1 minute read

PRIMARY GEAR TRAIN – REAR INTERMEDIATE SHAFT

Next Article
FINAL ASSEMBLY

FINAL ASSEMBLY

Description

1 Flange. 2 Washer. 3 Tapered roller bearing. 4 Primary shaft. 5 Needle cage. 6 Pinion. 7 Synchro ring. 8 Spring. 9 Cotter. 10 Synchro hub. 11 Sliding gear. 12 Synchro ring. 13 Synchro ring. 14 Synchro ring. 15 Pinion. 16 Plain bush. 17 Needle cage. 18 Plain bush.

A Gearbox without low range. B Gearbox with low range.

21

20

323msm38

Description

19 Synchro hub. 20 Spring. 21 Cotter. 22 Sliding gear. 23 Synchro ring. 24 Tapered roller bearing. 25 Pinion. 26 Cylindrical bearing. 27 Rear intermediate shaft. 28 Needle bearing.

19 22 23 24 25 26 27 28 29 30 31 32

Fig. 2

29 Seal. 30 Tapered roller bearing. 31 Shim (Thicknesses available: 0,10 ; 0,15 ; 0,50). 32 Internal circlip.

This article is from: