2 Nut M10 11 W asher 1 1x24x2 4 U- bolt 2 Ride control decal 2 ° elbow 2 Accumulator hose 585 ( ) 1 ° elbow 2 Ride control right tube 370.7 ( 14.6 ) 1 Ride control left tube 338.2 ( 13.3 ) 1 Split flange clamp ( 0.7 ) 4 Straight connector 1 O- ring 4 Split flange clamp 8 Lock washer Bolt M12x45 Spring lock washer 8 Bolt M10x35 8 O- ring 2 T ube mounting block 2 Clamp cover plate 2 Bolt M10x80 4 Ride control right hose 548.6 ( 21.6 ) 1 Ride control left hose 630 ( 24.8 ) 1 Ride control hose 1885 ( 74.2 ) 2 O- ring 3 Ride control valve return hose 900 ( 35.4 ) 1 Danger crush hazard decal (English) 2 Danger crush hazard decal (Spanish) 2 Danger crush hazard decal (French) 2 Danger crush hazard decal (Non -W ord) 2